This notice provides details for a federal construction solicitation for elevator replacement work at the Tomah VA Medical Center in Tomah, Wisconsin. The project involves demolishing an existing elevator, shaft, and mechanical room, and infilling the adjacent stairwell on floors one through three. Two new elevators will be installed next to existing elevator and mechanical rooms, with new shafts constructed in currently occupied spaces. The performance period is 400 calendar days from notice to proceed. The estimated price range is $2-5 million. The solicitation will be issued on August 5th as a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. Interested vendors must register in SAM and have an active ORCA registration. A pre-bid conference and site walk are scheduled for the week of August 9th. Inquiries should be directed to the points of contact provided.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 676-21-110 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25221B0029 08/08/2021

X X

X

PLEASE FIND ATTACHED FIRST SET OF RFI RESPONSES

FIRST SET OF RESPONSES TO RFIs

1. Is there an asbestos sampling report for B402?

According to the 2015 information that we have, the crawl space in B402 is ACM free.

1. There is a spec for abatement, and nothing called out on the drawings.

Correct – these spec sections were added in because there may be some hidden or unforeseen items.

Thus in the SOW - IV. ADDITIONAL REQUIREMENTS:

1. The VA does not anticipate lead or asbestos abatement in the project. However, the contractor shall be cautious and investigate potential asbestos containing materials that may be hidden within walls. Report potential ACM to the COR for further action. Provide a cost line for asbestos abatement in your bid for an amount not to exceed $35,000 in the event asbestos abatement is required. If this amount is not required, the unused portion will be deducted from the contract.

1. Will B402 3rd floor be occupied during the construction project?

We will have a decision from leadership by the end of this month – information forthcoming.

1. During construction can a window on each floor be removed to bring in new materials and remove demoed material?

Yes, if the window is in the construction area.

However, any damage to the windows, frames, building, etc. – must be repaired at contractors’ own expense.