S02 - Attachment - 8 DRAWINGS Part 1 -546-21-110 Upgrade HVAC System in the Utility Plant Building 44 - Copy.pdf

PDF 5 MB Posted

Attached to
Upgrade HVAC System in the Utility Plant Building 44
Solicitation number
36C24823R0123
Issued by

About this file

This solicitation is for an upgrade to the HVAC system in Building 44 at the Miami VA Medical Center. Key details include upgrading the HVAC system serving the utility plant building to address deficiencies. Site visits will be held on April 24, 2023 and RFIs are due by May 1, 2023. The project is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The solicitation provides relevant project information and dates for interested contractors to obtain additional details on the opportunity.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT

LOCATION

TRUE

NORTH

TRUE

NORTH

PROJECT

LOCATION

INDEX OF DRAWINGS

G001

SHEET

NO.

GENERAL

COVER SHEET

DRAWING

TITLE

MECHANICAL

M001 MECHANICAL GENERAL NOTES, ABBREVIATIONS, AND LEGENDS

MDH101 FIRST FLOOR HVAC DEMOLITION PLAN

M502 MECHANICAL DETAILS

M601 MECHANICAL SCHEDULES

SECOND FLOOR HVAC DEMOLITION PLAN

THIRD FLOOR HVAC DEMOLITION PLAN

FOURTH FLOOR HVAC DEMOLITION PLAN

MDH102

MDH103

MDH104

MDP101

MDP102

MDP103

FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN

MDP104

SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN

THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN

FOURTH FLOOR MECHANICAL PIPING DEMOLITION PLAN

MH101 FIRST FLOOR HVAC PLAN - NEW WORK

SECOND FLOOR HVAC PLAN - NEW WORK

THIRD FLOOR HVAC PLAN - NEW WORK

FOURTH FLOOR HVAC PLAN - NEW WORK

MH102

MH103

MH104

FIRST FLOOR MECHANICAL PIPING PLAN - NEW WORK

SECOND FLOOR MECHANICAL PIPING PLAN - NEW WORK

THIRD FLOOR MECHANICAL PIPING PLAN - NEW WORK

FOURTH FLOOR MECHANICAL PIPING PLAN - NEW WORK

MP101

MP102

MP103

MP104

M401 ENLARGED MECHANICAL PIPING PLANS

M501 HYDRONIC DETAILS

M801 CONTROLS AND SCHEMATICS - MECHANICAL

ELECTRICAL

E001 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS

E002 ELECTRICAL LEGEND

ELECTRICAL FIRST FLOOR HVAC DEMOLITION PLAN

ELECTRICAL SECOND FLOOR HVAC DEMOLITION PLAN

ELECTRICAL THIRD FLOOR HVAC DEMOLITION PLAN

ED101

ED102

ED103

ED104

ED105

ED106

ELECTRICAL FOURTH FLOOR HVAC DEMOLITION PLAN

ELECTRICAL FIRST FLOOR PIPING DEMOLITION PLAN

ELECTRICAL SECOND FLOOR PIPING DEMOLITION PLAN

E101 ELECTRICAL FIRST FLOOR HVAC POWER PLAN

ELECTRICAL SECOND FLOOR HVAC POWER PLAN

ELECTRICAL THIRD FLOOR HVAC POWER PLAN

ELECTRICAL FOURTH FLOOR HVAC POWER PLAN

E102

E103

E104

ELECTRICAL SECOND FLOOR PIPING POWER PLAN

ELECTRICAL DETAILS

E105

E501

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

COVER SHEET UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

G001

546-21-110

JMK JSW/RCP

BID DOCUMENTS

03-03-2023

UPGRADE HVAC SYSTEM IN THE

UTILITY PLANT BUILDING 44

MIAMI VETERANS HEALTH CARE SYSTEM

1201 NORTH WEST , MIAMI, FL 33125

PROJECT NO. 546-21-110

AREA MAP

NOT TO SCALE

LOCATION MAP

NOT TO SCALE

BID DOCUMENTS

jwilliamson Snapshot

H

CO2

CO

HS

NO2

S

TH

TS

T

MS

2"

4"

4"

PIPE RISE

PIPE DROP

PIPE TEE REDUCING 45

DEGREE TEE

45 DEGREE TEE

2" DOM. WM

PIPE ACCESSORY TAGS

DOMESTIC WATER

METER

BALANCING VALVE

1/4 TURN BALL VALVE

CHECK VALVE

3-WAY MIXING VALVE

MOTORIZED CONTROL

VALVE

3 WAY MOTORIZED

CONTROL VALVE

PRESSURE REDUCING

VALVE

REFRIGERANT SOLENOID

VALVE

BUTTERFLY VALVE

2"

BALANCING

2" SHUTOFF

2" CHECK

2" TMV

2" M-CNTRL

2" 3-WAY

CNTRL

2" PRV

3/8"

SOLENOID

2"

BUTTERFLY

CAP

PLUG

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL

OTHER DRAWINGS IN THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN

ON THIS SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.

F

S

M

B

D

C

48"x2 1/2"

LINEAR BAR

GRILLE

RTU-XX

VAV-XX

EQUIPMENT

TAG

EQUIPMENT TAG

VAV BOX

ROOFTOP UNIT

MANUAL BALANCING

DAMPER

BACKDRAFT DAMPER

COMBINATION

FIRE/SMOKE

DAMPER

FIRE DAMPER

SMOKE DAMPER

MOTORIZED DAMPER

CHS

CD

MPS

CR

CS

HWR

HWS

LPS

CHR

CHILLED WATER

RETURN

CHILLED WATER

SUPPLY

CONDENSATE

DRAINAGE

MEDIUM PRESSURE

STEAM

CONDENSER WATER

RETURN

CONDENSER WATER

SUPPLY

HEATING WATER

RETURN

HEATING WATER

SUPPLY

LOW PRESSURE

STEAM

LPSR

LOW PRESSURE

STEAM RETURN

MPSR

PCD

CDR

MEDIUM PRESSURE

STEAM RETURN

PUMP CONDENSATE

DISCHARGE

CONDENSATE

RETURN

A. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS,

BOTH EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS, AS

WELL AS THOSE WHICH CAN BE REASONABLY ANTICIPATED

INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,

PLUMBING, FIRE PROTECTION, AND OTHER SYSTEMS INVOLVED ON

THIS PROJECT.

B. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM

AND SHALL CONFORM TO ALL CURRENT REQUIREMENTS FOUND IN

THE UNITED STATES DEPARTMENT OF VETERANS AFFAIRS TECHNICAL

INFORMATION LIBRARY, INCLUDING BUT NOT LIMITED TO THE

PHYSICAL SECURITY MANUAL, HVAC DESIGN MANUAL, AND STEAM,

HEATING HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEM DESIGN

MANUAL. ALL WORK SHALL ALSO CONFORM TO ALL FEDERAL, STATE,

AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO THE

INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL

CODE.

C. INSTALL ALL EQUIPMENT AND DEVICES IN ACCORDANCE WITH THEIR

RESPECTIVE MANUFACTURER’S INSTALLATION INSTRUCTIONS AT A

LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH THESE

DOCUMENTS. ANY DEVIATIONS BETWEEN THE INSTALLATION

INSTRUCTIONS AND THESE DOCUMENTS WILL BE BROUGHT TO THE

ATTENTION TO THE COR BEFORE ANY COURSE OF ACTION BY THE

CONTRACTOR IS INITIATED, INCLUDING PURCHASE OF EQUIPMENT.

D. CONTRACTOR SHALL COORDINATE ALL WORK DESCRIBED AND

ILLUSTRATED IN THESE DRAWINGS. LOCATIONS OF PIPING,

DUCTWORK AND EQUIPMENT AS INDICATED ON THESE DRAWINGS ARE

APPROXIMATE AND SUBJECT TO ADJUSTMENTS IN THE FIELD. OFFSET

DUCTS, PIPING, AND SHIFT EQUIPMENT AS REQUIRED TO AVOID

INTERFERENCE AND CONFLICTS IN THE FIELD. COORDINATE DUCT

AND PIPE ROUTING AND EQUIPMENT LOCATIONS WITH PLUMBING AND

ELECTRICAL INSTALLATIONS AND WITH BUILDING STRUCTURAL

MEMBERS.

E. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE

NOT TO BE SCALED. BEFORE BEGINNING WORK, THE CONTRACTOR

SHALL VISIT THE SITE AND COMPLETE MEASURED SURVEY AND

CREATE LAYOUT DRAWINGS AS REQUIRED BY THE

SPECIFICATIONS. WORK SHALL NOT BEGIN UNTIL ALL LAYOUT

DRAWINGS ARE APPROVED BY THE COR.

F. COORDINATE LOCATIONS OF CEILING REGISTERS AND DIFFUSERS

WITH LIGHTING, CEILING GRID, AND OTHER CEILING MOUNTED

DEVICES.

G. DUCT SIZES INDICATED ARE MINIMUM CLEAR INSIDE DIMENSIONS.

WHERE DUCT LINER OCCURS, INCREASE SHEET METAL DUCT SIZES TO

ACCOMMODATE LINER.

H. DUCT AND PIPE SUPPORTS ARE NOT SHOWN ON DRAWINGS.

I. SUPPORT ALL DUCTS, PIPING, AND EQUIPMENT FROM PRIMARY

BUILDING STRUCTURAL MEMBERS. PROVIDE ADDITIONAL STRUCTURAL

MEMBERS WHERE NECESSARY TO ACCOMPLISH THIS REQUIREMENT.

J. NEW AND EXISTING SUPPORT, RODS, AND ASSOCIATED

APPURTENANCES SHALL NOT RESTRICT EQUIPMENT SERVICE AND

MAINTENANCE ACCESS. EXISTING SUPPORTS SHALL BE MODIFIED TO

PROVIDE FOR EQUIPMENT SERVICE AND MAINTENANCE ACCESS.

K. DUCT HANGERS SHALL BE IN STRICT ACCORDANCE WITH FIG 4-4 OF

SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND

FLEXIBLE - SECOND EDITION EXCEPT THAT HANGER WIRE SHALL NOT

BE USED TO SUPPORT DUCTS OR EQUIPMENT, AND HANGERS THAT

REQUIRE PENETRATION OF DUCT WITH BOLTS, RIVETS, SCREWS,

WIRES OR ANY OTHER FASTENER SHALL NOT BE USED.

L. CONTRACTOR SHALL REWORK EXISTING HANGERS AND OTHER

SUPPORT FOR DUCT AND PIPING TO COORDINATE WITH NEW

EQUIPMENT AND WALL LOCATIONS. ADD SUPPORT (TRAPEZE, CLEVIS,

ETC) AT EQUIPMENT AND ON EACH SIDE OF NEW WALLS SO FULL

WEIGHT OF DUCT AND PIPING IS SUPPORTED FROM STRUCTURE AND

EQUIPMENT AND NEW WALLS BEAR NO WEIGHT.

M. CONTRACTOR SHALL PROVIDE A LIST OF ALL MECHANICAL

EQUIPMENT, DEVICES, AND ALL APPURTENANCES REQUIRING POWER

TO THE COR FOR REVIEW AND APPROVAL AS PART OF COORDINATION

FOR THIS PROJECT. LIST ALL ELECTRICAL REQUIREMENT

CHARACTERISTICS, INCLUDING BUT NOT LIMITED TO VOLTAGE,

AMPERAGE, PHASE, DISCONNECTING MEANS, OVER CURRENT

PROTECTION AND ALL CHARACTERISTICS FOR A FULLY FUNCTIONAL

AND COORDINATED SYSTEM. REFER TO ELECTRICAL DRAWINGS FOR

VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.

N. DO NOT USE SCHEDULED EQUIPMENT IDENTIFICATION NUMBERS

SHOWN ON DRAWINGS FOR FINAL EQUIPMENT SIGNS AND FOR

CONTROL SYSTEM SCHEMATICS. CONTACT COR AND OBTAIN FROM

REFRIGERATION AND HVAC MAINTENANCE SUPERVISOR THE

CORRECT NOMENCLATURE AND EQUIPMENT NUMBERS FOR

INCLUSION IN SIGNAGE, CONTROL SCHEMATICS, AND AS-BUILT

DRAWINGS.

O. CONTROL DEVICES ASSOCIATED WITH THE WORK OF THIS PROJECT

SHALL BE RELOCATED AS NECESSARY SO THAT THE FINAL PRODUCT

RESULTS IN A FULLY FUNCTIONAL AND FULLY ACCESSIBLE SYSTEM.

CONTRACTOR SHALL RELOCATE ALL EXISTING CONTROLS, SENSORS,

PROBES, OR OTHER DEVICES AND PROVIDE NEW WIRING, CONDUIT,

AND/OR TUBING TO EXTEND SUCH DEVICES AS NECESSARY TO

PRODUCE A FULLY FUNCTIONAL SYSTEM EQUAL OR BETTER THAN

EXISTING. PROTECT AND STORE ALL SUCH RELOCATED DEVICES.

GENERAL MECHANICAL NOTES

A. CONTRACTOR SHALL PHASE ALL WORK AS REQUIRED TO MAINTAIN

CONTINUOUS OPERATION OF THE HOSPITAL.

B. HOSPITAL OPERATIONS SHALL NOT BE INTERRUPTED DUE TO THE

WORK OF THIS PROJECT EXCEPT FOR SCHEDULED SHUTDOWNS OF

NO LONGER THAN ONE HOUR. CONTRACTOR SHALL GIVE

REASONABLE NOTICE TO COR BEFORE ANY SUCH SHUTDOWN OR

INTERRUPTION.

C. WHERE LONGER SHUTDOWNS ARE REQUIRED TO COMPLETE THE

WORK DESCRIBED IN THIS DOCUMENT, THE CONTRACTOR SHALL

SCHEDULE THE EVENT A MINIMUM OF 3 WEEKS PRIOR TO

COMMENCING WORK. ALL SUCH SHUTDOWNS AND INTERRUPTIONS

SHALL BE MINIMIZED AND SHALL UTILIZE WEEKENDS, FEDERAL

HOLIDAYS, NIGHTS, AND OTHER TIMES WHEN HOSPITAL OPERATIONS

ARE MINIMIZED AND OTHER SUCH TIMES AGREEABLE TO THE COR.

D. WHERE NECESSARY TO INTERRUPT CONTINUOUS OPERATION OF THE

HOSPITAL, THE CONTRACTOR SHALL DIVIDE WORK INTO PHASED

CONSTRUCTION THAT IS NOT NECESSARILY SHOWN ON THESE

DOCUMENTS. AS PART OF SCHEDULING AN INTERRUPTION OR

SHUTDOWN, THE CONTRACTOR SHALL PROVIDE THE COR WITH A

DETAILED SHUTDOWN PLAN INDICATING THE SYSTEMS AFFECTED,

INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,

MECHANICAL, PLUMBING, FIRE PROTECTION, AND OTHER SYSTEMS

INVOLVED. THE PLAN SHALL INCLUDE THE WORK TO BE PERFORMED,

THE LENGTH OF INTERRUPTION, AND A DETAILED PHASING AND

MANNING DESCRIPTION. THE PLAN SHALL INCLUDE AND ADDRESS

CONTINGENCY FOR MITIGATING ANY DELAYS THAT MAY OCCUR IN THE

PLANNED WORK. PROVIDE THIS PLAN TO THE COR 5 WEEKS BEFORE

THE EVENT FOR APPROVAL.

A. THE TEST AND BALANCE CONTRACTOR SHALL BE A SUBCONTRACTOR

TO THE PRIME CONTRACTOR AND NOT A SUBCONTRACTOR TO THE

MECHANICAL OR ANY OTHER SUBCONTRACTOR.

PHASING MECHANICAL NOTES

TEST AND BALANCE MECHANICAL NOTES

PIPING SYMBOLSHVAC SYMBOLS

CONTINUATION SYMBOL

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

GENERAL MECHANICAL SYMBOLS

ROOM NAME AND NUMBER

LIMIT OF DEMOLITION

Ref

(E)

2"

1/8" / 12" SLOPE

PIPE SIZE TAG (DIAMETER)

BELOW GROUND PIPING

EXISTING PIPE TAG

PIPING BEING DEMOLISHED

INVERT: -105' - 1" PIPE INVERT ELEVATION TAG

PIPE SLOPE TAG

NEW WORK NOTES

DEMOLISHED WORK NOTES

CONNECT NEW DUCT TO EXISTING DUCT

ACCESS DOOR ON TOP OF DUCT

ACCESS DOOR ON SIDE OF DUCT

ACCESS DOOR ON BOTTOM OF DUCT

Room

AREA NOT IN CONTRACT

SHEET NOMENCLATURE

M P # # #

SHEET

NUMBER

SERIES

MECHANICAL

(H) HVAC

(P) PIPING

(D) DEMO

SERIES

0 - SYMBOLS AND NOTES

1 - PLAN VIEWS

3 - ELEVATIONS AND SECTIONS

4 - LARGE SCALE - PLANS AND SECTIONS

5 - SCHEMATICS AND DETAILS

6 - SCHEDULES

8 - CONTROLS

16"x8"

16"/8"

16"Ø

EXISTING DUCT TAG

OVAL DUCT SIZE TAG (WIDTH / HEIGHT)

SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)

RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE

RECTANGULAR RETURN/TRANSFER AIR DUCT RISE

ROUND DUCT SIZE TAG (DIAMETER)

DUCT BEING DEMOLISHED

ROUND SUPPLY/OUTSIDE AIR DUCT RISE

ROUND RETURN/TRANSFER AIR DUCT RISE

RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE

ROUND EXHAUST/RELIEF AIR DUCT RISE

DROP

DROP

DROP

DROP

DROP

DROP

(E)16"Ø

3-CONE

DIFFUSER

CFM

NECK SIZE

TYPE (SEE SCHEDULE)

EGGCRATE

RETURN GRILLE

10"x10"

CFM

NECK SIZE

TYPE (SEE SCHEDULE)

10"Ø

SD1

EQUIPMENT ID

SYMBOL

TYPE (SEE SCHEDULE)

CFM

ACTIVE SLOT LENGTH

(PLENUM LENGTH)

GRILLES, REGISTERS & DIFFUSERS TAG

MECHANICAL EQUIPMENT TAGS

DATA DEVICE TAGS

DAMPER TAGS

ABBREVIATIONS

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

L LITER

L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUEFIED PETROLEUM GAS

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN

(CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND

(OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

Nm NEWTON METER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC &

ATMOSPHERIC ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD

AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD

REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P PUMP

Pa PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER

(SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE)

STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR

CONDITIONER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD RETURN AIR DAMPER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RELAD RELIEF AIR DAMPER

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPRV STEAM PRESSURE REDUCING

VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT

EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING

VALVE

SVS STEAM VENT SILENCER

SW SOFTWATER

SWHX STEAM TO WATER HEAT

EXCHANGER

T&PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

U UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

V VENT

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH

ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

WAG WASTE ANESTHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT

EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFIER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

J INTENTIONALLY LEFT BLANK

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AAV AUTOMATIC AIR VENT

AB AIR BLENDER

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,

TWO POSITION

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

AQST AQUASTAT

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING

REFRIGERATION AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BE BOTTOM ELEVATION

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELSIUS)

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS

(SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS

(SUBMISSION2)

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CR/CWTT CONDENSER WATER RETURN (TO

COOLING TOWER)

CS/CWFT CONDENSER WATER SUPPLY (FROM

COOLING TOWER)

D DAMPER - AUTOMATIC

Db DRY-BULB TEMPERATURE

DB DECIBELS

DCW DOMESTIC COLD WATER

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

A. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM

THE PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS,

ELECTRICAL CONDUIT, WIRING, JUNCTION BOXES, PIPING, CONTROLS,

ACCESSORIES AND ALL APPURTENANCES THAT ARE RENDERED

USELESS OR ABANDONED BY THE REMOVAL OF THE INDICATED

EQUIPMENT.

B. WHERE THESE DOCUMENTS REQUIRE REMOVAL OF DUCTWORK,

PIPING, EQUIPMENT OR ASSOCIATED APPURTENANCES, CONTRACTOR

SHALL PROTECT ALL EXISTING-TO-REMAIN COMPONENTS FROM

DAMAGE. CONTRACTOR SHALL COVER ALL OPENINGS IN DUCT,

PIPING, EQUIPMENT, AND ANY OTHER DEVICE FROM CONSTRUCTION

DUST AND DEBRIS.

C. WHERE EQUIPMENT, DUCTWORK, OR PIPING IS TO BE REMOVED THAT

IS IN-SERVICE, CONTRACTOR SHALL GIVE NOTICE TO THE COR OF ANY

INTERRUPTIONS ANTICIPATED. IT IS THE RESPONSIBILITY OF THE

CONTRACTOR TO COORDINATE ALL SHUTDOWNS OR INTERRUPTIONS

TO THE SATISFACTION OF THE COR AND HOSPITAL STAFF.

DEMOLITION MECHANICAL NOTES

HUMIDISTAT

HUMIDITY SENSOR

NITROGEN DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

TEMPERATURE & HUMIDITY

SENSOR

TEMPERATURE SENSOR

THERMOSTAT

MANUAL SWITCH

SENSOR

RTU-XX

VAV-XX

1. AREAS REQUIRING PIPE FREEZING SHALL ADHERE TO THE FOLLOWING

REQUIREMENTS.

1. CONTRACTOR SHALL NOTIFY THE VA COR 2 WEEKS BEFORE

BEGINNING WORK.

2. CONTRACTOR SHALL VERIFY THAT OPERATING CONDITIONS

REQUIRED TO PERFORM A STANDARD LINE FREEZE ARE MET

BEFORE BEGINNING WORK. THIS INCLUDES TEMPERATURE,

PRESSURE, NO-FLOW, PIPE MATERIAL, PIPE WALL THICKNESS, AND

SPACE FOR STANDARD EQUIPMENT AND ADJACENCY TO FITTINGS,

WELDS, AND OTHER PIPING APPURTENANCES THAT WILL BE

AFFECTED OR WILL AFFECT THE FREEZE. TO ENSURE ICE PLUG

INTEGRITY, THE CONTRACTOR SHALL ENSURE THAT NO-FLOW

CONDITIONS EXIST WITHIN 15 PIPE DIAMETERS FROM THE PLUG.

THIS INCLUDES NO-FLOW IN HEADERS WITHIN THAT DISTANCE

FROM PLUG.

3. BEFORE BEGINNING WORK, THE GENERAL CONDITION OF THE PIPE

SHOULD BE EVALUATED AND CHECKED FOR WALL THINNING,

PITTING, GOUGES, BLISTERS, AND LAMINATIONS. IF THERE ARE

ANY CRACKS THE FREEZE SHALL NOT TAKE PLACE.

4. PIPE FREEZE SHALL BEGIN WHEN THE CONTRACTOR VERIFIES A

‘NO FLOW’ CONDITION IN THE PIPING. CONTRACTOR IS

RESPONSIBLE FOR VERIFICATION AND SHALL NOTIFY VA COR

WHEN CONFIRMED.

5. IF A FREEZE POINT SHALL BE LOCATED WITHIN 20 PIPE DIAMETERS

OF A CLOSED END, (WELDED CAP, OR ANY END THAT CANNOT BE

MADE TO RELIEVE PRESSURE) THE CONTRACTOR SHALL PROVIDE

FOR A MEANS TO MONITOR AND RELIEVE PRESSURE DUE TO

FREEZING. COORDINATE WITH COR ANY AND ALL MONITOR AND

PRESSURE RELIEF METHODS.

6. FREEZE POINT SHALL BE NO LESS THAN 6" FROM A BUTTWELD OR

NON-SEAM WELD. IF THE JACKET IS CLOSER TO A WELD, THE

CONTRACTOR SHALL VISUALLY INSPECT ANY WELDS FOR

DEFECTS SUCH AS PITTING, BEFORE AND AFTER THE FREEZE.

BEFORE FREEZE, NOTIFY THE COR OF ANY SUCH DEFECTS.

7. IF FREEZE POINT TAKES PLACE ON SEAM WELDED PIPING, THE

SEAM SHALL BE VISUALLY INSPECTED BEFORE AND AFTER THE

FREEZE FOR DEFECTS AS NOTED ABOVE. THIS INSPECTION SHALL

EXTEND 4 PIPE DIAMETERS ON BOTH SIDES OF THE FREEZE POINT.

8. PIPE INSULATION SHALL BE REMOVED EQUAL TO THE FREEZE

JACKET LENGTH PLUS 4 PIPE DIAMETERS ON EITHER SIDE.

9. CONTRACTOR SHALL ESTABLISH A FREEZE PLUG FOR EACH

LOCATION BEFORE REMOVING ANY PIPING COMPONENTS.

PIPE FREEZE NOTES

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

MECHANICAL LEGEND,

ABBREVIATIONS, AND NOTES

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

M001

546-21-110

JMK JSW/RCP

BID DOCUMENTS

03-03-2023

5000 CFM

8"x6"

"x

(E) 12x8

500 CFM

EXHAUST

(E) 8X6

100 CFM

(E) 8x6

75 CFM EXH.

(E) 18x10

420 CFM

(TYP OF 5)

(E) 12x8

500 CFM

24x24

LOUVER

(E) 48x30

1,980 CFM

24x24

135 CFM

(TYP OF 2)

24x6

190 CFM

FUEL TANK

FUEL TANK

FUEL TANK

STAIR

SUMP

STOR.

ELEV

EQUIP

MECH

ROOM

MEETING/

OFFICE

ELEVATOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

ENTRANCE

JANITOR

CLOSET

STAIR

FP&L SW &

METERING

ROOM

STORAGE

1G108

1G103

1G100

1G104

1G105

S-1

C1-1

C1-2

C1-3

C1-4

C1-5

C1-6

1G106

1G103A

1G107

1G101

UP

UP

11-1-FCU2

11-1-FCU3

11-1-FCU1

11-1-EF1

6"x6"

80 CFM

B

A B

D E F

1 1

2 2

3 3

4 4

.2

.5

6 6

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

FIRST FLOOR HVAC DEMOLITION

PLAN

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MDH101

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

3/16" = 1'-0"MDH101

1 FIRST FLOOR HVAC DEMOLITION PLAN

# MDH101 DEMOLITION NOTES

NOTE

NUMBER NOTE TEXT

1 REMOVE IN ITS ENTIRETY FAN COIL UNIT 11-1-FCU1 AND ALL

APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.

2 REMOVE IN ITS ENTIRETY FAN COIL UNIT 11-1-FCU2 AND ALL

APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.

3 REMOVE IN ITS ENTIRETY FAN COIL UNIT 11-1-FCU3 AND ALL

APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.

4 REMOVE IN ITS ENTIRETY EXHAUST FAN AND ALL APPURTENANCES

INCLUDING CONTROLS, CONTROL WIRING, AND PNEUMATIC DAMPER.

5 DISCONNECT EXISTING 24x6 RETURN GRILLE CLEAN AND STORE IN SAFE

PLACE TO REINSTALL DURING NEW CONTRACTION PHASE.

6 REMOVE IN ITS ENTIRETY PNEUMATIC DAMPER AND ALL

APPURTENANCES INCLUDING TUBES AND WIRING. PREPARE FOR NEW

MOTORIZED DAMPER. SEE NEW WORK SHEETS.

0 4' 8' 12'

MDH101 GENERAL NOTES

NOTE

NUMBER NOTE TEXT

A WHERE PNEUMATIC HOSES EXIST AND DEVICE IS BEING REMOVED, THE

CONTRACTOR SHALL REMOVE ALL PNEUMATIC TUBES BACK TO THE

SOURCE. PROVIDE SEALED ENDS WHERE DEVICE IS TO REMAIN SO THAT

FUNCTIONALITY OF SUCH DEVICE REMAINS AS CURRENTLY

FUNCTIONING.

WALKWAY

2G100

2G102

S1

2G103

2G101

2G101A

STAIR

TOILET

FIRE PUMP

ROOM

MECHANICAL

ROOM

BOILER

ROOM

GRAPHICS/

CONTROL

STAIR

ELEVATOR

DOWN UP

UP

DOWN

UP

700 CFM

14"x14"

100 CFM EXH

8X6 CR

14"x14"

600 CFM

48X10 TR

24X24 LOUVER

24X24 LOUVER

RS

14"x14"

600 CFM EXH

42X12 BR

UP

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

BOILER STACK

34X34

40x24 LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

CONTROL

PANEL

700 CFM

14"x14"

100 CFM EXH

8X6 CR

14"x14"

600 CFM

48X10 TR

24X24 LOUVER

24X24 LOUVER

RS

14"x14"

600 CFM EXH

42X12 BR

UP

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

BOILER STACK

34X34

40x24 LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

CONTROL

PANEL

(TYP)

FLEX. CONN

11-2-ICF1

11-2-PEF3 11-2-PEF5

MM

11-2-FCU4

8"DIA. CONN.

160 CFM EA.

24X24 CD

M

8X

M

M

A B D E F

1 1

2 2

3 3

.2

.5

CONTROL PANEL

(E) BOILER-1 (E) BOILER-2

ONE FAN

HIGH AND

ONE FAN LOW

(2 FANS)

(E)VFD-9 (E)VFD-8

(E)VFD-7

(E)VFD-6

(E)VFD-5

(E)VFD-4

(E)VFD-3

(E)VFD-2

(E)VFD1

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

SECOND FLOOR HVAC DEMOLITION

PLAN

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MDH102

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

3/16" = 1'-0"MDH102

1 SECOND FLOOR HVAC DEMOLITION PLAN

MDH102 DEMOLITION NOTES

NOTE

NUMBER NOTE TEXT

1 REMOVE IN ITS ENTIRETY WALL FAN, DAMPER AND ALL

APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.

2 CONTRACTOR SHALL REMOVE DAMPER AND ASSOCIATED

APPUTENANCES.

3 REMOVE IN ITS ENTIRETY FAN COIL UNIT, DIFFUSERS, GRILLES AND ALL

APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.

4 REMOVE IN ITS ENTIRETY EXHAUST FAN AND ALL APPURTENANCES

INCLUDING CONTROLS AND CONTROL WIRING.

0 4' 8' 12'

MDH102 GENERAL NOTES

NOTE

NUMBER NOTE TEXT

A WHERE PNEUMATIC HOSES EXIST AND DEVICE IS BEING REMOVED, THE

CONTRACTOR SHALL REMOVE ALL PNEUMATIC TUBES BACK TO THE

SOURCE. PROVIDE SEALED ENDS WHERE DEVICE IS TO REMAIN SO THAT

FUNCTIONALITY OF SUCH DEVICE REMAINS AS CURRENTLY

FUNCTIONING.

B WHERE WORK ABOVE A CEILING REQUIRES REMOVAL OF CEILING,

REMOVE AND STORE EXISTING CEILING FOR REINSTALLATION.

S-1

ELEVATORSTAIR

STAIR

3G102

COMMUNICATIONS

ROOM3G100

SWITCHGEAR

ROOM

3G103

TRANSFORMER

ROOM

STAIR

STAIR

3G104

TRANSFORMER

ROOM

3G101

TRANSFORMER

ROOM

DOWN

UP

UP

DOWN

UP

T

T

T

LOUVER

72x72

LOUVER

72x72

LOUVER

72x72

LOUVER

219x48

219x48

LOUVER

72x48 LOUVER

24X48 ACTIVE &

48x24 BLANK-OFF (BELOW)

LOUVER

72x72

LOUVER

72x72

11-3-PEF711-3-PEF6

11-3-VAF1

32"x24"

36"x24"

CFM

48"x24"

24"x24"

4500 CFM

11-3-FCU6

T

M M

M

B

B

M

M

M

M

M

M

M

M

A B D E F

1 1

2 2

3 3

4 4

OVERHEAD

DOOR

OVERHEAD

DOOR

BROKEN DUCTWORK

.2

.5

AHU

(E)16"x14"

(E )1

4" x1

2"

(E)14"x12"

(E )1

6" x1

4"

(E )1

4" x1

2"

(E )1

4" x1

2"

(E)14"x12"

(E )1

6" x1

4"

6 7

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

THIRD FLOOR HVAC DEMOLITION

PLAN

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MDH103

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

3/16" = 1'-0"MDH103

1 THIRD FLOOR HVAC DEMOLITION PLAN

MDH103 DEMOLITION NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR SHALL REMOVE EXISTING SUPPLY DUCTWORK.

2 CONTRACTOR SHALL REMOVE EXISTING AIR HANDLING UNIT.

3 CONTRACTOR SHALL REMOVE EXISTING INLINE FAN AND ALL ITS

APPURTENANCES. INCLUDING DUCTWORK, CONTROLS, AND ACTUATED

DAMPER.

4 CONTRACTOR SHALL REMOVE EXISTING EXHAUST FAN AND DAMPER.

PROVIDE 14-GAUGE ALUMINUM SHEET METAL TO BLANK OFF LOUVER.

INSTALL 3” RIGID FIBER GLASS INSULATION. ALUMINUM JACKET

CONSTRUCTION SHALL BE WATERTIGHT AND AIRTIGHT.

5 CONTRACTOR SHALL REMOVE DAMPER AND ASSOCIATED

APPURTENANCES.

6 CONTRACTOR SHALL REMOVE EXISTING DAMPER AND ASSOCIATED

APPURTENANCES. PROVIDE 14 GAUGE ALUMINUM SHEET METAL TO

BLANK OFF LOUVER. INSTALL 3” RIGID FIBER GLASS INSULATION.

ALUMINUM JACKET CONSTRUCTION SHALL BE WATERTIGHT AND

AIRTIGHT.

7 CONTRACTOR SHALL REMOVE EXISTING DUCTWORK FROM LOUVER

AND PREPARE FOR NEW WORK.

8 REMOVE IN ITS ENTIRETY FAN COIL UNIT 11-3-FCU6 AND ALL

APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.

9 CONTRACTOR SHALL REMOVE EXISTING LOUVER AND PREPARE FOR

NEW WORK. PROVIDE 14 GAUGE ALUMINUM SHEET METAL TO BLANK

OFF LOUVER NOT BE REUSED. INSTALL 3” RIGID FIBER GLASS

INSULATION. ALUMINUM JACKET CONSTRUCTION SHALL BE

WATERTIGHT AND AIRTIGHT.

0 4' 8' 12'

MDH103 GENERAL NOTES

NOTE

NUMBER NOTE TEXT

A WHERE PNEUMATIC HOSES EXIST AND DEVICE IS BEING REMOVED, THE

CONTRACTOR SHALL REMOVE ALL PNEUMATIC TUBES BACK TO THE

SOURCE. PROVIDE SEALED ENDS WHERE DEVICE IS TO REMAIN SO THAT

FUNCTIONALITY OF SUCH DEVICE REMAINS AS CURRENTLY

FUNCTIONING.

LOUVER

96x136

60x120 LOUVER

(TYPICAL OF 3)

60x120

LOUVER (TYP.

OF 6)

T

AIRFLOW DIVERTING PANEL

BDD BDD BDD

BDDBDDBDD

T

AIRFLOW DIVERTING PANEL

18" GENERATOR EXHAUST

UP THRU ROOF (TYP)

M

6" RD

6" RD

6" RD

UP

UP STAIR

ELEVATOR

PLENUM

STAIR

GENERATOR

ROOM

GENERATOR

ROOM

S1

4G102

4G101

4G100

11-4-PEF9

11-4-PEF8

A B D E F

1 1

2 2

3 3

4 4

.2

.5

5 44

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

FOURTH FLOOR HVAC DEMOLITION

PLAN

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MDH104

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

3/16" = 1'-0"MDH104

1 FOURTH FLOOR HVAC DEMOLITION PLAN

MDH104 DEMOLITION NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR SHALL REMOVE IN ITS ENTIRETY WALL FAN, DAMPER, AND

ALL APPURTENANCES INCLUDING CONTROLS AND CONTROL WIRING.

0 4' 8' 12'

MDH104 GENERAL NOTES

NOTE

NUMBER NOTE TEXT

A WHERE PNEUMATIC HOSES EXIST AND DEVICE IS BEING REMOVED, THE

CONTRACTOR SHALL REMOVE ALL PNEUMATIC TUBES BACK TO THE

SOURCE. PROVIDE SEALED ENDS WHERE DEVICE IS TO REMAIN SO THAT

FUNCTIONALITY OF SUCH DEVICE REMAINS AS CURRENTLY

FUNCTIONING.

STAIR

SUMP

STOR.

ELEV

EQUIP

MECH

ROOM

MEETING/

OFFICE

ELEVATOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

ENTRANCE

JANITOR

CLOSET

STAIR

FP&L SW &

METERING

ROOM

STORAGE

1G108

1G103

1G100

1G104

1G105

S-1

C1-1

C1-2

C1-3

C1-4

C1-5

C1-6

1G106

1G103A

1G107

1G101

UP

UP

VERTICAL TURBINE

PUMP SHAFT

(TYPICAL OF 4)

8" PRIMARY VENT

2" LEVEL INDICATOR

PLUG

2" FOR

4" PUMP

8" SECONDARY VENT

4" PUMP

4" SPARE

2" FOO

G

TO BLDG. 1 INTACT)

(LEAVE LPG CONNECTION

EXISTING LPG TANKS.

1/2" LPG UP FROM

LPG LPG

1/2" UP TO SECOND FLOOR

2" CPD

C P

D C

P D

CPD

2" CONDENSATE DRAIN

FROM CONDENSATE

TRANSFER PUMP IN

MAIN BUILDING.

2" CPD UP TO

SECOND FLOOR.

14" CWFT

W A

T E

R F

LO

W

12" B.O.P. AFF

18"

18"

ANCHOR PIPING

1 1/4"

1 1/4"

C H

C H

C H

R

1 1/2" CHR & CH UP

1 1/4"

LP

G

LP

G

LP

G

1/2"

1/2"

SEDIMENT COLLECTOR

CATCH BASIN/

4"

4" DN TO MANIFOLD

(NC, TYP)

VALVES

B-FLY

AT 2" AFF (TYP OF 6)

LOCATE BTM OF PIPE

4" DIA. MANIFOLD

FROM T.D.S. INDICATOR)

(NC, OPEN VIA SIGNAL

AUTOMATIC VALVE

4" BLOWDOWN DRAIN

2'-10" B.O.P. ABOVE

SUMP FLOOR

WALL SLEEVE W/MODULAR RUBBER LINK

W/STAINLESS BOLTS TYP. OF 14

C OF PIPE

EL.=9'-4.25"

TYP. OF 6

C OF PIPE

EL.=9'-5"

TYP. OF 3

C OF PIPE

EL.=9'-5.62"

TYP. OF 2

C OF PIPE

EL.=9'-6.25"

TYP. OF 1

C OF PIPE

EL.=14'-5.25"

TYP. OF 1

C OF PIPE

EL.=11'-0.25"

G G

3" G

3" G

3" G

4"

EJECTOR

SEWAGE

1" D

SPILL INTO SUMP

1" COND. DRAIN.

24" M.H.

(TYP)

24" M.H.

(TYP)

24" M.H.

(TYP)

24" M.H.

(TYP)

24" M.H.

(TYP)

F O

P -1

A

F O

P -1

B

F O

P -2

A

F O

P -2

B

F O

P -3

A

F O

P -3

B

1" FOR-B

2" FOO-B

2" FOS-G

1" FOR-G

2" FOO-G

2" FOS-B

24" M.H.

(TYP)

24" M.H.

(TYP)

1" FOR-B

2" FOS-B

2" FOO-B

11-1-FCU2

11-1-FCU3

11-1-FCU1

A B

D E F

1 1

2 2

3 3

4 4

.2

.5

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

FIRST FLOOR MECHANICAL PIPING

DEMOLITION PLAN

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MDP101

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

# MDP101 DEMOLITION NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR SHALL REMOVE ALL CORROSION, PRIME, AND PAINT ON

CONDENSER WATER PIPE. THE HATCHED AREAS ARE KNOWN SPOTS

FOR CORROSION. CONTRACTOR SHALL INSPECT ALL CONDENSER

WATER PIPING FOR CORROSION BEFORE PAINTING.

2 CONTRACTOR SHALL REMOVE FAN COIL UNITS; 1, 2, AND 3 AND ITS

APPURTENANCES.

3/16" = 1'-0"MDP101

1 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN

0 4' 8' 12'

MDP101 GENERAL NOTES

NOTE

NUMBER NOTE TEXT

A CONTRACTOR SHALL PRIME AND PAINT ALL CONDENSER WATER PIPING

TO TOWER AND FROM TOWER (CWTT – CONDENSING WATER TO TOWER

AND CWFT – CONDENSING WATER FROM TOWER). REFER TO

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2G100

2G102

S1

2G103

2G101

2G101A

STAIR

TOILET

FIRE PUMP

ROOM

MECHANICAL

ROOM

BOILER

ROOM

GRAPHICS/

BOILER

CONTROL

STAIR

ELEVATOR

DOWN UP

UP

DOWN

UP

C H

R

CWTT CWTT

24"DIA.

"D

IA

24"DIA. 24"DIA.24"DIA.

12"DIA.

4"DIA.

12"DIA.

1-1/2"

C W

R C

W S

24"DIA.

FILTER

12" DIA.

"D

IA

3/4"

D

IA

"D

IA

24"DIA. 24"DIA.

"D

IA

12" DIA.

24"DIA.24"DIA.

"D

IA

1"

D

FINISHED WALL AND SPILL

STUB PIPE 1" OUT OF

1" AUXILIARY DRAIN PIPE

DN

1/2" HW

BRINE

TANK

WATER SOFTENER

FEED SYSTEM

CT CHEMICAL

POT FEEDER

1"

3/4"

3/4"

3/4"

1"

BOILER

BREECHING

BDT

UP&DN

14" DIA. CWFT

EQUIP

PAD

BD SEP. VENT

CONNECT TO EXISTING

INCINERATOR PIPING SYSTEM

1.5" BD

1 1/2"

1" FOR-B

1" FOR-B DN

2" FOS-B DN

2" FOO-B DN

FOS-B

"D

IA

C

W T

T

BDT-1

24"DIA. CWTT

"D

IA

C

W T

T

TUBE

PULL

TUBE

PULL

IN

OUT

IN

OUT

LOW

HIGH

IN

OUT

LOW

HIGH

IN

OUT

LOW

HIGH

IN

OUT

IN

OUT

BOILER

CHEMICAL

FEED

SYSTEM

A B D E F

1 1

2 2

3 3

4 4

.2

.5

(E)11-2-CHILLER 1

(E)11-2-CHILLER 2

(E)11-2-CHILLER 3

(E)11-2-CHWP1

(E)11-2-CHWP2

(E)11-2-CHWP3

(E)11-2-CHWP4

14" DIA. CWTT UP

CONTROL PANEL

M401

M401

M401

M401

M401

M401

(E )1

1- 2-

C W

P -5

B

(E )1

1- 2-

C W

P -5

A

(E )1

1- 2-

C W

P -6

A

(E )1

1- 2-

C W

P -6

B

(E )1

1- 2-

C W

P -7

A

(E )1

1- 2-

C W

P -7

B

(E )1

1- 2-

C W

P -8

A

(E )1

1- 2-

C W

P -8

B

(E )4

4- 2-

C W

P -9

A

(E )4

4- 2-

C W

P -9

B

(E )4

4- 2-

C W

P -1

0A

(E )4

4- 2-

C W

P -1

0B

(E )4

4- 2-

C W

T P

-4

(E )4

4- 2-

C W

T P

-3

(E )4

4- 2-

C W

T P

-2

(E )4

4- 2-

C W

T P

-1

2 TYP 2 TYP 2 TYP 2 TYP

(ON ALL

VERTICAL PIPE)

11-2-FCU4

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

SECOND FLOOR MECHANICAL

PIPING DEMOLITION PLAN

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MDP102

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

3/16" = 1'-0"MDP102

1 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN

0 4' 8' 12'

MDP102 DEMOLITION NOTES

NOTE

NUMBER NOTE TEXT

1 REMOVE HSC PUMP, SUCTION DIFFUSER, AND ISOLATION BASE.

CONTRACTOR TO REUSE EXISTING HYDRONIC COMPONENTS SUCH AS

ISOLATION VALVES AND STRAINERS. EXERCISE ISOLATION VALVES AND

CLEAN STRAINERS BEFORE BEGINNING WORK. NOTIFY COR OF ANY

CONCERNS. PREPARE FOR NEW WORK.

2 REMOVE ES PUMP, SUCTION DIFFUSER, HYDRONIC SPECIALTIES SUCH

AS ISOLATION VALVES AND STRAINERS, AND ISOLATION BASE. ALL

HYDRONIC COMPONENTS SHALL BE REPLACED. CONTRACTOR SHALL

UTILIZE PIPE FREEZING TECHNIQUES TO ISOLATE EACH PUMP BEFORE

REMOVING VALVES. SEE PIPE FREEZE NOTES ON SHEET M001. PREPARE

FOR NEW WORK.

3 CONTRACTOR SHALL REMOVE ALL CORROSION, PRIME, AND PAINT ON

CONDENSER WATER PIPE. THE HATCHED AREAS ARE KNOWN SPOTS

FOR CORROSION. CONTRACTOR SHALL INSPECT ALL CONDENSER

WATER PIPING FOR CORROSION BEFORE PAINTING.

MDP102 GENERAL NOTES

NOTE

NUMBER NOTE TEXT

A CONTRACTOR SHALL PRIME AND PAINT ALL CONDENSER WATER PIPING

TO TOWER AND FROM TOWER (CWTT – CONDENSING WATER TO TOWER

AND CWFT – CONDENSING WATER FROM TOWER). REFER TO

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

STAIR

3G102

COMMUNICATIONS

ROOM3G100

SWITCHGEAR

ROOM

3G103

TRANSFORMER

ROOM

STAIR

STAIR

3G104

TRANSFORMER

ROOM

3G101

TRANSFORMER

ROOM

DOWN

UP

UP

DOWN

UP

UP

2" FOO-G

UP

2" FOO-G

2" FOO-G DN

UP

2" FOO-G

UP

2" FOO-G

UP

2" FOO-G

UP&DN

1" FOR-G

UP&DN

2" FOS-G

UP

2" FOO-G

2"2"

2"

1"

UP&DN

14"∅ CWFT

14"∅ CWTT

UP&DN

11-3-FCU6

DOWN

STACK UP &

30" BOILER

A B D E F

1 1

2 2

3 3

4 4

.2

.5

AHU

(E) 3" CHS

(E) 3" CHR

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

THIRD FLOOR MECHANICAL PIPING

DEMOLITION PLAN

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MDP103

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

MDP103 DEMOLITION NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR SHALL REMOVE EXISTING CHILLED WATER SUPPLY AND

RETURN PIPING TO THE APPROXIMATE LIMITS.

2 CONTRACTOR SHALL REMOVE EXISTING AIR HANDLING UNIT.

3/16" = 1'-0"MDP103

1 THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN

0 4' 8' 12'

6" RD

6" RD

UP

UP STAIR

ELEVATOR

PLENUM

STAIR

GENERATOR

ROOM

GENERATOR

ROOM

S1

4G102

4G101

4G100

1"

MUSHROOM VENT CAP

14"∅ CWFT

DN

2"1"

DN

2" FOO-G

1"

VENT UP THRU ROOF,

TERMINATE WITH

MUSHROOM VENT CAP

2" FOO-G DN

2"

2"

1"

2"

1"

2"

2"

FILTER

DN

2" FOO-G

DN

2" FOO-G

2" FOO-G DN 2" FOO-G DN

1"

2"

1"

2"

1"

2"

VALVE

CONTROL

FLOW

VALVE

CONTROL

2-WAY

(TYPICAL)

10" SHUT-OFF VALVE

14"∅ CWTT DOWN

(TYPICAL)

10" SHUT-OFF VALVE

1"

1"

1"

1"

1"

1"

A B D E F

1 1

2 2

3 3

4 4

.2

.5

1 1

(ON ALL

VERTICAL PIPE)

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

FOURTH FLOOR MECHANICAL

PIPING DEMOLITION PLAN

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MDP104

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

3/16" = 1'-0"MDP104

1 FOURTH FLOOR MECHANICAL PIPING DEMOLITION PLAN

0 4' 8' 12'

MDP104 DEMOLITION NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR SHALL REMOVE ALL CORROSION, PRIME, AND PAINT ON

CONDENSER PIPE. THE HATCHED AREAS ARE KNOWN SPOTS FOR

CORROSION

MDP104 GENERAL NOTES

NOTE

NUMBER NOTE TEXT

A CONTRACTOR SHALL PRIME AND PAINT ALL CONDENSER WATER PIPING

TO TOWER AND FROM TOWER (CWTT – CONDENSING WATER TO TOWER

AND CWFT – CONDENSING WATER FROM TOWER). REFER TO

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5000 CFM

8"x6"

"x

(E) 12x8

500 CFM

EXHAUST

(E) 8X6

100 CFM

(E) 8x6

75 CFM EXH.

(E) 18x10

420 CFM

(TYP OF 5)

(E) 12x8

500 CFM

24x24

LOUVER

(E) 48x30

1,980 CFM

24x24

135 CFM

(TYP OF 2)

24x6

190 CFM

FUEL TANK

FUEL TANK

FUEL TANK

STAIR

SUMP

STOR.

ELEV

EQUIP

MECH

ROOM

MEETING/

OFFICE

ELEVATOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

ENTRANCE

JANITOR

CLOSET

STAIR

FP&L SW &

METERING

ROOM

STORAGE

1G108

1G103

1G100

1G104

1G105

S-1

C1-1

C1-2

C1-3

C1-4

C1-5

C1-6

1G106

1G103A

1G107

1G101

UP

UP

T

T T

T

A B

D E F

1 1

2 2

3 3

4 4

.2

.5

44-1-EF-1

44-1-FCU-2 44-1-FCU-1

M

44-1-FCU-3

M

6"x6" O/A

M 7 8M

44-1-FCU-3

-1

-E F

-1

-1 -F

C U

-2

-1

-F C

U -1

12"x12" S/A

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

FIRST FLOOR HVAC PLAN - NEW

WORK

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MH101

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

3/16" = 1'-0"MH101

1 FIRST FLOOR HVAC PLAN -NEW WORK

MH101 NEW WORK NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR SHALL INSTALL NEW EXHAUST FAN 44-1-EF-1 AND

CONNECT TO EXISTING DUCTWORK. INSTALL NEW MOTORIZED

DAMPER AT EXISTING LOUVER. INSTALL NEW CONTROLS AND

CONTROL WIRING.

2 CONTRACTOR SHALL INSTALL NEW FAN COIL UNIT 44-1-FCU-3 WITH

AUXILIARY PAN AND MOISTURE SENSOR AND CONNECT TO

EXISTING DUCTWORK. INSTALL NEW CONTROLS AND CONTROL

WIRING. FAN COIL UNIT 44-1-FCU-3 SHALL BE CONTROLLED BY

THERMOSTAT SHOWN.

3 CONTRACTOR SHALL INSTALL NEW FAN COIL UNIT 44-1-FCU-2 WITH

AUXILIARY PAN AND MOISTURE SENSOR AND CONNECT TO

EXISTING DUCTWORK. INSTALL NEW CONTROLS AND CONTROL

WIRING. FAN COIL UNIT 44-1-FCU-2 SHALL BE CONTROLLED BY

THERMOSTAT SHOWN.

4 CONTRACTOR SHALL INSTALL NEW FAN COIL UNIT 44-1-FCU-1 WITH

AUXILIARY PAN AND MOISTURE SENSOR AND CONNECT TO

EXISTING DUCTWORK. INSTALL NEW CONTROLS AND CONTROL

WIRING. FAN COIL UNIT 44-1-FCU-1 SHALL BE CONTROLLED BY

THERMOSTAT SHOWN.

5 CONTRACTOR SHALL REBALANCE THE SYSTEM TO CFM SHOWN.

6 CONTRACTOR SHALL CONNECT EXISTING 24x6 RETURN GRILLE TO NEW 12x12 RETURN DUCT.

7 24x40 LOUVER. INSTALL 20x12 MOTORIZED DAMPER. INTERLOCK

WITH FAN COIL UNIT 44-1-FCU-2 AND EXHAUST FAN 44-1-EF-1.

8 CONTRACTOR SHALL INSTALL NEW 6x12 MOTORIZED DAMPER

BEHIND EXISTING LOUVER. CONTRACTOR SHALL VERIFY EXISTING

DAMPER SIZE. 24x24 LOUVER 6x12 ACTIVE (BLANK-OFF REMAINING

LOUVER).

0 4' 8' 12'

MH101 GENERAL NOTES

NOTE

NUMBER NOTE TEXT

A WHERE INSTALLING NEW FANS UTILIZING EXISTING LOUVERS.

CONTRACTOR SHALL PROVIDE 14 GA SHEET INSULATED

SHEETMETAL PLENUM. WHERE FAN, DUCT, DAMPER DIFFERS IN

SIZE, PROVIDE SHEETMETAL AS REQUIRED FOR INSTALLATION.

B WHERE CEILINGS WERE REMOVED. REINSTALL EXISTING CEILINGS.

WHERE MATERIALS ARE DAMAGED BEYOND REPAIR, REINSTALL TO

MATCH EXISTING.

2G100

2G102

S1

2G103

2G101

2G101A

STAIR

TOILET

FIRE PUMP

ROOM

MECHANICAL

ROOM

BOILER

ROOM

GRAPHICS/

BOILER

CONTROL

STAIR

ELEVATOR

DOWN UP

UP

DOWN

UP

700 CFM

14"x14"

100 CFM EXH

8X6 CR

14"x14"

600 CFM

48X10 TR

24X24 LOUVER

24X24 LOUVER

RS

14"x14"

600 CFM EXH

42X12 BR

UP

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

BOILER STACK

34X34

40x24 LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

CONTROL

PANEL

700 CFM

14"x14"

100 CFM EXH

8X6 CR

14"x14"

600 CFM

48X10 TR

24X24 LOUVER

24X24 LOUVER

RS

14"x14"

600 CFM EXH

42X12 BR

UP

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

BOILER STACK

34X34

40x24 LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

13'-0"H x 18'-10"

W/LOUVER

CONTROL

PANEL

T

T

T

A B D E F

1 1

2 2

3 3

4 4

.2

.5

CONTROL PANEL

44-2-FCU-4

44-2-EF-4 44-2-SF-5

12"x12" R/A

8"Ø A

8"Ø

A

8"Ø A

10"Ø S/A

12"Ø S/A

(HIGH)

(LOW)

M

(HIGH AND LOW)

6" Ø

O /A

12"x12" C

44-2-EF-1

14"x14"

14"x14"

M

44-2-EF-2

44-2-EF-3

M2

44-2-EF-2

AND

44-2-EF-4

44-2-FCU-4

44-2EF-5

(E)VFD-9

(E )V

F D

-8

(E )V

F D

-7

(E )V

F D

-6

(E )V

F D

-5

(E )V

F D

-4

(E )V

F D

-3

(E )V

F D

-2

(E )V

F D

M

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

SECOND FLOOR HVAC PLAN - NEW

WORK

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MH102

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

3/16" = 1'-0"MH102

1 SECOND FLOOR HVAC PLAN - NEW WORK

0 4' 8' 12'

MH102 NEW WORK NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR SHALL INSTALL NEW WALL MOUNTED EXHAUST FAN

AND GRAVITY DAMPER AT EXISTING LOUVER. INSTALL NEW

CONTROLS AND CONTROL WIRING FOR NEW EXHAUST FANS.

2 CONTRACTOR SHALL INSTALL NEW MOTORIZED DAMPER FULL SIZE

OF DUCT OR LOUVER AS INDICATED. CONTRACTOR SHALL VERIFY

EXISTING SIZES.

3 CONTRACTOR SHALL INSTALL NEW INLINE EXHAUST FAN. INSTALL

NEW CONTROLS AND CONTROL WIRING.

4 CONTRACTOR SHALL INSTALL NEW FAN COIL UNIT 44-2-FCU-4 WITH

AUXILIARY PAN AND MOISTURE SENSOR AND INSTALL NEW DUCT

AND GRILLES WITH NEW CONTROLS AND CONTROL WIRING.

5 CONTRACTOR SHALL TIE NEW FAN (44-2EF-3) INTO EXISTING

REFRIGERANT MONITORING SYSTEM.

6 START VENTILATION FAN(S) 44-2-EF-2 AND 44-2-EF-4 TO MAINTAIN

85°F SPACE TEMPERATURE. WHEN SPACE TEMPERATURE DROPS

BELOW 80°F, STOP FAN.

6 THERMOSTAT CONTROLS 2 FANS.

MH102 GENERAL NOTES

NOTE

NUMBER NOTE TEXT

A WHERE INSTALLING NEW FANS UTILIZING EXISTING LOUVERS.

CONTRACTOR SHALL PROVIDE 14 GA SHEET INSULATED

SHEETMETAL PLENUM. WHERE FAN, DUCT, DAMPER DIFFERS IN

SIZE, PROVIDE SHEETMETAL AS REQUIRED FOR INSTALLATION.

B WHERE CEILINGS WERE REMOVED. REINSTALL EXISTING CEILINGS.

WHERE MATERIALS ARE DAMAGED BEYOND REPAIR, REINSTALL TO

MATCH EXISTING.

STAIR

3G102

COMMUNICATIONS

ROOM3G100

SWITCHGEAR

ROOM

3G103

TRANSFORMER

ROOM

STAIR

STAIR

3G104

TRANSFORMER

ROOM

3G101

TRANSFORMER

ROOM

DOWN

UP

UP

DOWN

UP

T

T

T

T

T

T

T

T

T

T

T

T

A B D E F

1 1

2 2

3 3

4 4

.2

.5

38"x24" S/A

"x

"x

44-TU-01

18"x10" B

18"x16" S/A

TYP OF 4

18"x10" B

TYP OF 4

18"x16" S/A

44-TU-02

"Ø

S /A

"x

S /A

18"Ø S/A

38"x24" S/A

44-TU-06

18"x10" B

TYP OF 4

16"Ø S/A

"x

S /A

16"Ø S/A 18"x16" S/A

44-TU-08

18"x10" B

TYP OF 4

18"x16" S/A

44-TU-05

16"Ø S/A

18"x10" B

TYP OF 4

18"x16" S/A

44-TU-04

16"Ø S/A

18"x10" B

TYP OF 4

16"Ø S/A

18"x16" S/A

44-TU-07

18"x10" B

TYP OF 4

44-TU-03

18"x16" S/A 16"Ø S/A

18"x10" B

TYP OF 4

12"x12" O/A

44-3-AHU-1

M

44-3-FCU-5

F

44-3-FD-4

44-3-FD-6

44-3-FD-8

F

44-TU-03

44-TU-07

44-TU-08

-3

-F C

U -5

44-TU-06

-T

U -0

-T U

-0

44-TU-04

60"x24"

44-3-FD-3

5 72"x72" F

"x

F

44-3-FD-1

44-3-FD-2

F

44-3-FD-9

F

44-3-FD-5

F

44-3-FD-7

44-TU-05

M502

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

THIRD FLOOR HVAC PLAN - NEW

WORK

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MH103

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

3/16" = 1'-0"MH103

1 THIRD FLOOR HVAC PLAN - NEW WORK

MH103 NEW WORK NOTES

NOTE

NUMBER NOTE TEXT

1 CONSTRACTOR SHALL INSTALL NEW AIR HANDLING UNIT

44-3-AHU-1.

2 CONSTRACTOR SHALL INSTALL NEW DUCTWORK AND GRILLES

3 CONTRACTOR TO INSTALL NEW MOTORIZED DAMPER BEHIND

EXISTING LOUVER. CONTRACTOR SHALL VERIFY EXISTING DAMPER

SIZE.

4 CONTRACTOR SHALL INSTALL NEW FAN COIL UNIT 44-3-FCU-5 WITH

AUXILIARY PAN AND MOISTURE SENSOR. INSTALL NEW CONTROLS

AND CONTROL WIRING. FAN COIL UNIT 44-3-FCU-5 SHALL BE

CONTROLLED BY THERMOSTAT SHOWN. FAN SHALL START AND

CHILLED WATER VALVE TO UNIT SHALL OPEN ON A RISE IN SPACE

TEMPERATURE ABOVE 85 F ADJUSTABLE. STOP FAN AND CLOSE

CONTROL VALVE WHEN SPACE TEMPERATURE DROPS BELOW 80 F

ADJUSTABLE.

5 CONTRACTOR TO INSTALL TOP ELEVATION OF FIRE DAMPER TO

BOTTOM OF STRUCTURE.

0 4' 8' 12'

LOUVER

96x136

60x120 LOUVER

(TYPICAL OF 3)

60x120

LOUVER (TYP.

OF 6)

AIRFLOW DIVERTING PANEL

BDD BDD BDD

BDDBDDBDD

AIRFLOW DIVERTING PANEL

18" GENERATOR EXHAUST

UP THRU ROOF (TYP)

M

6" RD

6" RD

6" RD

UP

UP STAIR

ELEVATOR

PLENUM

STAIR

GENERATOR

ROOM

GENERATOR

ROOM

S1

4G102

4G101

4G100

T

T

A B D E F

1 1

2 2

3 3

4 4

.2

.5

44-4-EF-7

44-4-EF-7

44-4-EF-6

44-4-EF-6

AMBMICU

TOWER

8 7

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

N.T.S.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

PROJECT AREA

FOURTH FLOOR HVAC PLAN - NEW

WORK

UPGRADE HVAC SYSTEM IN

THE UTILITY PLANT BUILDING

VA MIAMI, FL

MH104

546-21-110

JMK JSW/RCP03-03-2023

BID DOCUMENTS

3/16" = 1'-0"MH104

1 FOURTH FLOOR HVAC PLAN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .