S02 Attachment AHU Commissioning Scope 589A5-15-115B ED Phase II.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25522R0042
- Issued by
-
Department of Veterans Affairs
About this file
This document contains commissioning plans and diagrams for mechanical systems related to a federal construction project to upgrade an emergency department at the Topeka VA Medical Center. The project involves commissioning of existing air handling units that serve the GI lab and emergency department areas to supply air as part of Phase 1 and Phase 2 of the upgrade. Test and balancing of the existing units is required along with commissioning to verify proper system operation per the sequences of operation. Adjustments to air flows and minimum outdoor air levels are specified. The commissioning process is defined in the general commissioning requirements section and will be managed by an appointed commissioning agent, with cooperation from the contractor and VA required for documentation, testing and training of operations and maintenance personnel.
The related federal contract opportunity notice is for solicitation number 36C25522R0042 to upgrade the emergency department at the Topeka VA Medical Center for project number 589A5-15-115B. The opportunity is listed as a pre-solicitation and the Department of Veterans Affairs is identified as the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTANT VOLUME AIR HANDLING UNIT WITH MINIMUM OUTSIDE AIR CONTROL DIAGRAM
NO SCALE
NO SCALE1
POINT SCALE LIST FOR CONSTANT AIR
HANDLING UNIT WITH MINIMUM OUTSIDE AIR
ALARM
PROCESSING
DU
TY
C
YC
LE
FU
NC
TI
O
N
SC
H
ED
UL
E
ST
AR
T/
ST
O
P
HUMIDITY HIGH LIMIT
SUPPLY FAN VSMC ALARM
STATIC PRESSURE HIGH LIMIT
Supply Air Flow (cfm)
ST
AT
U S
SYSTEM
AL
AR
M
PR
IO
RI
TY
/A D
D-
AL
TE
RN
AT
E
NO
EL
EC
TR
IC
D
EV
IC
E
SP
EE
D C
O M
M
AN
D
PO
IN
T
ID
Discharge Static Pressure
Discharge Air Humidity
Discharge Air Temperature
Pre-Heat Temperature
Mixed Air Temperature
Cooiling Coil Temperature
SYSTEM COMPONENT:
Return Air Flow (cfm)
Return air Temperature
-- O
PE
N/ C
LO
SE
ST
AR
T/
ST
O P
-- VA
LV
E
PO
SI
TI
O N
D
AM
PE
R
PO
SI
TI
O
N
JOB: 0555.09
VAV AIR HANDLER
VA SAMPLE POINO SCALE LIST
SYSTEM:
BUILDING:
LEGEND
POINT
BINARY
TE
M
PE
R
AT
UR
E (T
I)
Lo ca l A la rm P an el
M as te r A la rm
P an el
Ar ea
A la rm P an el
H
IG
H S
TA
TI
C P
R
ES
SU
R
E
HI
G
H H
U M
ID
IT
Y
PR
ES
SU
RE
--LO
W
T
EM
PE
R
AT
UR
E
PE
RC
EN
T
PR
ES
SU
RE
PO
SI
TI
O
N
FL
O W
HI
G
H L
IM
IT
LO
W
L
IM
IT
SYSTEM INPUTS
ANA- BINARY ANALOG
SP
AC
E
TE
M P.
