S02 - Attachment 4 - EHRM Readiness Infrastructure Self-Assessment Hines.xlsx

XLSX spreadsheet 30 MB Posted

Attached to
Z1AZ--EHRM Training and Admin Space Support - Phase 2 - Hines, IL 578-21-706 (VA-21-00021817)
Solicitation number
36C77621R0055
Issued by

About this file

This document outlines a presolicitation notice for architectural and engineering services. The Department of Veterans Affairs seeks to award an firm-fixed price design contract for the development of construction documents including drawings, specifications, reports, and construction period services for the Hines EHRM Training and Administration Phase II project located at the Hines, Illinois VA Medical Center. The project value is estimated between $5-10 million. Responses are due by March 1, 2021 and award is anticipated by May 2021 with a 120 day period of performance. The procurement is set aside 100% for service-disabled veteran-owned small businesses. Firms are to submit a Standard Form 330 along with past performance questionnaires and must be verified as an SDVOSB in the Vendor Information Portal database to be considered.

View the file

Other files

File Type Posted
S02 - Attachment 27 - Cutting Welding and Other Hot Work.pdf PDF
S02 - Attachment 6 - EHRM Design Schedule.docx DOCX document
S02 - Attachment 19 - OIT Standards Alert 003C2B-SA-017.pdf PDF
S02 - Attachment 5 - Past Performance Questionnaire.docx DOCX document
S02 - Attachment 13 - OIT Horizontal Cable Requirements.pdf PDF
S02 - Attachment 24 - Dig Permit SOP Form.pdf PDF
S02 - Attachment 10 - No Smoking Policy 10-1-19.pdf PDF
S02 - Attachment 1 - 578-21-706 SOW EHRM Training and Admin 2021-01-22 FINAL.docx DOCX document
S02 - Attachment 11 - Contractor Parking.pdf PDF
S02 - Attachment 25 - Hines COVID-19 Guidelines.pdf PDF
S02 - Attachment 31 - Infection Control Risk Assessment (ICRA).docx DOCX document
S02 - Attachment 28 - Safety and Health During Construction Activities.pdf PDF
S02 - Attachment 9 - Contractor PIV Instructions and Form.pdf PDF
S02 - Attachment 16 - OEHRM Infrastructure Readiness Playbook v2.0.pdf PDF
S02 - Attachment 23 - Hines Data Closet Security.pdf PDF
S02 - Attachment 3 - Sensitive Infrastructure Data Classication.pdf PDF
S02 - Attachment 8 - Hines Underground Utility Plan.pdf PDF
S02 - Attachment 18 - OIT-InfrastrucStdsTelecommSpaces v3.0.pdf PDF
S02 - Attachment 22 - OIT-Design Guide Templates-CriticalTelecommSpaces.pdf PDF
S02 - Attachment 26 - Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 - Attachment 17 - VA EHRM Site Infrastructure and EUD Requirements - 1.8.pdf PDF
S02 - Attachment 2 - SOCAMES 6 Design Alert 1.pdf PDF
36C77621R0055.docx DOCX document
S02 - Attachment 30 - Interim Life Safety Measures (ILSM).docx DOCX document
S02 - Attachment 7 - Hines VA Campus Site Plan.pdf PDF
S02 - Attachment 21 - OIT Design Guide.pdf PDF
S02 - Attachment 14 - Fire Protection Code Reviews.pdf PDF
S02 - Attachment 15 - 578-21-703 Combined Drawing Set.pdf PDF
S02 - Attachment 29 - Pre-Construction Risk Assessment (PCRA).docx DOCX document
S02 - Attachment 20 - HEFP SEP-EHRM Training_Admin Space-Planning Job Aid.pdf PDF
S02 - Attachment 12 - AE Design Checklist.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .