This is a Performance Work Statement (PWS) for HVAC Maintenance Services at Miramar National Cemetery, a Department of Veterans Affairs National Cemetery Administration facility located at 5796 Nobel Drive, San Diego, California. The PWS outlines the contractor's responsibility to furnish all supplies, materials, personnel, equipment, tools, and supervision necessary to provide complete heating, ventilation, air conditioning, and variable refrigerant flow (HVAC/VRF) maintenance services in accordance with 2026 National HVAC Regulations, ASHRAE Standard 180, and industry standards.

The scope of work consists of two primary service lines: (1) one annual comprehensive maintenance service covering split HVAC systems, VRF units, exhaust fans, and fan coil units across three facilities (Administrative Building, Maintenance Building, and Honor Guard Building), including detailed inspections, coil cleaning, compressor checks, electrical connection verification, and system performance testing; and (2) four quarterly operational maintenance services with filter changes, coil inspections, pressure and temperature verification, and bearing lubrication. Deliverables include written reports documenting all work accomplished during each visit. The contractor must comply with applicable standards from ASHRAE, ACCA, EPA Section 608 for refrigerant handling, and AHRI. The contractor is responsible for providing meeting materials and facilitation support for a post-award kickoff meeting and potential monthly status reviews conducted either in-person at the cemetery or via teleconference at the Contracting Officer's discretion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Cemetery Administration

Miramar National Cemetery

Heating, Ventilation, and Air Conditioning Maintenance Services

Performance Work Statement for the HVAC Services at Miramar National Cemetery

Table of Contents

1.0General3
2.0Specific Requirements/Tasks4
3.0Contractor Quality Assurance.7
4.0Delivery or Deliverables7
5.0Meetings7

Attachement 1 - Equipment Inventory…………………………………………………………………..8 Attachement 2 - Service Frequency………………………………………………………………….……9 Attachement 3 Air Filter Inventory………………………………………………………………………10

Performance Work Statement (PWS) for the HVAC Maintenance Services at Miramar National Cemetery

1.0General
1.1Introduction

The mission of Miramar National Cemetery is to honor eligible Veterans, active-duty Service Members, and eligible family members with final resting places in national shrines and with lasting tributes that commemorate their service and sacrifice to our Nation. The mission of the HVAC Maintenance Services at Miramar National Cemetery is to prevent the failure of the climate control units ensuring consistent and productive facility spaces. This acquisition is essential to maintain productive work areas, restrooms and welcoming customers and visitors.

1.2 Objective

To maintain daily facility cleanliness, climate control and general periodic maintenance to the Heating, Ventilation and Air Conditioning/Variable Refrigerant Flow Volume/Filter Change (HVAC) systems at Miramar National Cemetery.

1.3 Scope of Work

This is a Non-Personal Maintenance Service in which the Contractor shall furnish all supplies, materials, personnel, equipment, tools, and supervision necessary to provide complete HVAC/VRF maintenance services in accordance with 2026 National HVAC Regulations, ASHRAE Standard 180, and normal industry standards and practices.

1.4 Background

The Department of Veterans Affairs, National Cemetery Administration (NCA) requires regular and periodic maintenance services to be performed at Miramar National Cemetery. The National Cemetery is a National Shrine. The standards of maintenance and appearance at this cemetery must reflect this nation’s concern for those interred there. For this reason, the Contractor’s strict adherence to the standards is required and essential.

1.5Place of Performance
1.7.1Station address: Miramar National Cemetery, 5796 Nobel Drive, San Diego, CA, 92122.
1.7.2Facilities on Station with HVAC/VRF Condensing units
1.7.2.1 Administrative Building
1.7.2.2 Maintenance Building

1.6.1.3 Honor Guard Building

1.6 Applicable Documents

1.6.1 ASHRAE (American Society of Heating, Refrigerating and Air-Conditioning Engineers. Ventilation Standards 62.1/62.2, Thermal Comfort Standard 55, Commercial Maintenance Standard 180.

1.6.2 ACCA (Air Conditioning Contractors of America).

1.6.3 EPA (Environmental Protection Agency) Refrigerant Handling Section 608.

1.6.4 AHRI (Air-Conditioning, Heating, and Refrigeration Institute).

2.0Specific Requirements/Tasks/HVAC Maintenance Service (CLIN 0001)
2.1Task One - Provide Annual Comprehensive Split HVAC, VRF, Exhaust Fan and Fan Coil Unit Maintenance.
2.1.1– HVAC Split System

-Perform standard operational inspection -Tighten set screws on fan assembly locking collars -Clean condensation pan -Clean condenser coil with condenser coil cleaner as required -Inspect evaporator coil and clean as required -Inspect fan and motor operation -Check compressor operation and amperage draw -Tighten all electrical connections -Check thermal expansion valve for proper superheat and subcooling -Observe overall condition and report any deficiencies

2.1.2 – VRF

-Perform all items listed in Operational inspection
-Clean Condenser coil with condenser coil cleaner as required
-Check compressor oil level and system for modulation
-Put system in test mode and record input and output readings
-Inspect fan and motor operation
-Check compressor operation and amperage draw
-Tighten all electrical connections
-Check thermal expansion valve for proper superheat and subcooling

2.1.3 – Exhaust Fan

-Check fans for unusual noise and vibration
-Examine belts for wear and alignment, change as required
-Check condition of blower wheels
-Inspect and lubricate bearings as needed
-Check condition of electrical hardware and connections
-Check motors starter and wiring for discoloration or indications of heat

-Observe overall condition and report any deficiencies that are discovered

2.1.4 – Fan Coil Unit
-All steps performed in Operational Maintenance
-Clean cooling coil as required
-Clean heating coil as required

2.2 Task Two - Provide Four Quarterly Operational Split HVAC, VRF, Exhaust Fan and Fan Coil Unit Maintenance. (CLIN 002)

2.2.1 – HVAC Split System

-Check air filters, change as required
-Inspect evaporator and condenser coils for obstruction and dirt
-Confirm proper condensate flow
-Lubricate fan bearings
-Check belts and adjust as required
-Check operation controls and safety controls

-Check thermal expansion valve sensing bulb for proper security and insulation

-Check electrical connections for any signs of wear or overheating
-Verify proper system pressures and temperatures

-Observe overall condition and report any deficiencies that are discovered -Replace filters

2.2.2 – VRF

-Inspect condenser coils for obstruction and dirt
-Check operation controls and safety controls
-Visual inspection of signs of oil and refrigerant leak
-Visually inspect condenser fan for proper modulation

-Check thermal expansion valve sensing bulb for proper security and insulation

-Check electrical connections for any signs of wear or overheating
-Verify proper system pressures and temperatures

-Observe overall condition and report any deficiencies that are discovered

2.2.3 – Fan Coil Unit
-Verify operation
-Change filter as required
-Inspect fan blades
-Inspect bearings for excessive wear and end play
-Check bearings for abnormal noise
-Inspect for corrosion and wear
-Check housing clearance
-Check alignment, balance and security to shaft
-Check and tighten electrical connections
-Inspect cooling coil
-Inspect heating coil
-Inspect condensate pans and drains
-Check gate valves for leaks

3.0 Contractor Quality Assurance.

Contractor shall utilize the Performance Work Statement to provide written report to the station COR of when and what work was accomplished each quarter and possible recommended repairs.

4.0 Delivery or Deliverables

4.1 Annual Comprehensive Maintenance Service shall be completed at all Miramar National Cemetery facilities that have HVAC/VRF/Fan units.

4.2 Four quarterly Operational Maintenance Services shall be completed at all Miramar National Cemetery facilities that have HVAC/VRF/Fan units.

4.3 Written report of all work accomplished during visit.

5.0 Meetings

For all meetings, the contractor shall be responsible for providing meeting materials, and administrative and facilitation support. Meetings will be conducted at either the COR’s office or administration conference room at 5795 Nobel Drive, San Diego, CA, or through an alternative method of communication (such as a teleconferencing), as approved by the Contracting Officer.

5.1 Post-award Kickoff Meeting

The Government will conduct a post-award kickoff meeting at Miramar National Cemetery or through an online Microsoft Teams link.

5.2 Intermittent Project Status Reviews

At the sole discretion of the Government, intermittent project status reviews may be conducted on an informal basis by telephone or teleconference or in person at Miramar National Cemetery monthly as approved by the Contracting Officer or station COR.

-End-

Attachment 1 – Equipment Inventory

Attachment 2 – Service Frequency

Attachment 3 – Air Filter Inventory

PWS for HVAC Maintenance Services at Miramar National Cemetery Page 2 of 15

Table 1: Model for List of Deliverables For fixed-price line items:

Line Item #
Description
NAICS
Accounting
Unit of measure
Quantity
Unit price (FP)
Total price
Delivery schedule

OR

Period of performance Destination

OR

Place of performance

2.1
Comprehensive Maintenance on Split HVAC/VRF/Exhaust Fan/Fan Coil Units
238220
257401
JB
1
Annual
Miramar National Cemetery
2.2
Operational Maintenance on Split HVAC/VRF/Exhaust Fan/Fan Coil Units
238220
257401
JB
4
Quarterly
Miramar National Cemetery
2.2
Written report of all work accomplished during visit
238220
257401
EA
4
Quarterly
Miramar National Cemetery