This is a set of architectural and electrical drawings for installing patient lifts at Edward Hines Jr. VA Hospital in Hines, IL. The drawings detail the installation of 47 new patient lift locations across multiple buildings and floors, including Buildings 1, 8, 12, 113, 128, 217, 200, and 228.

The drawings provide detailed floor plans, enlarged layouts, electrical panel schedules, and installation details for ceiling-mounted patient lifts in various hospital areas including nuclear medicine, blind rehabilitation, spinal cord injury, ICU, surgical recovery, and other patient care areas. The drawings specify mounting details for different structural conditions (bar joists, cast-in-place concrete, structural steel), electrical connections for lift chargers and control enclosures, and phasing requirements to maintain hospital operations during installation. Key electrical requirements include 20A circuits for the lift equipment connected to existing panels. The work must be coordinated with infection control requirements, and some areas require after-hours work due to 24/7 patient care operations.

View the file

Other files

File Type Posted
36C25225B0011 0004.docx DOCX document
36C25225B0011 0003.docx DOCX document
S06 - Att.1 VA Alert 14-07.pdf PDF
36C25225B0011 0002.docx DOCX document
36C25225B0011 0001.docx DOCX document
S02 - Att5 - Pre-Construction Checklist.pdf PDF
S02 - Att 9a - Pre-Construction Risk Assessment PCRA.pdf PDF
36C25225B0011_1.docx DOCX document
S02 - Att10c - ICRA Compiled Locations List.pdf PDF
S02 - Att2 - Project Manual Bid Specs 250124.pdf PDF
S02 - Att12 - Infection Control Barrier Sample.pdf PDF
S02 - Att 15 Final SOW Install Patient Lifts Construction 578-15-001.pdf PDF
S02 - Att 9b - PCRA Compiled Locations List.pdf PDF
S02 - Att8 - Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 - Att4 - Contractor Badging - Fingerprint Request Form 2025.pdf PDF
S02 - Att7 - Cutting Welding and Other Hot Work.pdf PDF
S02 - Att14 Wage Determination IL 20240009 dtd 1.10.2025.pdf PDF
S02 - Att10b - Infection Control Risk Assessment ICRA - Level 2.pdf PDF
S02 - Att10a - Infection Control Risk Assessment ICRA - Level 1.pdf PDF
S02 - Att6 - Safety and Health During Construction Activities.pdf PDF
S02 - Att3 - Contractor Parking.pdf PDF
S02 - Att13 - No Smoking Policy 10-1-19.pdf PDF
S02 - Att11 - Interim Life Safety Measures ILSM.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT OFFICER REPRESENTATIVE DATE

CHIEF OF ENGINEERING DATE

INTERIOR DESIGNER DATE

DEPARTMENT HEAD DATE

CONTRACT SPECIALIST DATE LEAD USER SIGNATURE DATE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:2

P

M

GI000

COVER SHEET

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TDC

578-15-001

INSTALL PATIENT LIFTS

VA Hines

EDWARD HINES JR. VA HOSPITAL

100% CONSTRUCTION DOCUMENTS

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SHEET INDEX

SHEET

NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI001 PHASING NOTES

ARCHITECTURAL

A001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

A101 BUILDING 1- 2ND & 3RD FLOOR

A102 ENLARGED PLANS & PHOTOS - BUILDING1, 2ND & 3RD FLOORS

A103 BUILDING 8 - 1ST FLOOR PLAN

A104 ENLARGED PLANS & PHOTOS - BUILDING 8

A105 BUILDING 12 - 2ND FLOOR

A106 ENLARGED PLANS & PHOTOS - BUILDING 12, 2ND FLOOR

A107 BUILDING 113 - 1ST FLOOR

A108 ENLARGED PLANS & PHOTOS - BUILDING 113- 1ST FLOOR

A109 BUILDING 128- 1ST FLOOR PLAN

A111 ENLARGED PLANS & PHOTOS - BUILDING 128 1ST FLOOR

A112 BUILDING 217- 1ST & 2ND FLOORS

A113 ENLARGED PLANS AND PHOTOS - BUILDING 217, 1ST FLOOR

A114 ENLARGED PLANS AND PHOTOS - BUILDING 217, 1ST FLOOR

A115 ENLARGED PLANS AND PHOTOS - BUILDING 217, 1ST & 2ND

FLOOR

A116 BUILDING 200 BASEMENT PLAN

A117 ENLARGED PLANS & PHOTOS- BUILDING 200 BASEMENT

A118 BUILDING 200 - 1ST FLOOR

A119 ENLARGED PLANS AND PHOTOS- BUILDING 200 1ST FLOOR

A120 BUILDING 200 2ND FLOOR

A121 ENLARGED PLANS & PHOTOS- BUILDING 200 2ND FLOOR

A122 ENLARGED PLANS & PHOTOS- BUILDING 200 2ND FLOOR

A123 BUILDING 200- 7TH FLOOR PLAN

A124 ENLARGED PLAN & PHOTO- BUILDING 200 7TH FLOOR

A125 ENLARGED PLAN & PHOTO- BUILDING 200 7TH FLOOR

A126 ENLARGED PLANS & PHOTOS- BUILDING 200, 7TH FLOOR

A127 BUILDING 200- 10TH FLOOR PLAN

A128 ENLARGED PLANS & PHOTOS- BUILDING 200, 10TH FLOOR

A129 ENLARGED PLANS & PHOTOS-BUILDING 200, 10TH FLOOR

A130 BUILDING 200- 11TH FLOOR PLAN

A131 ENLARGED PLANS AND PHOTOS- BUILDING 200, 11TH FLOOR

A132 BUILDING 200- 13TH FLOOR PLAN

A133 ENLARGED PLANS AND PHOTOS - BUILDING 200,13TH FLOOOR

A134 BUILDING 228- BASEMENT

A135 ENLARGED PLANS & PHOTOS - BUILDING 228, BASEMENT

A136 BUILDING 228- 5TH FLOOR PLAN

A137 ENLARGED PLANS & PHOTOS BUILDING 228 - 5TH FLOOR

A501 LIFT DETAILS

A502 LIFT DETAILS

ELECTRICAL

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

E001 ELECTRICAL GENERAL NOTES

E101 BUILDING 1- 2ND & 3RD FLOOR

E102 ENLARGED PLAN - BUILDING 1, 2ND & 3RD FLOORS

E103 BUILDING 8 - 1ST FLOOR PLAN

E104 ENLARGED PLANS - BUILDING 8

E105 BUILDING 12 - 2ND FLOOR

E106 ENLARGED PLAN - BUILDING 12, 2ND FLOOR

E107 BUILDING 113 - 1ST FLOOR

E108 ENLARGED PLAN - BUILDING 113- 1ST FLOOR

E109 BUILDING 128 - 1ST FLOOR PLAN

E111 ENLARGED PLANS - BUILDING 128 1ST FLOOR

E112 BUILDING 217- 1ST & 2ND FLOORS

E113 ENLARGED PLAN 1ST FLOOR

E114 ENLARGED PLAN 1ST FLOOR

E115 ENLARGED PLANS 1ST & 2ND FLOOR

E116 BUILDING 200 BASEMENT PLAN

E117 ENLARGED PLAN- BUILDING 200 BASEMENT

E118 BUILDING 200 - 1ST FLOOR

E119 ENLARGED PLAN- BUILDING 200 1ST FLOOR

E120 BUILDING 200 2ND FLOOR

E121 ENLARGED PLAN- BUILDING 200 2ND FLOOR

E122 ENLARGED PLAN- BUILDING 200 2ND FLOOR

E123 BUILDING 200- 7TH FLOOR PLAN

E124 ENLARGED PLAN- BUILDING 200 7TH FLOOR

E125 ENLARGED PLAN- BUILDING 200 7TH FLOOR

E126 ENLARGED PLANS- BUILDING 200, 7TH FLOOR

E127 BUILDING 200- 10TH FLOOR PLAN

E128 ENLARGED PLAN- BUILDING 200, 10TH FLOOR

E129 ENLARGED PLAN- BUILDING 200, 10TH FLOOR

E130 BUILDING 200- 11TH FLOOR PLAN

E131 ENLARGED PLAN- BUILDING 200, 11TH FLOOR

E132 BUILDING 200- 13TH FLOOR PLAN

E133 ENLARGED PLANS - BUILDING 200,13TH FLOOOR

E134 BUILDING 228- BASEMENT

E135 BUILDING 228-ENLARGED PLAN- B217, BASEMENT

E136 BUILDING 228- 5TH FLOOR PLAN

E137 ENLARGED PLAN BUILDING 228 - 5TH FLOOR

E600 PANEL SCHEDULES

E601 PANEL SCHEDULES

E602 PANEL SCHEDULES

E603 PANEL SCHEDULES

E604 PANEL SCHEDULES

Contact: Contact:

EDWARD HINES JR. VAMC

Ernest G. Wright, Jr.

Healthcare Engineer

5000 S. Fifth Avenue Building 2, Room 117 Hines, IL 60141 p: 708-202-8387 ext. 21147 e: ernest.wright@va.gov

OWNER

GUIDON DESIGN INC.

Adam Ogrzewalla

Sr. Project Manager

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 103 e: aogrzewalla@guidondesign.com

ARCHITECT

AREA MAP

VICINITY MAP

CAMPUS MAP

Revisions: Date:

Contact:

GUIDON DESIGN INC.

Andrew Kennedy

Sructural Engineer

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 121 e: akennedy@guidondesign.com

STRUCTURAL ENGINEER

Contact:

GUIDON DESIGN INC.

Tom Chapman

Electrical Engineer

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 e: tchapman@guidondesign.com

ELECTRICAL ENGINEER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:2

P

M

GI001

PHASING NOTES

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TAA

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

Indicates 24/7 area with patients which may require special provisions.

Total number of new lift locations 47 4 5

8 1st Floor Bed Repair 19 North 19 South H-Track 9 A Low I Steel deck.

128 1st Floor Spinal Cord Injury Rehab Gym A100 H-Track, existing, spans over several therapy stations, convert 1 lift to 3 lifts

B High II This will require an ICRA enclosure.

113 1st Floor Blind Rehab A128, A133, A134 A121 H-Track 7 B High II Two rooms at time can be done.

3rd Floor Education D355 H-Track B Low II This will require an ICRA enclosure.

2nd Floor Nuclear Medicine G201 H-Track B High II This will require an ICRA enclosure. This will require off-duty work.1

2nd Floor Nuclear Medicine G226 H-Track

B High II

12 2nd Floor Neurology 205, 226 H-Track B High II Two rooms at time can be done.

12 2nd Floor Neurology Alcove Single-Track with scale

B High II

5th Floor Rehab Services - Prosthetics 5035, 5038 5042 H-Track B High II 5042 will require an ICRA enclosure. This will require off-duty work.

Basement Kinesiotherapy Department B1025 H-Track

B High II This will require off-duty work.

2nd Floor CLC - Occupational Therapy 2A34A H-Track B High II This will require off-duty work. Steel deck.

1st Floor CLC - Geriatric Clinic 1B167, 1B175, 1B176 1B168, 1B171, 1B172 H-Track B High II Only one room at a time can be completed.

1st Floor CLC - 1B Patient Rooms B107, B122, B126, B130 H-Track B High II Two rooms at time can be done.

1st Floor CLC - 1C Patient Room C152 H-Track, Bariatric

B High II

13th Floor GI Recovery 1349, Bay 4 H-Track B High II This will require an ICRA enclosure.

11th Floor Rehab Gym 1134 - Convert from Dining Room H-Track & Straight B High II This will require an ICRA enclosure. This will require off-duty work.

10th Floor Observation 1037, 1038, 1041, 1043, 1046 1035 H-Track B High II 1043 & 1046 to be done one at a time. Remaining rooms two at a time.

7th Floor Patient Rooms 701, 709, 713, 714, 716, 721, 725, 735, 737

715 H-Track B High II Only one room at a time can be completed.

2nd Floor SICU B2003, B2016, B2045

(Bays 1,10, 14)

H-Track B High II Only one room at a time can be completed.

2nd Floor MICU A2095, A2106 (Bays 1, 9) H-Track B High II Only one room at a time can be completed.

1st Floor X-Ray D102 (holding area) H-Track B High II This will require an ICRA enclosure. This will require off-duty work.

1st Floor MRI C105 (holding area) H-Track B High II This will require an ICRA enclosure. This will require off-duty work.

1st Floor Emergency Department Ambulance Bay H-Track, Bariatric; Cold Weather Rated B Medium II

Basement Ambulatory Care A001A H-Track

B High II This will require an ICRA enclosure.

A Priority B Priority C Priority Activity

Category

Risk

Category

Level

Building Area Unit Rooms Type Phase ICRA Comments

Patient Lift Locations

SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

SCALE: ??

VIEW TITLE

N

NORTH ARROW

LED WALL MOUNTED LIGHT FIXTURE

LED SURFACE MOUNTED LIGHT FIXTURE

LED SURFACE MOUNTED LIGHT FIXTURE

LED RECESSED LIGHT FIXTURE

HVAC RETURN AIR GRILLE

HVAC SUPPLY DIFFUSER

PENDANT LIGHT

ACCESS PANEL

EXIT LIGHTING

S

D

SPEAKER

SMOKE DETECTOR

LED RECESSED LIGHT FIXTURE

A 9'-0"

CEILING TAG CEILING TYPE

FINISHED CEILING HEIGHT

REFER TO CEILING LEGEND FOR MORE

INFORMATION

EXTENT OF REVISION

REVISION SET

MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY, NIC

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

A/C AIR CONDITION

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANT ANTENNA

APPD APPROVED

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ATCH ATTACHMENT

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING INSTITUTE

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BEV BEVEL

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKG BLOCKING

BLKT BLANKET

BM BEAM OR BENCHMARK

BOT BOTTOM

BRCG BRACING

BRDG BRIDGING

BRG BEARING

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C CELSIUS CHANNEL OR CHANNEL CELSIUS

C CONC CAST CONCRETE

C TO C CENTER TO CENTER

CAB CABINET

CB CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CLEANOUT

CO₂ CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CS CAST CONCRETE STONE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

N NORTH

NA NOT APPLICABLE

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEG NEGATIVE

NEUT NEUTRAL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION

OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE RADIUS

ORD ORDNANCE OR OVERFLOW ROOF DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR PORTLAND CEMENT

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PLATE, PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION OR REFRIGERATION

REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)

YD YARD

YR YEAR

1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®

SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION

MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL

DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,

SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES

MANAGEMENT.

2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE

CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE

NATIONAL CAD STANDARD AS GUIDES.

3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT

TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.

CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER

QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY

THE BID DUE DATE.

4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH

OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED

WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,

ACCESS CONTROL, ETC.

5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN

FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT

LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK

AND ACCESS TO EXISTING UTILITIES FOR TIE IN.

6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING

BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC

MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR

VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH

THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS

AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,

ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION

REQUIREMENTS.

7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF

WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE

FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK

THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF

WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY

CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.

8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR

UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,

GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.

9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING

AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING

CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING

PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED

METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.

10. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT

IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW

CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION

BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED

CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY

ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR

MISSING DIMENSIONS.

11. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL

ORIENTATION AND CONTEXT ONLY.

12. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF

CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.

13. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW

STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN

GRID LINES UNLESS NOTED OTHERWISE.

14. FLOOR ELEVATION 100'-0" IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING

SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.

15. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.

16. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS

“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE

DETAIL, AREA, OR ITEM REFERENCED.

17. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,

INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.

18. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS

AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL

DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.

19. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND

EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF

DELIVERY AND ROUGH-IN.

20. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY

CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.

21. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE

FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND

HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.

22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL

UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO

UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE

OWNER.

23. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING

REQUIRED DURING CONSTRUCTION.

24. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT

CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE

CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE

CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO

COST TO THE OWNER.

25. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT

DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER

QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM OR DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOZ DOZEN

DN DOWN

DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION AGENCY

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

ETS EXPOSE TO STRUCTURE

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FH FLAT HEAD OR FLAT HEAD SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIP FILLER PANEL

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLUOR FLUORESCENT

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT, OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR FIBERGLASS

REINFORCED PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTIC

GI GALVANIZED IRON

GL GLASS

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

H HIGH

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER OR HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR HORSEPOWER

HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE DIAMETER

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE ASSEMBLY

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

J-BOX JUNCTION BOX

JT JOINT

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE OR LEFT HAND REVERSE

LATENT HEAT RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM OR MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE OR MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

X

X

XXXX

SHEET LOCATION

VIEW NUMBER

X X

X

SHEET LOCATION

VIEW NUMBER

XXXX

BUILDING SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

BUILDING X

XXXX

X

XXXX

ELEVATION REFERENCES

NEW WALL

WALL TO BE

REMOVED

S3A.G

INDICATES STRUCTURAL MATERIAL

INDICATES NOMINAL SIZE

INDICATES STRUCTURE AND FINISH HEIGHTS

INDICATES QUALIFER

EXISTING WALL TO

REMAIN

TEMPORARY IC

BARRIER WALL

CONSTRUCTION

ROOM

ROOM TAG

NEW DOOR

EXISTING DOOR

DEMOLISHED DOOR

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE DETECTOR OR SOAP

DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

S SOUTH

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL STEEL

STL LNTL STEEL LINTEL

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

TA TOILET ACCESSORY

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL OR TEMPERATURE

CONTROL PANEL OR TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD FINISH

TRTD TREATED

TS TENSILE STRENGTH OR TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

REVISION TO PLAN CALLOUT

WALLS

DOOR TAG

KEY NOTE TAGS

WALL TAG : REFER TO WALL LEGEND FOR MORE INFORMATION

DOORS

PT-1

A

T

101 EQUIPMENT/FURNITURE TAG

FINISH INDICATION

FRAME / WINDOW

GLAZING1

1 PLAN NOTE

1 DEMOLITION NOTE

ALTERNATE/BID DEDUCT ITEM

KEY NOTE SYMBOLS

CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLS

REFLECTED CEILING PLAN SYMBOLS

ARCHITECTURAL ABBREVIATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:1

P

M

A001

ARCHITECTURAL SYMBOLS AND

ABBREVIATIONSGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TDC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

VERTICAL SPACE

STAIR

RCC245R

A&MM ADMIN OFFICE

G260D

TENANT SPACE

STORAGE ROOM

G260C

UNASSIGNED VACANT

SPACE

G256

COMMON SPACE

CORRIDOR

RCC246R

A&MM ADMIN OFFICE

G260

DIRECTOR'S SUITE

STORAGE ROOM

G256C

NUCLEAR MEDICINE

PROCEDURE ROOM

G256A VERTICAL SPACE

CHASE

RCC209C

COMMON SPACE

CORRIDOR

RCC244R

RADIOLOGY STORAGE

ROOM

R256B

RADIOLOGY CHASE

RCC208C

RADIOLOGY STORAGE

ROOM

G251

NUCLEAR MEDICINE

TOILET

G252

VERTICAL SPACE

CHASE

RCC216C

NUCLEAR MEDICINE

LOCKERS

G252A

NUCLEAR MEDICINE

STORAGE

G250

NUCLEAR MEDICINE

OFFICE

G248

NUTRITION/FOOD

OFFICE

G246

NUCLEAR MEDICINE

OFFICE

G244

NUCLEAR MEDICINE

FILE ROOM

G242

NUCLEAR MEDICINE

ELECTRICAL CLOSET

G240

NUCLEAR MEDICINE

OFFICE

G236

UNASSIGNED VACANT

SPACE

G245

NUCLEAR MEDICINE

LAB

G231

NUCLEAR MEDICINE

MECHANICAL ROOM

G235

COMMON SPACE

CORRIDOR

RCC243R

VERTICAL SPACE

STAIR

RCC239R

NUCLEAR MEDICINE

OFFICE

G228

COMMON SPACE

CORRIDOR

RCC242R

NUCLEAR MEDICINE

OFFICE

G227

NUCLEAR MEDICINE

TOILET

RCC237R

VERTICAL SPACE

CHASE

RCC225C

VERTICAL SPACE

ELEVATOR

RCC238R

NUCLEAR MEDICINE

PROCEDURE ROOM

G226

NUCLEAR MEDICINE

OFFICE

G224

COMMON SPACE

CORRIDOR

RCC241R

VERTICAL SPACE

CHASE

RCC228C

NUCLEAR MEDICINE

TOILET

G222

NUCLEAR MEDICINE

OFFICE

G225

NUCLEAR MEDICINE

CONFERENCE ROOM

G223

NUCLEAR MEDICINE

LAB

G221

NUCLEAR MEDICINE

FILE ROOM

G219

VERTICAL SPACE

CHASE

RCC245C

NUCLEAR MEDICINE

STORAGE

G220D

NUCLEAR MEDICINE

EXAM

G220B

NUCLEAR MEDICINE

OFFICE

G220A

NUCLEAR MEDICINE

OFFICE

G220C

NUCLEAR MEDICINE

CHASE

RCC247C

NUCLEAR MEDICINE

WAITING ROOM

G220

NUCLEAR MEDICINE

RECEPTION

G218

NUCLEAR MEDICINE

LAB

G214

NUCLEAR MEDICINE

LOCKERS

G212

NUCLEAR MEDICINE

MECHANICAL ROOM

G210

NUCLEAR MEDICINE

PROCEDURE ROOM

G206

NUCLEAR MEDICINE

LOUNGE

G202

COMMON SPACE

CORRIDOR

RCC240R

NUCLEAR MEDICINE

LAB

G201

NUCLEAR MEDICINE

COMPUTER ROOM

G201A

NUCLEAR MEDICINE

TREATMENT ROOM

G201B

A102

Sim

MEDICAL

RESEARCH/DEV

OFFICE

D318

MEDICAL

RESEARCH/DEV

OFFICE

D320

MEDICAL

RESEARCH/DEV

OFFICE

D322

EDUCATION STORAGE

D315

EDUCATION CHASE

RCC359C

EDUCATION CLASS

ROOM

D317

EDUCATION CHASE

RCC360C

EDUCATION

COMPUTER LAB

D323

MEDICAL

RESEARCH/DEV

OFFICE

D326

EDUCATION OFFICE

D340

EDUCATION TOILET

D342

VERTICAL SPACE

CHASE

RCC363C

EDUCATION

MECHANICAL ROOM

D327

VERTICAL SPACE

STAIR

RCC326R

EDUCATION CHASE

RCC355C

EDUCATION OFFICE

D344

EDUCATION OFFICE

D344B

EDUCATION STORAGE

D344A

EDUCATION TEL

CLOSET

D331

EDUCATION CABLE

CLOSET

D332

EDUCATION

ELECTRICAL CLOSET

D340A

EDUCATION OFFICE

D335

VERTICAL SPACE

ELEVATOR

RCC327R

VERTICAL SPACE

CHASE

RCC365C

EDUCATION TOILET

D335A

EDUCATION CHASE

RCC367C

EDUCATION COPY

ROOM

D346

EDUCATION OFFICE

D348

EDUCATION

COMPUTER LAB

D341

EDUCATION CLASS

ROOM

D349

EDUCATION OFFICE

D353

EDUCATION OFFICE

D356

EDUCATION OFFICE

D352

EDUCATION OFFICE

D358

EDUCATION OFFICE

D360

EDUCATION KITCHEN

D346A

EDUCATION CLASS

ROOM

D355

EDUCATION OFFICE

D362

EDUCATION CHASE

RCC371C

EDUCATION CHASE

RCC370C

EDUCATION CHASE

RCC369C

VERTICAL SPACE

CHASE

RCC366C

EDUCATION CHASE

RCC362C

MEDICAL

RESEARCH/DEV

OFFICE

D316

VERTICAL SPACE

CHASE

RCC364C

EDUCATION TOILET

D365

EDUCATION TOILET

D367

EDUCATION STORAGE

D369

EDUCATION STORAGE

E301

EDUCATION OFFICE

D364

EDUCATION OFFICE

D366

EDUCATION OFFICE

D368

SURGICAL OFFICE

E302

COMMON SPACE

CORRIDOR

RCC328R

N

ABCDEFG

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:1

P

M

A101

BUILDING 1- 2ND & 3RD FLOOR

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TDC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 1/8" = 1'-0"A101

1 BUILDING 1 - 2ND FLOOR PLAN SECTION G

SCALE: 1/8" = 1'-0"A101

2 BUILDING 1 - 3RD FLOOR PLAN SECTION D

SCALE: 1" = 160'-0"

KEYPLAN - B1

NUCLEAR MEDICINE

PROCEDURE ROOM

G226

1' - 10 7/8"

1'

9' - 10 3/4"

A501

Sim

A501

Sim

N

ABCDEFG

7 3/8"

1/

2"

9' - 0"

A501

Sim

A501

Sim

PATIENT LIFT LEGEND

FIXED RAIL

MOVABLE RAIL

EXISTING LIGHT

FIXTURE

EXISTING CUBICLE

CURTAIN TRACK

TO REMAIN.

EXISTING HVAC

GRILLES

EXISTING IV TRACK

EXAM TABLE / BED

TEMPORARY

BARRIER

A501

Sim

A501

Sim

9 1/2" 9' - 0"

4"

9'

1. REMOVE EXIST. RAIL AND MOTOR. TURN OVER TO OWNER. STRUCTURAL

SUPPORTS SHALL BE REUSED.

2. ABOVE CEILING DEMOLITION WILL BE REQUIRED FOR INSTALLATION OF

STRUCTURAL HANGER. THERE IS A PARTIAL OLD PLASTER CEILING.

GENERAL CONTRACTOR TO LIMIT DEMOLITION AS MUCH AS POSSIBLE.

DEMOLITION PLAN NOTES

1. CONTRACTOR SHALL PROVIDE EDGE GUARD ICRA BARRIER. BARRIER SHALL

BE SIZED FOR THE SPACE NEEDED TO COMPLETE WORK.

2. PROTECT EQUIPMENT. SEE GENERAL NOTE ON PROJECT PHASING SHEET

GI001.

3. AFTER HOURS WORK REQUIRED.

PHASING PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:1

P

M

A102

ENLARGED PLANS & PHOTOS -

BUILDING1, 2ND & 3RD FLOORSGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TDC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/8" = 1'-0"A102

1 B1-2-G226

SCALE: 1" = 160'-0"

KEYPLAN - B1

SCALE: 3/8" = 1'-0"A102

2 B1-3-D355

SCALE: 3/8" = 1'-0"A102

3 B1-2-G201

ENGINEERING TOOL

ROOM

112B

Room

EMS TOILET

112C

ENGINEERING OFFICE

112A

ENGINEERING

MACHINE SHOP

ENGINEERING LOUNGE

112D

ENGINEERING

STORAGE

ENGINEERING

WELDING SHOP

110A

ENGINEERING

STORAGE

ENGINEERING PAINT

ROOM

111B

ENGINEERING PARTS

ROOM

ENGINNERING LOCKER

108 COMMON SPACE

CORRIDOR

RCC101R

EMS TOILET

RCC105R

Room

ENGINNERING

EQUIPMENT STORAGE

Room

ENGINEERING VACANT

RCC106R

Room

Room

Room

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:1

P

M

A103

BUILDING 8 - 1ST FLOOR PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TDC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 1/8" = 1'-0"A103

1 BLDG 8 - 1ST FLOOR PLAN

SCALE: 1 : 400

KEY PLAN - B8

PATIENT LIFT LEGEND

FIXED RAIL

MOVABLE RAIL

EXISTING LIGHT

FIXTURE

EXISTING CUBICLE

CURTAIN TRACK

TO REMAIN.

EXISTING HVAC

GRILLES

EXISTING IV TRACK

EXAM TABLE / BED

TEMPORARY

BARRIER

A501

Sim

A501

Sim

2' - 8 5/8" 12' - 0"

/8

8'

A501

Sim

A501

Sim

12' - 0" 2' - 8 5/8"

8'

/8

1 1

2 2

N

1. EXISTING STRUCTURE IS BAR JOISTS THAT ARE 20" ABOVE EXISTING.

COORDINATE STRUCTURE AND ABOVE CEILING MEP.

2. THESE PATIENT CEILING LIFTS ARE 1000 LBS.

PHASING PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:1

P

M

A104

ENLARGED PLANS & PHOTOS -

BUILDING 8GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TDC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/8" = 1'-0"A104

1 B8-1-106R

SCALE: 1 : 400

KEY PLAN - B8

N

COMMON SPACE

WAITING

VERTICAL SPACE

ELEVATOR

RCC201R

VERTICAL SPACE

STAIR

ACS-PRIMARY CARE

OFFICE

ACS-PRIMARY CARE

OFFICE

ACS-PRIMARY CARE

OFFICE

ACS-PRIMARY CARE

WORKROOM

ACS-PRIMARY CARE

MEDICAL SIPPLY

ACS-PRIMARY CARE

BREAK ROOM

ACS-PRIMARY CARE

DIR/EXAM

ACS-PRIMARY CARE

EXAM

ACS-PRIMARY CARE

EXAM

ACS-PRIMARY CARE

EXAM

VERTICAL SPACE

STAIR

COMMON SPACE

ELECTRICAL CLOSET

COMMON SPACE TELE

COM

COMMON SPACE

CORRIDOR

ACS-PRIMARY CARE

WORKROOM

ACS-PRIMARY CARE

TOILET

ACS-PRIMARY CARE

H.A.C.

ACS-PRIMARY CARE

EXAM

ACS-PRIMARY CARE

EXAM

ACS-PRIMARY CARE

EXAM

ACS-PRIMARY CARE

EXAM

ACS-PRIMARY CARE

EXAM

ACS-PRIMARY CARE

EXAM

ACS-PRIMARY CARE

EXAM

ACS-PRIMARY CARE

OFFICE

ACS-PRIMARY CARE

OFFICE

VERTICAL SPACE

CHASE

RCC203C

ACS-PRIMARY CARE

TOILET

ACS-PRIMARY CARE

TOILET

VERTICAL SPACE

CHASE

RCC202C

A106

A106

A106

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:1

P

M

A105

BUILDING 12 - 2ND FLOOR

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TDC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 1" = 50'-0"

KEYPLAN - B12

SCALE: 1/8" = 1'-0"A105

1 BUILDING 12 - 2ND FLOOR PLAN

PATIENT LIFT LEGEND

FIXED RAIL

MOVABLE RAIL

EXISTING LIGHT

FIXTURE

EXISTING CUBICLE

CURTAIN TRACK

TO REMAIN.

EXISTING HVAC

GRILLES

EXISTING IV TRACK

EXAM TABLE / BED

TEMPORARY

BARRIER

1. LIFTS WILL BE INSTALLED IN TWO ROOMS AT A TIME.

- ROOMS 205 & 226 WILL BE DONE FIRST.

- ALCOVE WILL BE DONE SECOND.

PHASING PLAN NOTES

A501

Sim

A501

Sim

0"

12' - 0"

ACS-PRIMARY CARE

OFFICE

9 1/2" 9 1/2"

1/

4"

1/

4"

1/

4"

1/

4"

12' - 0"

2'

1' - 1 1/8"

A501

Sim

A501

Sim

A501

Sim

A501

Sim

7'

10" 12' - 5 7/8"

1'

/8

ACS-PRIMARY CARE

EXAM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:1

P

M

A106

ENLARGED PLANS & PHOTOS -

BUILDING 12, 2ND FLOORGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TDC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

NO SCALE

KEYPLAN - B12

Revisions: Date:

SCALE: 3/8" = 1'-0"A106

1 B12-2-205

SCALE: 3/8" = 1'-0"A106

2 B12-2-216

SCALE: 3/8" = 1'-0"A106

3 B12-2-226

BEDS BLIND REHAB

PATIENT ROOM

B100

BEDS BLIND REHAB

PATIENT ROOM

B101

BEDS BLIND REHAB

PATIENT ROOM

B102

BEDS BLIND REHAB

PATIENT ROOM

B103

BEDS BLIND REHAB

PATIENT ROOM

B104

BEDS BLIND REHAB

PATIENT ROOM

B105

BEDS BLIND REHAB

LAUNDRY

B106

BEDS BLIND REHAB

PATIENT ROOM

B107

BEDS BLIND REHAB

PATIENT ROOM

B108

EMS CLEAN LINEN

B109

ENGINEERING

ELECTRICAL ROOM

B110

BEDS BLIND REHAB

PATIENT ROOM

B111

BEDS BLIND REHAB

PATIENT ROOM

B112

BEDS BLIND REHAB

PATIENT ROOM

B113

BEDS BLIND REHAB

PATIENT ROOM

B114

BEDS BLIND REHAB

PATIENT ROOM

B115

BEDS BLIND REHAB

PATIENT ROOM

B116

BEDS BLIND REHAB

PATIENT ROOM

B117

BEDS BLIND REHAB

PATIENT ROOM

B118

BEDS BLIND REHAB

PATIENT ROOM

B119

BEDS BLIND REHAB

PATIENT ROOM

B120

BEDS BLIND REHAB

LAUNDRY

B121

EMS H.A.C.

B122

BEDS BLIND REHAB

CONTROL DESK

B123

BEDS BLIND REHAB

PATIENT ROOM

B124

EMS H.A.C

B125

BEDS BLIND REHAB

PATIENT ROOM

B126

BEDS BLIND REHAB

DINING

B127

BEDS BLIND REHAB

PATIENT ROOM

B128

BEDS BLIND REHAB

PATIENT ROOM

B129

COMMON SPACE

CORRIDOR

RCC104R

NUTRITION/FOOD

KITCHEN

B131

BEDS BLIND REHAB

PATIENT ROOM

B132EMS TOILET

132B

EMS TOILET

138B

ENGINEERING

MECHANICAL ROOM

A139

ENGINEERING

ELECTRICAL ROOM

A140

BEDS BLIND REHAB

OFFICE

A142

BEDS BLIND REHAB

OFFICE

A141

EMS H.A.C.

A137

EMS TOILET

A136

EMS TOILET

A135

EMS TOILET

A102

EMS TOILET

A103

BEDS BLIND REHAB

LOUNGE

A144

BEDS BLIND REHAB

OFFICE

A143

BEDS BLIND REHAB

OFFICE

A145

VERTICAL SPACE

STAIR

RCC113R

BEDS BLIND REHAB

STORAGE

A152

ENGINEERING PUMP

ROOM

RCC101R

VERTICAL SPACE

ELEVATOR

RCC114R

COMMON SPACE

CORRIDOR

RCC110R

EMS TOILET

128B

EMS TOILET

129B

VERTICAL SPACE

CHASE

RCC101R

EMS TOILET

126B

EMS TOILET

118B

EMS TOILET

120B

EMS TOILET

119B

COMMON SPACE

CORRIDOR

RCC103R

COMMON SPACE

CORRIDOR

RCC102R

EMS TOILET

117B

EMS TOILET

116B

EMS TOILET

115B

EMS TOILET

114B

EMS TOILET

113B

EMS TOILET

112B

EMS TOILET

B167

EMS TOILET

110B

EMS TOILET

107B

EMS TOILET

108B

VERTICAL SPACE

STAIR

RCC112R

EMS TOILET

102B

EMS TOILET

104B

EMS TOILET

101B

EMS TOILET

103B

COMMON SPACE

CORRIDOR

RCC109R

BEDS BLIND REHAB

PATIENT ROOM

A122

EMS TOILET

100B

EMS TOILET

123A

BEDS BLIND REHAB

PATIENT ROOM

A123

BEDS BLIND REHAB

PATIENT ROOM

A121

VERTICAL SPACE

ELEVATOR

RCC111R

EMS TOILET

122A

EMS TOILET

128A

BEDS BLIND REHAB

PATIENT ROOM

A128

BEDS BLIND REHAB

OFFICE

A125

EMS TOILET

121A

BEDS BLIND REHAB

PATIENT ROOM

A120

EMS TOILET

120ABEDS BLIND REHAB

PATIENT ROOM

A117

EMS TOILET

114A

EMS TOILET

117A

BEDS BLIND REHAB

PATIENT ROOM

A113

OI&T TELEPHONE

A119

BEDS BLIND REHAB

OFFICE

A116

BEDS BLIND REHAB

OFFICE

A115

BEDS BLIND REHAB

OFFICE

A109

BEDS BLIND REHAB

GYM

A106

BEDS BLIND REHAB

OFFICE

A127

BEDS BLIND REHAB

EXAM

A130

BEDS BLIND REHAB

WAITING ROOM

A126

BEDS BLIND REHAB

PATIENT ROOM

A114EMS TOILET

113A

EMS TOILET

112A

BEDS BLIND REHAB

PATIENT ROOM

A112

BEDS BLIND REHAB

OFFICE

A111

BEDS BLIND REHAB

STORAGE

A110

ENGINEERING

ELECTRICAL ROOM

A108

BEDS BLIND REHAB

STORAGE

A107

COMMON SPACE

CORRIDOR

RCC107R

EMS TOILET

107A

BEDS BLIND REHAB

PATIENT ROOM

A133

EMS TOILET

134A

EMS TOILET

133A

BEDS BLIND REHAB

PATIENT ROOM

A134

BEDS BLIND REHAB

PATIENT ROOM

A138

BEDS BLIND REHAB

STUDY ROOM

A104

BEDS BLIND REHAB

INDPNT. LIVING APT.

A105 EMS TOILET

105A

COMMON SPACE

CORRIDOR

RCC105R

BEDS BLIND REHAB

OFFICE

A151 BEDS BLIND REHAB

CONFERENCE ROOM

A147

BEDS BLIND REHAB

MEDS

A131BEDS BLIND REHAB

SPD SERVICE

A132

BEDS BLIND REHAB

RECEPTION

A101

COMMON SPACE

CORRIDOR

RCC106R

BEDS BLIND REHAB

OFFICE

B227

BEDS BLIND REHAB

OFFICE

A148

BEDS BLIND REHAB

OFFICE

A149

BEDS BLIND REHAB

OFFICE

A150

COMMON SPACE

CORRIDOR

RCC108R

VERTICAL SPACE

CHASE

RCC102C

A108

Sim

A108

Sim

A108

Sim

A108

Sim

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:1

P

M

A107

BUILDING 113 - 1ST FLOOR

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TDC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 1/8" = 1'-0"A107

1 BUILDING 113 - 1ST FLOOR PLAN

SCALE: 1" = 60'-0"

KEYPLAN - B113

BEDS BLIND REHAB

PATIENT ROOM

A121

12' - 0"

3'

/2

6 1/2"

A501

Sim

A501

Sim

BEDS BLIND REHAB

PATIENT ROOM

A128

10"

12' - 0"

3/

4"

A501

Sim

A501

Sim

BEDS BLIND REHAB

PATIENT ROOM

A133

10"

3/

4"

12' - 0"

A501

Sim

A501

Sim

1' - 3 7/8"

A501

Sim

A501

Sim

4 1/8"

12' - 0"

BEDS BLIND REHAB

PATIENT ROOM

A134

PATIENT LIFT LEGEND

FIXED RAIL

MOVABLE RAIL

EXISTING LIGHT

FIXTURE

EXISTING CUBICLE

CURTAIN TRACK

TO REMAIN.

EXISTING HVAC

GRILLES

EXISTING IV TRACK

EXAM TABLE / BED

TEMPORARY

BARRIER

1. ONLY TWO ROOMS CAN BE DONE IN A SINGLE PHASE. SEE GENERAL NOTE -

WORK AREA CONDITIONS SHEET GI001.

PHASING PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:2

P

M

A108

ENLARGED PLANS & PHOTOS -

BUILDING 113- 1ST FLOORGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

NO SCALE

KEYPLAN - B113

SCALE: 3/8" = 1'-0"A108

1 B113-1-A121

SCALE: 3/8" = 1'-0"A108

2 B113-1-A128

SCALE: 3/8" = 1'-0"A108

3 B113-1-A133

SCALE: 3/8" = 1'-0"A108

4 B113-1-A134

BEDS SCID PATIENT

ROOM

B125

EMS TOILET

B125A

EMS TOILET

B126A

BEDS SCID PATIENT

ROOM

B126

COMMON SPACE

RCC110R

BEDS SCID PATIENT

ROOM

C119

EMS TOILET

C119A

EMS TOILET

C120A

BEDS SCID PATIENT

ROOM

C120

BEDS SCID PATIENT

ROOM

C122

BEDS SCID AIRBORNE

PREASSURE

C121

EMS TOILET

C123A

EMS TOILET

C122A

BEDS SCID PATIENT

ROOM

C123

BEDS SCID AIRBORNE

PREASSURE

C124

BEDS SCID PATIENT

ROOM

C125

EMS TOILET

C125A

EMS TOILET

C126A

BEDS SCID PATIENT

ROOM

C126

BEDS SCID PATIENT

ROOM

C127

EMS TOILET

C127A

EMS TOILET

C128A

BEDS SCID PATIENT

ROOM

C128

BEDS SCID PATIENT

ROOM

C129

EMS TOILET

C130A

EMS TOILET

C129A

BEDS SCID PATIENT

ROOM

C130

BEDS SCID PATIENT

ROOM

C131

EMS TOILET

C131A

EMS TOILET

C132A

BEDS SCID PATIENT

ROOM

C132

BEDS SCID CLEAN

UTILITY

C133

ENGINEERING

ELECTRICAL

C134

EMS TOILET

C138A

BEDS SCID PATIENT

ROOM

C138

BEDS SCID PATIENT

ROOM

C142

EMS SHARED TOILET

RCC102R

BEDS SCID PATIENT

ROOM

C145

BEDS SCID PATIENT

ROOM

C147

BEDS SCID STORAGE

A100B

EMS TOILET

A100A

COMMON SPACE

RCC101R

REHAB MEDICINE

THERAPY GYM/ADL

TRAINING

A100

BEDS SCID

TREATMENT ROOM

A100C

BEDS SCID OFFICE

A100D

BEDS SCID STORAGE

A100E

BEDS SCID OFFICE

A108

BEDS SCID OFFICE

A109

BEDS SCID OFFICE

A111

BEDS SCID OFFICE

A113

BEDS SCID OFFICE

A115

BEDS SCID OFFICE

A117

BEDS SCID OFFICE

A120

BEDS SCID OFFICE

A122

BEDS SCID OFFICE

A116

BEDS SCID OFFICE

A114

BEDS SCID OFFICE

A112

BEDS SCID OFFICE

A110

BEDS SCID

CONFERENCE ROOM

A121

OI&T TEL CLOSET

RCC106R

BEDS SCID OFFICE

A123

COMMON SPACE

ENTRY

RCC115R BEDS SCID OFFICE

A127

BEDS SCID RECEPTION

A124 EMS TOILET

A134

BEDS SCID PATIENT

ROOM

B129

EMS TOILET

B129A

ENGINEERING

ELECTRICAL

A152

OI&T TEL CLOSET

A151

BEDS SCID FAMILY

CONFERENCE ROOM

A150

BEDS SCID OFFICE

B128

EMS TOILET

B127

BEDS SCID STAFF

LOCKERS

C118

EMS TOILET

RCC107R

EMS TOILET

RCC108R

EMS TOILET

C117A

BEDS SCID PATIENT

ROOM

C117

BEDS SCID PATIENT

ROOM

C116

EMS TOILET

C116A

EMS TOILET

C115A

BEDS SCID PATIENT

ROOM

C115

BEDS SCID BREAK

ROOM

C112

EMS TOILET

C110A

BEDS SCID PATIENT

ROOM

C110

BEDS SCID PATIENT

ROOM

C106

EMS SHARED TOILET

RCC103R

BEDS SCID PATIENT

ROOM

C104

BEDS SCID REPORT

ROOM

C101

ENGINEERING

ELECTRICAL

C100

EMS H.A.C.

C102

BEDS SCID STORAGE

C146

BEDS SCID LAUNDRY

ROOM

C103

BEDS SCID STORAGE

C144

BEDS SCID OFFICE

C105

BEDS SCID OFFICE

C107

LINEN SERVICE LINEN

C143

EMS SOILED UTILITY

C141

BEDS SCID CLEAN

STERILE

C140

BEDS SCID OFFICE

C108

EMS TOILET

C109

LINEN SERVICE LINEN

C139

BEDS SCID NUTRITION

C111

BEDS SCID MEDS

C136

BEDS SCID SERVICE

C137

BEDS SCID NURSE

STATION

C00NS

BEDS SCID

DINING/RECREATION

A148

COMMON SPACE

RCC109R

BEDS SCID OFFICE

A149

COMMON SPACE

CORRIDOR

RCC129R

COMMON SPACE

CORRIDOR

RCC130R

COMMON SPACE

CORRIDOR

RCC131R

COMMON SPACE

CORRIDOR

RCC123R

COMMON SPACE

CORRIDOR

RCC124R

COMMON SPACE

CORRIDOR

RCC120R

COMMON SPACE

CORRIDOR

RCC119R

COMMON SPACE

CORRIDOR

RCC121R

COMMON SPACE

CORRIDOR

RCC122R

A111

Sim

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/1

.6

.1

I n s ta ll P a ti e n t L if ts

/1

.6

.1

A v

.r v t

/2

/2

:3

:2

P

M

A109

BUILDING 128- 1ST FLOOR PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

INSTALL PATIENT LIFTS

EDWARD HINES JR. VA HOSPITAL

578-15-001

VARIES

1/24/2025 MJ TDC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 1/8" = 1'-0"A109

1 BUILDING 128- 1ST FLOOR PLAN

NO SCALE

KEY PLAN - B128

REHAB MEDICINE

THERAPY GYM/ADL

TRAINING

A100

A501

Sim

A501

Sim

6" 23' - 7 3/4" 6"

8'

24' - 0" 6" 23' - 7 3/4" 6" 24' - 0"

2 2

1 1

1 1 1

A502

Sim

A502

Sim

A502

Sim

A502

Sim

N

PATIENT LIFT LEGEND

FIXED RAIL

MOVABLE RAIL

EXISTING LIGHT

FIXTURE

EXISTING CUBICLE

CURTAIN TRACK

TO REMAIN.

EXISTING HVAC

GRILLES

EXISTING IV TRACK

EXAM TABLE / BED

TEMPORARY

BARRIER

1. PROVIDE EDGE GUARD ICRA BARRIER.

2. PROVIDE NEW RAILS WITH END CAPS TO CREATE 3 EQUARL LENGTH OF

RAILS W/ END CAPS. PROVIDE 3 TRANSVERSE RAILS AND MOTORS. SEE

DETAIL FOR MORE INFORMATION.

PHASING PLAN NOTES

1. REMOVE EXIST. SURFACE RAILS. TURN OVER TO OWNER. STRUCTURAL

SUPPORTS SHALL BE REUSED. DIMENSIONS ARE FOR REFERENCE ONLY.

DEMOLITION PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .