This document is a Cost Estimate Worksheet template for a federal contract opportunity. The template is for a project titled "Replace Walk Area, ADA Plates and Curb Island, Fort Snelling National Cemetery" under Solicitation Number 36C78623Q0060. The worksheet requires lump sum pricing for various construction divisions such as General Conditions, Mobilization, Site Investigation, and various trades. The related federal contract opportunity is for a project titled "Y1JZ--Crown Hill NC - New Storage Facility (VA-24-00054456)" under Solicitation Number 36C78624B0025_1. This is a solicitation for the Department of Veterans Affairs National Cemetery Administration to construct a fully functional, turnkey type storage facility, with the contractor required to provide all labor, materials, tools, equipment, and design services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Offeror shall use and edit to fit Task Order Project | |
| Project Number: | 894NRM21002 |
| Solicitation Number: | 36C78623Q0060 |
| Project Title: | Replace Walk Area, ADA Plates and Curb Island, Fort snelling National Cemetery |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| GRAND TOTALS | $ |