S02 - Attachment 25 - Hines COVID-19 Guidelines.pdf

PDF 313 KB Posted

Attached to
Z1AZ--EHRM Training and Admin Space Support - Phase 2 - Hines, IL 578-21-706 (VA-21-00021817)
Solicitation number
36C77621R0055
Issued by

About this file

This document provides details for a presolicitation notice seeking Architect-Engineer qualifications packages for the Hines EHRM Training and Administration Phase II project at the Hines VA Medical Center in Illinois. The project requires design services including working drawings, specifications, reports, commissioning, and construction period support. A 100% set-aside is designated for Service-Disabled Veteran-Owned Small Businesses. Submissions are due by March 1, 2021 and are to be evaluated based on specialized experience, professional qualifications, capacity, past performance, locality, and construction period experience. Discussions will be held with the highest rated firms before awarding an A-E contract with an anticipated performance period of 120 days from notice to proceed.

View the file

Other files

File Type Posted
S02 - Attachment 4 - EHRM Readiness Infrastructure Self-Assessment Hines.xlsx XLSX spreadsheet
S02 - Attachment 27 - Cutting Welding and Other Hot Work.pdf PDF
S02 - Attachment 6 - EHRM Design Schedule.docx DOCX document
S02 - Attachment 19 - OIT Standards Alert 003C2B-SA-017.pdf PDF
S02 - Attachment 5 - Past Performance Questionnaire.docx DOCX document
S02 - Attachment 13 - OIT Horizontal Cable Requirements.pdf PDF
S02 - Attachment 24 - Dig Permit SOP Form.pdf PDF
S02 - Attachment 10 - No Smoking Policy 10-1-19.pdf PDF
S02 - Attachment 1 - 578-21-706 SOW EHRM Training and Admin 2021-01-22 FINAL.docx DOCX document
S02 - Attachment 11 - Contractor Parking.pdf PDF
S02 - Attachment 31 - Infection Control Risk Assessment (ICRA).docx DOCX document
S02 - Attachment 28 - Safety and Health During Construction Activities.pdf PDF
S02 - Attachment 9 - Contractor PIV Instructions and Form.pdf PDF
S02 - Attachment 16 - OEHRM Infrastructure Readiness Playbook v2.0.pdf PDF
S02 - Attachment 23 - Hines Data Closet Security.pdf PDF
S02 - Attachment 3 - Sensitive Infrastructure Data Classication.pdf PDF
S02 - Attachment 8 - Hines Underground Utility Plan.pdf PDF
S02 - Attachment 18 - OIT-InfrastrucStdsTelecommSpaces v3.0.pdf PDF
S02 - Attachment 22 - OIT-Design Guide Templates-CriticalTelecommSpaces.pdf PDF
S02 - Attachment 26 - Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 - Attachment 17 - VA EHRM Site Infrastructure and EUD Requirements - 1.8.pdf PDF
S02 - Attachment 2 - SOCAMES 6 Design Alert 1.pdf PDF
36C77621R0055.docx DOCX document
S02 - Attachment 30 - Interim Life Safety Measures (ILSM).docx DOCX document
S02 - Attachment 7 - Hines VA Campus Site Plan.pdf PDF
S02 - Attachment 21 - OIT Design Guide.pdf PDF
S02 - Attachment 14 - Fire Protection Code Reviews.pdf PDF
S02 - Attachment 15 - 578-21-703 Combined Drawing Set.pdf PDF
S02 - Attachment 29 - Pre-Construction Risk Assessment (PCRA).docx DOCX document
S02 - Attachment 20 - HEFP SEP-EHRM Training_Admin Space-Planning Job Aid.pdf PDF
S02 - Attachment 12 - AE Design Checklist.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hines COVID-19 Guidelines The following are rules set in place to control the spread of the Coronavirus at the Hines hospital, all buildings on the campus, and the Community Based Outpatient Clinics (CBOCs).

General

A) Masks or face coverings are required to be worn at Hines.

B) All contractors need to have their PIV cards on their person.

C) All the doors on Hines campus close at 4:30 PM except the Emergency Department and the main lobby of Building 200. Once the doors on campus are secured at 4:30 PM, the only entrances to enter the facility are the Emergency Department and the main lobby of Building 200. Unauthorized entry to any other doors that have been secured will be enforced by the VA Police.

Upon Arrival at the Station

A) The station has four main entry points for COVID screening.

1. The main lobby of Building 200

2. The Atrium just north of Building 45

3. C-Section east entrance to Building 1

4. The main lobby of Building 217

B) Everyone entering the screening points will have their temperature checked and symptoms queried daily.

C) You will be given a sticker to place on you PIV card showing you have been screened for the day.

Exiting and Re-entry

A) You may exit any building from any normal door leading to the exterior. Please be sure the door is fully closed behind you after exiting.

B) If you need to re-enter the facility, you will need to go to one of the screening points. If you have already been screened you need only show the dated sticker showing you were screened earlier in the day.

C) After 4:30 PM, only the main lobby in Building 200 and the Emergency Department may be used for re-entry.

D) Propping open doors and allowing unscreened individuals to enter will result in immediate removal from the station and other penalties.

File details come from the government source that posted it. Updated .