S02 - Attachment - 12 NARRATIVE Part 3 - 546-21-110 Upgrade HVAC System in the Utility Plant Building 44 - Copy.pdf

PDF 5 MB Posted

Attached to
Upgrade HVAC System in the Utility Plant Building 44
Solicitation number
36C24823R0123
Issued by

About this file

This document contains a site assessment report and related federal contract opportunity for upgrading the HVAC system in a utility plant building. The site assessment report details the current condition of various HVAC equipment in Building 44 at the Miami VA Medical Center, including vertical turbine pumps, horizontal split pumps, chillers, boilers, and a deaerator tank. It notes equipment that is non-operational or in need of replacement. The related federal contract opportunity from the Department of Veterans Affairs seeks offers to upgrade the HVAC system in Building 44, with a site visit scheduled for April 24, 2023 and RFIs due by May 1, 2023. The opportunity will support upgrades to the HVAC equipment documented in the site assessment report.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Survey 21.06.07 Miami Building 44 Page 12

Survey 21.06.07 Miami Building 44 Page 13

Survey 21.06.07 Miami Building 44 Page 14

Pumps 7A and 7B:

Survey 21.06.07 Miami Building 44 Page 15

Survey 21.06.07 Miami Building 44 Page 16

Survey 21.06.07 Miami Building 44 Page 17

Survey 21.06.07 Miami Building 44 Page 18

Survey 21.06.07 Miami Building 44 Page 19

Survey 21.06.07 Miami Building 44 Page 20

Survey 21.06.07 Miami Building 44 Page 21

Survey 21.06.07 Miami Building 44 Page 22

7B

Survey 21.06.07 Miami Building 44 Page 23

Survey 21.06.07 Miami Building 44 Page 24

Survey 21.06.07 Miami Building 44 Page 25

Survey 21.06.07 Miami Building 44 Page 26

8A no pressure gauge

Survey 21.06.07 Miami Building 44 Page 27

Survey 21.06.07 Miami Building 44 Page 28

Survey 21.06.07 Miami Building 44 Page 29

8B no pressure gauge

Survey 21.06.07 Miami Building 44 Page 30

Survey 21.06.07 Miami Building 44 Page 31

Survey 21.06.07 Miami Building 44 Page 32

9A tag says 9B

Survey 21.06.07 Miami Building 44 Page 33

Survey 21.06.07 Miami Building 44 Page 34

Survey 21.06.07 Miami Building 44 Page 35

Survey 21.06.07 Miami Building 44 Page 36

Survey 21.06.07 Miami Building 44 Page 37

Survey 21.06.07 Miami Building 44 Page 38

Survey 21.06.07 Miami Building 44 Page 39

9B tag says 9B

Survey 21.06.07 Miami Building 44 Page 40

Survey 21.06.07 Miami Building 44 Page 41

Survey 21.06.07 Miami Building 44 Page 42

Survey 21.06.07 Miami Building 44 Page 43

10A mom is not accessible due to insulation

Survey 21.06.07 Miami Building 44 Page 44

Survey 21.06.07 Miami Building 44 Page 45

Survey 21.06.07 Miami Building 44 Page 46

Survey 21.06.07 Miami Building 44 Page 47

10B

Survey 21.06.07 Miami Building 44 Page 48

Survey 21.06.07 Miami Building 44 Page 49

Survey 21.06.07 Miami Building 44 Page 50

Survey 21.06.07 Miami Building 44 Page 51

Vertical transfer pumps 1-3 are not properly working or not in service.

Pump 4 is the only pump operational and according to the boiler tech, the pump parts have been scavenged to make it work.

According to Valerie, these pumps are in the works to be replace in another project.

Site Assessment - Vertical Turbine Pumps Thursday, February 17, 2022 12:04 PM

Survey 21.06.07 Miami Building 44 Page 52

Survey 21.06.07 Miami Building 44 Page 53

Survey 21.06.07 Miami Building 44 Page 54

Site Assessment - Horizontal Split Pumps Thursday, February 17, 2022 12:09 PM

Survey 21.06.07 Miami Building 44 Page 55

Survey 21.06.07 Miami Building 44 Page 56

Site Assessment - Chillers Thursday, February 17, 2022 12:10 PM

Survey 21.06.07 Miami Building 44 Page 57

Survey 21.06.07 Miami Building 44 Page 58

Survey 21.06.07 Miami Building 44 Page 59

Survey 21.06.07 Miami Building 44 Page 60

Survey 21.06.07 Miami Building 44 Page 61

Survey 21.06.07 Miami Building 44 Page 62

Survey 21.06.07 Miami Building 44 Page 63

Survey 21.06.07 Miami Building 44 Page 64

Boiler Flue is manifold for both boilers, routes outside the building 44 and routes to Building 1.

Note the work to reroute existing vent lines in process.

Boiler 1 is down for service.

VA in the process of adding an additional boiler according to the COR. Possibly adding a new boiler plant.

Boiler 1 is down for service. Discussing with mechanical contractor, the tubes are bad and need to be replace.

Site Assessment - Boiler Flue Thursday, February 17, 2022 12:14 PM

Survey 21.06.07 Miami Building 44 Page 65

DA Tank is new but not insulated

Survey 21.06.07 Miami Building 44 Page 66 ww ww.tola

P nd-mize

Atlan

Maco

Orlan

Monr

Salisbu

Pittsbur

Madis ell-molna nta, GA on, GA ndo, FL roe, LA ury, NC rgh, PA son, WI ar.com

File details come from the government source that posted it. Updated .