S02_Attachment-3_SOW_846CM3047.pdf
PDF 9 KB Posted
- Solicitation number
- 36C78621B0024
About this file
This document includes a scope of work and solicitation for the renovation of an historic stone wall at Fort Sam Houston National Cemetery. The scope of work involves the demolition and removal of existing structures, as well as furnishing labor, materials, and equipment to repair and renovate approximately 3,300 linear feet of historic stone wall along two roads. The work will be performed over 360 calendar days and includes tasks such as site preparation, erosion control, excavation, backfilling, grading, and planting of native grass seed. The solicitation is a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses, with a response deadline as noted in the solicitation and work to be awarded by the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Sam Houston
846CM3047
Scope of work
11-16-2021
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor, materials, equipment, and services and perform and complete all work for the repair / renovation of approximately 3,300 linear feet of Historic
Stone Wall at the Fort Sam Houston National Cemetery. The Wall is to be renovated along
Harry Wurzbach Road and along Winans Road. The Wall has deteriorated, it has broken cap stones and is leaning to one side.
A. CLIN 1: GENERAL CONSTRUCTION: Provide all labor, materials, tools, equipment, and services to construct the full extent of the work defined in this phase of work at the Fort Sam
Houston National Cemetery, including all work shown on the plans and described in the specifications. The Work of demolition of portions of the existing wall and construction of new portions of the wall shall be performed by a contractor or subcontractor with experience in historic wall / structural renovation. Prior to starting the work, the contractor and subcontractor shall review the Contract Documents fully for the complete requirements. The Work includes but is not limited to; demolition, site preparation, erosion control, excavation, backfilling, grading, construction of berms, planting of native grass seed mix for all disturbed areas as further defined by the drawings and specifications. The overall performance period for this project is
360 calendar days from issuance of the notice-to proceed (NTP). All other work will be completed prior to starting work on the portion of the Wall along Winans Road.
B. CLIN 2: Option1: Provide all labor, materials, tools, equipment, and services to construct the full extent of the work defined and called out as: Option 1 sheet AS-100, Sheets AS-111 thru
AS-119.
File details come from the government source that posted it. Updated .