S02_Attachment-13_Contractor Price Estimate Worksheet.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Y1PZ--Renovate Historic Wall at Fort Sam Houston National Cemetery: Project 846CM3047 Bid Documents shall be submitted by Electronic Delivery
Solicitation number
36C78621B0024
Issued by

About this file

This document contains an estimated construction cost worksheet and a pre-solicitation notice for a federal contract opportunity. The construction cost worksheet is a template for contractors to estimate costs for renovating and repairing various aspects of a project involving general requirements, existing conditions, concrete, masonry, metals, woods, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, transportation, waterway and marine construction, process interconnections, material processing and handling, process heating cooling and drying, process gas and liquid handling, pollution and waste control, industry-specific manufacturing, water and wastewater equipment, and electrical power generation.

The pre-solicitation notice indicates the Department of Veterans Affairs intends to issue a solicitation by November 15, 2021 for renovating a historic wall at Fort Sam Houston National Cemetery. The acquisition will be an Invitation for Bid between $500,000 and $1 million under NAICS code 238140. The procurement is 100% set aside for verified Service-Disabled Veteran-Owned Small Businesses. Electronic bid documents will be available at SAM.gov as of the notice date, with no paper copies issued. Bids are due by the date specified in the IFB.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DescriptionUnitCost/Unit# UnitsTotal CostRemarks
Offeror shall use and edit to fit Task Order Project
Division 01 - General Requirements
Project set-upL.S.$0.000$0.00
CoordinationL.S.$0.000$0.00
General DemolitionL.S.$0.000$0.00
Selective demo. GWB / Act ceilingSF$0.000$0.00
Selective demo. of floor fin and floor prep.SF$0.000$0.00
Selective demo. WallsEach$0.000$0.00
Selective demolition & salvageEach$0.000$0.00
Job supervision and misc. laborWeek$0.000$0.00
Mobilization / DemobilizationJob$0.000$0.00
Division 02 - Existing Conditions
$0.000$0.00
Division 03 - Concrete
Concrete floor trenching and infillL.S.$0.000$0.00
Concrete floor prep., flash patchL.S.$0.000$0.00
Division 04 - Masonry
$0.000$0.00
Division 05 - Metals
Misc. equipment supportsL.S.$0.000$0.00
Modification to Metal Window frameEach$0.000$0.00
Division 06 - Wood, Plastics, and Composites
Misc. blocking, framingL.S.$0.000$0.00
Chair RailLF$0.000$0.00
Blocking for CaseworkL.S.$0.000$0.00
Wood Trim (At Tech Station)LF$0.000$0.00
Plywood and wood trim (at Lockers)LF$0.000$0.00
Coat RodEach$0.000$0.00
Division 07 -Thermal & Moisture Protection
FirestoppingLF$0.000$0.00
Joint sealantsLF$0.000$0.00
Division 08 - Openings
New Door and Mtl. FrameEach$0.000$0.00
New Lead-lined door and frame assemblyEach$0.000$0.00
Modifications to existing lead windowsEach$0.000$0.00
Division 09 - Finishes
Acoustical ceiling tileSF$0.000$0.00
Existing Wall PatchingSF$0.000$0.00
Metal stud, gyp.board assembliesLF$0.000$0.00
GWB over exist framingLF$0.000$0.00
PaintSF$0.000$0.00
Vinyl BoarderLF$0.000$0.00
Resilient baseLF$0.000$0.00
Sheet Vinyl flooring and accessoriesSF$0.000$0.00
CarpetYr$0.000$0.00
Division 10 - Specialties
Hospital Curtain and TrackLF$0.000$0.00
Toilet and Bath AccessoriesEach$0.000$0.00
Casework Base and WallLF$0.000$0.00
CountertopsLF$0.000$0.00
Countertops with supportsLF$0.000$0.00
P. Lam ShelvingLF$0.000$0.00
Med. CabinetEach$0.000$0.00
LockersEach$0.000$0.00
Wall HooksL.S.$0.000$0.00
White BoardEach$0.000$0.00
Division 11 - Equipment
$0.000$0.00
Division 12 - Furnishings
-$0.000$0.00

Division 13 - Special Construction

Division 14 - Conveying Equipment

Division 21 - Fire Suppression
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 22 - Plumbing
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 23 - HVAC
RemovalsLS$0.000$0.00
Computer Room A/C % HumidifierEach$0.000$0.00
Electric Reheat CoilsEach$0.000$0.00
Fan Coil UnitEach$0.000$0.00
DuctworkLS$0.000$0.00
RGD'sEach$0.000$0.00
HVAC InsulationLS$0.000$0.00
Temperature ControlsLS$0.000$0.00
Test and BalanaceLS$0.000$0.00
Division 25 - Intergrated Automation
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 26 - Electrical
General Conditions and Administration-$0.000$0.00
Allowance-$0.000$0.00
Wiring DevicesEach$0.000$0.00
Wiring Device CircuitingEach$0.000$0.00
Light Fixtures & CircuitingEach$0.000$0.00
Specialty Light Fixtures & CircuitingEach$0.000$0.00
Relocate Panel board & circuitsEach$0.000$0.00
Relocate Nurse CallLS$0.000$0.00
Telephone / DataEach$0.000$0.00
Cath Equipment Connections & FeederLS$0.000$0.00
HVAC Equipment ConnectionsLS$0.000$0.00
DemolitionLS$0.000$0.00
Division 27 - Communications
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 28 - Electronic Safety and Security
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 31 - Earthwork
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 32 - Exterior Improvements
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 33 - Utilities
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 34 - Transportation
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 35 - Waterway and Marine Construction
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 40 - Process Interconnections
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 41 - Material Processing and Handling
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 42 - Process Heating, Cooling, and Drying
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 43 - Process Gas and Liquid Handling
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 44 - Pollution and Waste Control
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 45 - Industry-Specific Manufacturing
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 46 - Water and Wastewater Equipment
TBDLS$0.000$0.00
TBD-$0.000$0.00
Division 48 - Electrical Power Generation
TBDLS$0.000$0.00
TBD-$0.000$0.00
General Construction Subtotal$0.00
Mechanical, Electrical, Plumbing Subtotal$0.00

Total Base Construction Cost $0.00

Overhead0%$0.00
Profit0%$0.00
Bonding (If applicable)0%$0.00

Total Estimated Construction Cost $0.00

&8B & J Multi Services

Relace Water Main&"Arial,Bold"Estimated Construction
Cost Worksheet&8VA-528-07-RP-0135

Project # 528A8-04-808