This notice provides details for a federal construction solicitation. The Department of Veterans Affairs is seeking to replace an elevator at the Tomah VA Medical Center in Tomah, Wisconsin. The project involves demolishing the existing elevator, shaft, and mechanical room, and infilling the existing stairwell to create office and storage spaces. Two new elevators will be installed next to the existing elevator and mechanical rooms, with new shafts constructed in currently existing conference rooms and offices. The estimated price range for construction is between $2 million and $5 million. Pursuant to Public Law 109-461, this solicitation will be issued as a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The solicitation and specifications will be posted on August 5, 2021, with a bid due date on or around September 2021. A pre-bid site conference is scheduled for the week of August 9, 2021.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
No. Revisions Date
REPLACE EXISTING AND PROVIDE
SECONDARY ELEVATORS
B-402, B-404 AND B-406
12/07/2016
676-14-110
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg.
Office of
Construction and Facilities
Management
BID DOCUMENTS
TOMAH, WI
1 2 3 4 5 6 7 8 9 10
A
B
C
E
F o n e e i g h t h i n c h e f o t e q u a r t e r i n c e f o r e e e i g h t h s i n c e f o e h a l f i n c e f o r e e q u a r t e r s i n c e f o e i n c e f o e a n d o n e h a l f i n c e f o r e e i n c h e s e f o
FULLY SPRINKLED
AE PROJECT # 13774
250 3rd Ave. N, Ste 450 | Minneapolis, MN 55401 | 612.338.2029 of
402, 404, 406
NTS
DUCTWORK SQUARE VANE ELBOWS
NOTE:
1.
2.
3.
4.
ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE REGARDLESS OF W DIMENSION.
ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE BETWEEN VANES
AND A 3/4" [20mm] TRAILING EDGE.
WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE VANE TYPE.
W
W1
DUCTWORK RADIUS ELBOWS
VANE
THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL SHORT RADIUS ELBOWS
SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY
SMACNA.
R SHALL
EQUAL OR
BE GREATER
THAN W.
THAN 1/3W.
R
THAN 1/6W.
STANDARD RADIUS OR LONG RADIUS ELBOW
SHORT RADIUS ELBOW WITH ONE
SHORT RADIUS ELBOW WITH TWO
VANES
W W
1/6W
AIR TERMINAL UNITS
SMACNA FIGURE 4-6
45° LEED IN
RIGID DUCT TO AIR TERMINAL UNIT.
MAIN SUPPLY
PLAN VIEW
ALTERNATE SUPPLY DUCT TAKEOFF -
FLOW
L
O
EXHAUST OR RETURN BRANCH DUCTWORK
MAIN EXHAUST OR RETURN
AIR
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" [100mm] MIN.
BRANCH DUCT
VD
VOLUME DAMPER DETAIL
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS &
ROUND DAMPERS.
INSULATION SEE
SPECIFICATION
DAMPER BLADE
1/8" [6mm]
CLEARANCE ALL
AROUND
OUTSIDE END BEARING
INSIDE END BEARING
HANDLE WITH
LOCKING QUADRANT
INSULATION
STAND-OFF
1/2" [15mm] ROUND ROD PIN
DUCT
STIFFEN BLADE
AS REQUIRED
SIDE ELEVATION SECTION
ACCESS SECTION FOR ROUND/OVAL DUCT
HOUSING WELDED TO
DUCT SECTION
ROUND OR FLAT
OVAL DUCT
SECTION
COVER WITH HANDLE AND
CHAIN RETAINER GASKETED
AND PRESSURE SEALED
ROUND DUCT HANGERS
2500 [1133]
1320 [598]
420 [190]ONE 1 [25] x 18 GA STRAP36 [900]
TWO 1/2 [13]Ø RODS
TWO 3/8 [10]Ø. RODS
ONE 1 [25] x 16 GA STRAP
84 [2100]
60 [1500]
50 [1250] 700 [317]
ONE 1 [25] x 22 GA STRAP
QUANTITY/SIZE
MAX. DUCT Ø
26 [650]
HANGER STRAPS OR RODS
MAX. LOAD
LBS. [kg]
260 [119]
MAX.
144 [3600]
IN. [mm]
SPACING
TABULATED DATA FROM SMACNA ALLOWS FOR
DUCT REINFORCING AND INSULATION, BUT NO
EXTERNAL LOAD.
BAND
OVER 50"
[1250mm]Ø
HANGER RODS
BAND OF SAME
SIZE AS HANGER
STRAP
LOAD RATED
FASTENERS
50" [1250mm]Ø &
UNDER
12"
CEILING
SUPPORT SADDLE
VOLUME DAMPER W/
LOCKING QUAD
SADDLE
SHEET METAL
CONICAL OUTLET
FOR CHANGE OF
DIRECTION GREATER
USE RIGID ELBOWS
THAN 45°
[300mm]
FLEXIBLE AIR DUCT CONNECTOR
SEE SPECIFICATIONS FOR CLAMPS AND
SEALANT (TYP.)
FROM STRUCTURE
SAME AS DIFFUSER
INLET: 5'-0" MAX
FLEXIBLE DUCT SIZE
LENGTH.
THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE DEDICATED AHU
SERVING THE SURGICAL SUITE.
TYPICAL DIFFUSER
OR REGISTER IN
LAY-IN CLG.
THERMAL INSULATION
SEE SPECIFICATIONS
SUPPLY DUCTWORK TAKE-OFFS
AIR SPLIT DUCT TAKE-OFF PLAN VIEW
BRANCH DUCT TAKE-OFF PLAN VIEW
SUPPLY REGISTER TAKE-OFF PLAN VIEW
I
SUPPLY REGISTER
OR BRANCH DUCT
TURNING VANES
SEE FLOOR PLAN FOR
SPLIT DIMENSION
PROVIDE VOLUME
DAMPER
PROVIDE VOLUME
ADJUSTABLE
METAL ROD OR
LINKAGE
TOP REGISTER
MAIN
SUPPLY
VOLUME EXTRACTOR; ADJUSTABLE
FROM FULLY CLOSED POSITION TO
CFM NOTED ON FLOOR PLANS
1/4 W OR 4"
[100mm] MIN.
MAIN SUPPLY DUCT
SUPPLY DUCT TAKEOFF - AIR TERMINAL UNIT
RIGID DUCT TO AIR TERMINAL UNIT.
ROUND SHEET METAL DUCT.
D
SECTION "A-A"
"B" "B"
ACCESS PANEL AND DOOR DETAIL
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15
ACCESS PANEL
ACCESS DOOR
CASING
GASKET
HANDLE INSIDE
FLEXIBLE
WASHER
FACTORY
FABRICATED
LATCH
SECTION "B-B"
GASKET
"A"
"A"
TILE CEILING
CEILING TEE (TYP)
PLENUM
REGISTER OR GRILLE
DUCT LINING AS SPECIFIED
(IF NO SOUND INSULATION,
PAINT INTERIOR OF PLENUM
FLAT BLACK)
INSTALLATION W/
GYP CEILING
CEILING GRILLE WITH FLANGE (WHEN
INSTALLED IN GYP CEILING)
DAMPER (SEE
PLAN FOR SIZE)
RETURN/EXHAUST CONNECTION DETAIL
13 12
(WITH EQUIPMENT MOUNTED IN DUCT)
DUCTWORK TRANSITIONS
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
M
X
Q
U
P
N T
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEW
TYPICAL DUCTWORK TRANSITION WITH EQUIPMENT
MOUNTED IN DUCT
PLAN OR SIDE VIEW
e e i g h t h i n c e f o e q u a r t e r i n c e f o r e e e i g h t h s i n c e f o e h a l f i n c e f o r e e q u a r t e r s i n c e f o e i n c e f o e a n d o n e h a l f i n c e f o r e e i n c h e e f o
FIRE DAMPER INSTALLATION
SECTION THRU
5.
6.
A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, 1S SIMILAR. FOLLOW DAMPER MANUFACTURER'S
INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST
BE INSTALLED IN THE PARTITION OR FLOOR AND NOT OUTSIDE THE PENETRATION.
GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER FRAME AND TO PERIMETER
ANGLES.
PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO PROVIDE 1" [25mm]
MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.
BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA.
ACCESS PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.
PROVIDE 1/4" TO 1/2" [6 TO 15mm] CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE WITH ROCK WOOL FIRESTOP
FIBER.
ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm] HIGH CONCRETE CURB AROUND OPENING FOR DUCT.
SLEEVE, NOTE 2
CONNECTION
NOTE 4
DAMPER, NOTE 1
DAMPER COLLAR EXTENSION
INTEGRAL PART OF SLEEVE
SLEEVE, NOTE 2
NOTE 6
FIRE BARRIER PARTITION
OR CHASE
TYPICAL DUCT
PERIMETER ANGLE, NOTE 3 (NOTE
FASTENED TO PARTITION)
ACCESS
PANEL NOTE 5
m
DUCT CONNECTIONS - AIR TERMINAL UNITS
5.
6.
7.
RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A
MINIMUM OF 3 TIMES THE DIAMETER OF INLET AND A MAXIMUM OF 5 TIMES THE DIAMETER OF
THE INLET.
A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT
ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0" [900mm].
A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET,
PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT EXCEED
10 FEET (3 METERS). FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A DUCT
TRANSITION TO MAINTAIN THE DUCT STATIC PRESSURE DROP AT OR BELOW 0.2"/100'
[1.64Pa/m].
FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT TO
DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm]. USE RIGID ELBOWS FOR CHANGE OF DIRECTION
GREATER THAN 45°.
COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE
INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.
USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE DEDICATED AHU
SERVING THE SURGICAL SUITE.
TAPE VAPOR BARRIER AT FLEX DUCT CONNECTION
AIR TERMINAL UNIT (CV
OR VAV)
REHEAT COIL
SOUND ATTENUATOR SEE
EQUIPMENT
SCHEDULE
FLEXIBLE AIR DUCT
CONNECTOR. SEE DETAIL
DIFFUSER (TYP.)
SEE SPECIFICATIONS FOR
CLAMPS AND SEALANT (TYP.)
SEE NOTE 5
S
SEE NOTE 3
SEE NOTE 2
SEE NOTE 1
LINEAR SLOT DIFFUSER
INSULATED FLEXIBLE AIR DUCT CONNECTOR
LENGTH NOT TO EXCEED 3' [900 MM]
VOLUME
ROUND OR OVAL INLET
COLLAR MINIMUM 2"
EXTENSION
INACTIVE LENGTHS TYP.
PLENUM WITH
INTERNALLY LINED
1.COORDINATE SLOT DIFFUSER FRAME/BORDER
TYPE AND END BORDER CONFIGURATION WITH
CEILING TYPE.
PLENUM
INLET COLLAR
LINEAR
DIFFUSER
CEILING
ACTIVE LENGTH
FLEXIBLE DUCT CONNECTIONS
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED CONNECTION ON
FAN SIDE
1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6"
[150mm] NOMINAL WITH MATERIAL TAUT
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
5/16" [8mm] FLANGE
SHEET METAL SCREWS ON 12"
[300mm] CENTERS
RIVET ON 4" [100mm]
CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
1" [25mm] FLANGE & HEMALTERNATE
POSITION OF
BOLT
1 1/2" [40mm] POCKET
SLIP
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1/2"
[15mm]
1/2"
[15mm]
1 1/2"
[40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6"
[150mm] NOMINAL WITH MATERIAL TAUT
FLANGED
CONNECTION ON
FAN SIDE
FLEXIBLE MATERIAL AS
FAN
2 1/2 D
STRAIGHT
2 1/2 D
STRAIGHT
EXPANSION BOLT TO
SUIT WEIGHT OF
EQUIPMENT
SPRING TYPE VIBRATION
ISOLATOR (4 REQUIRED)
MOTOR W/
BELT GUARD
1. FAN AND DUCTS MUST BE ALIGNED.
2. FLEXIBLE CONNECTORS TO BE ROLLED
WITH FABRIC TO THE OUTSIDE.
3. FLEXIBLE CONNECTOR MUST BE
STRETCHED TIGHT.
TRANSITION AS
REQUIRED (TYP)
DISCONNECT
SWITCH
SUPPORT BRACKET BY
FAN MANUFACTURER
CONNECTOR (TYP)
SUPPORT AS REQUIRED
BY BLDG STRUCTURE
IN-LINE FAN MOUNTING DETAIL
DUCT RISER SUPPORTS
ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND FAN ROOM FLOORS SHALL BE
PROVIDED WITH A 3" [75mm] HIGH CONCRETE CURB AROUND OPENING FOR DUCT.
SEAL HOLE WITH FIREPROOFING
MATERIAL AFTER DUCT INSTALLATION
2"x2"x1/4" [50x50x6mm] ANGLE
INSTALL ON BOTH LONG
DIMENSION SIDES OF DUCT.
DUCT RISER - SEE FLOOR
PLANS FOR DETAILS
SEAL HOLE WITH FIREPROOFING
MATERIAL AFTER DUCT INSTALLATION
FLOOR
EXTEND ANGLE 3" [75mm]
BEYOND DUCT
DUCT RISER - SEE FLOOR
PLANS FOR SIZES
SHEET METAL SCREWS 4" [100mm] ON
CENTER
1 1/2"x1 1/2"x1/8" [40x40x3mm] ANGLE INSTALL ON
BOTH LONG DIMENSION SIDES OF DUCT. FOR
DUCTS OVER 60" [1500mm] USE 2"x2"x1/8"
[50x50x3mm] ANGLE.
HOLE IN STRUCTURAL FLOOR
DUCT RISER
0.5 INCH WG [125Pa] TO 2 INCHES WG [500Pa] DUCT RISER SUPPORT
ARRANGE RISER SO REINFORCER
TRANSVERSE JOINT IS AT RISER SUPPORT
POINT
2 INCHES WG [500Pa] TO 4 INCHES WG [1000Pa] DUCT RISER SUPPORT
HOLE IN STRUCTURAL FLOOR
DUCT RISER
*ONLY USED IN BUILDING 404
e e i g h t h i n c e f o e q u a r t e r i n c e f o r e e e i g h t h s i n c e f o e h a l f i n c e f o r e e q u a r t e r s i n c e f o e i n c e f o e a n d o n e h a l f i n c e f o r e e i n c h e e f o
402, 404, 406404
20 2418 14 16128
1064 532 2 1/2 1 1/2
1 1 1/4
[9100] [9600][8500] [7600] [8200][7000][5800] [6700]
[5200][4100] [4900][3700][3000] [3400][2700]
[2100]
[4900]
[4100][3700] [4000]
[3000][2400][1800] [1500]
THRU 3/4
[2100] [2100]
[2100]
[2700]
[2400]
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB. [453KG]
UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE
SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE
SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" [200mm] MIN.)
BAND
1-5/8" [43mm] 12 GAUGE
CHANNEL OR 2"x2"x1/4"
[50x50x6.4mm] ANGLE
1/2" [15mm] DIA.
HANGER RODS WITH
36" [900mm] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF MIN.
DENSITY) UNDER INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
[mm]
FT.
FT.
PIPE HANGERS
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS
5 FT
THRU [20]
6 8 10
[32][25] [40]
[65]
[50]
[75]
1312 14
[125][100]
[150]
[250]
[200]
[300]
[400]
[350]
[450]
[600]
[500]
COIL
TEST PLUG (TYP.)
REDUCER, IF REQUIRED
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS
(TYP.)
WATER SUPPLY
TERMINAL UNIT WATER COILS -
SHUT OFF VALVE
DRAIN WITH HOSE
MV
MODULATION CONTROL VALVE
PIPING CONNECTIONS
BALANCING DEVICE
DRAIN WITH HOSE
TYPICAL MANUAL AIR VENT
TYPICAL CHILLED AND HOT WATER PIPING DRAIN
VALVE CONNECTIONS
ELEVATION THREADED
PIPING
ELEVATION WELDED
PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" [20mm] BALL VALVE
ADAPTER TO 3/4" [20mm] HOSE
THREAD-PROVIDE HOSE CAP NUT
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR PLANS LOCATE DRAIN AT
BOTTOM OF SCALE POCKET.
AIR VENT
1/2" [15mm]
BALL VALVE
1/4" [8mm]
COPPER TUBING
1/2" [15mm] x 4" [100mm]
NIPPLE
CIRCULATING WATER PIPING
ELEVATION
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
DRAIN VALVE AND AIR VENT CONNECTIONS
(HYDRONIC SYSTEMS)
SUPPORT/ANCHOR FOR PIPE RISERS
PROVIDE ANCHORS ONLY WHERE
SHOWN ON DRAWINGS.
EXTEND SLEEVE ABOVE FLOOR
WHERE SPECIFIED.
INSULATION BOLT (TYPICAL)
SLAB
FIRE-STOPPING
MATERIAL
BOLT
PIPEPIPE SLEEVE WHERE
RISER
CLAMP
PIPE SLEEVE
WHERE
RISER CLAMP. BOTTOM
CLAMP REQUIRED AT
ANCHOR POINTS ONLY.
ELEVATION
PLAN
CLAMP
STEEL EXPANSION SHIELD FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW
CONSTRICTION THIS TYPE SHALL BE
USED ONLY IN SLABS OR BEAMS OF 4"
[100mm] MIN DEPTH
3/8" [10mm] MIN DIA EXPANSION BOLTS FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW
CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS & WASHERS
3/8" [10mm] MIN DIA
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1
1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] &
LARGER USE 3"x3"x1/4" [75x75x6.4mm] ANGLE
TURNBUCKLE
3/8" [10mm] MIN DIA
3/8" [10mm] MIN DIA INSERTS
NEW CONSTRUCTION ONLY.
SECURING HANGER RODS IN CONCRETE
HWS
HEAT COIL
CONTROL VALVE
SEE SEQUENCE
OF CONTROL
FLOOR PLATE
HWR
CABINET
PIPE SLEEVE
SHUTOFF VALVE
CONVECTOR-HOT WATER PIPING CONNECTION
PENETRATION OF SMOKE/FIRE BARRIERS
1. APPLICABLE TO PENETRATIONS OF ALL FIRE
RATED MEMBRANES, IN ACCORDANCE WITH FP
NFPA. REFER TO SPECIFICATIONS SECTION 07 84
00, FIRE STOPPING SYSTEMS.
INSULATED PIPE OR
FIRESTOP MATERIAL
3/4" [19mm] APPROVED
FIRESTOP INSULATION WITH
VAPOR BARRIER
PIPE SLEEVE WHERE
1/4" [6.4mm]Ø ANCHOR ROD
FOR NEW CONSTRUCTION
WELD
FLOOR OR DECK PENETRATION
PARTITION OR CHASE PENETRATION
PIPE/DUCT
[150mm] [150mm]
MASONRY
PARTITION
PARTITION SUPPORT
FIRESTOP
MATERIAL
[150mm] [150mm]
3/4" [19mm] APPROVED
FIRESTOP INSULATION WITH
VAPOR BARRIER
DRYWALL PARTITION
INSULATED
PIPE OR
6" 6"
6" 6" e e i g h t h i n c e f o e q u a r t e r i n c e f o r e e e i g h t h s i n c e f o e h a l f i n c e f o r e e q u a r t e r s i n c e f o e i n c e f o e a n d o n e h a l f i n c e f o r e e i n c h e e f o
CONTROLS SYMBOLS
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
CT CONDUCTIVITY TRANSMITTER
SPS STATIC PRESSURE SENSOR
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
KR LOCAL RECORDING TIME CLOCK (RUNTIME)
TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
PDS PRESSURE DIFFERENTIAL SWITCH
LC LEVEL CONTROLLER
LT LEVEL TRANSMITTER
TSH TEMPERATURE SWITCH, HIGH (FREEZESTAT)
EPT ELECTRONIC TO PNEUMATIC TRANSDUCER
AT CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
CO2
AT
CO
OCCUPANCY SENSORAT
OC
LTCP LOCAL TEMPERATURE CONTROL PANEL
HVAC HVAC CONTROL PANEL
ECC
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS WORKSTATION
AT ENERGY CONTROL CENTER
TC TEMPERATURE CONTROLLER. SEE SEQUENCE OF OPERATION
VSMC VARIABLE SPEED MOTOR CONTROLLER
PC PRESSURE CONTROLLER. SEE SEQUENCE OF OPERATION
SC SPEED CONTROLLER. SEE SEQUENCE OF OPERATION
FC FLOW CONTROLLER. SEE SEQUENCE OF OPERATION
PSH PRESSURE SWITCH HIGH
FSH FLOW SWITCH HIGH
PSL PRESSURE SWITCH LOW
KC TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE
FSL FLOW SWITCH LOW
LENGTH IN DUCT WHEN SPACE PERMITS.)
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
SST START/STOP
ZC VALVE OR DAMPER POSITION CONTROLLER WITH FEEDBACK
FB
SD SMOKE DAMPER
FSD FIRE SMOKE DAMPER
1. REMOVE ALL PNEUMATIC CONTROLS ASSOCIATED WITH AIR TERMINAL UNITS AND ASSOCIATED ZONE HEAT COILS, CONVECTORS, CABINET UNIT HEATERS, AND FANS BEING REPLACED. REPLACEMENT EQUIPMENT SHALL BE PROVIDED
WITH ELECTRIC / DDC CONTROLS.
2. PNEUMATIC CONTROLS FOR AIR TERMINAL UNITS THAT CONTINUE TO BE USED AS THEY CURRENTLY EXIST SHALL REMAIN
CONTROLLED AS THEY EXIST. IN SOME CASES, THERE MAY BE AN EXISTING AIR TERMINAL UNIT THAT NEEDS TO BE MOVED
OR REPOSITIONED. THE ASSOCIATED EXISTING CONTROLS SHALL BE MODIFIED AS REQUIRED TO CONTINUE TO FUNCTION
AS THEY CURRENTLY EXIST.
3. ALL NEW AIR TERMINAL UNITS AND ASSOCIATED ZONE HEAT COILS, EXISTING AND NEW CONVECTORS INTENDED TO
FUNCTION AS SUPPLEMENTAL HEAT OR AS STAND ALONE HEAT, CABINET UNIT HEATERS, AND NEW FANS TO INCLUDE NEW
ELECTRIC / DDC CONTROLS.
4. NEW ELECTRIC / DDC HVAC CONTROLS SHALL INCLUDE CONTROL VALVES, DAMPER AND VALVE ACTUATORS, FLOW
MEASURING STATIONS, ETC. CONTROL SHALL BE INTEGRATED WITH ASSOCIATED AIR HANDLING SYSTEM DDC CONTROLS.
5. ALL NEW ELECTRIC / DDC ACTUATORS SHALL INCLUDE POSITION FEEDBACK FOR MODULATING/PROPORTIONAL ACTUATORS
AND END SWITCHES FOR TWO POSITION OR FLOATING CONTROL ACTUATORS.
6. WORK WITH ELECTRICAL TO PROVIDE REQUIRED POWER FOR CONTROLS.
7. UPGRADE ECC GRAPHICS TO INCLUDE ALL NEW EQUIPMENT AND ASSOCIATED CONTROLS.
8. ALL CONTROL SEQUENCES, POINT LISTS, GRAPHICS, ETC. SHALL USE THE EXACT SAME TAG AND EQUIPMENT NUMBERS
AND NAMES AS FOUND ON PLANS, ANY DISCREPANCIES SHOULD BE REVIEWED WITH VA COR.
9. FOR THIS PROJECT AIRFLOW CONTROL VALVES ARE TO BE SINGLE DUCT AIRVALVES INSTALLED TO OPERATE ON RETURN
AND EXHAUST AIR SYSTEMS. FAST ACTING HIGH PERFORMANCE AIRVALVES SUCH AS USED IN CLEAN ROOMS, LABS, AND
OPERATING ROOMS ARE NOT REQUIRED.
10.AIR TERMINAL UNITS DESIGNATED AS CAV, SHALL OPERATE AS CONSTANT AIRFLOW BUT BE CAPABLE OF BEING
ADJUSTED TO OPERATE AT OTHER AIRFLOWS.
11.CABINET UNIT HEATERS NEAR EXTERIOR DOORS SHALL BE INDEPENDENTLY CONTROLLED, SEPARATE, NOT
SUPPLEMENTAL HEAT TO AIR TERMINAL UNIT SERVING THE SPACE.
12.SOME CONVECTORS SHALL BE STAND ALONE AND NOT FUNCTION AS SUPPLEMENTAL HEAT FOR AN AIR TERMINAL UNIT.
13.SOME SPACES SHALL HAVE LIGHTING OCCUPANCY SENSORS WITH AUXILIARY CONTACT FOR USE WITH THE HVAC
CONTROL SYSTEM. COORDINATE WITH ELECTRICAL. ROOMS WITH OCCUPANCY SENSORS SHALL BE PROVIDED WITH TWO
POSITION EXHAUST OR RETURN AIR DAMPERS WHICH, ALONG WITH THE AIR TERMINAL UNIT DAMPER WILL BE USED TO
REDUCE AIRFLOW WHEN THE SPACE IS DETERMINED TO BE UNOCCUPIED.
14.DIFFERENTIAL PRESSURE SENSORS USED FOR DUCT STATIC PRESSURE SHALL BE LOCATED ROUGHLY 2/3S OF WAY
DOWN DUCT FROM THE FAN. THE SENSOR SHALL BE CLEARLY TAGGED AND LOCATION INDICATED ON RECORD
DOCUMENTS. THE REFERENCE END OF THE STATIC PRESSURE SENSOR SHALL BE A PLATE STYLE AND SHALL TERMINATE
IN A COMMON SPACE AS INDICATED ON PLAN. THE SENSOR PORT SHALL BE CLEARLY IDENTIFIED AND LOCATION INDICATED
ON RECORD DOCUMENTS.
15.TEMPERATURE AND HUMIDITY SENSOR SHALL INDICATE SETPOINT AND ACTUAL CONDITION AND FOR TEMPERATURE THE
SETPOINT SHALL PROVIDE LIMITED ADJUSTMENT FROM THE SPACE.
16.ELEVATOR CONTROL ROOMS
a. REMOVE ALL EXISTING TEMPERATURE CONTROLS AND LOCAL ALARMS ASSOCIATED WITH ELEVATOR MACHINERY
ROOMS.
b. PROVIDE NEW TEMPERATURE AND HUMIDITY SENSORS IN ELEVATOR CONTROL ROOMS. INTERFACE WITH EEC TO
PROVIDE TRENDING AND ALARM (LOCAL AND AT ECC) WHEN TEMPERATURE IS OUT OF RANGE. INITIAL ACCEPTABLE
RANGE 60 DEG. F. TO 80 DEG. F. INCLUDE PERMANENT SIGNAGE PER PLANS.
c. PROVIDE HIGH LIMIT COOLING CONTROL VALVE WITH AIR TERMINAL UNIT, REDUCING TO ZERO AIRFLOW AND PROVIDE
LOW LIMIT HEATING CONTROL WITH CONVECTOR HEATING CONTROL VALVE. DEADBAND SHALL BE ADJUSTABLE.
d. PROVIDE ECC INPUT FROM WATER DETECTION SENSOR / DEVICE IN CONVECTOR PIPING DRIP PANS FOR ELEVATOR
CONTROL ROOMS. ECC TO ALARM (LOCAL AND AT ECC) UPON DETECTION OF WATER IN DRIP PAN OVERFLOW
CONTAINMENT.
17.NEW EXHAUST FANS:
a. INTERLOCK WITH ASSOCIATED AIR HANDLING UNIT.
18.BUILDING 404 EXISTING HOISTWAY VENT:
a. REMOVE AND DISPOSE OF HOISTWAY VENT DAMPER AND CONTROLS.
18.BUILDING 404 ELEVATOR PENTHOUSE FAN RELOCATION / REPLACEMENT:
a. REMOVE, SALVAGE, AND REINSTALL ALL SENSORS AND INSTRUMENTATION.
b. AIRFLOW MEASURING STATIONS THAT ARE INDICATED TO BE REMOVED OR ARE REMOVED AS A CONSEQUENT OF
OTHER WORK GENERALLY ARE NOT TO BE REINSTALLED. WHEN FOUND, REVIEW WITH VA COR FOR FINAL DIRECTION.
c. RETURN FAN 3 IS TO BE REPLACED. REMOVE ALL CONTROLS ASSOCIATED WITH THE INLET VANE CONTROL. NEW FAN
SHALL INCLUDE VFD. VFD SHALL BE CONTROLLED BASED ON DUCT STATIC PRESSURE SAME AS EXISTING FOR INLET
VANE.
d. COORDINATE WITH FIRE ALARM WORK FOR RELOCATION OF DUCT SMOKE DETECTORS.
19.BUILDING 406 PHARMACY STORAGE AREA:
a. AS REQUIRED, REMOVE AND SALVAGE TEMP TRAK TEMPERATURE MONITORING FOR PHARMACY REFRIGERATORS.
WORK WITH VA COR TO DETERMINE NEW FREEZER LOCATION AND REINSTALL TEMPERATURE MONITORING THROUGH
TO EEC. VERIFY ALARMS.
b. REMOVE AND SALVAGE DIFFERENTIAL PRESSURE SENSOR AND MONITORING INSTRUMENTATION AND CONTROLS FOR
PHARMACY STORAGE ROOM. VERIFY EXISTING CONTROLS WHICH ARE BELIEVED TO CONTROL TERMINAL UNIT AND
MODULATING EXHAUST AIR TO MAINTAIN PRESSURE DIFFERENTIAL BETWEEN PHARMACY STORAGE AND ADJACENT
CORRIDOR. REINSTALL DIFFERENTIAL PRESSURE SENSOR WHERE INDICATED AND VERIFY OPERATION. THE
PROJECT WILL PROVIDE AN AIR TERMINAL UNIT ON SUPPLY AIR AND AN AIR FLOW CONTROL VALVE ON EXHAUST AIR.
NEW CONTROLS SHALL PROVIDE AN AIRFLOW OFFSET CONTROL. EXISTING DIFFERENTIAL PRESSURE
INSTRUMENTATION SHALL BE REINSTALLED FOR MONITORING AND ALARMING, LOCALLY AND AT ECC.
20. LABEL BOTTOM OF ALL AIR TERMINAL UNITS, AIR VALVES AND OTHER ABOVE CEILING DEVICES SUCH THAT THE FULL AIR
TERMINAL UNIT TAG NUMBER AND THE FC BUS ADDRESS TO BE VISIBLE AND LEGIBLE FROM 60” ABOVE THE FLOOR. ALL
UNITS SHALL INCLUDE LEGIBLE TAG NUMBERS AND FC BUS ADDRESSES.
21. NETWORK RISER DIAGRAMS SUBMITTED SHALL BE COMPREHENSIVE FOR THE BUILDING AND SHOW ALL CONTROL
COMPONENTS.
CONTROL NOTES
e e i g h t h i n c e f o e q u a r t e r i n c e f o r e e e i g h t h s i n c e f o e h a l f i n c e f o r e e q u a r t e r s i n c e f o e i n c e f o e a n d o n e h a l f i n c e f o r e e i n c h e e f o
V-2
ROOM THERMOSTAT/SENSOR
WALL MOUNTED
48" [1200mm] AFF.
VARIABLE VOLUME AIR TERMINAL UNIT CONTROL DIAGRAM
NO SUPPLEMENTAL HEATING
WITH SUPPLEMENTAL HEATING
ROOM TEMPERATURE (°F)
HEATING
MINIMUM
VAV BOX CONTROL SEQUENCE
SP
TU
RHC
V-1
REHEAT
TERMINAL
UNIT
AIR FLOW
TE
ATU
CONTROLLER
PC
NO DEADBAND
W/DEADBAND
SUPPLEMENTAL
HEAT
FE
100%
100%
100% 100%
H
V
A. UPON FALL IN SPACE TEMPERATURE THE
VAV DAMPER WILL MODULATE TO MINIMUM
POSITION.
B. UPON FURTHER DROP IN SPACE
TEMPERATURE VALVE V-1 WILL MODULATE
TO MAINTAIN SET POINT + .5° F. THE
ADJUSTABLE TOLERANCE OF + .5° F HAS
BEEN SELECTED TO PREVENT VALVE
HUNTING
C. THE REVERSE SHALL OCCUR ON THE RISE
IN SPACE TEMPERATURE.
A. SET POINTS SHALL BE SET AS FOLLOWS:
COOLING 75°F (ADJ)
HEATING 70°F(ADJ)
DEADBAND OF 5° F BETWEEN HEATING AND
COOLING SET POINTS WILL BE MAINTAINED.
B. UPON FALL IN SPACE TEMPERATURE THE
C. UPON FURTHER DROP IN SPACE
D. THE REVERSE SHALL OCCUR ON THE RISE
A. UPON FALL IN SPACE TEMPERATURE THE
B. UPON FURTHER DROP IN SPACE
C. VALVE V-2 SHALL BE ENABLED WHEN
OUTSIDE AIR FALLS BELOW 40° F (ADJ)
AND VALVE V-1 HAS BEEN MODULATED
OPEN ABOVE 30% (ADJ). VALVE V-2
SHALL MAINTAIN SET POINT + .5° F. THE
ADJUSTABLE TOLERANCE OF + .5°F HAS
HUNTING. THE REVERSE SHALL OCCUR ON
A RISE IN SPACE TEMPERATURE.
A. SET POINTS SHALL BE SET AS FOLLOWS:
COOLING 75°F (ADJ)
HEATING 70°F(ADJ)
DEADBAND OF 5° F BETWEEN HEATING AND
COOLING SET POINTS WILL BE MAINTAINED.
B. UPON FALL IN SPACE TEMPERATURE THE
C. UPON FURTHER DROP IN SPACE
TEMPERATURE VALVE V-1 WILL MODULATE TO MAINTAIN SET
POINT + .5° F. THE ADJUSTABLE TOLERANCE OF + .5° F HAS BEEN
SELECTED TO PREVENT VALVE HUNTING
D. VALVE V-2 SHALL BE ENABLED WHEN
OPEN ABOVE 30% (ADJ). VALVE V-2
SHALL MAINTAIN SET POINT + .5° F. THE
ADJUSTABLE TOLERANCE OF + .5°F HAS
HUNTING.
E. THE REVERSE SHALL OCCUR ON THE RISE
V-2
CONSTANT VOLUME AIR TERMINAL UNIT CONTROL DIAGRAM
WITH SUPPLEMENTAL HEATING
CV
CFM
CV BOX CONTROL SEQUENCE
SUPPLEMENTAL
HEAT
SP SP
A. UPON FALL IN SPACE TEMPERATURE
BELOW SET POINT VALVE V-1 WILL
MODULATE TO MAINTAIN SET POINT +
.5°, THE ADJUSTABLE TOLERANCE OF +
.5° HAS BEEN SELECTED TO PREVENT
VALVE HUNTING
B. THE REVERSE SHALL OCCUR ON RISE
A. SET POINTS SHALL SET AS FOLLOWS:
COOLING 75° F (ADJ)
HEATING 70° F (ADJ)
DEADBAND OF 5° F BETWEEN HEATING
AND COOLING SET POINT WILL BE
MAINTAINED
B. UPON FALL IN SPACE TEMPERATURE
.5°,THE ADJUSTABLE TOLERANCE OF +
.5° HAS BEEN SELECTED TO PREVENT
C. THE REVERSE SHALL OCCUR ON RISE
A. UPON FALL IN SPACE
TEMPERATURE BELOW SET POINT VALVE V-1
WILL MODULATE TO MAINTAIN SET POINT +
.5°, THE ADJUSTABLE TOLERANCE OF + .5°
HAS BEEN SELECTED TO PREVENT VALVE
B. VALVE V-2 SHALL BE ENABLED WHEN
OUTSIDE AIR FALLS BELOW 40° F (ADJ) AND
VALVE V-1 HAS BEEN MODULATED OPEN
ABOVE 30% (ADJ) V-2 SHALL THEN BE
MODULATED TO MAINTAIN
SET POINT + .5° F. THE ADJUSTABLE
TOLERANCE OF .5° F HAS BEEN SELECTED TO
PREVENT VALVE HUNTING.
C. THE REVERSE SHALL OCCUR ON RISE IN
SPACE TEMPERATURE.
A. SET POINTS SHALL SET AS FOLLOWS:
COOLING 75° F (ADJ)
HEATING 70° F (ADJ)
DEADBAND OF 5° F BETWEEN HEATING
AND COOLING SET POINT WILL BE
MAINTAINED
B. UPON FALL IN SPACE TEMPERATURE
.5°, THE ADJUSTABLE TOLERANCE OF + .5°
HAS BEEN SELECTED TO PREVENT
C. VALVE V-2 SHALL BE ENABLED WHEN
OPEN ABOVE 30% (ADJ) V-2 SHALL
THEN BE MODULATED TO MAINTAIN SET
POINT + .5° F. THE ADJUSTABLE
TOLERANCE OF .5° F HAS BEEN
SELECTED TO PREVENT VALVE HUNTING.
D. THE REVERSE SHALL OCCUR ON RISE
ALARM
JOB: ELEVATORS
SYSTEM:
BUILDING:
SYSTEM OUTPUTS
ANALOG
REMARKS
SYSTEM SOFTWARE/CONTROL
PROGRAMS
AIR TERMINAL UNIT POINT LIST
K
Y
G
-V
J
DISCHARGE TEMPERATURE
ZONE AIRFLOW (CFM)
ZONE DAMPER POSITION
ZONE TEMPERATURE
SYSTEM, APPARATUS OR
AREA POINT DESCRIPTION
HEAT VALVE POSITION
SUPPLEMENTAL HEAT VALVE POSITION
AIR TERMINAL UNIT - WITH REHEAT
AIR TERMINAL UNIT - AIR ONLY
AIR TERMINAL UNIT - WITH REHEAT & SUPPLEMENTAL HEAT
CONVECTORS
X X
XX
SEQUENCE OF OPERATION
VARIABLE FLOW AIR TERMINAL UNITS
OCCUPANCY SENSOR LIGHT OS AUXILIARY CONTACT
DIGITAL
ZONE TEMPERATURE SETPOINT
OCCUPIED HEAT
OCCUPIED COOL
UNOCCUPIED HEAT
UNOCCUPIED COOL
OCCUPANCY SENSOR
EXHAUST/RETURN AIR DAMPER POSITION
SYSTEM INPUTS
ANALOG DIGITAL
X X X
GENERAL:
UNITS ARE VARIABLE AIR VOLUME WITH REHEAT (VAVR) AND INCLUDE
OCCUPANCY CONTROL:
GENERAL:
UNITS ARE VARIABLE AIR VOLUME WITH REHEAT (VAVR).
SOME UNITS OPERATE AT CONSTANT VOLUME (SEE CONTROL DIAGRAMS).
SOME UNITS INCLUDE SUPPLEMENTAL HEAT USING CONVECTORS (SEE
CONTROL DIAGRAMS).
SOME UNITS INCLUDE OCCUPANCY CONTROL.
OCCUPANCY CONTROL:
DDC SYSTEM SHALL USE THE LIGHTING OCCUPANCY SENSOR AUXILIARY
CONTACT TO DETERMINE OCCUPANCY STATE.
CONTROL STRATEGY SHALL INCLUDE A TIME DELAY (INITIAL SETTING 20
MINUTES (ADJUSTABLE)) BETWEEN DETERMINING A SPACE IS UNOCCUPIED
AND PLACING THE SPACE IN AN UNOCCUPIED STATE AND.
TEMPERATURE CONTROL:
SYSTEM SHALL UTILIZE CONTROL LOGIC TO PREVENT THE AIR TERMINAL UNIT
FROM SWITCHING BACK AND FORTH BETWEEN HEATING AND COOLING MODES
(SEQUENCE DEPICTS A 5F DEADBAND DURING OCCUPIED MODE).
WHEN THE OCCUPANCY MODE IS OCCUPIED:
COOLING CONTROL: WHEN THE ZONE TEMPERATURE IS ABOVE THE ZONE
TEMPERATURE SETPOINT (ADJ, INITIALLY 75 DEG. F.), THE ZONE DAMPER
SHALL MODULATE BETWEEN THE MIN DAMPER SETPOINT (ADJ, INITIALLY
BASED ON TAB AND DESIGN AIRFLOW VALUES) AND THE MAX DAMPER
SETPOINT (ADJ, INITIALLY BASED ON TAB AND DESIGN AIRFLOW VALUES)
TO MAINTAIN THE ZONE TEMPERATURE. REHEAT VALVE SHALL BE FULLY
CLOSED. PROVIDE ALARM SHOULD AIR TERMINAL UNIT DISCHARGE AIR
TEMPERATURE EXCEED ALARM SETPOINT (INITIAL SETTING 60 F)
HEATING CONTROL: WHEN THE ZONE TEMPERATURE IS LESS THAN THE
ZONE HEATING TEMP SETPOINT (ADJ, INITIALLY 70 DEG. F.), ZONE DAMPER
SHOULD BE AT MINIMUM DAMPER SET POINT AND THE CONTROLLER
SHALL MODULATE THE HEATING VALVE TO MAINTAIN THE ZONE
TEMPERATURE. SHOULD HEAT VALVE BE FULLY OPEN AND ZONE
TEMPERATURE BELOW SETPOINT SLOWLY INCREASE ZONE AIRFLOW TO
ACHIEVE ZONE TEMPERATURE SETPOINT. PROVIDE ALARM SHOULD AIR
TERMINAL UNIT DISCHARGE AIR TEMPERATURE DROP BELOW ALARM
SETPOINT (INITIAL SETTING 70 F)
WHEN THE OCCUPANCY MODE IS UNOCCUPIED:
STANDY: WHEN ZONE TEMPERATURE IS BETWEEN THE UNOCCUPIED
HEATING SETPOINT (ADJ, INITIALLY 50 DEG. F.) AND THE UNOCCUPIED
COOLING SETPOINT (ADJ, INITIALLY 85 DEG. F), THE ZONE DAMPER SHALL
FULLY CLOSE, THE RETURN OR EXHAUST AIR DAMPER SHALL FULLY
CLOSE, AND THE REHEAT VALVE SHALL FULLY CLOSE.
COOLING CONTROL: WHEN THE ZONE TEMPERATURE IS ABOVE THE
UNOCCUPIED COOLING SETPOINT, THE ZONE AIR DAMPER SHALL OPEN
TO THE MAX DAMPER SETPOINT LONG ENOUGH TO BRING THE ZONE
TEMPERATURE TO 5 DEG. F. LOWER THAN THE UNOCCUPIED COOLING
SETPOINT. REHEAT VALVE SHALL BE FULLY CLOSED.
HEATING CONTROL: WHEN THE ZONE TEMPERATURE IS BELOW THE
UNOCCUPIED HEATING SETPOINT, THE REHEAT VALVE SHALL FULLY OPEN
AND THE ZONE DAMPER SHALL OPEN TO THE MIN DAMPER SETPOINT
LONG ENOUGH TO INCREASE THE ZONE TEMPERATURE 5 DEG. F. HIGHER
THAN THE UNOCCUPIED HEATING SETPOINT.
ZONE TEMPERATURE SHALL BE VISIBLE AT THE THERMOSTAT. ZONE TEMP
SETPOINT SHALL BE ADJUSTABLE FROM THE THERMOSTAT (+/- 3 DEG. F.).
SPACES WITH OCCUPANCY SENSORS
SPACES WITH OCCUPANCY SENSORS
e e i g h t h i n c e f o e q u a r t e r i n c e f o r e e e i g h t h s i n c e f o e h a l f i n c e f o r e e q u a r t e r s i n c e f o e i n c e f o e a n d o n e h a l f i n c e f o r e e i n c h e e f o
HOT WATER CABINET UNIT CONTROLS
FAN
CABINET UNIT
HEATER
FILTER
HEATING COIL
T-1
ROOM THERMOSTAT WALL MTD OR RETURN AIR MTD
HS
HOT WATER CABINET UNIT HEATER SEQUENCE
1. CABINET HEATER SHALL OPERATE ON A SCHEDULE AS SET BY THE ECC. FAN STATUS SHALL BE MONITORED AND AN
ALARM MESSAGE GENERATED IN THE EVENT THE UNIT FAILS TO RUN. THE ROOM TEMP SETPOINT WILL BE 74° (ADJ). THE
HOT WATER VALVE WILL BE ENABLED AS REQUIRED TO MAINTAIN SPACE TEMP SETPOINT. HI/LO/OFF SWITCH WILL ALLOW
LOCAL FAN SPEED ADJUSTMENT.
HI
LO
OFF
FAN MOTOR
120V
EMCS
ENABLE
STT
ALARM
SYSTEM
JOB: ELEVATOR
402,404,406
SYSTEM:
BUILDING:
SYSTEM OUTPUTS
REMARKS
SYSTEM SOFTWARE/CONTROL
PROGRAMS
INPUTS
-V
J
SYSTEM, APPARATUS OR
ELEVATORS-MISCELLANEOUS POINTS
AIR VALVE CONTROL DIAGRAM
ZC
HS
SST
ECC
IT
EXHAUST FAN PRESSURE CONTROL (ECM MOTOR)
PSL
SPS
PSH
2/3 WAY DOWN DUCT
0-10 VOLT
ELEVATOR CONTROL ROOM:
TEMPERATURE
HUMIDITY
WATER DETECTION
PHARMACY STORAGE:
TEMPERATURE
HUMIDITY
DIFFERENTIAL PRESSURE
AIRFLOW IN
AIRFLOW OUT
FREEZER TEMP TRACK
DAMPER POSITION
AIRFLOW (CFM)
EXHAUST AND RETURN DUCT AIRFLOW CONTROL VALVES ROOMS WITH + VE AND -VE PRESSURE
RELATIONSHIPS USING AIRFLOW
CONTROL
EXHAUST DUCT AIRFLOW CONTROL
DUCT DIFFERENTIAL PRESSURE SENSOR
EXHAUST FAN ECM
ROOMS WHERE EXHAUST AIR SHUTS
OFF WHEN OCCUPIED
402-EF-5A, 404-EF-4-1, 406-EF-2
CONVECTOR-STAND ALONE
CONVECTOR HEAT VALVE POSITION
CABINET UNIT HEATER
CABINET UNIT HEATER HEAT VALVE POSITION
CABINET UNIT HEATER FAN MOTOR
AREA POINT DESCRIPTION
EXHAUST FAN STATUS
ECC AND LOCAL ALARM
REINSTALL EXISTING
DIFFERENTIAL AIRFLOW CALC
DIFFERENTIAL AIRFLOW CALC
REINSTALL EXISTING
CURRENT SENSOR
SEQUENCE OF OPERATION
MISCELLANEOUS CONTROL SEQUENCES
OCCUPANCY SENSOR AIRFLOW CONTROL:
RETURN / EXHAUST AIR DAMPER
1. DDC SYSTEM TO OPEN AND CLOSE DAMPER DEPENDING ON OCCUPANCY
AND ACCOUNTING FOR UNOCCUPIED TIME DELAY.
2. TWO POSITION DAMPER WITH END SWITCHES FOR FULL OPEN AND FULL
CLOSED.
3. ALARM AT ECC IF DAMPER DOES NOT PROPERLY POSITION.
AIR TERMINAL UNIT (VAV SUPPLY)
1. DDC TO MODULATE DAMPER CLOSED WHEN SPACE DETERMINED TO BE
UNOCCUPIED AND ACCOUNTING FOR TIME DELAY.
2. DDC TO VERIFY DAMPER CLOSED USING ACTUATOR FEEDBACK.
3. ALARM AT ECC IF DAMPER DOES NOT PROPERLY POSITION.
PRESSURE SENSOR FOR EXHAUST FAN CONTROL (402-EF-5A, 404-EF-4-1,
406-EF-4-2)
1. VERIFY EXHAUST FANS ARE INTERLOCKED WITH ASSOCIATED AIR
HANDLING SYSTEM, IF NOT ALREADY INTERLOCKED, PROVIDE INTERLOCK.
2. PROVIDE DIFFERENTIAL PRESSURE SENSOR TO DETERMINE DUCT STATIC
PRESSURE COMPARED TO BUILDING. DDC SYSTEM TO MODULATE
EXHAUST FAN SPEED TO MAINTAIN DUCT STATIC PRESSURE AS EXHAUST
DAMPERS CLOSE.
3. WORK WITH TEST AND BALANCE TO DETERMINE LOWEST PRESSURE
SETTING (ADJUSTABLE) THAT PROVIDES DESIGN AIRFLOWS AS DAMPERS
OPEN AND CLOSE.
4. ALARM AT ECC SHOULD FAN NOT BE ABLE TO PROVIDE STATIC PRESSURE
SETPOINT.
ELEVATOR CONTROL ROOMS:
SINGLE DUCT AIR VALVE CONTROLS TO KEEP SPACE TEMPERATURE BELOW 80
DEG. F.
WHEN SPACE TEMPERATURE RISES TO 75 DEG. F. (ADJUSTABLE) BEGIN
OPENING AIR TERMINAL UNIT DAMPER, SHOULD SPACE TEMPERATURE
CONTINUE TO RISE OR HOLD STEADY, CONTINUE TO OPEN SUPPLY AIR VALVE
UNTIL ACHIEVE MAXIMUM DESIGN AIRFLOW (OBTAIN FROM PLAN SHEETS OR
ROOM AIR BALANCE SCHEDULE (ADJUSTABLE)). BEGIN CLOSING AIR TERMINAL
UNIT DAMPER WHEN SPACE TEMPERATURE DROPS TO 70 DEG. F.
(ADJUSTABLE).
EXHAUST AIR VALVE TRACKS SUPPLY AIR VALVE, PROVIDING 0 CFM OFFSET
WHEN SPACE TEMPERATURE DROPS TO 55 DEG. F. (ADJUSTABLE) BEGIN
OPENING CONVECTOR HEAT VALVE, SHOULD SPACE TEMPERATURE CONTINUE
TO DROP OR HOLD STEADY CONTINUE TO OPEN CONVECTOR HEAT VALVE.
BEGIN CLOSING CONVECTOR HEAT VALVE WHEN SPACE TEMPERATURE RISES
TO 60 DEG. F. FULLY CLOSE CONVECTOR HEAT VALVE WHEN SPACE
TEMPERATURE RISES TO 65 DEG. F. (ADJUSTABLE)
DDC TO VERIFY VALVE AND DAMPER POSITIONS USING ACTUATOR FEEDBACK.
ALARM CONDITIONS (LOCAL AND AT ECC):
1. HIGH / LOW TEMPERATURE; INITIAL SETPOINT 95 / 50 DEG. F.
2. HIGH / LOW HUMIDITY; SETPOINT TO BE PROVIDED BY VA COR.
3. HIGH / LOW DIFFERENTIAL AIRFLOW; INITIAL SETPOINT +30 / -30 CFM
(ADJUSTABLE)
SPOT WATER DETECTION:
1. PROVIDE SENSOR IN SECONDARY CONTAINMENT FOR PIPING IN
ELEVATOR CONTROL ROOMS.
2. ALARM LOCALLY AND AT ECC UPON DETECTION OF WATER.
PHARMACY STORAGE ROOM (BUILDING 406, ROOM 105):
THIS IS A CONSTANT VOLUME, POSITIVE PRESSURE SPACE.
SUPPLY AIR FLOW IS BASIS FOR DETERMINING OFFSET. EXHAUST AIR VALVE
TRACKS SUPPLY AIR VALVE PROVIDING 15% MORE AIR SUPPLY TO THE SPACE
THAN IS EXHAUSTED OR RETURNED. INITIAL SETTING 520 CFM SUPPLY
(ADJUSTABLE), 380 CFM RETURN (ADJUSTABLE), AIR ALSO TRANSFERS TO THE
ADJACENT JANITOR SPACE TO BE EXHAUSTED; 50 CFM (SET BY BALANCER).
EXISTING DIFFERENTIAL PRESSURE SENSOR SHALL BE REUSED TO SENSE THE
PRESSURE DIFFERENTIAL BETWEEN PHARMACY STORAGE AND THE ADJACENT
CORRIDOR.
MODULATE AIR TERMINAL UNIT HEAT CONTROL VALVE TO PROVIDE SPACE
TEMPERATURE, INITIAL SETTING 75 DEG. F. (ADJUSTABLE). PROVIDE FULL
OPEN VALVE WHEN SPACE TEMPERATURE IS 70 DEG. F., FULL CLOSED AT 78
DEG. F.
DDC TO VERIFY VALVE AND DAMPER POSITIONS USING ACTUATOR FEEDBACK.
ALARM CONDITIONS (LOCAL AND AT ECC):
1. HIGH / LOW TEMPERATURE; OBTAIN INITIAL SETPOINTS FROM VA
2. HIGH / LOW HUMIDITY; OBTAIN INITIAL SETPOINTS FROM VA (ADJUSTABLE).
3. HIGH / LOW SPACE DIFFERENTIAL PRESSURE; OBTAIN INITIAL SETPOINTS
FROM VA (ADJUSTABLE).
4. HIGH / LOW DIFFERENTIAL AIRFLOW; INITIAL SETPOINT 170 / 110 CFM
(ADJUSTABLE)
5. HIGH / LOW SPACE DIFFERENTIAL PRESSURE; SETPOINT TO BE
DETERMINED THROUGH WORK WITH CONTROLS CONTRACTOR BASED ON
DIFFERENTIAL PRESSURE ACHIEVED AT VARIOUS DIFFERENTIAL AIR
FLOWS (ADJUSTABLE)
CONVECTOR HEAT:
1. MODULATE CONVECTOR HEAT VALVE IN RESPONSE TO SPACE
TEMPERATURE AND SETPOINT (ADJUSTABLE).
2. INITIAL SETTING 75 DEG. F. (ADJUSTABLE). PROVIDE FULL OPEN VALVE
WHEN SPACE TEMPERATURE IS 70 DEG. F., FULL CLOSED AT 78 DEG. F.
3. DDC TO VERIFY VALVE POSITION USING ACTUATOR FEEDBACK.
4. ALARM AT ECC SHOULD TEMPERATURE SETPOINT NOT BE ACHIEVED.
CONVECTOR AS SUPPLEMENTAL HEAT:
1. SEE PLANS FOR SPACES WITH CONVECTORS AS SUPPLEMENTAL HEAT.
2. SHOULD AIR TERMINAL UNIT HEAT COIL NOT BE ABLE TO MAINTAIN SPACE
TEMPERATURE OPEN CONVECTOR HEAT VALVE TO PROVIDE ADDITIONAL
HEAT.
3. DDC TO VERIFY VALVE POSITION USING ACTUATOR FEEDBACK.
4. ALARM AT ECC SHOULD TEMPERATURE SETPOINT NOT BE ACHIEVED.
CABINET UNIT HEATER HEAT:
1. MODULATE CABINET UNIT HEATER HEAT VALVE IN RESPONSE TO SPACE
TEMPERATURE AND SETPOINT (ADJUSTABLE).
2. ENERGIZE FAN AFTER OPENING HEAT VALVE.
3. MONITOR FAN OPERATION WITH CURRENT SENSOR.
4. INITIAL SETTING 75 DEG. F. (ADJUSTABLE). PROVIDE FULL OPEN VALVE
WHEN SPACE TEMPERATURE IS 70 DEG. F., FULL CLOSED AT 78 DEG. F.
5. DDC TO VERIFY VALVE POSITION USING ACTUATOR FEEDBACK.
6. ALARM AT ECC SHOULD TEMPERATURE SETPOINT NOT BE ACHIEVED.
7. ALARM AT ECC SHOULD CABINET UNIT HEATER FAN NOT OPERATE.
11/30/2016
100% SUBMITTAL - NOT FOR CONSTRUCTION
e i g c f q u a r l f d f
AE PROJECT # 13774 of
PD PYC 023
402-GI101
BLDG 402 - INFECTION CONTROL
PLANS - PHASE 1
f f
PD PYC 024
402-GI102
PLANS - PHASE 2
f f
PD PYC 025
402-GI103
PLANS - PHASE 3
PD PYC 026
402-AD101
BLDG 402 - DEMOLITION PLANS
f f f f
PD PYC 027
402-AD102
BLDG 402 - DEMOLITION PLANS
f f
PD PYC 029
402-AS102
BLDG 402 - FLOOR PLANS, SCHEDULES
AND INTERIOR ELEVATIONS
f f
PD PYC 030
402-AS103
BLDG 402 - REFLECTED CEILING PLANS
f f
PD PYC 031
402-AS201
BLDG 402 - SIGNAGE PLANS
f f
PD PYC 032
402-AS301
BLDG 402 - BUILDING SECTIONS
f f
LOCATION MAP VICINITY MAP
PD PYC 001
GI101
COVER SHEET
OWNER AND CONSULTANTS:
ARCHITECT:
NAME: ANDERSON ENGINEERING OF MN, LLC
ADDRESS: 13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
CONTACT: PAUL DAHLBERG
PHONE: 763-412-4000 ext 4034
VA COR: VA COR
ADDRESS: 500 EAST VETERANS ST. B23
FACILITY SERVICE PROJECT SECTION
CONTACT: CHRIS KRAFT
PHONE: 608-315-0377
CONTACT VA MEDICAL
CENTER
PROJECT NAME:
SITE ADDRESS:
676-14-110 (superseded project number) 676-21-110 (updated project number)
500 E VETERANS ST.
VA MEDICAL CENTER
TOMAH, WISCONSIN 54660
VA PROJECT NUMBER:
STRUCTURAL ENGINEER:
NAME: LHB, CORP
ADDRESS: 701 WASHINGTON AVE NORTH, SUITE 200
MINNEAPOLIS, MN 55401
CONTACT: GREGG CURTIS, PE
PHONE: 612-766-2805
MECH/ELEC/PLUB/FIRE ENGINEER:
NAME: MEP ASSOCIATES, LLC
ADDRESS: 2720 ARBOR COURT
EAU CLAIRE, WI 54701
CONTACT: PAUL CULVER, DES
PHONE: 608-848-9556
ELEVATOR CONSULTANT:
NAME: ELEVATOR ADVISORY GROUP, INC
ADDRESS: 14530 PENNOCK AVE NORTH, SUITE 104
APPLE VALLEY, MN 55124
CONTACT: KATHLEEN A. MARKWELL, CSI,CDT
PHONE: 952-432-4443
f f
PD PYC 033
402-AS302
BLDG 402 - BUILDING SECTIONS
f f
PD PYC 002
GI102
DRAWING INDEX
2 3 4 5 6 7
2.4 6.6
F.1
402-SF102
TFE 942' - 5"
ETFE 942' - 2" ETFE 943' - 3"
ETFE 943' - 3" ETFE 945' - 6"
16" CONCRETE ELEVATOR MAT
SLAB W/ #6 AT 10" OC T&B
PROVIDE BOND BREAKER
BETWEEN NEW WALL AND
FOUNDATION AND ALL EXISTING
STRUCTURE, TYP
ETFE 944' - 3"
ETFE 944' - 3"
ETFE 943' - 0"
ETFE 941' - 9" ETFE 945' - 2"
ETFE 944' - 1" ETFE 945' - 10"
TFE 947' - 0"
ETFE 944' - 5" ETFE 944' - 10"
ETFE 946' - 5" ETFE 946' - 5"
TYP
1' - 0"
ETFE 945' - 6"
12' - 11" 12' - 3 1/2" 8' - 8" 12' - 3 1/2" 12' - 11"
/2
4' - 11" 8' - 0" 8' - 0" 4' - 11"
9' - 8"
1' - 1 1/2"
1' - 6"
1' - 1 1/2"
9' - 8"
2 3 4 5 6
12' - 11" 12' - 3 1/2" 8' - 8" 12' - 3 1/2"
12' - 11"
F.13
NEW 3.5" LWC ON 3" VLI 18 GA COMPOSITE
STEEL DECK (6.5" TOTAL DEPTH) REINF. W/
6x6 - W2.9xW2.9
Sim
FV
FV
NEW 8" CONC SLAB REINF. W/
#7 AT 8" OC EA WAY, TYP
HOIST BM, COORD W/ ELEVATOR
SUPPLIER FOR LOCATION, TYP
LHB PROJ. NO: COPYRIGHT 2016 BY LHB, INC. ALL RIGHTS RESERVED.
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title ig th c e f o rt in e f o re n c e f o lf i n c e f o rs c e f o e i n c e f o i n c e f o n c h e e f o
126AE PROJECT # 13774No. Revisions Date
\G i\ ts \1 w le v to il i.
rv
/3
:3
:2
402-SF101
SWH150150
BUILDING 402 - FRAMING
PLANS
1/8" = 1'-0"
CRAWL SPACE FOUNDATION FOUNATION PLAN
FIRST LEVEL FRAMING PLAN
SECOND LEVEL FRAMING PLAN
THIRD LEVEL FRAMING PLAN
ATTIC FLOOR FRAMING PLAN
f f
PD PYC 003
GI103
GENERAL NOTES, SYMBOLS
AND ABBREVIATIONS
EXISTING 10.5 x 22 CONCRETE BM
L4x4x3/8 CONT. W/ 1/2" DIA.
EXP ANCHORS @ 12" O.C.
TYP. ALL (4) SIDES
NEW SLAB ON METAL DECK
SEE PLAN
NEW 8" CMU WALL
8x16" BOND BEAM
W/ (2) #5 CONT.
GRID
TOP OF SLAB EL
FIRST LEVEL
953' - 0"
SECOND LEVEL
964' - 6"
THIRD LEVEL
976' - 5"
CRAWL SPACE
942' - 7"
3 4 5 6
ATTIC ROOF
1004' - 2 1/2"
ATTIC FLOOR
988' - 4"
LR
2"
FORMS MUST BE REMOVED AND
2" CLEARANCE MAINTAINED.
FIRST LEVEL
953' - 0"
SECOND LEVEL
964' - 6"
THIRD LEVEL
976' - 5"
CRAWL SPACE
942' - 7"
ATTIC ROOF
1004' - 2 1/2"
988' - 4"
CENTERLINE OF SUPPORT
MEMBER @ DECK LAP SPLICE
CENTERLINE OF
INTERMEDIATE
SUPPORT MEMBERS
DECK SUPPORT @
EXT BRG WALL
TYPICAL DECK WELD
6"oc @ EXT
SUPPORTS
TYPICAL WELD ⅝"Ø
(EFFECTIVE) FUSION
DIAMETER
DECK WELDS @ 12" MAX
SPACING @ INTERMEDIATE
SUPPORTS - TYPICAL
AT DECK SIDE LAPS MAX SPACE BETWEEN
ATTACHMENTS IS 36" - PROVIDE BUTTON
PUNCH OR TEK SCREW CONNECTION
WELD REQUIRED @
EACH DECK SEAM
GRID
SOLID BLOCK AND GROUT AROUND
EXISTING CONCRETE FLOOR SYSTEM.
MIN 8" BOND BM W/ (2) #5 CONT
BELOW EA FLOOR, TYP
GROUT FIRST COURSE SOLID ALL
AROUND
8" CMU WALL REINF W/ #5 AT 2'-0" OC, TYP
FULL LAP DOWEL AT TRANSITION
IA
SEE SECTION 402-SF6/102
FOR MORE INFORMATION
NON SHRINK GROUT AS REQ'D
FOR SMOOTH BEARING (1/2" MIN)
GROUT BM POCKET SOLID AFTER
BM PLACEMENT
DRILL AND EPOXY (2)
3/4" DIA THREADED
ROD (8" EMBED)
W8 HOIST BM, SEE PLAN
PROVIDE MIN OF 13'-1" CLR TO FLR
BELOW, COORD W/ ELEVATOR SUPPLIER
8" CONC SLAB, SEE PLAN FOR
REINF
CRUSHED STONE
BACKFILL
#6 @ 10" EACH
WAY TOP & BOTTOM
CONT WATER
STOP, TYP
STANDARD 90° HOOK,
#5 AT 12" OC BELOW FIRST
LEVEL
#5 @ 12" oc
24"
24"
TOP OF SLAB EL
TOP OF FOOTING EL
SLOP TO DRAIN
GROUT CMU SOLID
BELOW FIRST LEVEL
8" BOND BM W/ (2) #5 x
CONT, TYP
IN
8" CMU WALL REINF W/ #5 AT 2'-0" OC, TYP
(2) #5 x CONT AROUND
BASE OF WALL
CONC SLAB, SEE PLAN
#5 DWLS (30" x 30") AT
8" OC EA SIDE, TYP
8" BOND BM REINF W/
(2) #5 CONT
8" CMU, SEE PLAN FOR
REINF.
(2) #5 CONT, TYP
LHB PROJ. NO: COPYRIGHT 2016 BY LHB, INC. ALL RIGHTS RESERVED.
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title c e f o e f o n c e f o i n c e f o c e f o e i n c e f o i n c e f o n c h e e f o
126AE PROJECT # 13774No. Revisions Date
\G i\ ts \1 w le v to il i.
rv
/3
:3
:2
SWH150150
BUILDING 402 -
STRUCTURAL SECTIONS
3/4" = 1'-0"
SECTION AT INFILL SLAB
1/4" = 1'-0"
NEW ELEVATOR SECTION N/S
1/4" = 1'-0"
NEW ELEVATOR SECTION E/W
NO SCALE
DETAIL - METAL DECK WELDING
TYPICAL CMU WALL AT EX FLOOR
SECTION ELEVATOR HOIST BEAM
ELEVATOR PIT FOOTING SECTION
SECTION CONCRETE CAP
240A
402A f f
PD PYC 004
GI104
SITE PLANS
402A f f
PD PYC 005
GI105
ENLARGED SITE PLANS
f f
PD PYC 006
GI106
DOOR & FRAME TYPES, DETAILS
AND PARTITION TYPES
e e i g h t h i n c e f o e q u a r t e r i n c e f o r e e e i g h t h s i n c e f o e h a l f i n c e f o r e e q u a r t e r s i n c e f o e i n c e f o e a n d o n e h a l f i n c e f o r e e i n c h e e f o
2 1/4" = 1'-0"
NORTH
3 1/4" = 1'-0"
1 1/4" = 1'-0"
4 NO SCALE
LPS
6" PUMP
RET.MPS
10" HPS
6" MPS
VAC
LPS
VR
DR
10" HPS
HYDRAULIC
LINE
VR
DR
PR
PR
PUMPED CONDENSATE
LPS CUTOFF
MPS
1"
1 1/4"
1"1"
3/4"
ELEVATOR
MACHINE
ROOM
EXISTING
CABINET HEATER
1/2" MPR
3/4" MPS
CONVECTOR
(TYP.)
10ø
26x12 x x
18x18 UP x x
EF-3
10x8 UP x
402-TU-5-33
402-TU-5-32
CD-E
RG-E
ø
EG-E
5-33
10 26x16
CUH-E
13.4
7.3 5.3
10.0
5.1
7.9
1"3/4"
402-EF-ELEV
5-32
36x1020x10
8ø
17x10
10x6
38x12
20x10
16x12
TEMP REG.
IN DUCT
EF-5
16x12 UP
EF-5A
14x14 UP
10X8 DN
8X6 UP
SENSOR IN
DUCTWORK
10x10
12X6
12x10
402-TU-5-18
LD-E
5-19
402-TU-5-19
402-TU-5-20
402-TU-5-21
402-TU-5-22
402-TU-5-23
402-TU-5-24
402-TU-5-26
402-TU-5-25
SG-E
5-26
5-22
5-21
5-25
5-23
5-24
5-20
5-18
402-TU-3-12
38x14 40x14
5-22
3-12
3/4"1"
42x20 UP
26x14 UP
40x18 UP
44x14
7 109 12 13 148 119.57 109 12 13 148 119.5
109 128 119.5
1098 9.5
HWS/R MAINS AND PIPING RUNOUTS LOCATED IN FUTURE ELEVATOR AREA TO BE
REMOVED AND RELOCATED AS REQUIRED FOR NEW ELEVATOR AND EQUIPMENT
INSTALLATION. PROVIDE FIELD OFFSETS AS REQUIRED FOR NEW INSTALLATION.
BRANCH PIPING TO CONVECTORS ABOVE TO BE REUSED, UNLESS THE
CONVECTOR ABOVE IS BEING REPLACED.
ELEVATOR MACHINERY ROOM COOLING UNIT, ASSOCIATED PIPING AND
CONTROLS TO BE REMOVED AND DISPOSED OF COMPLETELY. MANAGE AND
DISPOSE OF REFRIGERANT IN ACCORDANCE WITH ALL REGULATIONS. REMOVE
WATER AND DRAIN PIPING BACK TO MAIN OR DRAIN. CAP WATER PIPE WHERE
PREVIOUSLY CONNECTED TO MAIN.
ELEVATOR HYDRAULIC SYSTEM TO BE REMOVED AND DISPOSED OF COMPLETELY
BY ELEVATOR CONTRACTOR. COORDINATE PHASING WITH OWNER.
REMOVE AND DISPOSE OF EXHAUST FAN, EXHAUST GRILLE AND ASSOCIATED
DUCTWORK BACK TO WALL LOUVER. CAP, SEAL AND INSULATE EXISTING WALL
LOUVER. COORDINATE FILL, PATCH AND FINISH OF INTERIOR WALL OPENING NO
LONGER REQUIRED AND MATCH ADJACENT.
REMOVE AND DISPOSE OF EXISTING CABINET UNIT HEATER AND ALL ASSOCIATED
PIPING. CAP PIPING AT MAIN IN CRAWL SPACE BELOW.
REMOVE AND DISPOSE OF EXISTING DUCTWORK, DAMPERS AND DIFFUSERS
LOCATED IN FUTURE ELEVATOR AREA. INCLUDING BUT NOT LIMITED TO
DUCTWORK AND EQUIPMENT INDICATED ON PLAN.
REMOVE AND RELOCATE EXISTING SPACE THERMOSTAT. SEE SHEET MH101 FOR
NEW LOCATION.
PROVIDE PRELIMINARY AIRFLOW TEST OF EXISTING TERMINAL UNIT PRIOR TO
CONSTRUCTION.
PROVIDE PRELIMINARY AIRFLOW TEST OF EXISTING EXHAUST FAN, ASSOCIATED
RISERS, FLOOR RUN-OUTS AND ALL ASSOCIATED EXHAUST GRILLES PRIOR TO
PROVIDE PRELIMINARY AIRFLOW TEST OF EXISTING SUPPLY/RETURN GRILLE
PRIOR TO CONSTRUCTION.
REMOVE AND REINSTALL EXISTING TERMINAL UNIT AFTER DEMOLITION.
RECONNECT HWS/R LINES BASED ON NEW LOCATION. SEE SHEET MH101 FOR
TERMINAL UNIT LAYOUT.
REMOVE AND DISPOSE OF EXISTING CONVECTOR AND ASSOCIATED PIPING BACK
TO MAIN. CAP HWS/R PIPING IN CRAWL SPACE. COORDINATE FLOOR HOLE INFILL,
PATCH AND REPAIR WITH GENERAL CONTRACTOR TO MATCH ADJACENT.
PROVIDE SUPPLY AND RETURN CFM TOTALS OF EACH FLOOR BRANCH TAKEOFF
FOR 402-AHU-5.
REMOVE AND DISPOSE OF AIR TERMINAL UNIT WITH HOT WATER HEAT COIL,
INCLUDING THERMOSTAT, CONTROL VALVE, AND ALL RELATED CONTROLS.
REMOVE AND DISPOSE OF FIRE DAMPER.
KEYED NOTES
GENERAL NOTES
1. SUBMIT PRELIMINARY TEST INFORMATION TO OWNER (COR) AND ENGINEER PRIOR TO
CONSTRUCTION FOR REVIEW OF EXISTING SYSTEMS. INCLUDE PRELIMINARY TEST
INFORMATION WITH FINAL TEST AND BALANCE REPORT.
2. PRIOR TO DEMOLITION MEASURE EXISTING GRILLE, REGISTER, AND/OR DIFFUSER
AIRFLOW.
3. PRIOR TO DEMOLITION MEASURE DUCT AIRFLOW AND STATIC PRESSURE.
4. PRIOR TO BEGINNING DEMOLITION, MEASURE VAV AND ALL CONNECTED GRILLE AND
DIFFUSER AIRFLOWS. WORK WITH CONTROLS CONTRACTOR TO MEASURE VAV BOX
MAXIMUM AND MINIMUM AIRFLOWS.
5. PRIOR TO DEMOLITION, DOCUMENT EXISTING FAN AND MOTOR NAMEPLATE
INFORMATION. MEASURE FAN PERFORMANCE INCLUDING; AIRFLOW, AIR
TEMPERATURE AT TIME OF TEST, MAXIMUM AND MINIMUM AIRFLOWS IF ON VFD, FAN
STATIC PRESSURE, FAN RPM, MOTOR VOLTS, MOTOR AMPS, MOTOR RPM, ETC.
6. CHASE AND SHAFT INFORMATION BASED ON EXISTING PLANS, CONTRACTOR TO
VERIFY ACTUAL INSTALLATION.
7. REMOVE ALL DUCTWORK THAT IS NOT INDICATED TO REMAIN OR ABANDONED.
8. REMOVE ALL PIPING THAT IS NOT INDICATED TO REMAIN OR ABANDONED.
9. REMOVE ALL PNEUMATIC CONTROLS.
10. MECHANICAL CONTRACTOR TO COORDINATE WITH GENERAL CONTRACTOR THE
PATCH AND REPAIR OF ALL WALLS AND FLOORS DAMAGED OR MODIFIED DURING
CONSTRUCTION. PATCH AND REPAIR TO MATCH EXISTING.
18x18 UP
26x18 UP
26x18
AIR BALANCE NOTES
SUPPLY AIR DN FROM 402-AHU-5
RETURN AIR DN FROM 402-RF-5
EXHAUST AIR UP TO 402-EF-5
SUPPLY AIR FROM 402-AHU-3.
EXHAUST AIR UP TO 402-EF-3
EXHAUST AIR UP TO 402-EF-5A
AutoCAD SHX Text
B402 KEY PLAN
BUILDING 402 - INSTALL NEW ELEVATOR 1ST FLOOR - DEMOLITION
BUILDING 402 - INSTALL NEW ELEVATOR CRAWL SPACE - DEMOLITION
BUILDING 402 - INSTALL NEW ELEVATOR 2ND FLOOR - DEMOLITION
ELEVATOR MACHINERY ROOM COOLING UNIT
402-MD101
JRM
JAM
DEMOLITION PLANS - HVAC
BLDG 402 - MECHANICAL
2C15
S14
2C14
S14
2C25
2241A
2C25
PD PYC
GI107
INFECTION CONTROL INFORMATION
f f e e i g h t h i n c e f o e q u a r t e r i n c e f o r e e e i g h t h s i n c e f o e h a l f i n c e f o r e e q u a r t e r s i n c e f o e i n c e f o e a n d o n e h a l f i n c e f o r e e i n c h e e f o
2 1/4" = 1'-0"
1 1/4" = 1'-0"
6 NO SCALE
5 1/4" = 1'-0"4 1/4" = 1'-0"
3 1/4" = 1'-0"
12x6
20x10
8x8
Ø
8Ø
30x12
6Ø
10x8
5Ø
12x12
EF-5A
16x16 UP
14x14 DN
12x8
10x8 UP
8x6 DN
8x6
8x6
14x10
18x16 UP
16x12 DN
SENSOR
12x10 18x12
10Ø
5-14
5-13
5-12
5-8
5-5
402-TU-5-8
402-TU-5-5
402-TU-5-12
402-TU-5-13
402-TU-5-14
402-TU-3-6
3-6
402-TU-5-10
402-TU-5-9
402-TU-5-11
5-11
5-9
5-10
402-TU-5-4
402-TU-5-6
402-TU-5-7
5-6
5-7
40x14
20x12
16x6
SG-E
CONVECTOR
(TYP.
1 1/2"
1 1/4" 1 1/2"
3.9
6.1 5.8
10.0
5.1
3.9
5.8
1.7
26x14 UP
44x14
MD102
18x12
28" BOD
92" BOD
21-1/2" BOD
115-1/2" BOD
30x14
30x10
30x12
MD102
x
16x10
2" BOD
18x16
DN
16x16
DN
402-EF-5-A
402-EF-3
402-EF-5
402-AHU-5
42x20 RETURN DUCT
UP FROM BELOW
7 1098 119.5
109 12 138 119.5
KEYED NOTES
REMOVE AND DISPOSE OF EXISTING VAV AND ASSOCIATED DUCTWORK AND
PIPING AS SHOWN ON PLAN. CAP DUCTWORK AT MAINS. PROVIDE PRELIMINARY
AIRFLOW TEST OF EXISTING VAV PRIOR TO DEMOLITION.
EXISTING DUCTWORK, FIRE DAMPERS AND DIFFUSERS LOCATED IN FUTURE
ELEVATOR AREA TO BE REMOVED. INCLUDING BUT NOT LIMITED TO DUCTWORK
AND EQUIPMENT INDICATED ON PLAN. SEE SHEET MH102 FOR NEW
REMOVE AND DISPOSE OF EXISTING CONVECTOR SHOWN DASHED AND CAP
PIPING AT HW MAIN LOCATED IN 2ND FLOOR CEILING. SEE SHEET MD101 FOR
CONTINUATION.
PROVIDE PRELIMINARY AIRFLOW TEST OF EXISTING VAV UNIT PRIOR TO
CONSTRUCTION. RELOCATE VAV UNIT AS REQUIRED FOR CONSTRUCTION.
PROVIDE PRELIMINARY AIRFLOW TEST OF EXISTING EXHAUST FAN, ASSOCIATED
RISERS, FLOOR RUN-OUTS AND ALL ASSOCIATED EXHAUST GRILLES PRIOR TO
PROVIDE PRELIMINARY AIRFLOW TEST OF EXISTING GRILLE.
REMOVE AND DISPOSE OF EXISTING 30x12 FIRE DAMPER AS SHOWN. PATCH AND
REPAIR WALL AS REQUIRED FOR INSTALLATION OF NEW FIRE DAMPER AND DUCT.
REMOVE AND DISPOSE OF EXISTING EXHAUST FAN AND DUCTWORK AS REQUIRED
FOR INSTALLATION OF NEW EXHAUST FAN.
PROVIDE A COMPLETE AIRFLOW TEST OF EXISTING 402-AHU-5 PRIOR TO
CONSTRUCTION. TEST AHU-5 WITH ALL ASSOCIATED VAV UNITS 100% OPEN.
IDENTIFY MAXIMUM AND MINIMUM SUPPLY, RETURN AND OUTSIDE AIR. PROVIDE
SUPPLY AND RETURN CFM TOTALS FOR EACH FLOOR BRANCH TAKEOFF.
GENERAL NOTES
1. SUBMIT PRELIMINARY TEST INFORMATION TO OWNER (COR) AND ENGINEER PRIOR TO
CONSTRUCTION FOR REVIEW OF EXISTING SYSTEMS. INCLUDE PRELIMINARY TEST
INFORMATION WITH FINAL TEST AND BALANCE REPORT.
2. PRIOR TO DEMOLITION MEASURE EXISTING GRILLE, REGISTER, AND/OR DIFFUSER
AIRFLOW.
3. PRIOR TO DEMOLITION MEASURE DUCT AIRFLOW AND STATIC PRESSURE.
4. PRIOR TO BEGINNING DEMOLITION, MEASURE VAV AND ALL CONNECTED GRILLE AND
DIFFUSER AIRFLOWS. WORK WITH CONTROLS CONTRACTOR TO MEASURE VAV BOX
MAXIMUM AND MINIMUM AIRFLOWS.
5. PRIOR TO DEMOLITION, DOCUMENT EXISTING FAN AND MOTOR NAMEPLATE
INFORMATION. MEASURE FAN PERFORMANCE INCLUDING; AIRFLOW, AIR
TEMPERATURE AT TIME OF TEST, MAXIMUM AND MINIMUM AIRFLOWS IF ON VFD, FAN
STATIC PRESSURE, FAN RPM, MOTOR VOLTS, MOTOR AMPS, MOTOR RPM, ETC.
6. CHASE AND SHAFT INFORMATION BASED ON EXISTING PLANS, CONTRACTOR TO
VERIFY ACTUAL INSTALLATION.
7. REMOVE ALL DUCTWORK THAT IS NOT INDICATED TO REMAIN OR ABANDONED.
8. REMOVE ALL PIPING THAT IS NOT INDICATED TO REMAIN OR ABANDONED.
9. REMOVE ALL PNEUMATIC CONTROLS.
10. MECHANICAL CONTRACTOR TO COORDINATE WITH GENERAL CONTRACTOR THE
PATCH AND REPAIR OF ALL WALLS AND FLOORS DAMAGED OR MODIFIED DURING
CONSTRUCTION. PATCH AND REPAIR TO MATCH EXISTING.
x
AIR BALANCE NOTES
SUPPLY AIR DN FROM 402-AHU-5
RETURN AIR DN FROM 402-RF-5
EXHAUST AIR UP TO 402-EF-5
SUPPLY AIR FROM 402-AHU-3.
EXHAUST AIR UP TO 402-EF-3
EXHAUST AIR UP TO 402-EF-5A
B402 KEY PLAN
BUILDING 402 - INSTALL NEW ELEVATOR 3RD FLOOR - DEMOLITION
BUILDING 402 - INSTALL NEW ELEVATOR ATTIC - DEMOLITION
SECTION VIEW 6
SECTION VIEW 5
SECTION VIEW 4
SECTION VIEW 3
402-MD102
JRM
JAM
DEMOLITION PLANS - HVAC
BLDG 402 - MECHANICAL
2C35
3239A
EXISTING ATTIC
EXISTING PENTHOUSE
f f
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .