This document package includes construction plans and specifications for a federal contract opportunity to expand burial space at the Dallas-Fort Worth National Cemetery. The project involves grading and drainage improvements; construction of committal shelters, columbariums, and public facilities; and associated site work. Key details include the installation of temporary erosion and sediment controls; excavation and installation of underground storm and sanitary sewer lines; grading for new burial sections and roadways; and landscaping. The solicitation number is 36C78620B0019 and was issued by the Department of Veterans Affairs National Cemetery Administration for an indefinite-delivery/indefinite-quantity construction contract to add over 10,000 new burial spaces and related infrastructure at the cemetery located in Dallas County, Texas. The bid submission deadline is not provided.

View the file

Other files

File Type Posted
S06_ Amendment-0003_SF30_36C78620B0019_916CM3017.pdf PDF
S06_ Amendment-0002_SF30_36C78620B0019_916CM3017.pdf PDF
S06_Amend-1_Attach-1_Plans_916CM3017R1_Part1.pdf PDF
S06_Amend-1_Attach-5_Plans_916CM3017R1_Part5.pdf PDF
S06_Amend-1_Attach-4_Plans_916CM3017R1_Part4.pdf PDF
S06_Amend-1_Attach-2_Plans_916CM3017R1_Part2.pdf PDF
S06_Amend-1_Attach-11_Plans_916CM3017R1_Part11.pdf PDF
S06_Amend-1_Attach-7_Plans_916CM3017R1_Part7.pdf PDF
S06_Amend-1_Attach-12_Plans_916CM3017R1_Part12.pdf PDF
S06_Amend-1_Attach-9_Plans_916CM3017R1_Part9.pdf PDF
S06_Amend-1_Attach-13_Plans_916CM3017R1_Part13.pdf PDF
S06_Amend-1_Attach-6_Plans_916CM3017R1_Part6.pdf PDF
S06_ Amendment-0001_SF30_36C78620B0019_916CM3017.pdf PDF
S06_Amend-1_Attach-3_Plans_916CM3017R1_Part3.pdf PDF
S06_Amend-1_Attach-10_Plans_916CM3017R1_Part10.pdf PDF
S06_Amend-1_Attach-8_Plans_916CM3017R1_Part8.pdf PDF
S02_Attachment-12_Plans_916CM3017_Part10.pdf PDF
S02_Attachment-3_Plans_916CM3017_Part1.pdf PDF
S02_Attachment-9_Plans_916CM3017_Part7.pdf PDF
S02_Attachment-6_Plans_916CM3017_Part4.pdf PDF
S02_Attachment-7_Plans_916CM3017_Part5.pdf PDF
S02_Attachment-2_Specifications_916CM3017.pdf PDF
S02_Attachment-1_SOW_916CM3017.pdf PDF
S02_Attachment-16_WD_BUILDING_Dallas County_TX20200241 2-14-20.pdf PDF
S02_Attachment-8_Plans_916CM3017_Part6.pdf PDF
S02_Attachment-10_Plans_916CM3017_Part8.pdf PDF
S02_Attachment-14_Plans_916CM3017_Part12.pdf PDF
S02_Attachment-17_IFB Contractor Cost Estimate Worksheet.xlsx XLSX spreadsheet
S02_Attachment-15_Plans_916CM3017_Part13.pdf PDF
S02_Attachment-13_Plans_916CM3017_Part11.pdf PDF
S02_Attachment-4_Plans_916CM3017_Part2.pdf PDF
S02_Attachment-11_Plans_916CM3017_Part9.pdf PDF
S02_ Solicitation_36C78620B0019_6-17-18.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMITTAL

SHELTER A

COMMITTAL

SHELTER B

COMMITTAL

SHELTER C

COMMITTAL

SHELTER D

PUBLIC INFORMATION &

RESTROOMS

EX. LIGHT

POLE (TYP.)

+0

+0

12+00

+0

+0

+0

16+00

+0

+0

19+00

20+00

21+00

22+00

23+00 24+00

25+00

26+

27+00 28+00

29+00

+0

+0

32+00

33+00

34+0035+00 36+00

37+00

38+00

39+00

40+00

41+00

TEST PIT TO CONFIRM

HORIZONTAL AND

VERTICAL LOCATION

OF EXISTING GAS

LINE WITHIN LIMITS

OF WORK. SEE NOTE

#2, THIS SHEET FOR

ADDITIONAL INFO.

TEST PIT TO CONFIRM

HORIZONTAL AND VERTICAL

LOCATION OF EXISTING GAS

LINE WITHIN LIMITS OF WORK.

SEE NOTE #2, THIS SHEET

FOR ADDITIONAL INFO.

TEST PIT TO CONFIRM

HORIZONTAL AND VERTICAL

LOCATION OF EXISTING GAS

LINE WITHIN LIMITS OF WORK.

SEE NOTE #2, THIS SHEET FOR

ADDITIONAL INFO.

TEST PIT TO

CONFIRM

HORIZONTAL AND

VERTICAL LOCATION

OF EXISTING GAS

LINE WITHIN LIMITS

OF WORK.

SEE NOTE #2, THIS

SHEET FOR

ADDITIONAL INFO.

SEE DRAWINGS

CS102:SITE LAYOUT PLAN,

CG102:GRADING & DRAINAGE PLAN,

L-102:LANDSCAPE PLAN,

LI102:IRRIGATION PLAN

SEE DRAWING

CS103:SITE LAYOUT PLAN,

CG103:GRADING & DRAINAGE PLAN,

L-103:LANDSCAPE PLAN'

LI103:IRRIGATION PLAN

SEE DRAWING

CS101:SITE LAYOUT PLAN,

CG101:GRADING & DRAINAGE PLAN,

L-101:LANDSCAPE PLAN,

LI101:IRRIGATION PLAN

SEE DRAWING

GC101:EROSION AND

SEDIMENT CONTROL PLAN -

NORTHWESTERN AREA

SEE DRAWING

GC101:EROSION AND

SEDIMENT CONTROL PLAN -

NORTHWESTERN AREA

SEE DRAWING

GC102:EROSION AND

SEDIMENT CONTROL PLAN

PROPOSED

CORTEGE

EXPANSION

(N.I.C.)

PROPOSED

COMMITTAL

SHELTER

(N.I.C.)

PROPOSED

COLUMBARIUM

(N.I.C.)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

916CM3017

MAY 26, 2020 RPP MAC Dwg. of 72

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

DALLAS-FORT WORTH NATIONAL

CEMETERY BURIAL EXPANSION

DALLAS COUNTY, TEXAS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\E

NG

IN

\33

\02

\P

LA

NS

\B

ID

D

OC

UM

EN

TS

\C

S-

0.D W

G

Gordon

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

PROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Aqua Engineering

(970) 372-6104 rvi

(512) 480-0032

AES Group

(303) 841-3922

GRAPHICAL SCALE: 1" = 150'

150 75 0 150 300 450

KEY MAP

(NOT TO SCALE)

OVERALL SITE PLAN AND KEY MAP

CS100

BURIAL SECTION 25

BURIAL SECTION 24

PUBLIC INFORMATION &

RESTROOMS

BURIAL SECTION 31

BURIAL SECTION 32

BURIAL SECTION 33

EX. 8" SANITARY SEWER

MAIN

EX. 48" RCP

EX. 2

1"

RCP

EX. 24" RCP

EX. 18" RCP

EX. 4" PVC

UNDERDRAIN

EX

. 1

8" R

CP

EX

. 3

0" R

CP

EX

. 1

8" R

CP

EX. 18" RCP

EX. 36" RCP

EX

. 1

8" R

CP

EX. GRAVEL

DRIVE (TYP.)

EX. 30" RCP

510 510

PROPOSED

CORTEGE

EXPANSION

(N.I.C.)

CONSTRUCTION

STAGING, SPOILS &

STORAGE AREA

SC

F

SC

F

SC

F

SC

F

SCF

SCF

SC

F

SC

F SCF

SCF

SCF

TEMPORARY GRAVEL

CONSTRUCTION

ACCESS ROAD

15'

15'

FILTER

STONE SCF

CE

T

R

I

N

I

T

Y

W

A

Y

T

E

J

S

B

O

U

L

E

V

A

R

D T

E

J

U

L

E

V

A

R

D

CORTEGE

LO

O

P RO

AD

TEMPORARY STABILIZED

CONSTRUCTION EXIT WITH

WASH RACK. (WATER

SOURCE FROM TANK

TRUCK, OR EXISTING

ON-SITE WATER SERVICE)

SEDIMENT CONTROL FENCESCF SCF

STABILIZED CONSTRUCTION

ENTRANCE

DIVERSION DIKE

IP INLET PROTECTION

(EROSION CONTROL LOG)

OUTLET PROTECTION

(PLACED RIP-RAP AT OUTLET)

LIMITS OF WORK

DD

OP

CE

EROSION CONTROL LOGECL ECL ECL

ROCK BERM

GC501

GC501

GC501

GC501

GC501

GC501

GC501

CONCRETE WASHOUT

GC501

LEGEND:

ECL ECL

SEDIMENT BASIN

WITH PIPE OUTLET

GC501

S.B.

DRAINAGE DIVIDE

RB

SCF

CW

GRAVEL DRIVE 9

DT503

CONSTRUCTION STAGING,

SPOILS & STORAGE AREA

LIMITS OF CLEARING

VERTICAL TRACKING 9

GC501VT

BURIAL SECTION 28

BURIAL SECTION 29

BURIAL SECTION 30

BURIAL SECTION 31

EX

. 2

4"

RC

P

EX. GRAVEL

DRIVE (TYP.)

R

I G

H

T

O

F

W

A

Y

EX. UTILITY

POLE (TYP.)

EX. WROUGHT

IRON FENCE

(TYP.)

TEMPORARY STABILIZED

CONSTRUCTION EXIT

CE

15'

15'

T E

J

U

L E

V

A

R

D

M

O

U

N

T A

I N

C

R

E

E

K

P

R

K

W

A

Y

1. PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITY, ALL TEMPORARY EROSION AND

SEDIMENTATION (E&S) CONTROL MEASURES MUST BE PROPERLY INSTALLED AND MAINTAINED IN

ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS. THESE CONTROLS MUST REMAIN IN

PLACE UNTIL GOVERNMENT ACCEPTANCE.

2. ALL WORK AND EARTH DISTURBANCE SHALL BE DONE IN A MANNER THAT MINIMIZES POLLUTION OF

ANY ON-SITE OR OFF-SITE WATERS.

3. ANY EARTH DISTURBANCE SHALL BE PERFORMED IN SUCH A MANNER SO AS TO EFFECTIVELY

REDUCE ACCELERATED SOIL EROSION AND RESULTING SEDIMENTATION.

4. CONCRETE WASH WATER SHALL BE CONTAINED AND DISPOSED OF IN ACCORDANCE WITH LOCAL

AND STATE REGULATORY REQUIREMENTS. NO WASH WATER SHALL BE DISCHARGED TO OR

ALLOWED TO RUNOFF TO STATE WATERS, INCLUDING ANY SURFACE OR SUBSURFACE STORM

DRAINAGE SYSTEM OR FACILITIES.

5. THE DISCHARGE OF CONCRETE WASHOUT WATER TO AN INLET, SWALE, ANY PORTION OF THE

STORM DRAINAGE SYSTEM OR ANYTHING EXCEPT A DESIGNATED CONTAINMENT AREA SHALL BE

PROHIBITED

6. THE QUANTITY OF MATERIALS STORED ON THE PROJECT SITE SHALL BE LIMITED, AS MUCH AS

PRACTICAL, TO THAT QUANTITY REQUIRED TO PERFORM THE WORK IN AN ORDERLY SEQUENCE.

ALL MATERIALS STORED ON-SITE SHALL BE STORED IN A NEAT, ORDERLY MANNER, IN THEIR

ORIGINAL CONTAINERS, WITH ORIGINAL MANUFACTURER'S LABELS.

7. BULK STORAGE FOR PETROLEUM PRODUCTS AND OTHER CHEMICALS SHALL HAVE ADEQUATE

PROTECTION SO AS TO CONTAIN ALL SPILLS AND PREVENT ANY SPILLED MATERIAL FROM

ENTERING STATE WATERS, INCLUDING ANY SURFACE OR SUBSURFACE STORM DRAINAGE SYSTEM

OF FACILITIES.

8. CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY

TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES

NECESSARY TO ENSURE THAT STREETS ARE KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL

TIMES.

9. THE SEDIMENT BASIN SHOULD BE INSPECTED REGULARLY (AT LEAST AS OFTEN AS REQUIRED BY

THE TPDES GENERAL PERMIT REQUIREMENTS) TO CHECK FOR CLOGGING OF THE VOID SPACES

BETWEEN STONES. THE FILTER STONE MAY REQUIRE MAINTENANCE IF IT APPEARS CLOGGED OR MAY BE RAKED WITH A GARDEN RAKE TO ALLOW THE WATER TO RELEASE. IF THE FILTER STONE

APPEARS COMPLETELY CLOGGED, THEN THE FILTER STONE WILL HAVE TO BE REMOVED AND

REPLACED.

10. TRASH AND DEBRIS SHOULD BE REMOVED FROM THE SEDIMENT BASIN AFTER EACH STORM EVENT TO PREVENT IT FROM PLUGGING THE ROCK. DEPOSITED SEDIMENT SHALL BE REMOVED WHEN IT

ACCUMULATES TO ONE-HALF THE WET STORAGE DEPTH. THE REMOVED SEDIMENT SHALL BE

STOCKPILED OR REDISTRIBUTED IN AREAS THAT ARE PROTECTED WITH EROSION AND SEDIMENT

CONTROLS.

11. CHECK THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE AND INSPECT THE

EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY.

REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA.

12. SPECIFICATIONS FOR ALL CONSTRUCTION OF ALL EROSION AND SEDIMENT CONTROL ITEMS MAY

BE FOUND IN THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH

CENTRAL TEXAS COUNCIL OF GOVERNMENTS.

13. STABILIZATION OF DISTURBED AREAS MUST, AT A MINIMUM, BE INITIATED IMMEDIATELY WHENEVER

ANY CLEARING, GRADING, EXCAVATING, OR OTHER EARTH DISTURBING ACTIVITIES HAVE

PERMANENTLY CEASED ON ANY PORTION OF THE SITE, OR TEMPORARILY CEASED ON ANY

PORTION OF THE SITE AND WILL NOT RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS. IN THE CONTEXT OF THIS REQUIREMENT, "IMMEDIATELY" MEANS AS SOON AS PRACTICABLE, BUT NO

LATER THAN THE END OF THE NEXT WORK DAY, FOLLOWING THE DAY WHEN THE

EARTH-DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED.

14. TEMPORARY STABILIZATION MUST BE COMPLETED NO MORE THAN 14 CALENDAR DAYS AFTER INITIATION OF SOIL STABILIZATION MEASURES, AND FINAL STABILIZATION MUST BE ACHIEVED

PRIOR TO TERMINATION OF PERMIT COVERAGE.

E&S NOTES:

KEY

KEYNOTE LEGEND:

DESCRIPTION

1 TEMPORARY CHAIN LINK FENCE

2 TEMPORARY CHAN LINK VEHICLE GATE

3 CONSTRUCTION SIGN

4 CONSTRUCTION SAFETY SIGN

CI501

CI501

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

916CM3017

MAY 26, 2020 RPP MAC Dwg. of 72

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

DALLAS-FORT WORTH NATIONAL

CEMETERY BURIAL EXPANSION

DALLAS COUNTY, TEXAS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\E

NG

IN

\33

\02

\P

LA

NS

\B

ID

D

OC

UM

EN

TS

\G

C-

1.D W

G

Gordon

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

PROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Aqua Engineering

(970) 372-6104 rvi

(512) 480-0032

AES Group

(303) 841-3922

GC101

EROSION AND SEDIMENT CONTROL

PLAN - NORTHWEST AREA

GRAPHICAL SCALE: 1" = 60'

60 30 0 60 120 180

KEY MAP

(NOT TO SCALE)

NOTE: CONTRACTOR SHALL

COMPLETE INSTALLATION OF

THE TEMPORARY GRAVEL

CONSTRUCTION ACCESS ROAD

BEFORE ANY OTHER PROJECT

WORK IS STARTED. VA TO

ACCEPT WORK ON THE ROAD

ONCE INSTALLATION IS

COMPLETE FOR SHARED USE

BY A SEPARATE CONTRACT.

535530

530520

546 544

515 520

543544

481482

517 514 507506

509 508

518 517

516 515 514 513 512

477478

478479480

510 511

521522523524

517 516 515

UNITED GAS PIPELINE COMPANY

(TRACT 1) 30' EASEMENT

VOLUME 74139, PAGE 2931

D.R.D.C.T.

EX. GRAVEL

DRIVE (TYP.)

EX. CARILLON

12" PVC SAN. SEW.

(APPROXIMATE LOCATION)

APPROXIMATE LOCATION OF

100-YEAR FLOOD PLAIN

APPROXIMATE LOCATION OF

100-YEAR FLOOD PLAIN

EX. 8" WATER

MAIN (TYP.)

(LOCATION

APPROXIMATE)

EX

. 1

8"

RC

P

EX

. 1

8" R

CP

EX. UNDERGROUND

TELEPHONE CABLE & FIBER

OPTIC CABLE IN 4"Ø PVC

CONDUIT W/ 4"Ø PVC SPARE

CONDUIT (LOCATION

APPROXIMATE)

EX. 30"Ø HIGH PRESSURE

GAS TRANSMISSION MAIN

(LOCATION APPROXIMATE)

EX. 30"Ø HIGH PRESSURE

GAS TRANSMISSION MAIN

(LOCATION APPROXIMATE)

EX. 12"Ø POTABLE

WATER MAIN

(LOCATION

APPROXIMATE)

EX. UTILITY EASEMENT

VOLUME 98193, PAGE 2128

O.P.R.D.C.T.

12" PVC SAN. SEW.

(APPROXIMATE LOCATION)

EX. GRAVEL

DRIVE (TYP.)

EX. UTILITY EASEMENT

VOLUME 98193, PAGE 2128

(O.P.R.D.C.T.)

EX. LIGHT

POLE (TYP.)

EX. 12"Ø

IRRIGATION

WATER MAIN

(LOCATION

APPROXIMATE)

EX. 12"Ø POTABLE

WATER MAIN

(LOCATION

APPROXIMATE)

EX. 12"Ø POTABLE

WATER MAIN

(LOCATION

APPROXIMATE)

EX. IRRIGATION

BACKFLOW

PREVENTER AND

METER PIT (LOCATION

APPROXIMATE)

EX. GRAVEL

DRIVE (TYP.)

EX. FIRE

HYDRANT (TYP.)

EX. UNDERGROUND

TELEPHONE CABLE & FIBER

OPTIC CABLE IN 4"Ø PVC

CONDUIT W/ 4"Ø PVC SPARE

CONDUIT (LOCATION

APPROXIMATE)

EX. 2" IRRIGATION WATER

LATERAL (LOCATION

APPROXIMATE)

EX. 2" IRRIGATION

WATER LATERAL

(LOCATION

APPROXIMATE)

WETLAND 2 (PEM1E)

PERENNIAL

TRIBUTARY

STREAM

PERENNIAL

TRIBUTARY

STREAM

PERENNIAL

TRIBUTARY

STREAM

525530535

540545

515 510

SECTION 52

1,086 PRE-PLACED

DOUBLE-DEPTH CRYPTS

(WITHIN 3'x8' PLOTS)

SECTION 53

998 IN-GROUND

CREMAIN SITES

(WITHIN 4'x4' PLOTS)

SECTION 50

1,368 PRE-PLACED

DOUBLE-DEPTH CRYPTS

(WITHIN 3'x8' PLOTS)

SECTION 48

1,224 PRE-PLACED

DOUBLE-DEPTH CRYPTS

(WITHIN 3'x8' PLOTS)

SECTION 46

1,102 PRE-PLACED

DOUBLE-DEPTH CRYPTS

(WITHIN 3'x8' PLOTS)

SECTION 41

1,590 PRE-PLACED

DOUBLE-DEPTH CRYPTS

(WITHIN 3'x8' PLOTS) SECTION 43

932 PRE-PLACED

DOUBLE-DEPTH CRYPTS

(WITHIN 3'x8' PLOTS)

SECTION 45

698 PRE-PLACED

DOUBLE-DEPTH CRYPTS

(WITHIN 3'x8' PLOTS)

SECTION 51

998 IN-GROUND

CREMAIN SITES

(WITHIN 4'x4' PLOTS)

SECTION 49

532 IN-GROUND

CREMAIN SITES

(WITHIN 4'x4' PLOTS)

SECTION 47

690 IN-GROUND

CREMAIN SITES

(WITHIN 4'x4' PLOTS)

SECTION 40

996 IN-GROUND

CREMAIN SITES

(WITHIN 4'x4' PLOTS)

SECTION 42

998 IN-GROUND

CREMAIN SITES

(WITHIN 4'x4' PLOTS)

SECTION 44

788 IN-GROUND

CREMAIN SITES

(WITHIN 4'x4' PLOTS)

+0

+0

12+00

+0

+0

+0

16+00

+0

+0

19+00

20+00

21+00

22+00

23+00 24+00

25+00

26+

27+00 28+00

29+00

+0

+0

32+00

33+00

34+0035+00 36+00

37+00

38+00

PC: 10+42.83

PT: 11+70.38

PC: 12+30.14

PT: 13+81.65

PRC: 15+94.47

PRC: 17+80.76

PT

: 2

2+

.37

PC

: 2

2+

.47

PRC: 26+06.70

PR

C:

+9

8.8

PT

: 3

4+

.68

PC

: 3

5+

.87

" R

CP

24" RCP

" R

CP

15" RCP

15" RCP

" R

CP

" R

CP

12" RCP

24" RCP

18" R

CP

12" RCP

24" RCP

15" RCP

12" RCP

12" RCP

12" HDPE

" H

DP

E

HDPE

12" HDPE

" H

DP

E

45A

43A

21A

31A

33A

D6

D8

D4

D14

D12

D10

C1

C2

15" RCP

D3

12" RCP

18" RCP

D2

15" HDPE

PC: 14+41.94

" R

CP

24" RCP

4115" RCP

41A

D1

PROPOSED

COMMITTAL

SHELTER

(N.I.C.)

" H

DP

E

8" PVC

12" HDPE

12" HDPE

12" HDPE

12" HDPE

36" RCP

" H

DP

E

" H

DP

E

12" HDPE

15" HDPE

" H

DP

E

15" HDPE

D5

12" HDPE

12" HDPE 12" HDPE

12"

HD

PE

12" HDPE

12" HDPE

12" HDPE

D9

36" RCP

C3

C12

C11

C10

C9

C8

C7

C6

C5

C4

D11

D13

D15

8" PVC

D7

39+00

40+00

41+00

P

T

P

C

P

T

P

C

" R

CP

" R

CP

TEST PIT TO CONFIRM

HORIZONTAL AND

VERTICAL LOCATION

OF EXISTING GAS

LINE WITHIN LIMITS

OF WORK. SEE NOTE

#2, THIS SHEET FOR

ADDITIONAL INFO.

TEST PIT TO CONFIRM

HORIZONTAL AND VERTICAL

LOCATION OF EXISTING GAS

LINE WITHIN LIMITS OF WORK.

SEE NOTE #2, THIS SHEET

FOR ADDITIONAL INFO.

TEST PIT TO CONFIRM

HORIZONTAL AND VERTICAL

LOCATION OF EXISTING GAS

LINE WITHIN LIMITS OF WORK.

SEE NOTE #2, THIS SHEET FOR

ADDITIONAL INFO.

TEST PIT TO

CONFIRM

HORIZONTAL AND

VERTICAL LOCATION

OF EXISTING GAS

LINE WITHIN LIMITS

OF WORK.

SEE NOTE #2, THIS

SHEET FOR

ADDITIONAL INFO.

EC

L

EC

L

EC

L

EC

L

EC

L

EC

L

EC

L

EC

L

EC

L

EC

L

EC

L

EC

L

EC

L

EC

L

ECL

ECL

ECL

ECL

EC

L

EC

L

EC

L

EC

L

ECL ECL

ECLECL

ECL

ECL

ECL

ECL

IP IP

IP

IP

IP

IP IP

IP

IP

IP

IP

IP

IP

IP

OP

IP

IP

ECL ECL

ECL ECL

DD

DD

TO: SLOPE DRAIN

D.A.=2.05 AC.

MIN. PIPE SIZE=21"

21" PVC

DRAIN

PIPE

RIP-RAP

APRON

S.B.

#1

FILTER

STONE

FILTER

STONE

RB

RB

RB

RB

RB

RB

RB

RB

RB

DD

DD

DD

DDDD

DD

DD

DD

DD

DD

DD

DD

TEMPORARY GRAVEL

CONSTRUCTION

ACCESS ROAD

SCF

SCF

SCF

SCF

SCF

SCF

SCF

SC

F

SC

F

SC

F

SC

F

SCF

SCF

SCF

DD

RB

SCF

SCFSCF

CW

15'

10' RIP-RAP

OUTLET

PROTECTION

SCF

OP

SCF

IP

GS

SCF

SCF

SC

F

SC

F

SC

F

SC

F

SC

F

SC

F

485485

3:1 3:1

TO SED. BASIN

D.A. = AC.

#1 19.15

215'

485 3:1

SCF SCF SCF SCF

SCF

SCF

SCF

SC

F

SC

F

SC

F

SC

F

SC

F

SC

F

SC

F

479 478

86 00

GS

86 00

GS

86 00

GS

86 00

GS

83 70

GS

78 00

GS

SB

#1

SCF

SCF

FILTER

STONE

84 50

GS

SCF

SCF

8' WIDE

EMERGENCY

SPILLWAY

4'x4' BOX RISER

STRUCTURE

TOP OF EMBANKMENT=486.00

DESIGN HIGH WATER=484.00

PRINCIPAL SPILLWAY CREST

(TOP OF DRY STORAGE)=483.00

DEWATERING ORIFICE INVERT

(TOP OF WET STORAGE)=480.25

CLEANOUT ELEVATION=479.20

BOTTOM OF BASIN=477.40

LONE STAR CIRCLE

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

SCF

SCF

SCF

SCF

SCF

SCF

SCF

SCF

SC

F

SC

F

SC

F

SC

F

SC

F

SC

F

SC

F

SC

F

SC

F

SC

F

RB

OP

36" RCP

RB

SC

F

SCF

SCF

SCF

SCF

SCF

SCF

SCF

SCF

SC

F

SCF

SCF

SCF SCF SCF

SCF

SCF

SCF

SCF

SCF

SCF

SCF

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

RB

VT

VT

VT

VT

VT

VT

VT

VT

VT

VT

VT

VT

VT

VT

SEDIMENT CONTROL FENCESCF SCF

STABILIZED CONSTRUCTION

ENTRANCE

DIVERSION DIKE

IP INLET PROTECTION

(EROSION CONTROL LOG)

OUTLET PROTECTION

(PLACED RIP-RAP AT OUTLET)

LIMITS OF WORK

DD

OP

CE

EROSION CONTROL LOGECL ECL ECL

ROCK BERM

GC501

GC501

GC501

GC501

GC501

GC501

GC501

CONCRETE WASHOUT

GC501

LEGEND:

ECL ECL

SEDIMENT BASIN

WITH PIPE OUTLET

GC501

S.B.

DRAINAGE DIVIDE

RB

SCF

CW

GRAVEL DRIVE 9

DT503

CONSTRUCTION STAGING,

SPOILS & STORAGE AREA

LIMITS OF CLEARING

VERTICAL TRACKING 9

GC501VT

1. PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITY, ALL TEMPORARY EROSION AND

SEDIMENTATION (E&S) CONTROL MEASURES MUST BE PROPERLY INSTALLED AND MAINTAINED IN

ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS. THESE CONTROLS MUST REMAIN IN

PLACE UNTIL GOVERNMENT ACCEPTANCE.

2. ALL WORK AND EARTH DISTURBANCE SHALL BE DONE IN A MANNER THAT MINIMIZES POLLUTION OF

ANY ON-SITE OR OFF-SITE WATERS.

3. ANY EARTH DISTURBANCE SHALL BE PERFORMED IN SUCH A MANNER SO AS TO EFFECTIVELY

REDUCE ACCELERATED SOIL EROSION AND RESULTING SEDIMENTATION.

4. CONCRETE WASH WATER SHALL BE CONTAINED AND DISPOSED OF IN ACCORDANCE WITH LOCAL

AND STATE REGULATORY REQUIREMENTS. NO WASH WATER SHALL BE DISCHARGED TO OR

ALLOWED TO RUNOFF TO STATE WATERS, INCLUDING ANY SURFACE OR SUBSURFACE STORM

DRAINAGE SYSTEM OR FACILITIES.

5. THE DISCHARGE OF CONCRETE WASHOUT WATER TO AN INLET, SWALE, ANY PORTION OF THE

STORM DRAINAGE SYSTEM OR ANYTHING EXCEPT A DESIGNATED CONTAINMENT AREA SHALL BE

PROHIBITED

6. THE QUANTITY OF MATERIALS STORED ON THE PROJECT SITE SHALL BE LIMITED, AS MUCH AS

PRACTICAL, TO THAT QUANTITY REQUIRED TO PERFORM THE WORK IN AN ORDERLY SEQUENCE.

ALL MATERIALS STORED ON-SITE SHALL BE STORED IN A NEAT, ORDERLY MANNER, IN THEIR

ORIGINAL CONTAINERS, WITH ORIGINAL MANUFACTURER'S LABELS.

7. BULK STORAGE FOR PETROLEUM PRODUCTS AND OTHER CHEMICALS SHALL HAVE ADEQUATE

PROTECTION SO AS TO CONTAIN ALL SPILLS AND PREVENT ANY SPILLED MATERIAL FROM

ENTERING STATE WATERS, INCLUDING ANY SURFACE OR SUBSURFACE STORM DRAINAGE SYSTEM

OF FACILITIES.

8. CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY

TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES

NECESSARY TO ENSURE THAT STREETS ARE KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL

TIMES.

9. THE SEDIMENT BASIN SHOULD BE INSPECTED REGULARLY (AT LEAST AS OFTEN AS REQUIRED BY

THE TPDES GENERAL PERMIT REQUIREMENTS) TO CHECK FOR CLOGGING OF THE VOID SPACES

BETWEEN STONES. THE FILTER STONE MAY REQUIRE MAINTENANCE IF IT APPEARS CLOGGED OR MAY BE RAKED WITH A GARDEN RAKE TO ALLOW THE WATER TO RELEASE. IF THE FILTER STONE

APPEARS COMPLETELY CLOGGED, THEN THE FILTER STONE WILL HAVE TO BE REMOVED AND

REPLACED.

10. TRASH AND DEBRIS SHOULD BE REMOVED FROM THE SEDIMENT BASIN AFTER EACH STORM EVENT TO PREVENT IT FROM PLUGGING THE ROCK. DEPOSITED SEDIMENT SHALL BE REMOVED WHEN IT

ACCUMULATES TO ONE-HALF THE WET STORAGE DEPTH. THE REMOVED SEDIMENT SHALL BE

STOCKPILED OR REDISTRIBUTED IN AREAS THAT ARE PROTECTED WITH EROSION AND SEDIMENT

CONTROLS.

11. CHECK THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE AND INSPECT THE

EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY.

REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA.

12. SPECIFICATIONS FOR ALL CONSTRUCTION OF ALL EROSION AND SEDIMENT CONTROL ITEMS MAY

BE FOUND IN THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH

CENTRAL TEXAS COUNCIL OF GOVERNMENTS.

13. STABILIZATION OF DISTURBED AREAS MUST, AT A MINIMUM, BE INITIATED IMMEDIATELY WHENEVER

ANY CLEARING, GRADING, EXCAVATING, OR OTHER EARTH DISTURBING ACTIVITIES HAVE

PERMANENTLY CEASED ON ANY PORTION OF THE SITE, OR TEMPORARILY CEASED ON ANY

PORTION OF THE SITE AND WILL NOT RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS. IN THE CONTEXT OF THIS REQUIREMENT, "IMMEDIATELY" MEANS AS SOON AS PRACTICABLE, BUT NO

LATER THAN THE END OF THE NEXT WORK DAY, FOLLOWING THE DAY WHEN THE

EARTH-DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED.

14. TEMPORARY STABILIZATION MUST BE COMPLETED NO MORE THAN 14 CALENDAR DAYS AFTER INITIATION OF SOIL STABILIZATION MEASURES, AND FINAL STABILIZATION MUST BE ACHIEVED

PRIOR TO TERMINATION OF PERMIT COVERAGE.

E&S NOTES:

KEY

KEYNOTE LEGEND:

DESCRIPTION

1 TEMPORARY CHAIN LINK FENCE

2 TEMPORARY CHAN LINK VEHICLE GATE

3 CONSTRUCTION SIGN

4 CONSTRUCTION SAFETY SIGN

CI501

CI501

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

916CM3017

MAY 26, 2020 RPP MAC Dwg. of 72

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

DALLAS-FORT WORTH NATIONAL

CEMETERY BURIAL EXPANSION

DALLAS COUNTY, TEXAS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\E

NG

IN

\33

\02

\P

LA

NS

\B

ID

D

OC

UM

EN

TS

\G

C-

1.D W

G

Gordon

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

PROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Aqua Engineering

(970) 372-6104 rvi

(512) 480-0032

AES Group

(303) 841-3922

GC102

EROSION AND SEDIMENT CONTROL

PLAN

GRAPHICAL SCALE: 1" = 60'

60 30 0 60 120 180

KEY MAP

(NOT TO SCALE)

NOTE: CONTRACTOR SHALL

COMPLETE INSTALLATION OF

THE TEMPORARY GRAVEL

CONSTRUCTION ACCESS ROAD

BEFORE ANY OTHER PROJECT

WORK IS STARTED. VA TO

ACCEPT WORK ON THE ROAD

ONCE INSTALLATION IS

COMPLETE FOR SHARED USE

BY A SEPARATE CONTRACT.

Sheets and Views
06 OVERALL SITE PLAN AND KEY MAP
07 EROSION AND SEDIMENT CONTROL PLAN - NORTHWEST AREA
08 EROSION AND SEDIMENT CONTROL PLAN
09 EROSION AND SEDIMENT CONTROL DETAILS
P-dfw-minor-LI100
Sheets and Views
LI100
P-dfw-minor-LI101
Sheets and Views
LI101
P-dfw-minor-LI102
Sheets and Views
LI102
P-dfw-minor-LI103
Sheets and Views
LI103
P-dfw-minor-LI500
Sheets and Views
LI500
P-dfw-minor-LI501
Sheets and Views
LI501
P-dfw-minor-LI502
Sheets and Views
LI502