C O
NT
RO
L
--ST
AT
IC
P
R
ES
SU
RE
R
ES
ET
--DE
M
AN
D
LI
M
IT
IN
G
TE
M
PE
RA
TU
RE
R
ES
ET
TE
M
PE
RA
TU
RE
O
VE
RR
ID
E
EN
TH
AL
PY
E
CO
NO
M
IZ
ER
TE
M
PE
RA
TU
RE
E C
O N
O M
IZ
ER
FA
IL
UR
E
M O
DE
PR
ES
SU
R
E/
VO
LU
M
E
CO
NT
RO
L
REMARKS
FU
LL
C O
M M
UN
IC
AT
IO
N
SYSTEM SOFTWARE/CONTROL
APPLICATION/FUNCTION
PAGE:
Return Air Humidity
SUPPLY FAN STATUS
MIXED AIR LOW LIMIT
RETURN AIR DAMPER D-2
STEAM HUMIDIFIER VALVE V-4
COILING VALVE V-1
PRE-HEAT VALVE V-2
SUPPLY FAN VSMC
OUTSIDE AIR DAMPER D-1
ST
AT
IC
P
R
ES
SU
R
E
C
AR
BO
N
M O
NO
XI
DE
H
UM
ID
IT
Y
VA
CU
UM
STEAM ISOLATION VALVE V-3
SUPPLY FAN START/STOP
AI-1
AI-2
AI-3
AI-4
AI-5
AI-6
AI-7
AI-8
AI-9
AI-10
TR
EN
D
IN
G
OUTSIDE AIR TEMPERATURE AI-11
BI-3
BI-4
BI-5
BI-6
BI-7
AO-2
AO-3
AO-4
AO-8
AO-9
AO-10
BO-2
BO-3
FULL COMMUNICATION
AB
BR
EV
IA
TI
O
N
RAT
RAH
RAF
MAT
PHT
CCT
DAT
DASP
DAH
SAF
OAT
SF-STS
TSL-1
SPS-2
HHL
SF-ALA
SF-SPD
OAD
RAD
PHT-V1
CLG-V1
HUM-V4
SF-SST
HUM-ISO-V3
OUTPUTS
LOG
D-3
D-2 P
R E
-F
IL
TE
R
D-1
C O
IL
P
R E
H E
A T
C O
IL
C
O O
LI
N
G
LOCATE SENSOR
OUTSIDE UNDER
SHIELD
MPS
V-2
V-1
NO
CHR
CHS
SUPPLY FAN
A
FM
D
RETURN AIR
A
FM
D
SUPPLY AIR TO
TERMINAL UNIT
TT
TT
TT TT
FT
A
FT
E R
FI
LT
E
R
TT
HS
IT
VSMC
FT
3 6
SD
ONLY WHERE
REQUIRED
PSH
SMOKE
DETECTOR
(EX)VARIABLE SPEED
MOTOR CONTROLLER, TYP.
ZC
ZC
PDS PDS
TT
SST
SD
SPSTSL
TSL-1
V-3
LPS
(EX)STEAM HUMIDIFIER
MS
MC
ECC
MT
PRESSURE SWITCH HIGH TO DISABLE
FAN WHEN HIGH PRESSURE LIMIT
SETPOINT IS REACHED
NOTES:
EXISTING AHU (EX)1-AHU-1 TO REMAIN A CONSTANT VOLUME AHU AND RA TO BE
ADDED AND CONTROL SYSTEM TO BE COMMISSIONED.
CONTROLS EQUIPMENT SHOWN ON NEW RA AND MIXED AIR TEMPERATURE ARE NEW.
1. GENERAL
a. UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE ECC. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE. WHEN THE UNIT IS "OFF" D-1, SHALL BE
FULLY CLOSED. WHEN THE UNIT IS "ON" D-1, SD-1 AND D-2 SHALL BE FULLY OPEN.
2. TEMPERATURE CONTROL
a. SUPPLY AIR TEMPERATURE, SENSED BY TT-1, SHALL BE MAINTAINED AT SETPOINT VIA DIGITAL CONTROL PANEL BY MODULATING V-1 OR V-2 IN SEQUENCE.
3. AIR FLOW CONTROL
a. THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL MAINTAINING THE SUPPLY FAN CONTANT SPEED MOTOR CONTROLLER TO MAINTAIN 1.0" [25mm] OF DUCT STATIC PRESSURE (FIELD ADJUSTABLE), SENSED BY SPS-1. RESET STATIC PRESSURE BASED ON ACTUAL BUILDING LOAD BY POLLING ALL ATU.
b. THE DIGITAL CONTROL PANEL, USING TOTAL SUPPLY AIR AND RETURN AIR FLOW SIGNALS, SHALL RESET THE RETURN AIR FAN VSMC TO MAINTAIN A CONSTANT AIR FLOW DIFFERENCE BETWEEN THE SUPPLY AIR AND THE RETURN AIR
EQUAL TO MINIMUM OUTSIDE AIR.
c. USING HIGH PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY FAN DISCHARGE, SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING OVER 3" [75mm] OF STATIC PRESSURE (FIELD ADJUSTABLE). IF STATIC PRESSURE AT SPS-2 DOES EXCEED 3" [75mm] THE SUPPLY AIR FAN SHALL STOP. SPS-2 SHALL BE HARDWIRED TO THE SUPPLY FAN VSMC AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR BYPASS MODE. SPS-2 WILL REQUIRE MANUAL RESET AT THE DEVICE.
4. HUMIDITY CONTROL
a. WHEN THE DIGITAL CONTROL PANEL IS NOT CALLING FOR HUMIDITY, SENSED BY RETURN AIR HUMIDITY H-1, 2-WAY "ON-OFF" CONTROL VALVE V-3 SHALL REMAIN CLOSED. DISABLE (EX)HUMIDIFIER WHEN THE DIGITAL CONTROL PANEL IS
CALLING FOR HUMIDITY, ENABLE (EX)HUMIDIFIER AND V-3 SHALL REMAIN OPEN.
b. RETURN AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT OF 35% RH (ADJ) VIA DIGITAL CONTROL PANEL BY MODULATING HUMIDIFIER TO MAINTAIN THE DESIRED HUMIDITY. THE DCP SHALL OVERRIDE THIS CONTROL TO MAINTAIN
HUMIDITY OF 80% AS SENSED BY H-2. DCP SHALL CLOSE VALVE V-3 WHENEVER THE SUPPLY FAN IS OFF. (EX)HUMIDIFIER SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE
TEMPERATURE APPROACHES STEAM TEMPERATURE.
5. FREEZE PROTECTION
a. IF THE AIR TEMPERATURE AS SENSED BY TT-3 FALLS BELOW 45°F [7°C], AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND ECC. IF THIS TEMPERATURE FALLS BELOW 40°F [4.4°C], AS SENSED BY THE TSL THE SUPPLY AND RETURN FANS
SHALL SHUT DOWN AND A CRITICAL ALARM SHALL INDICATE AT THE DIGITAL CONTROL PANEL AND ECC. TSL SHALL BE HARDWIRED TO THE SUPPLY FAN UFD AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR BYPASS MODE. TSL WILL
REQUIRE MANUAL RESET AT THE DEVICE.
6. AUTOMATIC SHUTDOWN/RESTART
a. WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR, SD, THE SUPPLY FANS SHALL SHUT "OFF" AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM. ALL SMOKE DAMPERS IN THE SUPPLY SHALL CLOSE.
b. EXHAUST FANS SERVING AREA OF THE SUPPLY FAN SHALL CONTINUE TO RUN. SUPPLY AND RETURN FANS SHALL RESTART AND SMOKE DAMPER SHALL OPEN WHEN FIRE ALARM CIRCUIT IS RESET.
7. EMERGENCY CONSTANT SPEED OPERATION
a. UPON FAILURE OF THE VSMC, THE SUPPLY FAN SHALL BE STARTED/STOPPED MANUALLY AT THE DIGITAL CONTROL PANEL OR THE BAS THROUGH THE BY-PASS STARTER. FANS SHALL THEN BE OPERATED AT CONSTANT SPEED.
SEQUENCE OF OPERATION FOR EXISTING CONSTANT VOLUME AHU WITH MINIMUM OUTSIDE AIR
SA = 4105 CFM
RANEGATIVE = 1670 CFM OANEGATIVE = 2435 CFM
RAPOSITIVE = 2080 CFM OAPOSITIVE = 2025 CFM
5TH FLOOR PENTHOUSE - GI LAB AHU
NO SCALE3
N
A
A
B
C o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
Building Key Plan: A/E Seal:
BLDG. 1
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
12" = 1'-0"
MC800
MECHANICAL
COMMISSIONING PLANS -
GI LAB AHU #589A5-15-115B
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
TJS KWP
05/07/2021
SA = 4105 CFM
RANEGATIVE = 1670 CFM OANEGATIVE = 2435 CFM
RAPOSITIVE = 2080 CFM OAPOSITIVE = 2035 CFM
TEST AND BALANCING AND COMMISSIONING OF EXISTING GI LAB. AHU-1:
1. THE CONTRACTOR SHALL PROVIDE TEST AND BALANCING SERVICES FOR THE EXISTING GI LAB AHU-1.
2. COMMISSION SERVICES SHALL ALSO INCLUDE COMMISSIONING OF EXISTING GI LAB AHU-1. THE COMMISSIONING PROCESS, WHICH THE CONTRACTOR IS
RESPONSIBLE TO EXECUTE, IS DEFINED IN SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. A COMMISSIONING AGENT (CXA) APPOINTED BY THE VA
WILL MANAGE THE COMMISSIONING PROCESS.
3. COMMISSIONING OF A SYSTEM OR SYSTEMS SPECIFIED IN DIVISION 23 IS PART OF THE CONSTRUCTION PROCESS. DOCUMENTATION AND TESTING OF THESE SYSTEMS, AS WELL AS TRAINING OF THE VA’S OPERATION AND MAINTENANCE PERSONNEL IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 01 91 00 AND OF DIVISION 23, IS REQUIRED IN COOPERATION WITH THE VA AND THE COMMISSIONING AGENT.
NOTE:
EXISTING SCHEDULE IS FROM ORIGINAL AHU INSTALLATION AND IS BASED ON THE BEST
INFORMATION AVAILABLE.
(PART OF PHASE 2)
NEW SHEET
No. Description Date
ADDENDUM 1 7/6/20211
07/07/2021
(E)1-AHU19
(E )3
2x
(E)32x18
(E)1-AHU1
(E )4
4x
(E)32x18
(E )4
4x
(E)44x24
(E )4
4x 18 (E
)4 4x
(E)30x18
(E)1-AFMD1
(E)1-AFMD2(E)1-AFMD3
(E) RETURN FAN
(E) FILTER BANK
(E)26"ø UP IN CHASE
(E )3
0x
(E )2
2x
(E)30x18
SA = 5130 CFM
RA = 3870 CFM
OA = 1350 CFM
EXISTING CONTROL DIAGRAMS
MOUNTED ON WALL.
MRI ZONE II
C146
OUTPATIENT ENTRY
C100
ED ENTRY
AC100
CORRIDOR
C144
ED WAITING
AC101
VA POLICE
AC101A
TLT
C130
ADMIT
AC101B
ADMIT
AC101C
WORK
AC132
NURSE MGR
AC133
WAITING
AC137
TLT
AC134A
(E)175
(E)260
(E)260
(E)200
(E)200(E)445
T
T
(E)85
(E)125
(E)150
(E)100
(E)130
(E)80 (E)80 (E)80
(E)210
(E)190
(E)210 (E)210
(E)90 (E)90 (E)90
(E)90 (E)80 (E)190
(E)190
(E)130
(E)100
(E)110
(E)120
(E)120
(E)150
ADJUST OUTPUT OF EXISTING
1-AHU19 TO 5130 SA WITH A
MIN OA OF 1380 CFM
(E)200
(E)120
(E)130
(E)80 (E)80
3870CFM DN. ADJUST OUTPUT
OF RETURN FAN 2 TO 3745 CFM
(E)90 (E)80
(E)100(E)380
(E)120
(E)130
(E)150
(E)120
(E)200 (E)200
(E)90 (E)90
(E)150
(E)85
(E)200
(E)250
(E)90
(E)90
(E)90
(E)90
(E)100
(E)100
(E)100
(E)90
(E)100
(E)110
(E)125260CFM FROM
MRI BATHROOM
(E)85
(E)90
(E)250
(E)250
(E)190
(E)80
(E)100
(E)90
(E)110 (E)125 (E)80
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
7/6/2021 1:11:26 PM
MC801
MECHANICAL
COMMISSIONING PLANS -
ED PHASE 1 & 2 AHUs #589A5-15-115B
TOPEKA, KS
05/07/2021
TJS KWP
UPGRADE
EMERGENCY
DEPARTMENT
1/8" = 1'-0" MC801
1 COMMISSIONING PLAN - BASEMENT
1/8" = 1'-0" MC801
2 COMMISSIONING PLAN - FIRST FLOOR
NEW SHEET
TEST AND BALANCING AND COMMISSIONING OF EXISTING 1-AHU19:
1. THE CONTRACTOR SHALL PROVIDE TEST AND BALANCING SERVICES FOR THE EXISTING 1-AHU19.
2. COMMISSION SERVICES SHALL ALSO INCLUDE COMMISSIONING OF EXISTING 1-AHU19. THE COMMISSIONING PROCESS, WHICH THE CONTRACTOR IS
RESPONSIBLE TO EXECUTE, IS DEFINED IN SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. A COMMISSIONING AGENT (CXA) APPOINTED BY THE VA
WILL MANAGE THE COMMISSIONING PROCESS.
3. COMMISSIONING OF A SYSTEM OR SYSTEMS SPECIFIED IN DIVISION 23 IS PART OF THE CONSTRUCTION PROCESS. DOCUMENTATION AND TESTING OF THESE SYSTEMS, AS WELL AS TRAINING OF THE VA’S OPERATION AND MAINTENANCE PERSONNEL IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 01 91 00 AND OF DIVISION 23, IS REQUIRED IN COOPERATION WITH THE VA AND THE COMMISSIONING AGENT.
4. COMMISSIONING AGENT TO REFER TO EXISTING CONTROL DIAGRAMS MOUNTED ON WALL AND VERIFY UNIT OPERATION PER SEQUENCE.
5. TEST AND BALANCE CONTRACTOR TO PROVIDE FINAL BALANCING OF EXISTING 1-AHU-1 FURNISHED IN PHASE 1.
No. Description Date
ADDENDUM 1 7/6/20211
07/07/2021
| Sheets |
| MC800 - MECHANICAL COMMISSIONING PLANS - GI LAB AHU |
| MC801 - MECHANICAL COMMISSIONING PLANS - ED PHASE 1 & 2 AHUs |
File details come from the government source that posted it. Updated .