S02 - Attachment 31 - Infection Control Risk Assessment (ICRA).docx

DOCX document 24 KB Posted

Attached to
Z1AZ--EHRM Training and Admin Space Support - Phase 2 - Hines, IL 578-21-706 (VA-21-00021817)
Solicitation number
36C77621R0055
Issued by

About this file

This document contains an infection control risk assessment template and federal contract opportunity notice. The risk assessment template provides guidance for classifying construction activities according to infection control risk groups and outlining corresponding contractor actions.

The federal contract opportunity is a pre-solicitation notice from the Department of Veterans Affairs seeking architect-engineer qualification packages for the EHRM Training and Administration Phase II project at the Hines, Illinois VAMC. Interested firms should submit SF-330 statements of qualifications by March 1, 2021 for design services with an anticipated 120-day performance period. The 100% SDVOSB set-aside contract value is estimated between $5-10 million. Evaluation criteria include specialized experience, professional qualifications, capacity, past performance, locality knowledge, and construction period experience. The secondary criterion is geographic proximity to the Hines VAMC.

View the file

Other files

File Type Posted
S02 - Attachment 4 - EHRM Readiness Infrastructure Self-Assessment Hines.xlsx XLSX spreadsheet
S02 - Attachment 27 - Cutting Welding and Other Hot Work.pdf PDF
S02 - Attachment 6 - EHRM Design Schedule.docx DOCX document
S02 - Attachment 19 - OIT Standards Alert 003C2B-SA-017.pdf PDF
S02 - Attachment 5 - Past Performance Questionnaire.docx DOCX document
S02 - Attachment 13 - OIT Horizontal Cable Requirements.pdf PDF
S02 - Attachment 24 - Dig Permit SOP Form.pdf PDF
S02 - Attachment 10 - No Smoking Policy 10-1-19.pdf PDF
S02 - Attachment 1 - 578-21-706 SOW EHRM Training and Admin 2021-01-22 FINAL.docx DOCX document
S02 - Attachment 11 - Contractor Parking.pdf PDF
S02 - Attachment 25 - Hines COVID-19 Guidelines.pdf PDF
S02 - Attachment 28 - Safety and Health During Construction Activities.pdf PDF
S02 - Attachment 9 - Contractor PIV Instructions and Form.pdf PDF
S02 - Attachment 16 - OEHRM Infrastructure Readiness Playbook v2.0.pdf PDF
S02 - Attachment 23 - Hines Data Closet Security.pdf PDF
S02 - Attachment 3 - Sensitive Infrastructure Data Classication.pdf PDF
S02 - Attachment 8 - Hines Underground Utility Plan.pdf PDF
S02 - Attachment 18 - OIT-InfrastrucStdsTelecommSpaces v3.0.pdf PDF
S02 - Attachment 22 - OIT-Design Guide Templates-CriticalTelecommSpaces.pdf PDF
S02 - Attachment 26 - Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 - Attachment 17 - VA EHRM Site Infrastructure and EUD Requirements - 1.8.pdf PDF
S02 - Attachment 2 - SOCAMES 6 Design Alert 1.pdf PDF
36C77621R0055.docx DOCX document
S02 - Attachment 30 - Interim Life Safety Measures (ILSM).docx DOCX document
S02 - Attachment 7 - Hines VA Campus Site Plan.pdf PDF
S02 - Attachment 21 - OIT Design Guide.pdf PDF
S02 - Attachment 14 - Fire Protection Code Reviews.pdf PDF
S02 - Attachment 15 - 578-21-703 Combined Drawing Set.pdf PDF
S02 - Attachment 29 - Pre-Construction Risk Assessment (PCRA).docx DOCX document
S02 - Attachment 20 - HEFP SEP-EHRM Training_Admin Space-Planning Job Aid.pdf PDF
S02 - Attachment 12 - AE Design Checklist.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Infection Control Risk Assessment for Construction / Renovation Projects

Project Name:
Project or Work-Order Number:
Project Manager or COR:
Extension:
Building Number:
Floor(s)/Room(s):
Start date:
Projected completion date:
Construction Activity
Infection Control Risk Group

☐ TYPE A: DUST LEVEL Low Non-invasive activity, low noise, no vibration.

☒ GROUP 1: LOW

Office areas, FMS areas, all non-patient care areas.

☒ TYPE B: DUST LEVEL: Moderate to High Small scale, short duration, low-moderate noise, low-moderate vibration.

☐ GROUP 2: MEDIUM

All other patient care areas including general medicine floors, ultrasound, Rehab, Occupational Therapy.

☐ TYPE C: DUST LEVEL Moderate to High Requires more than one work shift (independent of working days) to complete, low-moderate noise, moderate–high vibration

☐ GROUP 3: MEDIUM/HIGH

ED, Radiology/MRI, admissions, food service areas, laboratories.

☐ TYPE D: DUST LEVEL High Major demolition and construction activities. Requires consecutive work shifts, moderate-high noise, moderate-high vibration

☐ GROUP 4: HIGHEST

Operating rooms, SPS, ICU’s, Outpatient areas, oncology, anesthesia, post anesthetic recovery, all endoscope areas, Pharmacy, Renal Dialysis

Project Class Determination Matrix

Construction Activity Type Risk Group Type “A” Type “B” Type “C” Type “D”

Group 1
I
II
II
III
Group 2
I
II
III
IV
Group 3
I
III
III
IV
Group 4
III
IV
IV
IV

Contractors Actions by Project Class

All personnel will have Emergency Preparedness training/posting/ID card.

CLASS

I

1. Execute work to minimize air-borne dust dispersed into atmosphere from construction operations.

2. Immediately replace any ceiling tile displaced for visual inspection.

3. Contain construction waste before transport in tightly covered containers.

4. Clean work area upon completion of task including wiping surfaces with disinfectant.

5. Contact EMS for appropriate preparation for return to operation(s).

CLASS

II

In addition to above:

6. Post the signed ICRA at the entrance.

7. Isolate work area from patients/staff. Use appropriate temporary barriers and more permanent containment methods (i.e., seal holes in walls, tape gaps in doors, etc.)

8. Water mist work surfaces to control dust while cutting.

9. Block off and seal supply air vents. Place filter over return/exhaust vents.

10. Place dust mat or wipe feet at entrance/exit of work area.

11. Wet mop and/or vacuum w/HEPA filtered vacuum before leaving work areas.

CLASS

III

In addition to above:

12. Install barriers to create a negative pressure ante room and/or workroom.

13. Maintain negative air pressure in work area at all times until completion utilizing HEPA-equipped air filtration units.

14. Vacuum personnel with HEPA vacuum before leaving. Or, Don-Doff coveralls each time leaving work site. All wear shoe covers changed each time exiting the area.

15. Vacuum the entire work area with HEPA vacuums or wet mop with disinfectant at the completion of project.

16. Do not remove barriers until completed project is inspected by Safety, IC-Team, EMS, and Area Manager.

17. Carefully remove barriers to minimize spread of dirt and debris. Contact EMS for final clean.

CLASS

IV

In addition to above:

18. Provide a disinfectant wipe down of any tool carts or waste transports prior to leaving the containment area.

19. Do not remove barriers until terminal clean is performed inside work zone and barriers are included in the cleaning process.

20. Perform 2nd terminal cleaning after removal of barriers. Contact EMS for final clean.

Signatures
Date

Contractor’s Signature:

(Projects Only)

Project Planner or Maintenance Worker Signature:

Supervisor Signature:

Infection Control:

File details come from the government source that posted it. Updated .