S02_Attachment-13_Contractor Price Estimate Worksheet.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- 36C78621B0024
About this file
This document contains an estimated construction cost worksheet and a pre-solicitation notice for a federal contract opportunity. The construction cost worksheet is a template for contractors to estimate costs for renovating and repairing various aspects of a project involving general requirements, existing conditions, concrete, masonry, metals, woods, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, transportation, waterway and marine construction, process interconnections, material processing and handling, process heating cooling and drying, process gas and liquid handling, pollution and waste control, industry-specific manufacturing, water and wastewater equipment, and electrical power generation.
The pre-solicitation notice indicates the Department of Veterans Affairs intends to issue a solicitation by November 15, 2021 for renovating a historic wall at Fort Sam Houston National Cemetery. The acquisition will be an Invitation for Bid between $500,000 and $1 million under NAICS code 238140. The procurement is 100% set aside for verified Service-Disabled Veteran-Owned Small Businesses. Electronic bid documents will be available at SAM.gov as of the notice date, with no paper copies issued. Bids are due by the date specified in the IFB.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Description | Unit | Cost/Unit | # Units | Total Cost | Remarks |
| Offeror shall use and edit to fit Task Order Project | |||||
| Division 01 - General Requirements | |||||
| Project set-up | L.S. | $0.00 | 0 | $0.00 | |
| Coordination | L.S. | $0.00 | 0 | $0.00 | |
| General Demolition | L.S. | $0.00 | 0 | $0.00 | |
| Selective demo. GWB / Act ceiling | SF | $0.00 | 0 | $0.00 | |
| Selective demo. of floor fin and floor prep. | SF | $0.00 | 0 | $0.00 | |
| Selective demo. Walls | Each | $0.00 | 0 | $0.00 | |
| Selective demolition & salvage | Each | $0.00 | 0 | $0.00 | |
| Job supervision and misc. labor | Week | $0.00 | 0 | $0.00 | |
| Mobilization / Demobilization | Job | $0.00 | 0 | $0.00 | |
| Division 02 - Existing Conditions | |||||
| $0.00 | 0 | $0.00 |
| Division 03 - Concrete | ||||
| Concrete floor trenching and infill | L.S. | $0.00 | 0 | $0.00 |
| Concrete floor prep., flash patch | L.S. | $0.00 | 0 | $0.00 |
| Division 04 - Masonry | |||
| $0.00 | 0 | $0.00 |
| Division 05 - Metals | ||||
| Misc. equipment supports | L.S. | $0.00 | 0 | $0.00 |
| Modification to Metal Window frame | Each | $0.00 | 0 | $0.00 |
| Division 06 - Wood, Plastics, and Composites | ||||
| Misc. blocking, framing | L.S. | $0.00 | 0 | $0.00 |
| Chair Rail | LF | $0.00 | 0 | $0.00 |
| Blocking for Casework | L.S. | $0.00 | 0 | $0.00 |
| Wood Trim (At Tech Station) | LF | $0.00 | 0 | $0.00 |
| Plywood and wood trim (at Lockers) | LF | $0.00 | 0 | $0.00 |
| Coat Rod | Each | $0.00 | 0 | $0.00 |
| Division 07 -Thermal & Moisture Protection | ||||
| Firestopping | LF | $0.00 | 0 | $0.00 |
| Joint sealants | LF | $0.00 | 0 | $0.00 |
| Division 08 - Openings | ||||
| New Door and Mtl. Frame | Each | $0.00 | 0 | $0.00 |
| New Lead-lined door and frame assembly | Each | $0.00 | 0 | $0.00 |
| Modifications to existing lead windows | Each | $0.00 | 0 | $0.00 |
| Division 09 - Finishes | ||||
| Acoustical ceiling tile | SF | $0.00 | 0 | $0.00 |
| Existing Wall Patching | SF | $0.00 | 0 | $0.00 |
| Metal stud, gyp.board assemblies | LF | $0.00 | 0 | $0.00 |
| GWB over exist framing | LF | $0.00 | 0 | $0.00 |
| Paint | SF | $0.00 | 0 | $0.00 |
| Vinyl Boarder | LF | $0.00 | 0 | $0.00 |
| Resilient base | LF | $0.00 | 0 | $0.00 |
| Sheet Vinyl flooring and accessories | SF | $0.00 | 0 | $0.00 |
| Carpet | Yr | $0.00 | 0 | $0.00 |
| Division 10 - Specialties | ||||
| Hospital Curtain and Track | LF | $0.00 | 0 | $0.00 |
| Toilet and Bath Accessories | Each | $0.00 | 0 | $0.00 |
| Casework Base and Wall | LF | $0.00 | 0 | $0.00 |
| Countertops | LF | $0.00 | 0 | $0.00 |
| Countertops with supports | LF | $0.00 | 0 | $0.00 |
| P. Lam Shelving | LF | $0.00 | 0 | $0.00 |
| Med. Cabinet | Each | $0.00 | 0 | $0.00 |
| Lockers | Each | $0.00 | 0 | $0.00 |
| Wall Hooks | L.S. | $0.00 | 0 | $0.00 |
| White Board | Each | $0.00 | 0 | $0.00 |
| Division 11 - Equipment | |||
| $0.00 | 0 | $0.00 |
| Division 12 - Furnishings | ||||
| - | $0.00 | 0 | $0.00 |
Division 13 - Special Construction
Division 14 - Conveying Equipment
| Division 21 - Fire Suppression | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 22 - Plumbing | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 23 - HVAC | ||||
| Removals | LS | $0.00 | 0 | $0.00 |
| Computer Room A/C % Humidifier | Each | $0.00 | 0 | $0.00 |
| Electric Reheat Coils | Each | $0.00 | 0 | $0.00 |
| Fan Coil Unit | Each | $0.00 | 0 | $0.00 |
| Ductwork | LS | $0.00 | 0 | $0.00 |
| RGD's | Each | $0.00 | 0 | $0.00 |
| HVAC Insulation | LS | $0.00 | 0 | $0.00 |
| Temperature Controls | LS | $0.00 | 0 | $0.00 |
| Test and Balanace | LS | $0.00 | 0 | $0.00 |
| Division 25 - Intergrated Automation | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 26 - Electrical | ||||
| General Conditions and Administration | - | $0.00 | 0 | $0.00 |
| Allowance | - | $0.00 | 0 | $0.00 |
| Wiring Devices | Each | $0.00 | 0 | $0.00 |
| Wiring Device Circuiting | Each | $0.00 | 0 | $0.00 |
| Light Fixtures & Circuiting | Each | $0.00 | 0 | $0.00 |
| Specialty Light Fixtures & Circuiting | Each | $0.00 | 0 | $0.00 |
| Relocate Panel board & circuits | Each | $0.00 | 0 | $0.00 |
| Relocate Nurse Call | LS | $0.00 | 0 | $0.00 |
| Telephone / Data | Each | $0.00 | 0 | $0.00 |
| Cath Equipment Connections & Feeder | LS | $0.00 | 0 | $0.00 |
| HVAC Equipment Connections | LS | $0.00 | 0 | $0.00 |
| Demolition | LS | $0.00 | 0 | $0.00 |
| Division 27 - Communications | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 28 - Electronic Safety and Security | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 31 - Earthwork | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 32 - Exterior Improvements | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 33 - Utilities | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 34 - Transportation | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 35 - Waterway and Marine Construction | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 40 - Process Interconnections | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 41 - Material Processing and Handling | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 42 - Process Heating, Cooling, and Drying | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 43 - Process Gas and Liquid Handling | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 44 - Pollution and Waste Control | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 45 - Industry-Specific Manufacturing | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 46 - Water and Wastewater Equipment | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| Division 48 - Electrical Power Generation | ||||
| TBD | LS | $0.00 | 0 | $0.00 |
| TBD | - | $0.00 | 0 | $0.00 |
| General Construction Subtotal | $0.00 |
| Mechanical, Electrical, Plumbing Subtotal | $0.00 |
Total Base Construction Cost $0.00
| Overhead | 0% | $0.00 |
| Profit | 0% | $0.00 |
| Bonding (If applicable) | 0% | $0.00 |
Total Estimated Construction Cost $0.00
&8B & J Multi Services
| Relace Water Main | &"Arial,Bold"Estimated Construction |
| Cost Worksheet | &8VA-528-07-RP-0135 |
Project # 528A8-04-808