S02 - Attachment 11 - Specialized Experience.pdf

PDF 70 KB Posted

Attached to
Cancellation Notice* Z1DA--PROJECT 546-24-119, Bid-Build (BB) Replace Roof in Building 7 at Miami VAHCS
Solicitation number
36C24824R0156
Issued by

About this file

This document is a Specialized Experience Form for a federal contract opportunity. The form requires the offeror to provide details on three relevant projects, including the contractor information, contract number and award date, project title/location, role as prime/subcontractor, percentage of work performed, descriptions of the scope of work and the offeror's specific responsibilities, any difficulties or obstacles encountered, performance period and completion date, termination information, and original vs. final contract price.

The related federal contract opportunity is for the "Replace Roof in Building 7 at Miami VAHCS, Project 546-24-119" for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The contract is for construction services to replace the roof on a building at the Miami VA Healthcare System. The solicitation number is 36C24824R0156.

View the file

Other files

File Type Posted
36C24824R0156 Cancellation Notice.pdf PDF
36C24824R0156 0004.pdf PDF
S02 - Attachment 14 - Site Visit 2.pdf PDF
Solicitation 36C24824R0156.pdf PDF
Attachment 2 - VAAR Clause 852.215-70.docx DOCX document
Amendment 36C24824R0156 0003.pdf PDF
Attachment 1 - Statement of Work SOW.pdf PDF
RFI Tracking Log.pdf PDF
36C24824R0156 0002.pdf PDF
S02 - Attachment 1 - Statement of Work.pdf PDF
36C24824R0156 0001.pdf PDF
Picture 1 Equipment removal.pdf PDF
Picture 2 Drain locations.pdf PDF
Picture 3 40 yard dumpster location.pdf PDF
RFI Tracking Log.pdf PDF
546-24-119 Bldg 7 Roof Plan.pdf PDF
Site visit sign in.pdf PDF
Solicitation 36C24824R0156 .pdf PDF
S02 - Attachment 4 - Bldg. 7 Roof Plan Drawing.pdf PDF
S02 - Attachment 7 - 13A Roof Drain Bottom of Deck.pdf PDF
S02 - Attachment 1 - Statement of Work SOW.pdf PDF
S02 - Attachment 6 - Roof Area 1 Floor Plan.pdf PDF
S02 - Attachment 13 - Past Performance Forms.pdf PDF
S02 - Attachment 5 - Existing Sandwich Slab Type Detail Drawing.pdf PDF
S02 - Attachment 2 - Wall Sections and Roof Details Drawing.pdf PDF
S02 - Attachment 8 - DBA Wage Determination.pdf PDF
S02 - Attachment 9 - Base Offer Price Breakdown.xlsx XLSX spreadsheet
S02 - Attachment 10 - Limitations on Subcontracting.pdf PDF
S02 - Attachment 12 - EMR.docx DOCX document
S02 - Attachment 3 - Concrete Core.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIALIZED EXPERIENCE FORM

SPECIALIZED EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 1 Must have a total of THREE (3) projects, more than 3 will not be evaluated; less than 3 may result in a lower rating.

a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)

e. Percent (%) of project work performed by your company

f. if you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 3

i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution

j. Describe unforeseen conditions and how each were resolved

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date: original completion date, if not completed, projected completion date (mm/dd/yyyy)

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

If not completed, Why?

m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.

n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences:

File details come from the government source that posted it. Updated .