S02 - Attachment 9 - Release of Claims.docx

DOCX document 15 KB Posted

Attached to
Z2DA--VAMC Garland Roof Replacement 549-157R (VA-21-00007690)
Solicitation number
36C77621R0023_1
Issued by

About this file

This document contains a release of claims form and details of a federal contract opportunity for roof replacement services. The Program Contracting Activity Central is seeking a contractor to provide all labor, materials, supervision, and other resources to reroof and reinsulate approximately 42,000 square feet of built-up roofing systems at two Department of Veterans Affairs facilities in Garland, Texas. The work includes replacing the roofs of the 22,000 square foot Medical Office Building and the 20,000 square foot warehouse. Interested contractors should review the attached documentation for additional requirement details. The release of claims form provides a template for contractors to use to release the United States from any claims upon final payment for services performed under the contract number and date listed.

View the file

Other files

File Type Posted
S02 - Attachment 11- Section 01 33 23 - Shop Drawings- Products-and Samples.docx DOCX document
S02 - Attachment 2 - Statement of Work - Garland Roof Replacement - Final (12-3-2020 YMR).docx DOCX document
S02 - Attachment 1 - Spec 001121 - RFP to DB (12-29-2020 YMR).doc DOC document
S02 - Attachment 14 - Section 01 32 16.16 - Network Analysis Schedules (Design-Build Only).docx DOCX document
S02 - Attachment 7- Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
S02 - Attachment 8- Past Performance Questionnaire.docx DOCX document
S02 - Attachment 6 - VHA Master Specifications.docx DOCX document
S02 - Attachment 12 - Section 01 35 26 - Safety Requirements.docx DOCX document
S02 - Attachment 13 - Section 01 57 19 - Temporary Evironmental Controls.doc DOC document
S02 - Attachment 10 - Section 01 42 19 - Reference Standards.docx DOCX document
S02 - 36C77621R0023_1.docx DOCX document
S02 - Attachment 18 - Section 01 32 16 Project Schedules.doc DOC document
S02 - Attachment 15 - Quality Control Requirements Plan SCE 11-19-2018.docx DOCX document
S02 - Attachment 5 - Labor Standards Wage Determination - Dallas County TX.pdf PDF
S02 - Attachment 16- Section 07 51 00 - Built-Bituminous Roofing.docx DOCX document
S02 - Attachment 17 - Section 07 72 00 - Roofing Accessories.docx DOCX document
S02 - Attachment 3 - Drawings.pdf PDF
S02 - Attachment 4 - Construction Wage Determination - Dallas County TX.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RELEASE OF CLAIMS

For and in consideration of the payments heretofore made, and payment of final installment now due by reason of performance of Contract No. __________________, dated __________________, the undersigned Design-Build contractor hereby releases and discharges the United States of America from any and all claims arising under or by virtue of said contract, except as follows: (In this space describe and list in stated amounts excepted claims, if any; otherwise this release will be considered as free of all claims. If no claims reserved, insert None.)

IN WITNESS WHEREOF, This release has been duly executed this ________________ day of ___________________.

Design-Build Contractor

BY: _____________________________________

(Print or type name under signature)

Title (Print or type)

(End of Clause)

File details come from the government source that posted it. Updated .