This file appears to be a photo documentation showing infection control barrier setup and monitoring equipment for a construction area, likely part of a VA medical facility project to install patient lifts. The images show a construction entrance area with required safety signage including "DANGER CONSTRUCTION AREA KEEP OUT" and "DANGER HARD HAT AREA" posted.

The setup includes monitoring equipment with a Dwyer DigiMag manometer/pressure gauge installed on an edge guard to measure room pressure, with the reading showing -0.10. Various required forms are posted including ILSM (Interim Life Safety Measures), Sign-in sheets, PCRA (Preconstruction Risk Assessment) and ICRA (Infection Control Risk Assessment). The pressure monitoring system is configured with poly connected to the positive side to accurately measure room pressure, with notes indicating the HEPA filter machine should be blowing out of the room to maintain negative pressure for infection control purposes.

View the file

Other files

File Type Posted
36C25225B0011 0004.docx DOCX document
36C25225B0011 0003.docx DOCX document
S06 - Att.1 VA Alert 14-07.pdf PDF
36C25225B0011 0002.docx DOCX document
36C25225B0011 0001.docx DOCX document
S02 - Att5 - Pre-Construction Checklist.pdf PDF
S02 - Att 9a - Pre-Construction Risk Assessment PCRA.pdf PDF
36C25225B0011_1.docx DOCX document
S02 - Att1 - Bid Drawings 250124.pdf PDF
S02 - Att10c - ICRA Compiled Locations List.pdf PDF
S02 - Att2 - Project Manual Bid Specs 250124.pdf PDF
S02 - Att 15 Final SOW Install Patient Lifts Construction 578-15-001.pdf PDF
S02 - Att 9b - PCRA Compiled Locations List.pdf PDF
S02 - Att8 - Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 - Att4 - Contractor Badging - Fingerprint Request Form 2025.pdf PDF
S02 - Att7 - Cutting Welding and Other Hot Work.pdf PDF
S02 - Att14 Wage Determination IL 20240009 dtd 1.10.2025.pdf PDF
S02 - Att10b - Infection Control Risk Assessment ICRA - Level 2.pdf PDF
S02 - Att10a - Infection Control Risk Assessment ICRA - Level 1.pdf PDF
S02 - Att6 - Safety and Health During Construction Activities.pdf PDF
S02 - Att3 - Contractor Parking.pdf PDF
S02 - Att13 - No Smoking Policy 10-1-19.pdf PDF
S02 - Att11 - Interim Life Safety Measures ILSM.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAHINDoyleL Text Box Entrance

VHAHINDoyleL Text Box Manometer

VHAHINDoyleL Text Box

ICRA

VHAHINDoyleL Text Box

PCRA

VHAHINDoyleL Text Box

ILSM

VHAHINDoyleL Text Box Sign-in

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINSidleB Image

VHAHINSidleB Text Box Dwyer DigiMag Installed on edge guard. Poly is connected to positive side (+) to give accurate reading of room pressure. Hepa filter machine should be blowing out of room.

VHAHINSidleB Image

File details come from the government source that posted it. Updated .