S02 - Attachment 9 - Base Offer Price Breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Cancellation Notice* Z1DA--PROJECT 546-24-119, Bid-Build (BB) Replace Roof in Building 7 at Miami VAHCS
Solicitation number
36C24824R0156
Issued by

About this file

This document is a Base Offer Price Breakdown template for a federal contract opportunity. The template includes a breakdown of labor and material costs by CSI construction division, as well as sections for overhead, profit, and bond percentages. The related federal contract opportunity is for the project "Replace Roof in Building 7 at Miami VAHCS, Project 546-24-119" issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The solicitation number is 36C24824R0156 and the overall base offer price must be provided. Offerors are required to provide additional price breakdown to avoid lump sum pricing, as this document will be used for the government's price analysis.

View the file

Other files

File Type Posted
36C24824R0156 Cancellation Notice.pdf PDF
36C24824R0156 0004.pdf PDF
S02 - Attachment 14 - Site Visit 2.pdf PDF
Solicitation 36C24824R0156.pdf PDF
Attachment 2 - VAAR Clause 852.215-70.docx DOCX document
Amendment 36C24824R0156 0003.pdf PDF
Attachment 1 - Statement of Work SOW.pdf PDF
RFI Tracking Log.pdf PDF
36C24824R0156 0002.pdf PDF
S02 - Attachment 1 - Statement of Work.pdf PDF
36C24824R0156 0001.pdf PDF
Picture 1 Equipment removal.pdf PDF
Picture 2 Drain locations.pdf PDF
Picture 3 40 yard dumpster location.pdf PDF
RFI Tracking Log.pdf PDF
546-24-119 Bldg 7 Roof Plan.pdf PDF
Site visit sign in.pdf PDF
Solicitation 36C24824R0156 .pdf PDF
S02 - Attachment 11 - Specialized Experience.pdf PDF
S02 - Attachment 4 - Bldg. 7 Roof Plan Drawing.pdf PDF
S02 - Attachment 7 - 13A Roof Drain Bottom of Deck.pdf PDF
S02 - Attachment 1 - Statement of Work SOW.pdf PDF
S02 - Attachment 6 - Roof Area 1 Floor Plan.pdf PDF
S02 - Attachment 13 - Past Performance Forms.pdf PDF
S02 - Attachment 5 - Existing Sandwich Slab Type Detail Drawing.pdf PDF
S02 - Attachment 2 - Wall Sections and Roof Details Drawing.pdf PDF
S02 - Attachment 8 - DBA Wage Determination.pdf PDF
S02 - Attachment 10 - Limitations on Subcontracting.pdf PDF
S02 - Attachment 12 - EMR.docx DOCX document
S02 - Attachment 3 - Concrete Core.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .