S02 - Attachment 23 - Hines Data Closet Security.pdf

PDF 40 KB Posted

Attached to
Z1AZ--EHRM Training and Admin Space Support - Phase 2 - Hines, IL 578-21-706 (VA-21-00021817)
Solicitation number
36C77621R0055
Issued by

About this file

This document includes a pre-solicitation notice for architectural and engineering services and a physical security survey memorandum. The pre-solicitation notice is for design services for the Hines EHRM Training and Administration Phase II project at the Hines, Illinois VA Medical Center. Required services include project design, construction documents, commissioning, and construction period support. The contract will be set aside for Service-Disabled Veteran-Owned Small Businesses. The period of performance for design is 120 days from award with an anticipated award date of May 2021. Submissions are due by March 1, 2021 and will be evaluated based on specialized experience, professional qualifications, capacity, past performance, locality, and construction period experience. The physical security survey memorandum documents findings and recommendations from a security assessment of telecom/data closets at the Hines VA Medical Center campus regarding door locks and hinges. Recommended corrective actions include installing mortise locks and spot welding or securing hinges.

View the file

Other files

File Type Posted
S02 - Attachment 4 - EHRM Readiness Infrastructure Self-Assessment Hines.xlsx XLSX spreadsheet
S02 - Attachment 27 - Cutting Welding and Other Hot Work.pdf PDF
S02 - Attachment 6 - EHRM Design Schedule.docx DOCX document
S02 - Attachment 19 - OIT Standards Alert 003C2B-SA-017.pdf PDF
S02 - Attachment 5 - Past Performance Questionnaire.docx DOCX document
S02 - Attachment 13 - OIT Horizontal Cable Requirements.pdf PDF
S02 - Attachment 24 - Dig Permit SOP Form.pdf PDF
S02 - Attachment 10 - No Smoking Policy 10-1-19.pdf PDF
S02 - Attachment 1 - 578-21-706 SOW EHRM Training and Admin 2021-01-22 FINAL.docx DOCX document
S02 - Attachment 11 - Contractor Parking.pdf PDF
S02 - Attachment 25 - Hines COVID-19 Guidelines.pdf PDF
S02 - Attachment 31 - Infection Control Risk Assessment (ICRA).docx DOCX document
S02 - Attachment 28 - Safety and Health During Construction Activities.pdf PDF
S02 - Attachment 9 - Contractor PIV Instructions and Form.pdf PDF
S02 - Attachment 16 - OEHRM Infrastructure Readiness Playbook v2.0.pdf PDF
S02 - Attachment 3 - Sensitive Infrastructure Data Classication.pdf PDF
S02 - Attachment 8 - Hines Underground Utility Plan.pdf PDF
S02 - Attachment 18 - OIT-InfrastrucStdsTelecommSpaces v3.0.pdf PDF
S02 - Attachment 22 - OIT-Design Guide Templates-CriticalTelecommSpaces.pdf PDF
S02 - Attachment 26 - Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 - Attachment 17 - VA EHRM Site Infrastructure and EUD Requirements - 1.8.pdf PDF
S02 - Attachment 2 - SOCAMES 6 Design Alert 1.pdf PDF
36C77621R0055.docx DOCX document
S02 - Attachment 30 - Interim Life Safety Measures (ILSM).docx DOCX document
S02 - Attachment 7 - Hines VA Campus Site Plan.pdf PDF
S02 - Attachment 21 - OIT Design Guide.pdf PDF
S02 - Attachment 14 - Fire Protection Code Reviews.pdf PDF
S02 - Attachment 15 - 578-21-703 Combined Drawing Set.pdf PDF
S02 - Attachment 29 - Pre-Construction Risk Assessment (PCRA).docx DOCX document
S02 - Attachment 20 - HEFP SEP-EHRM Training_Admin Space-Planning Job Aid.pdf PDF
S02 - Attachment 12 - AE Design Checklist.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF Memorandum

VETERANS AFFAIRS

Date: 09/16/2020

From: Chief of Police Service (07)

Subj: Physical Security Survey

To: Chief, Information Resources 4agement (IRM) Thru: Director, Medical Center (09)

1. PURPOSE:

To advise the results of a physical security survey of your Service completed on September 16, 2020 and to recommend corrective actions.

2. SCOPE OF SURVEY:

Telecom/Data Connection Closets

3. SURVEYING OFFICIAL:

Physical Security Specialist William C. Armstrong

4. FINDINGS:

A. Doors and door locks: All exterior doors to Telecom/Data closets located on Hines campus are not equipped with mortise locks with deadlock feature; IAW ANSI/BHMA A156.13 American National Standards for Mortise Locks. per 0730/4 Appendix B.

B. Doors and door locks: All exterior doors to Telecom/Data closets located on Hines campus that swing outward have removable hinge pins that are not spot welded or retained with set pins per 0730/4 Appendix B.

5. RECOMMENDATIONS:

A. Doors and Door Locks: Install mortise locks with a deadlock feature on all Telecom/Data closets on Hines Campus.

Automated VA FORM 2105

B. Doors and Door Locks: Spot weld all exterior door hinges or install set pins to all Telcom/Data Closets located on Hines Campus that have a swingout door

The recommendations made are based on the Physical Security Requirements set forth in the VA Handbook 0730/4, March 29, 2013, Appendix B "Physical Security Requirements".

Please submit a written response within 30 calendar days from the receipt of this memorandum.

o3z_a, Chief, Polies-IS ervice Kimberly Coleman

Automated VA FORM 2105

Page 1
Page 2

File details come from the government source that posted it. Updated .