S02 - Attachment - 12 NARRATIVE Part 3 - 546-21-110 Upgrade HVAC System in the Utility Plant Building 44 - Copy.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24823R0123
About this file
This document contains a site assessment report and related federal contract opportunity for upgrading the HVAC system in a utility plant building. The site assessment report details the current condition of various HVAC equipment in Building 44 at the Miami VA Medical Center, including vertical turbine pumps, horizontal split pumps, chillers, boilers, and a deaerator tank. It notes equipment that is non-operational or in need of replacement. The related federal contract opportunity from the Department of Veterans Affairs seeks offers to upgrade the HVAC system in Building 44, with a site visit scheduled for April 24, 2023 and RFIs due by May 1, 2023. The opportunity will support upgrades to the HVAC equipment documented in the site assessment report.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Survey 21.06.07 Miami Building 44 Page 12
Survey 21.06.07 Miami Building 44 Page 13
Survey 21.06.07 Miami Building 44 Page 14
Pumps 7A and 7B:
Survey 21.06.07 Miami Building 44 Page 15
Survey 21.06.07 Miami Building 44 Page 16
Survey 21.06.07 Miami Building 44 Page 17
Survey 21.06.07 Miami Building 44 Page 18
Survey 21.06.07 Miami Building 44 Page 19
Survey 21.06.07 Miami Building 44 Page 20
Survey 21.06.07 Miami Building 44 Page 21
Survey 21.06.07 Miami Building 44 Page 22
7B
Survey 21.06.07 Miami Building 44 Page 23
Survey 21.06.07 Miami Building 44 Page 24
Survey 21.06.07 Miami Building 44 Page 25
Survey 21.06.07 Miami Building 44 Page 26
8A no pressure gauge
Survey 21.06.07 Miami Building 44 Page 27
Survey 21.06.07 Miami Building 44 Page 28
Survey 21.06.07 Miami Building 44 Page 29
8B no pressure gauge
Survey 21.06.07 Miami Building 44 Page 30
Survey 21.06.07 Miami Building 44 Page 31
Survey 21.06.07 Miami Building 44 Page 32
9A tag says 9B
Survey 21.06.07 Miami Building 44 Page 33
Survey 21.06.07 Miami Building 44 Page 34
Survey 21.06.07 Miami Building 44 Page 35
Survey 21.06.07 Miami Building 44 Page 36
Survey 21.06.07 Miami Building 44 Page 37
Survey 21.06.07 Miami Building 44 Page 38
Survey 21.06.07 Miami Building 44 Page 39
9B tag says 9B
Survey 21.06.07 Miami Building 44 Page 40
Survey 21.06.07 Miami Building 44 Page 41
Survey 21.06.07 Miami Building 44 Page 42
Survey 21.06.07 Miami Building 44 Page 43
10A mom is not accessible due to insulation
Survey 21.06.07 Miami Building 44 Page 44
Survey 21.06.07 Miami Building 44 Page 45
Survey 21.06.07 Miami Building 44 Page 46
Survey 21.06.07 Miami Building 44 Page 47
10B
Survey 21.06.07 Miami Building 44 Page 48
Survey 21.06.07 Miami Building 44 Page 49
Survey 21.06.07 Miami Building 44 Page 50
Survey 21.06.07 Miami Building 44 Page 51
Vertical transfer pumps 1-3 are not properly working or not in service.
Pump 4 is the only pump operational and according to the boiler tech, the pump parts have been scavenged to make it work.
According to Valerie, these pumps are in the works to be replace in another project.
Site Assessment - Vertical Turbine Pumps Thursday, February 17, 2022 12:04 PM
Survey 21.06.07 Miami Building 44 Page 52
Survey 21.06.07 Miami Building 44 Page 53
Survey 21.06.07 Miami Building 44 Page 54
Site Assessment - Horizontal Split Pumps Thursday, February 17, 2022 12:09 PM
Survey 21.06.07 Miami Building 44 Page 55
Survey 21.06.07 Miami Building 44 Page 56
Site Assessment - Chillers Thursday, February 17, 2022 12:10 PM
Survey 21.06.07 Miami Building 44 Page 57
Survey 21.06.07 Miami Building 44 Page 58
Survey 21.06.07 Miami Building 44 Page 59
Survey 21.06.07 Miami Building 44 Page 60
Survey 21.06.07 Miami Building 44 Page 61
Survey 21.06.07 Miami Building 44 Page 62
Survey 21.06.07 Miami Building 44 Page 63
Survey 21.06.07 Miami Building 44 Page 64
Boiler Flue is manifold for both boilers, routes outside the building 44 and routes to Building 1.
Note the work to reroute existing vent lines in process.
Boiler 1 is down for service.
VA in the process of adding an additional boiler according to the COR. Possibly adding a new boiler plant.
Boiler 1 is down for service. Discussing with mechanical contractor, the tubes are bad and need to be replace.
Site Assessment - Boiler Flue Thursday, February 17, 2022 12:14 PM
Survey 21.06.07 Miami Building 44 Page 65
DA Tank is new but not insulated
Survey 21.06.07 Miami Building 44 Page 66 ww ww.tola
P nd-mize
Atlan
Maco
Orlan
Monr
Salisbu
Pittsbur
Madis ell-molna nta, GA on, GA ndo, FL roe, LA ury, NC rgh, PA son, WI ar.com
File details come from the government source that posted it. Updated .