S02 - Attachment - 8 DRAWINGS Part 1 -546-21-110 Upgrade HVAC System in the Utility Plant Building 44 - Copy.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24823R0123
About this file
This solicitation is for an upgrade to the HVAC system in Building 44 at the Miami VA Medical Center. Key details include upgrading the HVAC system serving the utility plant building to address deficiencies. Site visits will be held on April 24, 2023 and RFIs are due by May 1, 2023. The project is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The solicitation provides relevant project information and dates for interested contractors to obtain additional details on the opportunity.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
TRUE
NORTH
TRUE
NORTH
PROJECT
LOCATION
INDEX OF DRAWINGS
G001
SHEET
NO.
GENERAL
COVER SHEET
DRAWING
TITLE
MECHANICAL
M001 MECHANICAL GENERAL NOTES, ABBREVIATIONS, AND LEGENDS
MDH101 FIRST FLOOR HVAC DEMOLITION PLAN
M502 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
SECOND FLOOR HVAC DEMOLITION PLAN
THIRD FLOOR HVAC DEMOLITION PLAN
FOURTH FLOOR HVAC DEMOLITION PLAN
MDH102
MDH103
MDH104
MDP101
MDP102
MDP103
FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN
MDP104
SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN
THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN
FOURTH FLOOR MECHANICAL PIPING DEMOLITION PLAN
MH101 FIRST FLOOR HVAC PLAN - NEW WORK
SECOND FLOOR HVAC PLAN - NEW WORK
THIRD FLOOR HVAC PLAN - NEW WORK
FOURTH FLOOR HVAC PLAN - NEW WORK
MH102
MH103
MH104
FIRST FLOOR MECHANICAL PIPING PLAN - NEW WORK
SECOND FLOOR MECHANICAL PIPING PLAN - NEW WORK
THIRD FLOOR MECHANICAL PIPING PLAN - NEW WORK
FOURTH FLOOR MECHANICAL PIPING PLAN - NEW WORK
MP101
MP102
MP103
MP104
M401 ENLARGED MECHANICAL PIPING PLANS
M501 HYDRONIC DETAILS
M801 CONTROLS AND SCHEMATICS - MECHANICAL
ELECTRICAL
E001 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS
E002 ELECTRICAL LEGEND
ELECTRICAL FIRST FLOOR HVAC DEMOLITION PLAN
ELECTRICAL SECOND FLOOR HVAC DEMOLITION PLAN
ELECTRICAL THIRD FLOOR HVAC DEMOLITION PLAN
ED101
ED102
ED103
ED104
ED105
ED106
ELECTRICAL FOURTH FLOOR HVAC DEMOLITION PLAN
ELECTRICAL FIRST FLOOR PIPING DEMOLITION PLAN
ELECTRICAL SECOND FLOOR PIPING DEMOLITION PLAN
E101 ELECTRICAL FIRST FLOOR HVAC POWER PLAN
ELECTRICAL SECOND FLOOR HVAC POWER PLAN
ELECTRICAL THIRD FLOOR HVAC POWER PLAN
ELECTRICAL FOURTH FLOOR HVAC POWER PLAN
E102
E103
E104
ELECTRICAL SECOND FLOOR PIPING POWER PLAN
ELECTRICAL DETAILS
E105
E501
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
COVER SHEET UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
G001
546-21-110
JMK JSW/RCP
BID DOCUMENTS
03-03-2023
UPGRADE HVAC SYSTEM IN THE
UTILITY PLANT BUILDING 44
MIAMI VETERANS HEALTH CARE SYSTEM
1201 NORTH WEST , MIAMI, FL 33125
PROJECT NO. 546-21-110
AREA MAP
NOT TO SCALE
LOCATION MAP
NOT TO SCALE
BID DOCUMENTS
jwilliamson Snapshot
H
CO2
CO
HS
NO2
S
TH
TS
T
MS
2"
4"
4"
PIPE RISE
PIPE DROP
PIPE TEE REDUCING 45
DEGREE TEE
45 DEGREE TEE
2" DOM. WM
PIPE ACCESSORY TAGS
DOMESTIC WATER
METER
BALANCING VALVE
1/4 TURN BALL VALVE
CHECK VALVE
3-WAY MIXING VALVE
MOTORIZED CONTROL
VALVE
3 WAY MOTORIZED
CONTROL VALVE
PRESSURE REDUCING
VALVE
REFRIGERANT SOLENOID
VALVE
BUTTERFLY VALVE
2"
BALANCING
2" SHUTOFF
2" CHECK
2" TMV
2" M-CNTRL
2" 3-WAY
CNTRL
2" PRV
3/8"
SOLENOID
2"
BUTTERFLY
CAP
PLUG
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL
OTHER DRAWINGS IN THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN
ON THIS SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
F
S
M
B
D
C
48"x2 1/2"
LINEAR BAR
GRILLE
RTU-XX
VAV-XX
EQUIPMENT
TAG
EQUIPMENT TAG
VAV BOX
ROOFTOP UNIT
MANUAL BALANCING
DAMPER
BACKDRAFT DAMPER
COMBINATION
FIRE/SMOKE
DAMPER
FIRE DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
CHS
CD
MPS
CR
CS
HWR
HWS
LPS
CHR
CHILLED WATER
RETURN
CHILLED WATER
SUPPLY
CONDENSATE
DRAINAGE
MEDIUM PRESSURE
STEAM
CONDENSER WATER
RETURN
CONDENSER WATER
SUPPLY
HEATING WATER
RETURN
HEATING WATER
SUPPLY
LOW PRESSURE
STEAM
LPSR
LOW PRESSURE
STEAM RETURN
MPSR
PCD
CDR
MEDIUM PRESSURE
STEAM RETURN
PUMP CONDENSATE
DISCHARGE
CONDENSATE
RETURN
A. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS,
BOTH EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS, AS
WELL AS THOSE WHICH CAN BE REASONABLY ANTICIPATED
INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,
PLUMBING, FIRE PROTECTION, AND OTHER SYSTEMS INVOLVED ON
THIS PROJECT.
B. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM
AND SHALL CONFORM TO ALL CURRENT REQUIREMENTS FOUND IN
THE UNITED STATES DEPARTMENT OF VETERANS AFFAIRS TECHNICAL
INFORMATION LIBRARY, INCLUDING BUT NOT LIMITED TO THE
PHYSICAL SECURITY MANUAL, HVAC DESIGN MANUAL, AND STEAM,
HEATING HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEM DESIGN
MANUAL. ALL WORK SHALL ALSO CONFORM TO ALL FEDERAL, STATE,
AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO THE
INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL
CODE.
C. INSTALL ALL EQUIPMENT AND DEVICES IN ACCORDANCE WITH THEIR
RESPECTIVE MANUFACTURER’S INSTALLATION INSTRUCTIONS AT A
LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH THESE
DOCUMENTS. ANY DEVIATIONS BETWEEN THE INSTALLATION
INSTRUCTIONS AND THESE DOCUMENTS WILL BE BROUGHT TO THE
ATTENTION TO THE COR BEFORE ANY COURSE OF ACTION BY THE
CONTRACTOR IS INITIATED, INCLUDING PURCHASE OF EQUIPMENT.
D. CONTRACTOR SHALL COORDINATE ALL WORK DESCRIBED AND
ILLUSTRATED IN THESE DRAWINGS. LOCATIONS OF PIPING,
DUCTWORK AND EQUIPMENT AS INDICATED ON THESE DRAWINGS ARE
APPROXIMATE AND SUBJECT TO ADJUSTMENTS IN THE FIELD. OFFSET
DUCTS, PIPING, AND SHIFT EQUIPMENT AS REQUIRED TO AVOID
INTERFERENCE AND CONFLICTS IN THE FIELD. COORDINATE DUCT
AND PIPE ROUTING AND EQUIPMENT LOCATIONS WITH PLUMBING AND
ELECTRICAL INSTALLATIONS AND WITH BUILDING STRUCTURAL
MEMBERS.
E. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE
NOT TO BE SCALED. BEFORE BEGINNING WORK, THE CONTRACTOR
SHALL VISIT THE SITE AND COMPLETE MEASURED SURVEY AND
CREATE LAYOUT DRAWINGS AS REQUIRED BY THE
SPECIFICATIONS. WORK SHALL NOT BEGIN UNTIL ALL LAYOUT
DRAWINGS ARE APPROVED BY THE COR.
F. COORDINATE LOCATIONS OF CEILING REGISTERS AND DIFFUSERS
WITH LIGHTING, CEILING GRID, AND OTHER CEILING MOUNTED
DEVICES.
G. DUCT SIZES INDICATED ARE MINIMUM CLEAR INSIDE DIMENSIONS.
WHERE DUCT LINER OCCURS, INCREASE SHEET METAL DUCT SIZES TO
ACCOMMODATE LINER.
H. DUCT AND PIPE SUPPORTS ARE NOT SHOWN ON DRAWINGS.
I. SUPPORT ALL DUCTS, PIPING, AND EQUIPMENT FROM PRIMARY
BUILDING STRUCTURAL MEMBERS. PROVIDE ADDITIONAL STRUCTURAL
MEMBERS WHERE NECESSARY TO ACCOMPLISH THIS REQUIREMENT.
J. NEW AND EXISTING SUPPORT, RODS, AND ASSOCIATED
APPURTENANCES SHALL NOT RESTRICT EQUIPMENT SERVICE AND
MAINTENANCE ACCESS. EXISTING SUPPORTS SHALL BE MODIFIED TO
PROVIDE FOR EQUIPMENT SERVICE AND MAINTENANCE ACCESS.
K. DUCT HANGERS SHALL BE IN STRICT ACCORDANCE WITH FIG 4-4 OF
SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND
FLEXIBLE - SECOND EDITION EXCEPT THAT HANGER WIRE SHALL NOT
BE USED TO SUPPORT DUCTS OR EQUIPMENT, AND HANGERS THAT
REQUIRE PENETRATION OF DUCT WITH BOLTS, RIVETS, SCREWS,
WIRES OR ANY OTHER FASTENER SHALL NOT BE USED.
L. CONTRACTOR SHALL REWORK EXISTING HANGERS AND OTHER
SUPPORT FOR DUCT AND PIPING TO COORDINATE WITH NEW
EQUIPMENT AND WALL LOCATIONS. ADD SUPPORT (TRAPEZE, CLEVIS,
ETC) AT EQUIPMENT AND ON EACH SIDE OF NEW WALLS SO FULL
WEIGHT OF DUCT AND PIPING IS SUPPORTED FROM STRUCTURE AND
EQUIPMENT AND NEW WALLS BEAR NO WEIGHT.
M. CONTRACTOR SHALL PROVIDE A LIST OF ALL MECHANICAL
EQUIPMENT, DEVICES, AND ALL APPURTENANCES REQUIRING POWER
TO THE COR FOR REVIEW AND APPROVAL AS PART OF COORDINATION
FOR THIS PROJECT. LIST ALL ELECTRICAL REQUIREMENT
CHARACTERISTICS, INCLUDING BUT NOT LIMITED TO VOLTAGE,
AMPERAGE, PHASE, DISCONNECTING MEANS, OVER CURRENT
PROTECTION AND ALL CHARACTERISTICS FOR A FULLY FUNCTIONAL
AND COORDINATED SYSTEM. REFER TO ELECTRICAL DRAWINGS FOR
VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.
N. DO NOT USE SCHEDULED EQUIPMENT IDENTIFICATION NUMBERS
SHOWN ON DRAWINGS FOR FINAL EQUIPMENT SIGNS AND FOR
CONTROL SYSTEM SCHEMATICS. CONTACT COR AND OBTAIN FROM
REFRIGERATION AND HVAC MAINTENANCE SUPERVISOR THE
CORRECT NOMENCLATURE AND EQUIPMENT NUMBERS FOR
INCLUSION IN SIGNAGE, CONTROL SCHEMATICS, AND AS-BUILT
DRAWINGS.
O. CONTROL DEVICES ASSOCIATED WITH THE WORK OF THIS PROJECT
SHALL BE RELOCATED AS NECESSARY SO THAT THE FINAL PRODUCT
RESULTS IN A FULLY FUNCTIONAL AND FULLY ACCESSIBLE SYSTEM.
CONTRACTOR SHALL RELOCATE ALL EXISTING CONTROLS, SENSORS,
PROBES, OR OTHER DEVICES AND PROVIDE NEW WIRING, CONDUIT,
AND/OR TUBING TO EXTEND SUCH DEVICES AS NECESSARY TO
PRODUCE A FULLY FUNCTIONAL SYSTEM EQUAL OR BETTER THAN
EXISTING. PROTECT AND STORE ALL SUCH RELOCATED DEVICES.
GENERAL MECHANICAL NOTES
A. CONTRACTOR SHALL PHASE ALL WORK AS REQUIRED TO MAINTAIN
CONTINUOUS OPERATION OF THE HOSPITAL.
B. HOSPITAL OPERATIONS SHALL NOT BE INTERRUPTED DUE TO THE
WORK OF THIS PROJECT EXCEPT FOR SCHEDULED SHUTDOWNS OF
NO LONGER THAN ONE HOUR. CONTRACTOR SHALL GIVE
REASONABLE NOTICE TO COR BEFORE ANY SUCH SHUTDOWN OR
INTERRUPTION.
C. WHERE LONGER SHUTDOWNS ARE REQUIRED TO COMPLETE THE
WORK DESCRIBED IN THIS DOCUMENT, THE CONTRACTOR SHALL
SCHEDULE THE EVENT A MINIMUM OF 3 WEEKS PRIOR TO
COMMENCING WORK. ALL SUCH SHUTDOWNS AND INTERRUPTIONS
SHALL BE MINIMIZED AND SHALL UTILIZE WEEKENDS, FEDERAL
HOLIDAYS, NIGHTS, AND OTHER TIMES WHEN HOSPITAL OPERATIONS
ARE MINIMIZED AND OTHER SUCH TIMES AGREEABLE TO THE COR.
D. WHERE NECESSARY TO INTERRUPT CONTINUOUS OPERATION OF THE
HOSPITAL, THE CONTRACTOR SHALL DIVIDE WORK INTO PHASED
CONSTRUCTION THAT IS NOT NECESSARILY SHOWN ON THESE
DOCUMENTS. AS PART OF SCHEDULING AN INTERRUPTION OR
SHUTDOWN, THE CONTRACTOR SHALL PROVIDE THE COR WITH A
DETAILED SHUTDOWN PLAN INDICATING THE SYSTEMS AFFECTED,
INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,
MECHANICAL, PLUMBING, FIRE PROTECTION, AND OTHER SYSTEMS
INVOLVED. THE PLAN SHALL INCLUDE THE WORK TO BE PERFORMED,
THE LENGTH OF INTERRUPTION, AND A DETAILED PHASING AND
MANNING DESCRIPTION. THE PLAN SHALL INCLUDE AND ADDRESS
CONTINGENCY FOR MITIGATING ANY DELAYS THAT MAY OCCUR IN THE
PLANNED WORK. PROVIDE THIS PLAN TO THE COR 5 WEEKS BEFORE
THE EVENT FOR APPROVAL.
A. THE TEST AND BALANCE CONTRACTOR SHALL BE A SUBCONTRACTOR
TO THE PRIME CONTRACTOR AND NOT A SUBCONTRACTOR TO THE
MECHANICAL OR ANY OTHER SUBCONTRACTOR.
PHASING MECHANICAL NOTES
TEST AND BALANCE MECHANICAL NOTES
PIPING SYMBOLSHVAC SYMBOLS
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
ROOM NAME AND NUMBER
LIMIT OF DEMOLITION
Ref
(E)
2"
1/8" / 12" SLOPE
PIPE SIZE TAG (DIAMETER)
BELOW GROUND PIPING
EXISTING PIPE TAG
PIPING BEING DEMOLISHED
INVERT: -105' - 1" PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
NEW WORK NOTES
DEMOLISHED WORK NOTES
CONNECT NEW DUCT TO EXISTING DUCT
ACCESS DOOR ON TOP OF DUCT
ACCESS DOOR ON SIDE OF DUCT
ACCESS DOOR ON BOTTOM OF DUCT
Room
AREA NOT IN CONTRACT
SHEET NOMENCLATURE
M P # # #
SHEET
NUMBER
SERIES
MECHANICAL
(H) HVAC
(P) PIPING
(D) DEMO
SERIES
0 - SYMBOLS AND NOTES
1 - PLAN VIEWS
3 - ELEVATIONS AND SECTIONS
4 - LARGE SCALE - PLANS AND SECTIONS
5 - SCHEMATICS AND DETAILS
6 - SCHEDULES
8 - CONTROLS
16"x8"
16"/8"
16"Ø
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR DUCT RISE
ROUND DUCT SIZE TAG (DIAMETER)
DUCT BEING DEMOLISHED
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE
ROUND EXHAUST/RELIEF AIR DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP
(E)16"Ø
3-CONE
DIFFUSER
CFM
NECK SIZE
TYPE (SEE SCHEDULE)
EGGCRATE
RETURN GRILLE
10"x10"
CFM
NECK SIZE
TYPE (SEE SCHEDULE)
10"Ø
SD1
EQUIPMENT ID
SYMBOL
TYPE (SEE SCHEDULE)
CFM
ACTIVE SLOT LENGTH
(PLENUM LENGTH)
GRILLES, REGISTERS & DIFFUSERS TAG
MECHANICAL EQUIPMENT TAGS
DATA DEVICE TAGS
DAMPER TAGS
ABBREVIATIONS
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN
(CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC &
ATMOSPHERIC ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD
AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD
REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER
(SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE)
STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING
VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT
EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING
VALVE
SVS STEAM VENT SILENCER
SW SOFTWATER
SWHX STEAM TO WATER HEAT
EXCHANGER
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
V VENT
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH
ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
WAG WASTE ANESTHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J INTENTIONALLY LEFT BLANK
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,
TWO POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AQST AQUASTAT
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BE BOTTOM ELEVATION
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS
(SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS
(SUBMISSION2)
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CR/CWTT CONDENSER WATER RETURN (TO
COOLING TOWER)
CS/CWFT CONDENSER WATER SUPPLY (FROM
COOLING TOWER)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
A. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM
THE PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS,
ELECTRICAL CONDUIT, WIRING, JUNCTION BOXES, PIPING, CONTROLS,
ACCESSORIES AND ALL APPURTENANCES THAT ARE RENDERED
USELESS OR ABANDONED BY THE REMOVAL OF THE INDICATED
EQUIPMENT.
B. WHERE THESE DOCUMENTS REQUIRE REMOVAL OF DUCTWORK,
PIPING, EQUIPMENT OR ASSOCIATED APPURTENANCES, CONTRACTOR
SHALL PROTECT ALL EXISTING-TO-REMAIN COMPONENTS FROM
DAMAGE. CONTRACTOR SHALL COVER ALL OPENINGS IN DUCT,
PIPING, EQUIPMENT, AND ANY OTHER DEVICE FROM CONSTRUCTION
DUST AND DEBRIS.
C. WHERE EQUIPMENT, DUCTWORK, OR PIPING IS TO BE REMOVED THAT
IS IN-SERVICE, CONTRACTOR SHALL GIVE NOTICE TO THE COR OF ANY
INTERRUPTIONS ANTICIPATED. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO COORDINATE ALL SHUTDOWNS OR INTERRUPTIONS
TO THE SATISFACTION OF THE COR AND HOSPITAL STAFF.
DEMOLITION MECHANICAL NOTES
HUMIDISTAT
HUMIDITY SENSOR
NITROGEN DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
TEMPERATURE & HUMIDITY
SENSOR
TEMPERATURE SENSOR
THERMOSTAT
MANUAL SWITCH
SENSOR
RTU-XX
VAV-XX
1. AREAS REQUIRING PIPE FREEZING SHALL ADHERE TO THE FOLLOWING
REQUIREMENTS.
1. CONTRACTOR SHALL NOTIFY THE VA COR 2 WEEKS BEFORE
BEGINNING WORK.
2. CONTRACTOR SHALL VERIFY THAT OPERATING CONDITIONS
REQUIRED TO PERFORM A STANDARD LINE FREEZE ARE MET
BEFORE BEGINNING WORK. THIS INCLUDES TEMPERATURE,
PRESSURE, NO-FLOW, PIPE MATERIAL, PIPE WALL THICKNESS, AND
SPACE FOR STANDARD EQUIPMENT AND ADJACENCY TO FITTINGS,
WELDS, AND OTHER PIPING APPURTENANCES THAT WILL BE
AFFECTED OR WILL AFFECT THE FREEZE. TO ENSURE ICE PLUG
INTEGRITY, THE CONTRACTOR SHALL ENSURE THAT NO-FLOW
CONDITIONS EXIST WITHIN 15 PIPE DIAMETERS FROM THE PLUG.
THIS INCLUDES NO-FLOW IN HEADERS WITHIN THAT DISTANCE
FROM PLUG.
3. BEFORE BEGINNING WORK, THE GENERAL CONDITION OF THE PIPE
SHOULD BE EVALUATED AND CHECKED FOR WALL THINNING,
PITTING, GOUGES, BLISTERS, AND LAMINATIONS. IF THERE ARE
ANY CRACKS THE FREEZE SHALL NOT TAKE PLACE.
4. PIPE FREEZE SHALL BEGIN WHEN THE CONTRACTOR VERIFIES A
‘NO FLOW’ CONDITION IN THE PIPING. CONTRACTOR IS
RESPONSIBLE FOR VERIFICATION AND SHALL NOTIFY VA COR
WHEN CONFIRMED.
5. IF A FREEZE POINT SHALL BE LOCATED WITHIN 20 PIPE DIAMETERS
OF A CLOSED END, (WELDED CAP, OR ANY END THAT CANNOT BE
MADE TO RELIEVE PRESSURE) THE CONTRACTOR SHALL PROVIDE
FOR A MEANS TO MONITOR AND RELIEVE PRESSURE DUE TO
FREEZING. COORDINATE WITH COR ANY AND ALL MONITOR AND
PRESSURE RELIEF METHODS.
6. FREEZE POINT SHALL BE NO LESS THAN 6" FROM A BUTTWELD OR
NON-SEAM WELD. IF THE JACKET IS CLOSER TO A WELD, THE
CONTRACTOR SHALL VISUALLY INSPECT ANY WELDS FOR
DEFECTS SUCH AS PITTING, BEFORE AND AFTER THE FREEZE.
BEFORE FREEZE, NOTIFY THE COR OF ANY SUCH DEFECTS.
7. IF FREEZE POINT TAKES PLACE ON SEAM WELDED PIPING, THE
SEAM SHALL BE VISUALLY INSPECTED BEFORE AND AFTER THE
FREEZE FOR DEFECTS AS NOTED ABOVE. THIS INSPECTION SHALL
EXTEND 4 PIPE DIAMETERS ON BOTH SIDES OF THE FREEZE POINT.
8. PIPE INSULATION SHALL BE REMOVED EQUAL TO THE FREEZE
JACKET LENGTH PLUS 4 PIPE DIAMETERS ON EITHER SIDE.
9. CONTRACTOR SHALL ESTABLISH A FREEZE PLUG FOR EACH
LOCATION BEFORE REMOVING ANY PIPING COMPONENTS.
PIPE FREEZE NOTES
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
MECHANICAL LEGEND,
ABBREVIATIONS, AND NOTES
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
M001
546-21-110
JMK JSW/RCP
BID DOCUMENTS
03-03-2023
5000 CFM
8"x6"
"x
(E) 12x8
500 CFM
EXHAUST
(E) 8X6
100 CFM
(E) 8x6
75 CFM EXH.
(E) 18x10
420 CFM
(TYP OF 5)
(E) 12x8
500 CFM
24x24
LOUVER
(E) 48x30
1,980 CFM
24x24
135 CFM
(TYP OF 2)
24x6
190 CFM
FUEL TANK
FUEL TANK
FUEL TANK
STAIR
SUMP
STOR.
ELEV
EQUIP
MECH
ROOM
MEETING/
OFFICE
ELEVATOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
ENTRANCE
JANITOR
CLOSET
STAIR
FP&L SW &
METERING
ROOM
STORAGE
1G108
1G103
1G100
1G104
1G105
S-1
C1-1
C1-2
C1-3
C1-4
C1-5
C1-6
1G106
1G103A
1G107
1G101
UP
UP
11-1-FCU2
11-1-FCU3
11-1-FCU1
11-1-EF1
6"x6"
80 CFM
B
A B
D E F
1 1
2 2
3 3
4 4
.2
.5
6 6
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
FIRST FLOOR HVAC DEMOLITION
PLAN
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MDH101
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
3/16" = 1'-0"MDH101
1 FIRST FLOOR HVAC DEMOLITION PLAN
# MDH101 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 REMOVE IN ITS ENTIRETY FAN COIL UNIT 11-1-FCU1 AND ALL
APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.
2 REMOVE IN ITS ENTIRETY FAN COIL UNIT 11-1-FCU2 AND ALL
APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.
3 REMOVE IN ITS ENTIRETY FAN COIL UNIT 11-1-FCU3 AND ALL
APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.
4 REMOVE IN ITS ENTIRETY EXHAUST FAN AND ALL APPURTENANCES
INCLUDING CONTROLS, CONTROL WIRING, AND PNEUMATIC DAMPER.
5 DISCONNECT EXISTING 24x6 RETURN GRILLE CLEAN AND STORE IN SAFE
PLACE TO REINSTALL DURING NEW CONTRACTION PHASE.
6 REMOVE IN ITS ENTIRETY PNEUMATIC DAMPER AND ALL
APPURTENANCES INCLUDING TUBES AND WIRING. PREPARE FOR NEW
MOTORIZED DAMPER. SEE NEW WORK SHEETS.
0 4' 8' 12'
MDH101 GENERAL NOTES
NOTE
NUMBER NOTE TEXT
A WHERE PNEUMATIC HOSES EXIST AND DEVICE IS BEING REMOVED, THE
CONTRACTOR SHALL REMOVE ALL PNEUMATIC TUBES BACK TO THE
SOURCE. PROVIDE SEALED ENDS WHERE DEVICE IS TO REMAIN SO THAT
FUNCTIONALITY OF SUCH DEVICE REMAINS AS CURRENTLY
FUNCTIONING.
WALKWAY
2G100
2G102
S1
2G103
2G101
2G101A
STAIR
TOILET
FIRE PUMP
ROOM
MECHANICAL
ROOM
BOILER
ROOM
GRAPHICS/
CONTROL
STAIR
ELEVATOR
DOWN UP
UP
DOWN
UP
700 CFM
14"x14"
100 CFM EXH
8X6 CR
14"x14"
600 CFM
48X10 TR
24X24 LOUVER
24X24 LOUVER
RS
14"x14"
600 CFM EXH
42X12 BR
UP
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
BOILER STACK
34X34
40x24 LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
CONTROL
PANEL
700 CFM
14"x14"
100 CFM EXH
8X6 CR
14"x14"
600 CFM
48X10 TR
24X24 LOUVER
24X24 LOUVER
RS
14"x14"
600 CFM EXH
42X12 BR
UP
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
BOILER STACK
34X34
40x24 LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
CONTROL
PANEL
(TYP)
FLEX. CONN
11-2-ICF1
11-2-PEF3 11-2-PEF5
MM
11-2-FCU4
8"DIA. CONN.
160 CFM EA.
24X24 CD
M
8X
M
M
A B D E F
1 1
2 2
3 3
.2
.5
CONTROL PANEL
(E) BOILER-1 (E) BOILER-2
ONE FAN
HIGH AND
ONE FAN LOW
(2 FANS)
(E)VFD-9 (E)VFD-8
(E)VFD-7
(E)VFD-6
(E)VFD-5
(E)VFD-4
(E)VFD-3
(E)VFD-2
(E)VFD1
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
SECOND FLOOR HVAC DEMOLITION
PLAN
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MDH102
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
3/16" = 1'-0"MDH102
1 SECOND FLOOR HVAC DEMOLITION PLAN
MDH102 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 REMOVE IN ITS ENTIRETY WALL FAN, DAMPER AND ALL
APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.
2 CONTRACTOR SHALL REMOVE DAMPER AND ASSOCIATED
APPUTENANCES.
3 REMOVE IN ITS ENTIRETY FAN COIL UNIT, DIFFUSERS, GRILLES AND ALL
APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.
4 REMOVE IN ITS ENTIRETY EXHAUST FAN AND ALL APPURTENANCES
INCLUDING CONTROLS AND CONTROL WIRING.
0 4' 8' 12'
MDH102 GENERAL NOTES
NOTE
NUMBER NOTE TEXT
A WHERE PNEUMATIC HOSES EXIST AND DEVICE IS BEING REMOVED, THE
CONTRACTOR SHALL REMOVE ALL PNEUMATIC TUBES BACK TO THE
SOURCE. PROVIDE SEALED ENDS WHERE DEVICE IS TO REMAIN SO THAT
FUNCTIONALITY OF SUCH DEVICE REMAINS AS CURRENTLY
FUNCTIONING.
B WHERE WORK ABOVE A CEILING REQUIRES REMOVAL OF CEILING,
REMOVE AND STORE EXISTING CEILING FOR REINSTALLATION.
S-1
ELEVATORSTAIR
STAIR
3G102
COMMUNICATIONS
ROOM3G100
SWITCHGEAR
ROOM
3G103
TRANSFORMER
ROOM
STAIR
STAIR
3G104
TRANSFORMER
ROOM
3G101
TRANSFORMER
ROOM
DOWN
UP
UP
DOWN
UP
T
T
T
LOUVER
72x72
LOUVER
72x72
LOUVER
72x72
LOUVER
219x48
219x48
LOUVER
72x48 LOUVER
24X48 ACTIVE &
48x24 BLANK-OFF (BELOW)
LOUVER
72x72
LOUVER
72x72
11-3-PEF711-3-PEF6
11-3-VAF1
32"x24"
36"x24"
CFM
48"x24"
24"x24"
4500 CFM
11-3-FCU6
T
M M
M
B
B
M
M
M
M
M
M
M
M
A B D E F
1 1
2 2
3 3
4 4
OVERHEAD
DOOR
OVERHEAD
DOOR
BROKEN DUCTWORK
.2
.5
AHU
(E)16"x14"
(E )1
4" x1
2"
(E)14"x12"
(E )1
6" x1
4"
(E )1
4" x1
2"
(E )1
4" x1
2"
(E)14"x12"
(E )1
6" x1
4"
6 7
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
THIRD FLOOR HVAC DEMOLITION
PLAN
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MDH103
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
3/16" = 1'-0"MDH103
1 THIRD FLOOR HVAC DEMOLITION PLAN
MDH103 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL REMOVE EXISTING SUPPLY DUCTWORK.
2 CONTRACTOR SHALL REMOVE EXISTING AIR HANDLING UNIT.
3 CONTRACTOR SHALL REMOVE EXISTING INLINE FAN AND ALL ITS
APPURTENANCES. INCLUDING DUCTWORK, CONTROLS, AND ACTUATED
DAMPER.
4 CONTRACTOR SHALL REMOVE EXISTING EXHAUST FAN AND DAMPER.
PROVIDE 14-GAUGE ALUMINUM SHEET METAL TO BLANK OFF LOUVER.
INSTALL 3” RIGID FIBER GLASS INSULATION. ALUMINUM JACKET
CONSTRUCTION SHALL BE WATERTIGHT AND AIRTIGHT.
5 CONTRACTOR SHALL REMOVE DAMPER AND ASSOCIATED
APPURTENANCES.
6 CONTRACTOR SHALL REMOVE EXISTING DAMPER AND ASSOCIATED
APPURTENANCES. PROVIDE 14 GAUGE ALUMINUM SHEET METAL TO
BLANK OFF LOUVER. INSTALL 3” RIGID FIBER GLASS INSULATION.
ALUMINUM JACKET CONSTRUCTION SHALL BE WATERTIGHT AND
AIRTIGHT.
7 CONTRACTOR SHALL REMOVE EXISTING DUCTWORK FROM LOUVER
AND PREPARE FOR NEW WORK.
8 REMOVE IN ITS ENTIRETY FAN COIL UNIT 11-3-FCU6 AND ALL
APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.
9 CONTRACTOR SHALL REMOVE EXISTING LOUVER AND PREPARE FOR
NEW WORK. PROVIDE 14 GAUGE ALUMINUM SHEET METAL TO BLANK
OFF LOUVER NOT BE REUSED. INSTALL 3” RIGID FIBER GLASS
INSULATION. ALUMINUM JACKET CONSTRUCTION SHALL BE
WATERTIGHT AND AIRTIGHT.
0 4' 8' 12'
MDH103 GENERAL NOTES
NOTE
NUMBER NOTE TEXT
A WHERE PNEUMATIC HOSES EXIST AND DEVICE IS BEING REMOVED, THE
CONTRACTOR SHALL REMOVE ALL PNEUMATIC TUBES BACK TO THE
SOURCE. PROVIDE SEALED ENDS WHERE DEVICE IS TO REMAIN SO THAT
FUNCTIONALITY OF SUCH DEVICE REMAINS AS CURRENTLY
FUNCTIONING.
LOUVER
96x136
60x120 LOUVER
(TYPICAL OF 3)
60x120
LOUVER (TYP.
OF 6)
T
AIRFLOW DIVERTING PANEL
BDD BDD BDD
BDDBDDBDD
T
AIRFLOW DIVERTING PANEL
18" GENERATOR EXHAUST
UP THRU ROOF (TYP)
M
6" RD
6" RD
6" RD
UP
UP STAIR
ELEVATOR
PLENUM
STAIR
GENERATOR
ROOM
GENERATOR
ROOM
S1
4G102
4G101
4G100
11-4-PEF9
11-4-PEF8
A B D E F
1 1
2 2
3 3
4 4
.2
.5
5 44
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
FOURTH FLOOR HVAC DEMOLITION
PLAN
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MDH104
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
3/16" = 1'-0"MDH104
1 FOURTH FLOOR HVAC DEMOLITION PLAN
MDH104 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL REMOVE IN ITS ENTIRETY WALL FAN, DAMPER, AND
ALL APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.
0 4' 8' 12'
MDH104 GENERAL NOTES
NOTE
NUMBER NOTE TEXT
A WHERE PNEUMATIC HOSES EXIST AND DEVICE IS BEING REMOVED, THE
CONTRACTOR SHALL REMOVE ALL PNEUMATIC TUBES BACK TO THE
SOURCE. PROVIDE SEALED ENDS WHERE DEVICE IS TO REMAIN SO THAT
FUNCTIONALITY OF SUCH DEVICE REMAINS AS CURRENTLY
FUNCTIONING.
STAIR
SUMP
STOR.
ELEV
EQUIP
MECH
ROOM
MEETING/
OFFICE
ELEVATOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
ENTRANCE
JANITOR
CLOSET
STAIR
FP&L SW &
METERING
ROOM
STORAGE
1G108
1G103
1G100
1G104
1G105
S-1
C1-1
C1-2
C1-3
C1-4
C1-5
C1-6
1G106
1G103A
1G107
1G101
UP
UP
VERTICAL TURBINE
PUMP SHAFT
(TYPICAL OF 4)
8" PRIMARY VENT
2" LEVEL INDICATOR
PLUG
2" FOR
4" PUMP
8" SECONDARY VENT
4" PUMP
4" SPARE
2" FOO
G
TO BLDG. 1 INTACT)
(LEAVE LPG CONNECTION
EXISTING LPG TANKS.
1/2" LPG UP FROM
LPG LPG
1/2" UP TO SECOND FLOOR
2" CPD
C P
D C
P D
CPD
2" CONDENSATE DRAIN
FROM CONDENSATE
TRANSFER PUMP IN
MAIN BUILDING.
2" CPD UP TO
SECOND FLOOR.
14" CWFT
W A
T E
R F
LO
W
12" B.O.P. AFF
18"
18"
ANCHOR PIPING
1 1/4"
1 1/4"
C H
C H
C H
R
1 1/2" CHR & CH UP
1 1/4"
LP
G
LP
G
LP
G
1/2"
1/2"
SEDIMENT COLLECTOR
CATCH BASIN/
4"
4" DN TO MANIFOLD
(NC, TYP)
VALVES
B-FLY
AT 2" AFF (TYP OF 6)
LOCATE BTM OF PIPE
4" DIA. MANIFOLD
FROM T.D.S. INDICATOR)
(NC, OPEN VIA SIGNAL
AUTOMATIC VALVE
4" BLOWDOWN DRAIN
2'-10" B.O.P. ABOVE
SUMP FLOOR
WALL SLEEVE W/MODULAR RUBBER LINK
W/STAINLESS BOLTS TYP. OF 14
C OF PIPE
EL.=9'-4.25"
TYP. OF 6
C OF PIPE
EL.=9'-5"
TYP. OF 3
C OF PIPE
EL.=9'-5.62"
TYP. OF 2
C OF PIPE
EL.=9'-6.25"
TYP. OF 1
C OF PIPE
EL.=14'-5.25"
TYP. OF 1
C OF PIPE
EL.=11'-0.25"
G G
3" G
3" G
3" G
4"
EJECTOR
SEWAGE
1" D
SPILL INTO SUMP
1" COND. DRAIN.
24" M.H.
(TYP)
24" M.H.
(TYP)
24" M.H.
(TYP)
24" M.H.
(TYP)
24" M.H.
(TYP)
F O
P -1
A
F O
P -1
B
F O
P -2
A
F O
P -2
B
F O
P -3
A
F O
P -3
B
1" FOR-B
2" FOO-B
2" FOS-G
1" FOR-G
2" FOO-G
2" FOS-B
24" M.H.
(TYP)
24" M.H.
(TYP)
1" FOR-B
2" FOS-B
2" FOO-B
11-1-FCU2
11-1-FCU3
11-1-FCU1
A B
D E F
1 1
2 2
3 3
4 4
.2
.5
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
FIRST FLOOR MECHANICAL PIPING
DEMOLITION PLAN
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MDP101
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
# MDP101 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL REMOVE ALL CORROSION, PRIME, AND PAINT ON
CONDENSER WATER PIPE. THE HATCHED AREAS ARE KNOWN SPOTS
FOR CORROSION. CONTRACTOR SHALL INSPECT ALL CONDENSER
WATER PIPING FOR CORROSION BEFORE PAINTING.
2 CONTRACTOR SHALL REMOVE FAN COIL UNITS; 1, 2, AND 3 AND ITS
APPURTENANCES.
3/16" = 1'-0"MDP101
1 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN
0 4' 8' 12'
MDP101 GENERAL NOTES
NOTE
NUMBER NOTE TEXT
A CONTRACTOR SHALL PRIME AND PAINT ALL CONDENSER WATER PIPING
TO TOWER AND FROM TOWER (CWTT – CONDENSING WATER TO TOWER
AND CWFT – CONDENSING WATER FROM TOWER). REFER TO
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2G100
2G102
S1
2G103
2G101
2G101A
STAIR
TOILET
FIRE PUMP
ROOM
MECHANICAL
ROOM
BOILER
ROOM
GRAPHICS/
BOILER
CONTROL
STAIR
ELEVATOR
DOWN UP
UP
DOWN
UP
C H
R
CWTT CWTT
24"DIA.
"D
IA
24"DIA. 24"DIA.24"DIA.
12"DIA.
4"DIA.
12"DIA.
1-1/2"
C W
R C
W S
24"DIA.
FILTER
12" DIA.
"D
IA
3/4"
D
IA
"D
IA
24"DIA. 24"DIA.
"D
IA
12" DIA.
24"DIA.24"DIA.
"D
IA
1"
D
FINISHED WALL AND SPILL
STUB PIPE 1" OUT OF
1" AUXILIARY DRAIN PIPE
DN
1/2" HW
BRINE
TANK
WATER SOFTENER
FEED SYSTEM
CT CHEMICAL
POT FEEDER
1"
3/4"
3/4"
3/4"
1"
BOILER
BREECHING
BDT
UP&DN
14" DIA. CWFT
EQUIP
PAD
BD SEP. VENT
CONNECT TO EXISTING
INCINERATOR PIPING SYSTEM
1.5" BD
1 1/2"
1" FOR-B
1" FOR-B DN
2" FOS-B DN
2" FOO-B DN
FOS-B
"D
IA
C
W T
T
BDT-1
24"DIA. CWTT
"D
IA
C
W T
T
TUBE
PULL
TUBE
PULL
IN
OUT
IN
OUT
LOW
HIGH
IN
OUT
LOW
HIGH
IN
OUT
LOW
HIGH
IN
OUT
IN
OUT
BOILER
CHEMICAL
FEED
SYSTEM
A B D E F
1 1
2 2
3 3
4 4
.2
.5
(E)11-2-CHILLER 1
(E)11-2-CHILLER 2
(E)11-2-CHILLER 3
(E)11-2-CHWP1
(E)11-2-CHWP2
(E)11-2-CHWP3
(E)11-2-CHWP4
14" DIA. CWTT UP
CONTROL PANEL
M401
M401
M401
M401
M401
M401
(E )1
1- 2-
C W
P -5
B
(E )1
1- 2-
C W
P -5
A
(E )1
1- 2-
C W
P -6
A
(E )1
1- 2-
C W
P -6
B
(E )1
1- 2-
C W
P -7
A
(E )1
1- 2-
C W
P -7
B
(E )1
1- 2-
C W
P -8
A
(E )1
1- 2-
C W
P -8
B
(E )4
4- 2-
C W
P -9
A
(E )4
4- 2-
C W
P -9
B
(E )4
4- 2-
C W
P -1
0A
(E )4
4- 2-
C W
P -1
0B
(E )4
4- 2-
C W
T P
-4
(E )4
4- 2-
C W
T P
-3
(E )4
4- 2-
C W
T P
-2
(E )4
4- 2-
C W
T P
-1
2 TYP 2 TYP 2 TYP 2 TYP
(ON ALL
VERTICAL PIPE)
11-2-FCU4
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
SECOND FLOOR MECHANICAL
PIPING DEMOLITION PLAN
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MDP102
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
3/16" = 1'-0"MDP102
1 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN
0 4' 8' 12'
MDP102 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 REMOVE HSC PUMP, SUCTION DIFFUSER, AND ISOLATION BASE.
CONTRACTOR TO REUSE EXISTING HYDRONIC COMPONENTS SUCH AS
ISOLATION VALVES AND STRAINERS. EXERCISE ISOLATION VALVES AND
CLEAN STRAINERS BEFORE BEGINNING WORK. NOTIFY COR OF ANY
CONCERNS. PREPARE FOR NEW WORK.
2 REMOVE ES PUMP, SUCTION DIFFUSER, HYDRONIC SPECIALTIES SUCH
AS ISOLATION VALVES AND STRAINERS, AND ISOLATION BASE. ALL
HYDRONIC COMPONENTS SHALL BE REPLACED. CONTRACTOR SHALL
UTILIZE PIPE FREEZING TECHNIQUES TO ISOLATE EACH PUMP BEFORE
REMOVING VALVES. SEE PIPE FREEZE NOTES ON SHEET M001. PREPARE
FOR NEW WORK.
3 CONTRACTOR SHALL REMOVE ALL CORROSION, PRIME, AND PAINT ON
CONDENSER WATER PIPE. THE HATCHED AREAS ARE KNOWN SPOTS
FOR CORROSION. CONTRACTOR SHALL INSPECT ALL CONDENSER
WATER PIPING FOR CORROSION BEFORE PAINTING.
MDP102 GENERAL NOTES
NOTE
NUMBER NOTE TEXT
A CONTRACTOR SHALL PRIME AND PAINT ALL CONDENSER WATER PIPING
TO TOWER AND FROM TOWER (CWTT – CONDENSING WATER TO TOWER
AND CWFT – CONDENSING WATER FROM TOWER). REFER TO
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
STAIR
3G102
COMMUNICATIONS
ROOM3G100
SWITCHGEAR
ROOM
3G103
TRANSFORMER
ROOM
STAIR
STAIR
3G104
TRANSFORMER
ROOM
3G101
TRANSFORMER
ROOM
DOWN
UP
UP
DOWN
UP
UP
2" FOO-G
UP
2" FOO-G
2" FOO-G DN
UP
2" FOO-G
UP
2" FOO-G
UP
2" FOO-G
UP&DN
1" FOR-G
UP&DN
2" FOS-G
UP
2" FOO-G
2"2"
2"
1"
UP&DN
14"∅ CWFT
14"∅ CWTT
UP&DN
11-3-FCU6
DOWN
STACK UP &
30" BOILER
A B D E F
1 1
2 2
3 3
4 4
.2
.5
AHU
(E) 3" CHS
(E) 3" CHR
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
THIRD FLOOR MECHANICAL PIPING
DEMOLITION PLAN
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MDP103
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
MDP103 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL REMOVE EXISTING CHILLED WATER SUPPLY AND
RETURN PIPING TO THE APPROXIMATE LIMITS.
2 CONTRACTOR SHALL REMOVE EXISTING AIR HANDLING UNIT.
3/16" = 1'-0"MDP103
1 THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN
0 4' 8' 12'
6" RD
6" RD
UP
UP STAIR
ELEVATOR
PLENUM
STAIR
GENERATOR
ROOM
GENERATOR
ROOM
S1
4G102
4G101
4G100
1"
MUSHROOM VENT CAP
14"∅ CWFT
DN
2"1"
DN
2" FOO-G
1"
VENT UP THRU ROOF,
TERMINATE WITH
MUSHROOM VENT CAP
2" FOO-G DN
2"
2"
1"
2"
1"
2"
2"
FILTER
DN
2" FOO-G
DN
2" FOO-G
2" FOO-G DN 2" FOO-G DN
1"
2"
1"
2"
1"
2"
VALVE
CONTROL
FLOW
VALVE
CONTROL
2-WAY
(TYPICAL)
10" SHUT-OFF VALVE
14"∅ CWTT DOWN
(TYPICAL)
10" SHUT-OFF VALVE
1"
1"
1"
1"
1"
1"
A B D E F
1 1
2 2
3 3
4 4
.2
.5
1 1
(ON ALL
VERTICAL PIPE)
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
FOURTH FLOOR MECHANICAL
PIPING DEMOLITION PLAN
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MDP104
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
3/16" = 1'-0"MDP104
1 FOURTH FLOOR MECHANICAL PIPING DEMOLITION PLAN
0 4' 8' 12'
MDP104 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL REMOVE ALL CORROSION, PRIME, AND PAINT ON
CONDENSER PIPE. THE HATCHED AREAS ARE KNOWN SPOTS FOR
CORROSION
MDP104 GENERAL NOTES
NOTE
NUMBER NOTE TEXT
A CONTRACTOR SHALL PRIME AND PAINT ALL CONDENSER WATER PIPING
TO TOWER AND FROM TOWER (CWTT – CONDENSING WATER TO TOWER
AND CWFT – CONDENSING WATER FROM TOWER). REFER TO
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5000 CFM
8"x6"
"x
(E) 12x8
500 CFM
EXHAUST
(E) 8X6
100 CFM
(E) 8x6
75 CFM EXH.
(E) 18x10
420 CFM
(TYP OF 5)
(E) 12x8
500 CFM
24x24
LOUVER
(E) 48x30
1,980 CFM
24x24
135 CFM
(TYP OF 2)
24x6
190 CFM
FUEL TANK
FUEL TANK
FUEL TANK
STAIR
SUMP
STOR.
ELEV
EQUIP
MECH
ROOM
MEETING/
OFFICE
ELEVATOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
ENTRANCE
JANITOR
CLOSET
STAIR
FP&L SW &
METERING
ROOM
STORAGE
1G108
1G103
1G100
1G104
1G105
S-1
C1-1
C1-2
C1-3
C1-4
C1-5
C1-6
1G106
1G103A
1G107
1G101
UP
UP
T
T T
T
A B
D E F
1 1
2 2
3 3
4 4
.2
.5
44-1-EF-1
44-1-FCU-2 44-1-FCU-1
M
44-1-FCU-3
M
6"x6" O/A
M 7 8M
44-1-FCU-3
-1
-E F
-1
-1 -F
C U
-2
-1
-F C
U -1
12"x12" S/A
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
FIRST FLOOR HVAC PLAN - NEW
WORK
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MH101
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
3/16" = 1'-0"MH101
1 FIRST FLOOR HVAC PLAN -NEW WORK
MH101 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL INSTALL NEW EXHAUST FAN 44-1-EF-1 AND
CONNECT TO EXISTING DUCTWORK. INSTALL NEW MOTORIZED
DAMPER AT EXISTING LOUVER. INSTALL NEW CONTROLS AND
CONTROL WIRING.
2 CONTRACTOR SHALL INSTALL NEW FAN COIL UNIT 44-1-FCU-3 WITH
AUXILIARY PAN AND MOISTURE SENSOR AND CONNECT TO
EXISTING DUCTWORK. INSTALL NEW CONTROLS AND CONTROL
WIRING. FAN COIL UNIT 44-1-FCU-3 SHALL BE CONTROLLED BY
THERMOSTAT SHOWN.
3 CONTRACTOR SHALL INSTALL NEW FAN COIL UNIT 44-1-FCU-2 WITH
AUXILIARY PAN AND MOISTURE SENSOR AND CONNECT TO
EXISTING DUCTWORK. INSTALL NEW CONTROLS AND CONTROL
WIRING. FAN COIL UNIT 44-1-FCU-2 SHALL BE CONTROLLED BY
THERMOSTAT SHOWN.
4 CONTRACTOR SHALL INSTALL NEW FAN COIL UNIT 44-1-FCU-1 WITH
AUXILIARY PAN AND MOISTURE SENSOR AND CONNECT TO
EXISTING DUCTWORK. INSTALL NEW CONTROLS AND CONTROL
WIRING. FAN COIL UNIT 44-1-FCU-1 SHALL BE CONTROLLED BY
THERMOSTAT SHOWN.
5 CONTRACTOR SHALL REBALANCE THE SYSTEM TO CFM SHOWN.
6 CONTRACTOR SHALL CONNECT EXISTING 24x6 RETURN GRILLE TO NEW 12x12 RETURN DUCT.
7 24x40 LOUVER. INSTALL 20x12 MOTORIZED DAMPER. INTERLOCK
WITH FAN COIL UNIT 44-1-FCU-2 AND EXHAUST FAN 44-1-EF-1.
8 CONTRACTOR SHALL INSTALL NEW 6x12 MOTORIZED DAMPER
BEHIND EXISTING LOUVER. CONTRACTOR SHALL VERIFY EXISTING
DAMPER SIZE. 24x24 LOUVER 6x12 ACTIVE (BLANK-OFF REMAINING
LOUVER).
0 4' 8' 12'
MH101 GENERAL NOTES
NOTE
NUMBER NOTE TEXT
A WHERE INSTALLING NEW FANS UTILIZING EXISTING LOUVERS.
CONTRACTOR SHALL PROVIDE 14 GA SHEET INSULATED
SHEETMETAL PLENUM. WHERE FAN, DUCT, DAMPER DIFFERS IN
SIZE, PROVIDE SHEETMETAL AS REQUIRED FOR INSTALLATION.
B WHERE CEILINGS WERE REMOVED. REINSTALL EXISTING CEILINGS.
WHERE MATERIALS ARE DAMAGED BEYOND REPAIR, REINSTALL TO
MATCH EXISTING.
2G100
2G102
S1
2G103
2G101
2G101A
STAIR
TOILET
FIRE PUMP
ROOM
MECHANICAL
ROOM
BOILER
ROOM
GRAPHICS/
BOILER
CONTROL
STAIR
ELEVATOR
DOWN UP
UP
DOWN
UP
700 CFM
14"x14"
100 CFM EXH
8X6 CR
14"x14"
600 CFM
48X10 TR
24X24 LOUVER
24X24 LOUVER
RS
14"x14"
600 CFM EXH
42X12 BR
UP
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
BOILER STACK
34X34
40x24 LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
CONTROL
PANEL
700 CFM
14"x14"
100 CFM EXH
8X6 CR
14"x14"
600 CFM
48X10 TR
24X24 LOUVER
24X24 LOUVER
RS
14"x14"
600 CFM EXH
42X12 BR
UP
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
BOILER STACK
34X34
40x24 LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
13'-0"H x 18'-10"
W/LOUVER
CONTROL
PANEL
T
T
T
A B D E F
1 1
2 2
3 3
4 4
.2
.5
CONTROL PANEL
44-2-FCU-4
44-2-EF-4 44-2-SF-5
12"x12" R/A
8"Ø A
8"Ø
A
8"Ø A
10"Ø S/A
12"Ø S/A
(HIGH)
(LOW)
M
(HIGH AND LOW)
6" Ø
O /A
12"x12" C
44-2-EF-1
14"x14"
14"x14"
M
44-2-EF-2
44-2-EF-3
M2
44-2-EF-2
AND
44-2-EF-4
44-2-FCU-4
44-2EF-5
(E)VFD-9
(E )V
F D
-8
(E )V
F D
-7
(E )V
F D
-6
(E )V
F D
-5
(E )V
F D
-4
(E )V
F D
-3
(E )V
F D
-2
(E )V
F D
M
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
SECOND FLOOR HVAC PLAN - NEW
WORK
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MH102
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
3/16" = 1'-0"MH102
1 SECOND FLOOR HVAC PLAN - NEW WORK
0 4' 8' 12'
MH102 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL INSTALL NEW WALL MOUNTED EXHAUST FAN
AND GRAVITY DAMPER AT EXISTING LOUVER. INSTALL NEW
CONTROLS AND CONTROL WIRING FOR NEW EXHAUST FANS.
2 CONTRACTOR SHALL INSTALL NEW MOTORIZED DAMPER FULL SIZE
OF DUCT OR LOUVER AS INDICATED. CONTRACTOR SHALL VERIFY
EXISTING SIZES.
3 CONTRACTOR SHALL INSTALL NEW INLINE EXHAUST FAN. INSTALL
NEW CONTROLS AND CONTROL WIRING.
4 CONTRACTOR SHALL INSTALL NEW FAN COIL UNIT 44-2-FCU-4 WITH
AUXILIARY PAN AND MOISTURE SENSOR AND INSTALL NEW DUCT
AND GRILLES WITH NEW CONTROLS AND CONTROL WIRING.
5 CONTRACTOR SHALL TIE NEW FAN (44-2EF-3) INTO EXISTING
REFRIGERANT MONITORING SYSTEM.
6 START VENTILATION FAN(S) 44-2-EF-2 AND 44-2-EF-4 TO MAINTAIN
85°F SPACE TEMPERATURE. WHEN SPACE TEMPERATURE DROPS
BELOW 80°F, STOP FAN.
6 THERMOSTAT CONTROLS 2 FANS.
MH102 GENERAL NOTES
NOTE
NUMBER NOTE TEXT
A WHERE INSTALLING NEW FANS UTILIZING EXISTING LOUVERS.
CONTRACTOR SHALL PROVIDE 14 GA SHEET INSULATED
SHEETMETAL PLENUM. WHERE FAN, DUCT, DAMPER DIFFERS IN
SIZE, PROVIDE SHEETMETAL AS REQUIRED FOR INSTALLATION.
B WHERE CEILINGS WERE REMOVED. REINSTALL EXISTING CEILINGS.
WHERE MATERIALS ARE DAMAGED BEYOND REPAIR, REINSTALL TO
MATCH EXISTING.
STAIR
3G102
COMMUNICATIONS
ROOM3G100
SWITCHGEAR
ROOM
3G103
TRANSFORMER
ROOM
STAIR
STAIR
3G104
TRANSFORMER
ROOM
3G101
TRANSFORMER
ROOM
DOWN
UP
UP
DOWN
UP
T
T
T
T
T
T
T
T
T
T
T
T
A B D E F
1 1
2 2
3 3
4 4
.2
.5
38"x24" S/A
"x
"x
44-TU-01
18"x10" B
18"x16" S/A
TYP OF 4
18"x10" B
TYP OF 4
18"x16" S/A
44-TU-02
"Ø
S /A
"x
S /A
18"Ø S/A
38"x24" S/A
44-TU-06
18"x10" B
TYP OF 4
16"Ø S/A
"x
S /A
16"Ø S/A 18"x16" S/A
44-TU-08
18"x10" B
TYP OF 4
18"x16" S/A
44-TU-05
16"Ø S/A
18"x10" B
TYP OF 4
18"x16" S/A
44-TU-04
16"Ø S/A
18"x10" B
TYP OF 4
16"Ø S/A
18"x16" S/A
44-TU-07
18"x10" B
TYP OF 4
44-TU-03
18"x16" S/A 16"Ø S/A
18"x10" B
TYP OF 4
12"x12" O/A
44-3-AHU-1
M
44-3-FCU-5
F
44-3-FD-4
44-3-FD-6
44-3-FD-8
F
44-TU-03
44-TU-07
44-TU-08
-3
-F C
U -5
44-TU-06
-T
U -0
-T U
-0
44-TU-04
60"x24"
44-3-FD-3
5 72"x72" F
"x
F
44-3-FD-1
44-3-FD-2
F
44-3-FD-9
F
44-3-FD-5
F
44-3-FD-7
44-TU-05
M502
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
THIRD FLOOR HVAC PLAN - NEW
WORK
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MH103
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
3/16" = 1'-0"MH103
1 THIRD FLOOR HVAC PLAN - NEW WORK
MH103 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 CONSTRACTOR SHALL INSTALL NEW AIR HANDLING UNIT
44-3-AHU-1.
2 CONSTRACTOR SHALL INSTALL NEW DUCTWORK AND GRILLES
3 CONTRACTOR TO INSTALL NEW MOTORIZED DAMPER BEHIND
EXISTING LOUVER. CONTRACTOR SHALL VERIFY EXISTING DAMPER
SIZE.
4 CONTRACTOR SHALL INSTALL NEW FAN COIL UNIT 44-3-FCU-5 WITH
AUXILIARY PAN AND MOISTURE SENSOR. INSTALL NEW CONTROLS
AND CONTROL WIRING. FAN COIL UNIT 44-3-FCU-5 SHALL BE
CONTROLLED BY THERMOSTAT SHOWN. FAN SHALL START AND
CHILLED WATER VALVE TO UNIT SHALL OPEN ON A RISE IN SPACE
TEMPERATURE ABOVE 85 F ADJUSTABLE. STOP FAN AND CLOSE
CONTROL VALVE WHEN SPACE TEMPERATURE DROPS BELOW 80 F
ADJUSTABLE.
5 CONTRACTOR TO INSTALL TOP ELEVATION OF FIRE DAMPER TO
BOTTOM OF STRUCTURE.
0 4' 8' 12'
LOUVER
96x136
60x120 LOUVER
(TYPICAL OF 3)
60x120
LOUVER (TYP.
OF 6)
AIRFLOW DIVERTING PANEL
BDD BDD BDD
BDDBDDBDD
AIRFLOW DIVERTING PANEL
18" GENERATOR EXHAUST
UP THRU ROOF (TYP)
M
6" RD
6" RD
6" RD
UP
UP STAIR
ELEVATOR
PLENUM
STAIR
GENERATOR
ROOM
GENERATOR
ROOM
S1
4G102
4G101
4G100
T
T
A B D E F
1 1
2 2
3 3
4 4
.2
.5
44-4-EF-7
44-4-EF-7
44-4-EF-6
44-4-EF-6
AMBMICU
TOWER
8 7
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
N.T.S.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
PROJECT AREA
FOURTH FLOOR HVAC PLAN - NEW
WORK
UPGRADE HVAC SYSTEM IN
THE UTILITY PLANT BUILDING
VA MIAMI, FL
MH104
546-21-110
JMK JSW/RCP03-03-2023
BID DOCUMENTS
3/16" = 1'-0"MH104
1 FOURTH FLOOR HVAC PLAN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .