S02_Attachment-17_IFB Contractor Cost Estimate Worksheet.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C78620B0019
About this file
This document contains a contractor cost estimate worksheet template and information for a federal contract opportunity for burial expansion services at the Dallas-Fort Worth National Cemetery. The cost estimate worksheet template lists the common construction divisions and includes fields for lump sum costs for base bids and any contract line item numbers. Contractors must complete this template to break out their total proposed costs by division.
The related federal contract opportunity is a sealed bid solicitation issued by the Department of Veterans Affairs National Cemetery Administration. Services required include burial expansion at the Dallas-Fort Worth National Cemetery as part of project 916CM3017. Interested vendors should submit sealed bids via the VA's electronic contract management system portal by the response deadline to be considered for award.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number |
| Project Name |
| Division | Base Bid | CLIN1 | CLIN 2 | CLIN3 | Total |
| Division 0 | |||||
| Special Sections | |||||
| Division 01 | |||||
| General Requirements | |||||
| Division 02 | |||||
| Existing Conditions | |||||
| Division 03 | |||||
| Concrete | |||||
| Division 04 | |||||
| Masonry | |||||
| Division 05 | |||||
| Metals | |||||
| Division 06 | |||||
| Wood, Plastic, and Composites | |||||
| Division 07 | |||||
| Thermal and Moisture Protection | |||||
| Division 08 | |||||
| Openings (Doors, Windows, etc...) | |||||
| Division 09 | |||||
| Finishes | |||||
| Division 10 | |||||
| Specialties | |||||
| Division 11 | |||||
| Equipment | |||||
| Division 12 | |||||
| Furnishings | |||||
| Division 13 | |||||
| Special Construction | |||||
| Division 14 | |||||
| Fire Suppression | |||||
| Division 22 | |||||
| Plumbing | |||||
| Division 23 | |||||
| Heat, Ventilating, and Air Conditioning | |||||
| Division 25 | |||||
| Integrated Automation | |||||
| Division 26 | |||||
| Electrical | |||||
| Division 27 | |||||
| Communications | |||||
| Division 28 | |||||
| Electronic Safety and Security | |||||
| Division 31 | |||||
| Earthwork | |||||
| Division 32 | |||||
| Exterior Improvements | |||||
| Division 33 | |||||
| Utilities | |||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $ $ $ $