S02 - Att1 - Bid Drawings 250124.pdf
PDF 34 MB Posted
- Attached to
- Z1DA--Install Patient Lifts 578-15-001
- Solicitation number
- 36C25225B0011
About this file
This is a set of architectural and electrical drawings for installing patient lifts at Edward Hines Jr. VA Hospital in Hines, IL. The drawings detail the installation of 47 new patient lift locations across multiple buildings and floors, including Buildings 1, 8, 12, 113, 128, 217, 200, and 228.
The drawings provide detailed floor plans, enlarged layouts, electrical panel schedules, and installation details for ceiling-mounted patient lifts in various hospital areas including nuclear medicine, blind rehabilitation, spinal cord injury, ICU, surgical recovery, and other patient care areas. The drawings specify mounting details for different structural conditions (bar joists, cast-in-place concrete, structural steel), electrical connections for lift chargers and control enclosures, and phasing requirements to maintain hospital operations during installation. Key electrical requirements include 20A circuits for the lift equipment connected to existing panels. The work must be coordinated with infection control requirements, and some areas require after-hours work due to 24/7 patient care operations.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
INTERIOR DESIGNER DATE
DEPARTMENT HEAD DATE
CONTRACT SPECIALIST DATE LEAD USER SIGNATURE DATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:2
P
M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TDC
578-15-001
INSTALL PATIENT LIFTS
VA Hines
EDWARD HINES JR. VA HOSPITAL
100% CONSTRUCTION DOCUMENTS
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI001 PHASING NOTES
ARCHITECTURAL
A001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
A101 BUILDING 1- 2ND & 3RD FLOOR
A102 ENLARGED PLANS & PHOTOS - BUILDING1, 2ND & 3RD FLOORS
A103 BUILDING 8 - 1ST FLOOR PLAN
A104 ENLARGED PLANS & PHOTOS - BUILDING 8
A105 BUILDING 12 - 2ND FLOOR
A106 ENLARGED PLANS & PHOTOS - BUILDING 12, 2ND FLOOR
A107 BUILDING 113 - 1ST FLOOR
A108 ENLARGED PLANS & PHOTOS - BUILDING 113- 1ST FLOOR
A109 BUILDING 128- 1ST FLOOR PLAN
A111 ENLARGED PLANS & PHOTOS - BUILDING 128 1ST FLOOR
A112 BUILDING 217- 1ST & 2ND FLOORS
A113 ENLARGED PLANS AND PHOTOS - BUILDING 217, 1ST FLOOR
A114 ENLARGED PLANS AND PHOTOS - BUILDING 217, 1ST FLOOR
A115 ENLARGED PLANS AND PHOTOS - BUILDING 217, 1ST & 2ND
FLOOR
A116 BUILDING 200 BASEMENT PLAN
A117 ENLARGED PLANS & PHOTOS- BUILDING 200 BASEMENT
A118 BUILDING 200 - 1ST FLOOR
A119 ENLARGED PLANS AND PHOTOS- BUILDING 200 1ST FLOOR
A120 BUILDING 200 2ND FLOOR
A121 ENLARGED PLANS & PHOTOS- BUILDING 200 2ND FLOOR
A122 ENLARGED PLANS & PHOTOS- BUILDING 200 2ND FLOOR
A123 BUILDING 200- 7TH FLOOR PLAN
A124 ENLARGED PLAN & PHOTO- BUILDING 200 7TH FLOOR
A125 ENLARGED PLAN & PHOTO- BUILDING 200 7TH FLOOR
A126 ENLARGED PLANS & PHOTOS- BUILDING 200, 7TH FLOOR
A127 BUILDING 200- 10TH FLOOR PLAN
A128 ENLARGED PLANS & PHOTOS- BUILDING 200, 10TH FLOOR
A129 ENLARGED PLANS & PHOTOS-BUILDING 200, 10TH FLOOR
A130 BUILDING 200- 11TH FLOOR PLAN
A131 ENLARGED PLANS AND PHOTOS- BUILDING 200, 11TH FLOOR
A132 BUILDING 200- 13TH FLOOR PLAN
A133 ENLARGED PLANS AND PHOTOS - BUILDING 200,13TH FLOOOR
A134 BUILDING 228- BASEMENT
A135 ENLARGED PLANS & PHOTOS - BUILDING 228, BASEMENT
A136 BUILDING 228- 5TH FLOOR PLAN
A137 ENLARGED PLANS & PHOTOS BUILDING 228 - 5TH FLOOR
A501 LIFT DETAILS
A502 LIFT DETAILS
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E001 ELECTRICAL GENERAL NOTES
E101 BUILDING 1- 2ND & 3RD FLOOR
E102 ENLARGED PLAN - BUILDING 1, 2ND & 3RD FLOORS
E103 BUILDING 8 - 1ST FLOOR PLAN
E104 ENLARGED PLANS - BUILDING 8
E105 BUILDING 12 - 2ND FLOOR
E106 ENLARGED PLAN - BUILDING 12, 2ND FLOOR
E107 BUILDING 113 - 1ST FLOOR
E108 ENLARGED PLAN - BUILDING 113- 1ST FLOOR
E109 BUILDING 128 - 1ST FLOOR PLAN
E111 ENLARGED PLANS - BUILDING 128 1ST FLOOR
E112 BUILDING 217- 1ST & 2ND FLOORS
E113 ENLARGED PLAN 1ST FLOOR
E114 ENLARGED PLAN 1ST FLOOR
E115 ENLARGED PLANS 1ST & 2ND FLOOR
E116 BUILDING 200 BASEMENT PLAN
E117 ENLARGED PLAN- BUILDING 200 BASEMENT
E118 BUILDING 200 - 1ST FLOOR
E119 ENLARGED PLAN- BUILDING 200 1ST FLOOR
E120 BUILDING 200 2ND FLOOR
E121 ENLARGED PLAN- BUILDING 200 2ND FLOOR
E122 ENLARGED PLAN- BUILDING 200 2ND FLOOR
E123 BUILDING 200- 7TH FLOOR PLAN
E124 ENLARGED PLAN- BUILDING 200 7TH FLOOR
E125 ENLARGED PLAN- BUILDING 200 7TH FLOOR
E126 ENLARGED PLANS- BUILDING 200, 7TH FLOOR
E127 BUILDING 200- 10TH FLOOR PLAN
E128 ENLARGED PLAN- BUILDING 200, 10TH FLOOR
E129 ENLARGED PLAN- BUILDING 200, 10TH FLOOR
E130 BUILDING 200- 11TH FLOOR PLAN
E131 ENLARGED PLAN- BUILDING 200, 11TH FLOOR
E132 BUILDING 200- 13TH FLOOR PLAN
E133 ENLARGED PLANS - BUILDING 200,13TH FLOOOR
E134 BUILDING 228- BASEMENT
E135 BUILDING 228-ENLARGED PLAN- B217, BASEMENT
E136 BUILDING 228- 5TH FLOOR PLAN
E137 ENLARGED PLAN BUILDING 228 - 5TH FLOOR
E600 PANEL SCHEDULES
E601 PANEL SCHEDULES
E602 PANEL SCHEDULES
E603 PANEL SCHEDULES
E604 PANEL SCHEDULES
Contact: Contact:
EDWARD HINES JR. VAMC
Ernest G. Wright, Jr.
Healthcare Engineer
5000 S. Fifth Avenue Building 2, Room 117 Hines, IL 60141 p: 708-202-8387 ext. 21147 e: ernest.wright@va.gov
OWNER
GUIDON DESIGN INC.
Adam Ogrzewalla
Sr. Project Manager
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 103 e: aogrzewalla@guidondesign.com
ARCHITECT
AREA MAP
VICINITY MAP
CAMPUS MAP
Revisions: Date:
Contact:
GUIDON DESIGN INC.
Andrew Kennedy
Sructural Engineer
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 121 e: akennedy@guidondesign.com
STRUCTURAL ENGINEER
Contact:
GUIDON DESIGN INC.
Tom Chapman
Electrical Engineer
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 e: tchapman@guidondesign.com
ELECTRICAL ENGINEER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:2
P
M
GI001
PHASING NOTES
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TAA
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
Indicates 24/7 area with patients which may require special provisions.
Total number of new lift locations 47 4 5
8 1st Floor Bed Repair 19 North 19 South H-Track 9 A Low I Steel deck.
128 1st Floor Spinal Cord Injury Rehab Gym A100 H-Track, existing, spans over several therapy stations, convert 1 lift to 3 lifts
B High II This will require an ICRA enclosure.
113 1st Floor Blind Rehab A128, A133, A134 A121 H-Track 7 B High II Two rooms at time can be done.
3rd Floor Education D355 H-Track B Low II This will require an ICRA enclosure.
2nd Floor Nuclear Medicine G201 H-Track B High II This will require an ICRA enclosure. This will require off-duty work.1
2nd Floor Nuclear Medicine G226 H-Track
B High II
12 2nd Floor Neurology 205, 226 H-Track B High II Two rooms at time can be done.
12 2nd Floor Neurology Alcove Single-Track with scale
B High II
5th Floor Rehab Services - Prosthetics 5035, 5038 5042 H-Track B High II 5042 will require an ICRA enclosure. This will require off-duty work.
Basement Kinesiotherapy Department B1025 H-Track
B High II This will require off-duty work.
2nd Floor CLC - Occupational Therapy 2A34A H-Track B High II This will require off-duty work. Steel deck.
1st Floor CLC - Geriatric Clinic 1B167, 1B175, 1B176 1B168, 1B171, 1B172 H-Track B High II Only one room at a time can be completed.
1st Floor CLC - 1B Patient Rooms B107, B122, B126, B130 H-Track B High II Two rooms at time can be done.
1st Floor CLC - 1C Patient Room C152 H-Track, Bariatric
B High II
13th Floor GI Recovery 1349, Bay 4 H-Track B High II This will require an ICRA enclosure.
11th Floor Rehab Gym 1134 - Convert from Dining Room H-Track & Straight B High II This will require an ICRA enclosure. This will require off-duty work.
10th Floor Observation 1037, 1038, 1041, 1043, 1046 1035 H-Track B High II 1043 & 1046 to be done one at a time. Remaining rooms two at a time.
7th Floor Patient Rooms 701, 709, 713, 714, 716, 721, 725, 735, 737
715 H-Track B High II Only one room at a time can be completed.
2nd Floor SICU B2003, B2016, B2045
(Bays 1,10, 14)
H-Track B High II Only one room at a time can be completed.
2nd Floor MICU A2095, A2106 (Bays 1, 9) H-Track B High II Only one room at a time can be completed.
1st Floor X-Ray D102 (holding area) H-Track B High II This will require an ICRA enclosure. This will require off-duty work.
1st Floor MRI C105 (holding area) H-Track B High II This will require an ICRA enclosure. This will require off-duty work.
1st Floor Emergency Department Ambulance Bay H-Track, Bariatric; Cold Weather Rated B Medium II
Basement Ambulatory Care A001A H-Track
B High II This will require an ICRA enclosure.
A Priority B Priority C Priority Activity
Category
Risk
Category
Level
Building Area Unit Rooms Type Phase ICRA Comments
Patient Lift Locations
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
LED WALL MOUNTED LIGHT FIXTURE
LED SURFACE MOUNTED LIGHT FIXTURE
LED SURFACE MOUNTED LIGHT FIXTURE
LED RECESSED LIGHT FIXTURE
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
PENDANT LIGHT
ACCESS PANEL
EXIT LIGHTING
S
D
SPEAKER
SMOKE DETECTOR
LED RECESSED LIGHT FIXTURE
A 9'-0"
CEILING TAG CEILING TYPE
FINISHED CEILING HEIGHT
REFER TO CEILING LEGEND FOR MORE
INFORMATION
EXTENT OF REVISION
REVISION SET
MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ATCH ATTACHMENT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BEV BEVEL
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL OR CHANNEL CELSIUS
C CONC CAST CONCRETE
C TO C CENTER TO CENTER
CAB CABINET
CB CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CLEANOUT
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST CONCRETE STONE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEG NEGATIVE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
YD YARD
YR YEAR
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH
OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED
WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,
ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
10. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
11. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
12. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
13. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
14. FLOOR ELEVATION 100'-0" IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING
SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.
15. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
16. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
17. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
18. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
19. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
20. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
21. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
25. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOZ DOZEN
DN DOWN
DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
ETS EXPOSE TO STRUCTURE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIP FILLER PANEL
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR FIBERGLASS
REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
H HIGH
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER OR HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE OR LEFT HAND REVERSE
LATENT HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM OR MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE OR MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
NEW WALL
WALL TO BE
REMOVED
S3A.G
INDICATES STRUCTURAL MATERIAL
INDICATES NOMINAL SIZE
INDICATES STRUCTURE AND FINISH HEIGHTS
INDICATES QUALIFER
EXISTING WALL TO
REMAIN
TEMPORARY IC
BARRIER WALL
CONSTRUCTION
ROOM
ROOM TAG
NEW DOOR
EXISTING DOOR
DEMOLISHED DOOR
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR OR SOAP
DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
S SOUTH
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL STEEL
STL LNTL STEEL LINTEL
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
TA TOILET ACCESSORY
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL OR TEMPERATURE
CONTROL PANEL OR TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH OR TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
REVISION TO PLAN CALLOUT
WALLS
DOOR TAG
KEY NOTE TAGS
WALL TAG : REFER TO WALL LEGEND FOR MORE INFORMATION
DOORS
PT-1
A
T
101 EQUIPMENT/FURNITURE TAG
FINISH INDICATION
FRAME / WINDOW
GLAZING1
1 PLAN NOTE
1 DEMOLITION NOTE
ALTERNATE/BID DEDUCT ITEM
KEY NOTE SYMBOLS
CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLS
REFLECTED CEILING PLAN SYMBOLS
ARCHITECTURAL ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:1
P
M
A001
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TDC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
VERTICAL SPACE
STAIR
RCC245R
A&MM ADMIN OFFICE
G260D
TENANT SPACE
STORAGE ROOM
G260C
UNASSIGNED VACANT
SPACE
G256
COMMON SPACE
CORRIDOR
RCC246R
A&MM ADMIN OFFICE
G260
DIRECTOR'S SUITE
STORAGE ROOM
G256C
NUCLEAR MEDICINE
PROCEDURE ROOM
G256A VERTICAL SPACE
CHASE
RCC209C
COMMON SPACE
CORRIDOR
RCC244R
RADIOLOGY STORAGE
ROOM
R256B
RADIOLOGY CHASE
RCC208C
RADIOLOGY STORAGE
ROOM
G251
NUCLEAR MEDICINE
TOILET
G252
VERTICAL SPACE
CHASE
RCC216C
NUCLEAR MEDICINE
LOCKERS
G252A
NUCLEAR MEDICINE
STORAGE
G250
NUCLEAR MEDICINE
OFFICE
G248
NUTRITION/FOOD
OFFICE
G246
NUCLEAR MEDICINE
OFFICE
G244
NUCLEAR MEDICINE
FILE ROOM
G242
NUCLEAR MEDICINE
ELECTRICAL CLOSET
G240
NUCLEAR MEDICINE
OFFICE
G236
UNASSIGNED VACANT
SPACE
G245
NUCLEAR MEDICINE
LAB
G231
NUCLEAR MEDICINE
MECHANICAL ROOM
G235
COMMON SPACE
CORRIDOR
RCC243R
VERTICAL SPACE
STAIR
RCC239R
NUCLEAR MEDICINE
OFFICE
G228
COMMON SPACE
CORRIDOR
RCC242R
NUCLEAR MEDICINE
OFFICE
G227
NUCLEAR MEDICINE
TOILET
RCC237R
VERTICAL SPACE
CHASE
RCC225C
VERTICAL SPACE
ELEVATOR
RCC238R
NUCLEAR MEDICINE
PROCEDURE ROOM
G226
NUCLEAR MEDICINE
OFFICE
G224
COMMON SPACE
CORRIDOR
RCC241R
VERTICAL SPACE
CHASE
RCC228C
NUCLEAR MEDICINE
TOILET
G222
NUCLEAR MEDICINE
OFFICE
G225
NUCLEAR MEDICINE
CONFERENCE ROOM
G223
NUCLEAR MEDICINE
LAB
G221
NUCLEAR MEDICINE
FILE ROOM
G219
VERTICAL SPACE
CHASE
RCC245C
NUCLEAR MEDICINE
STORAGE
G220D
NUCLEAR MEDICINE
EXAM
G220B
NUCLEAR MEDICINE
OFFICE
G220A
NUCLEAR MEDICINE
OFFICE
G220C
NUCLEAR MEDICINE
CHASE
RCC247C
NUCLEAR MEDICINE
WAITING ROOM
G220
NUCLEAR MEDICINE
RECEPTION
G218
NUCLEAR MEDICINE
LAB
G214
NUCLEAR MEDICINE
LOCKERS
G212
NUCLEAR MEDICINE
MECHANICAL ROOM
G210
NUCLEAR MEDICINE
PROCEDURE ROOM
G206
NUCLEAR MEDICINE
LOUNGE
G202
COMMON SPACE
CORRIDOR
RCC240R
NUCLEAR MEDICINE
LAB
G201
NUCLEAR MEDICINE
COMPUTER ROOM
G201A
NUCLEAR MEDICINE
TREATMENT ROOM
G201B
A102
Sim
MEDICAL
RESEARCH/DEV
OFFICE
D318
MEDICAL
RESEARCH/DEV
OFFICE
D320
MEDICAL
RESEARCH/DEV
OFFICE
D322
EDUCATION STORAGE
D315
EDUCATION CHASE
RCC359C
EDUCATION CLASS
ROOM
D317
EDUCATION CHASE
RCC360C
EDUCATION
COMPUTER LAB
D323
MEDICAL
RESEARCH/DEV
OFFICE
D326
EDUCATION OFFICE
D340
EDUCATION TOILET
D342
VERTICAL SPACE
CHASE
RCC363C
EDUCATION
MECHANICAL ROOM
D327
VERTICAL SPACE
STAIR
RCC326R
EDUCATION CHASE
RCC355C
EDUCATION OFFICE
D344
EDUCATION OFFICE
D344B
EDUCATION STORAGE
D344A
EDUCATION TEL
CLOSET
D331
EDUCATION CABLE
CLOSET
D332
EDUCATION
ELECTRICAL CLOSET
D340A
EDUCATION OFFICE
D335
VERTICAL SPACE
ELEVATOR
RCC327R
VERTICAL SPACE
CHASE
RCC365C
EDUCATION TOILET
D335A
EDUCATION CHASE
RCC367C
EDUCATION COPY
ROOM
D346
EDUCATION OFFICE
D348
EDUCATION
COMPUTER LAB
D341
EDUCATION CLASS
ROOM
D349
EDUCATION OFFICE
D353
EDUCATION OFFICE
D356
EDUCATION OFFICE
D352
EDUCATION OFFICE
D358
EDUCATION OFFICE
D360
EDUCATION KITCHEN
D346A
EDUCATION CLASS
ROOM
D355
EDUCATION OFFICE
D362
EDUCATION CHASE
RCC371C
EDUCATION CHASE
RCC370C
EDUCATION CHASE
RCC369C
VERTICAL SPACE
CHASE
RCC366C
EDUCATION CHASE
RCC362C
MEDICAL
RESEARCH/DEV
OFFICE
D316
VERTICAL SPACE
CHASE
RCC364C
EDUCATION TOILET
D365
EDUCATION TOILET
D367
EDUCATION STORAGE
D369
EDUCATION STORAGE
E301
EDUCATION OFFICE
D364
EDUCATION OFFICE
D366
EDUCATION OFFICE
D368
SURGICAL OFFICE
E302
COMMON SPACE
CORRIDOR
RCC328R
N
ABCDEFG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:1
P
M
A101
BUILDING 1- 2ND & 3RD FLOOR
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TDC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 1/8" = 1'-0"A101
1 BUILDING 1 - 2ND FLOOR PLAN SECTION G
SCALE: 1/8" = 1'-0"A101
2 BUILDING 1 - 3RD FLOOR PLAN SECTION D
SCALE: 1" = 160'-0"
KEYPLAN - B1
NUCLEAR MEDICINE
PROCEDURE ROOM
G226
1' - 10 7/8"
1'
9' - 10 3/4"
A501
Sim
A501
Sim
N
ABCDEFG
7 3/8"
1/
2"
9' - 0"
A501
Sim
A501
Sim
PATIENT LIFT LEGEND
FIXED RAIL
MOVABLE RAIL
EXISTING LIGHT
FIXTURE
EXISTING CUBICLE
CURTAIN TRACK
TO REMAIN.
EXISTING HVAC
GRILLES
EXISTING IV TRACK
EXAM TABLE / BED
TEMPORARY
BARRIER
A501
Sim
A501
Sim
9 1/2" 9' - 0"
4"
9'
1. REMOVE EXIST. RAIL AND MOTOR. TURN OVER TO OWNER. STRUCTURAL
SUPPORTS SHALL BE REUSED.
2. ABOVE CEILING DEMOLITION WILL BE REQUIRED FOR INSTALLATION OF
STRUCTURAL HANGER. THERE IS A PARTIAL OLD PLASTER CEILING.
GENERAL CONTRACTOR TO LIMIT DEMOLITION AS MUCH AS POSSIBLE.
DEMOLITION PLAN NOTES
1. CONTRACTOR SHALL PROVIDE EDGE GUARD ICRA BARRIER. BARRIER SHALL
BE SIZED FOR THE SPACE NEEDED TO COMPLETE WORK.
2. PROTECT EQUIPMENT. SEE GENERAL NOTE ON PROJECT PHASING SHEET
GI001.
3. AFTER HOURS WORK REQUIRED.
PHASING PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:1
P
M
A102
ENLARGED PLANS & PHOTOS -
BUILDING1, 2ND & 3RD FLOORSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TDC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/8" = 1'-0"A102
1 B1-2-G226
SCALE: 1" = 160'-0"
KEYPLAN - B1
SCALE: 3/8" = 1'-0"A102
2 B1-3-D355
SCALE: 3/8" = 1'-0"A102
3 B1-2-G201
ENGINEERING TOOL
ROOM
112B
Room
EMS TOILET
112C
ENGINEERING OFFICE
112A
ENGINEERING
MACHINE SHOP
ENGINEERING LOUNGE
112D
ENGINEERING
STORAGE
ENGINEERING
WELDING SHOP
110A
ENGINEERING
STORAGE
ENGINEERING PAINT
ROOM
111B
ENGINEERING PARTS
ROOM
ENGINNERING LOCKER
108 COMMON SPACE
CORRIDOR
RCC101R
EMS TOILET
RCC105R
Room
ENGINNERING
EQUIPMENT STORAGE
Room
ENGINEERING VACANT
RCC106R
Room
Room
Room
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:1
P
M
A103
BUILDING 8 - 1ST FLOOR PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TDC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 1/8" = 1'-0"A103
1 BLDG 8 - 1ST FLOOR PLAN
SCALE: 1 : 400
KEY PLAN - B8
PATIENT LIFT LEGEND
FIXED RAIL
MOVABLE RAIL
EXISTING LIGHT
FIXTURE
EXISTING CUBICLE
CURTAIN TRACK
TO REMAIN.
EXISTING HVAC
GRILLES
EXISTING IV TRACK
EXAM TABLE / BED
TEMPORARY
BARRIER
A501
Sim
A501
Sim
2' - 8 5/8" 12' - 0"
/8
8'
A501
Sim
A501
Sim
12' - 0" 2' - 8 5/8"
8'
/8
1 1
2 2
N
1. EXISTING STRUCTURE IS BAR JOISTS THAT ARE 20" ABOVE EXISTING.
COORDINATE STRUCTURE AND ABOVE CEILING MEP.
2. THESE PATIENT CEILING LIFTS ARE 1000 LBS.
PHASING PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:1
P
M
A104
ENLARGED PLANS & PHOTOS -
BUILDING 8GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TDC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/8" = 1'-0"A104
1 B8-1-106R
SCALE: 1 : 400
KEY PLAN - B8
N
COMMON SPACE
WAITING
VERTICAL SPACE
ELEVATOR
RCC201R
VERTICAL SPACE
STAIR
ACS-PRIMARY CARE
OFFICE
ACS-PRIMARY CARE
OFFICE
ACS-PRIMARY CARE
OFFICE
ACS-PRIMARY CARE
WORKROOM
ACS-PRIMARY CARE
MEDICAL SIPPLY
ACS-PRIMARY CARE
BREAK ROOM
ACS-PRIMARY CARE
DIR/EXAM
ACS-PRIMARY CARE
EXAM
ACS-PRIMARY CARE
EXAM
ACS-PRIMARY CARE
EXAM
VERTICAL SPACE
STAIR
COMMON SPACE
ELECTRICAL CLOSET
COMMON SPACE TELE
COM
COMMON SPACE
CORRIDOR
ACS-PRIMARY CARE
WORKROOM
ACS-PRIMARY CARE
TOILET
ACS-PRIMARY CARE
H.A.C.
ACS-PRIMARY CARE
EXAM
ACS-PRIMARY CARE
EXAM
ACS-PRIMARY CARE
EXAM
ACS-PRIMARY CARE
EXAM
ACS-PRIMARY CARE
EXAM
ACS-PRIMARY CARE
EXAM
ACS-PRIMARY CARE
EXAM
ACS-PRIMARY CARE
OFFICE
ACS-PRIMARY CARE
OFFICE
VERTICAL SPACE
CHASE
RCC203C
ACS-PRIMARY CARE
TOILET
ACS-PRIMARY CARE
TOILET
VERTICAL SPACE
CHASE
RCC202C
A106
A106
A106
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:1
P
M
A105
BUILDING 12 - 2ND FLOOR
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TDC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 1" = 50'-0"
KEYPLAN - B12
SCALE: 1/8" = 1'-0"A105
1 BUILDING 12 - 2ND FLOOR PLAN
PATIENT LIFT LEGEND
FIXED RAIL
MOVABLE RAIL
EXISTING LIGHT
FIXTURE
EXISTING CUBICLE
CURTAIN TRACK
TO REMAIN.
EXISTING HVAC
GRILLES
EXISTING IV TRACK
EXAM TABLE / BED
TEMPORARY
BARRIER
1. LIFTS WILL BE INSTALLED IN TWO ROOMS AT A TIME.
- ROOMS 205 & 226 WILL BE DONE FIRST.
- ALCOVE WILL BE DONE SECOND.
PHASING PLAN NOTES
A501
Sim
A501
Sim
0"
12' - 0"
ACS-PRIMARY CARE
OFFICE
9 1/2" 9 1/2"
1/
4"
1/
4"
1/
4"
1/
4"
12' - 0"
2'
1' - 1 1/8"
A501
Sim
A501
Sim
A501
Sim
A501
Sim
7'
10" 12' - 5 7/8"
1'
/8
ACS-PRIMARY CARE
EXAM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:1
P
M
A106
ENLARGED PLANS & PHOTOS -
BUILDING 12, 2ND FLOORGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TDC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
NO SCALE
KEYPLAN - B12
Revisions: Date:
SCALE: 3/8" = 1'-0"A106
1 B12-2-205
SCALE: 3/8" = 1'-0"A106
2 B12-2-216
SCALE: 3/8" = 1'-0"A106
3 B12-2-226
BEDS BLIND REHAB
PATIENT ROOM
B100
BEDS BLIND REHAB
PATIENT ROOM
B101
BEDS BLIND REHAB
PATIENT ROOM
B102
BEDS BLIND REHAB
PATIENT ROOM
B103
BEDS BLIND REHAB
PATIENT ROOM
B104
BEDS BLIND REHAB
PATIENT ROOM
B105
BEDS BLIND REHAB
LAUNDRY
B106
BEDS BLIND REHAB
PATIENT ROOM
B107
BEDS BLIND REHAB
PATIENT ROOM
B108
EMS CLEAN LINEN
B109
ENGINEERING
ELECTRICAL ROOM
B110
BEDS BLIND REHAB
PATIENT ROOM
B111
BEDS BLIND REHAB
PATIENT ROOM
B112
BEDS BLIND REHAB
PATIENT ROOM
B113
BEDS BLIND REHAB
PATIENT ROOM
B114
BEDS BLIND REHAB
PATIENT ROOM
B115
BEDS BLIND REHAB
PATIENT ROOM
B116
BEDS BLIND REHAB
PATIENT ROOM
B117
BEDS BLIND REHAB
PATIENT ROOM
B118
BEDS BLIND REHAB
PATIENT ROOM
B119
BEDS BLIND REHAB
PATIENT ROOM
B120
BEDS BLIND REHAB
LAUNDRY
B121
EMS H.A.C.
B122
BEDS BLIND REHAB
CONTROL DESK
B123
BEDS BLIND REHAB
PATIENT ROOM
B124
EMS H.A.C
B125
BEDS BLIND REHAB
PATIENT ROOM
B126
BEDS BLIND REHAB
DINING
B127
BEDS BLIND REHAB
PATIENT ROOM
B128
BEDS BLIND REHAB
PATIENT ROOM
B129
COMMON SPACE
CORRIDOR
RCC104R
NUTRITION/FOOD
KITCHEN
B131
BEDS BLIND REHAB
PATIENT ROOM
B132EMS TOILET
132B
EMS TOILET
138B
ENGINEERING
MECHANICAL ROOM
A139
ENGINEERING
ELECTRICAL ROOM
A140
BEDS BLIND REHAB
OFFICE
A142
BEDS BLIND REHAB
OFFICE
A141
EMS H.A.C.
A137
EMS TOILET
A136
EMS TOILET
A135
EMS TOILET
A102
EMS TOILET
A103
BEDS BLIND REHAB
LOUNGE
A144
BEDS BLIND REHAB
OFFICE
A143
BEDS BLIND REHAB
OFFICE
A145
VERTICAL SPACE
STAIR
RCC113R
BEDS BLIND REHAB
STORAGE
A152
ENGINEERING PUMP
ROOM
RCC101R
VERTICAL SPACE
ELEVATOR
RCC114R
COMMON SPACE
CORRIDOR
RCC110R
EMS TOILET
128B
EMS TOILET
129B
VERTICAL SPACE
CHASE
RCC101R
EMS TOILET
126B
EMS TOILET
118B
EMS TOILET
120B
EMS TOILET
119B
COMMON SPACE
CORRIDOR
RCC103R
COMMON SPACE
CORRIDOR
RCC102R
EMS TOILET
117B
EMS TOILET
116B
EMS TOILET
115B
EMS TOILET
114B
EMS TOILET
113B
EMS TOILET
112B
EMS TOILET
B167
EMS TOILET
110B
EMS TOILET
107B
EMS TOILET
108B
VERTICAL SPACE
STAIR
RCC112R
EMS TOILET
102B
EMS TOILET
104B
EMS TOILET
101B
EMS TOILET
103B
COMMON SPACE
CORRIDOR
RCC109R
BEDS BLIND REHAB
PATIENT ROOM
A122
EMS TOILET
100B
EMS TOILET
123A
BEDS BLIND REHAB
PATIENT ROOM
A123
BEDS BLIND REHAB
PATIENT ROOM
A121
VERTICAL SPACE
ELEVATOR
RCC111R
EMS TOILET
122A
EMS TOILET
128A
BEDS BLIND REHAB
PATIENT ROOM
A128
BEDS BLIND REHAB
OFFICE
A125
EMS TOILET
121A
BEDS BLIND REHAB
PATIENT ROOM
A120
EMS TOILET
120ABEDS BLIND REHAB
PATIENT ROOM
A117
EMS TOILET
114A
EMS TOILET
117A
BEDS BLIND REHAB
PATIENT ROOM
A113
OI&T TELEPHONE
A119
BEDS BLIND REHAB
OFFICE
A116
BEDS BLIND REHAB
OFFICE
A115
BEDS BLIND REHAB
OFFICE
A109
BEDS BLIND REHAB
GYM
A106
BEDS BLIND REHAB
OFFICE
A127
BEDS BLIND REHAB
EXAM
A130
BEDS BLIND REHAB
WAITING ROOM
A126
BEDS BLIND REHAB
PATIENT ROOM
A114EMS TOILET
113A
EMS TOILET
112A
BEDS BLIND REHAB
PATIENT ROOM
A112
BEDS BLIND REHAB
OFFICE
A111
BEDS BLIND REHAB
STORAGE
A110
ENGINEERING
ELECTRICAL ROOM
A108
BEDS BLIND REHAB
STORAGE
A107
COMMON SPACE
CORRIDOR
RCC107R
EMS TOILET
107A
BEDS BLIND REHAB
PATIENT ROOM
A133
EMS TOILET
134A
EMS TOILET
133A
BEDS BLIND REHAB
PATIENT ROOM
A134
BEDS BLIND REHAB
PATIENT ROOM
A138
BEDS BLIND REHAB
STUDY ROOM
A104
BEDS BLIND REHAB
INDPNT. LIVING APT.
A105 EMS TOILET
105A
COMMON SPACE
CORRIDOR
RCC105R
BEDS BLIND REHAB
OFFICE
A151 BEDS BLIND REHAB
CONFERENCE ROOM
A147
BEDS BLIND REHAB
MEDS
A131BEDS BLIND REHAB
SPD SERVICE
A132
BEDS BLIND REHAB
RECEPTION
A101
COMMON SPACE
CORRIDOR
RCC106R
BEDS BLIND REHAB
OFFICE
B227
BEDS BLIND REHAB
OFFICE
A148
BEDS BLIND REHAB
OFFICE
A149
BEDS BLIND REHAB
OFFICE
A150
COMMON SPACE
CORRIDOR
RCC108R
VERTICAL SPACE
CHASE
RCC102C
A108
Sim
A108
Sim
A108
Sim
A108
Sim
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:1
P
M
A107
BUILDING 113 - 1ST FLOOR
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TDC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 1/8" = 1'-0"A107
1 BUILDING 113 - 1ST FLOOR PLAN
SCALE: 1" = 60'-0"
KEYPLAN - B113
BEDS BLIND REHAB
PATIENT ROOM
A121
12' - 0"
3'
/2
6 1/2"
A501
Sim
A501
Sim
BEDS BLIND REHAB
PATIENT ROOM
A128
10"
12' - 0"
3/
4"
A501
Sim
A501
Sim
BEDS BLIND REHAB
PATIENT ROOM
A133
10"
3/
4"
12' - 0"
A501
Sim
A501
Sim
1' - 3 7/8"
A501
Sim
A501
Sim
4 1/8"
12' - 0"
BEDS BLIND REHAB
PATIENT ROOM
A134
PATIENT LIFT LEGEND
FIXED RAIL
MOVABLE RAIL
EXISTING LIGHT
FIXTURE
EXISTING CUBICLE
CURTAIN TRACK
TO REMAIN.
EXISTING HVAC
GRILLES
EXISTING IV TRACK
EXAM TABLE / BED
TEMPORARY
BARRIER
1. ONLY TWO ROOMS CAN BE DONE IN A SINGLE PHASE. SEE GENERAL NOTE -
WORK AREA CONDITIONS SHEET GI001.
PHASING PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:2
P
M
A108
ENLARGED PLANS & PHOTOS -
BUILDING 113- 1ST FLOORGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
NO SCALE
KEYPLAN - B113
SCALE: 3/8" = 1'-0"A108
1 B113-1-A121
SCALE: 3/8" = 1'-0"A108
2 B113-1-A128
SCALE: 3/8" = 1'-0"A108
3 B113-1-A133
SCALE: 3/8" = 1'-0"A108
4 B113-1-A134
BEDS SCID PATIENT
ROOM
B125
EMS TOILET
B125A
EMS TOILET
B126A
BEDS SCID PATIENT
ROOM
B126
COMMON SPACE
RCC110R
BEDS SCID PATIENT
ROOM
C119
EMS TOILET
C119A
EMS TOILET
C120A
BEDS SCID PATIENT
ROOM
C120
BEDS SCID PATIENT
ROOM
C122
BEDS SCID AIRBORNE
PREASSURE
C121
EMS TOILET
C123A
EMS TOILET
C122A
BEDS SCID PATIENT
ROOM
C123
BEDS SCID AIRBORNE
PREASSURE
C124
BEDS SCID PATIENT
ROOM
C125
EMS TOILET
C125A
EMS TOILET
C126A
BEDS SCID PATIENT
ROOM
C126
BEDS SCID PATIENT
ROOM
C127
EMS TOILET
C127A
EMS TOILET
C128A
BEDS SCID PATIENT
ROOM
C128
BEDS SCID PATIENT
ROOM
C129
EMS TOILET
C130A
EMS TOILET
C129A
BEDS SCID PATIENT
ROOM
C130
BEDS SCID PATIENT
ROOM
C131
EMS TOILET
C131A
EMS TOILET
C132A
BEDS SCID PATIENT
ROOM
C132
BEDS SCID CLEAN
UTILITY
C133
ENGINEERING
ELECTRICAL
C134
EMS TOILET
C138A
BEDS SCID PATIENT
ROOM
C138
BEDS SCID PATIENT
ROOM
C142
EMS SHARED TOILET
RCC102R
BEDS SCID PATIENT
ROOM
C145
BEDS SCID PATIENT
ROOM
C147
BEDS SCID STORAGE
A100B
EMS TOILET
A100A
COMMON SPACE
RCC101R
REHAB MEDICINE
THERAPY GYM/ADL
TRAINING
A100
BEDS SCID
TREATMENT ROOM
A100C
BEDS SCID OFFICE
A100D
BEDS SCID STORAGE
A100E
BEDS SCID OFFICE
A108
BEDS SCID OFFICE
A109
BEDS SCID OFFICE
A111
BEDS SCID OFFICE
A113
BEDS SCID OFFICE
A115
BEDS SCID OFFICE
A117
BEDS SCID OFFICE
A120
BEDS SCID OFFICE
A122
BEDS SCID OFFICE
A116
BEDS SCID OFFICE
A114
BEDS SCID OFFICE
A112
BEDS SCID OFFICE
A110
BEDS SCID
CONFERENCE ROOM
A121
OI&T TEL CLOSET
RCC106R
BEDS SCID OFFICE
A123
COMMON SPACE
ENTRY
RCC115R BEDS SCID OFFICE
A127
BEDS SCID RECEPTION
A124 EMS TOILET
A134
BEDS SCID PATIENT
ROOM
B129
EMS TOILET
B129A
ENGINEERING
ELECTRICAL
A152
OI&T TEL CLOSET
A151
BEDS SCID FAMILY
CONFERENCE ROOM
A150
BEDS SCID OFFICE
B128
EMS TOILET
B127
BEDS SCID STAFF
LOCKERS
C118
EMS TOILET
RCC107R
EMS TOILET
RCC108R
EMS TOILET
C117A
BEDS SCID PATIENT
ROOM
C117
BEDS SCID PATIENT
ROOM
C116
EMS TOILET
C116A
EMS TOILET
C115A
BEDS SCID PATIENT
ROOM
C115
BEDS SCID BREAK
ROOM
C112
EMS TOILET
C110A
BEDS SCID PATIENT
ROOM
C110
BEDS SCID PATIENT
ROOM
C106
EMS SHARED TOILET
RCC103R
BEDS SCID PATIENT
ROOM
C104
BEDS SCID REPORT
ROOM
C101
ENGINEERING
ELECTRICAL
C100
EMS H.A.C.
C102
BEDS SCID STORAGE
C146
BEDS SCID LAUNDRY
ROOM
C103
BEDS SCID STORAGE
C144
BEDS SCID OFFICE
C105
BEDS SCID OFFICE
C107
LINEN SERVICE LINEN
C143
EMS SOILED UTILITY
C141
BEDS SCID CLEAN
STERILE
C140
BEDS SCID OFFICE
C108
EMS TOILET
C109
LINEN SERVICE LINEN
C139
BEDS SCID NUTRITION
C111
BEDS SCID MEDS
C136
BEDS SCID SERVICE
C137
BEDS SCID NURSE
STATION
C00NS
BEDS SCID
DINING/RECREATION
A148
COMMON SPACE
RCC109R
BEDS SCID OFFICE
A149
COMMON SPACE
CORRIDOR
RCC129R
COMMON SPACE
CORRIDOR
RCC130R
COMMON SPACE
CORRIDOR
RCC131R
COMMON SPACE
CORRIDOR
RCC123R
COMMON SPACE
CORRIDOR
RCC124R
COMMON SPACE
CORRIDOR
RCC120R
COMMON SPACE
CORRIDOR
RCC119R
COMMON SPACE
CORRIDOR
RCC121R
COMMON SPACE
CORRIDOR
RCC122R
A111
Sim
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
I n s ta ll P a ti e n t L if ts
/1
.6
.1
A v
.r v t
/2
/2
:3
:2
P
M
A109
BUILDING 128- 1ST FLOOR PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
INSTALL PATIENT LIFTS
EDWARD HINES JR. VA HOSPITAL
578-15-001
VARIES
1/24/2025 MJ TDC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 1/8" = 1'-0"A109
1 BUILDING 128- 1ST FLOOR PLAN
NO SCALE
KEY PLAN - B128
REHAB MEDICINE
THERAPY GYM/ADL
TRAINING
A100
A501
Sim
A501
Sim
6" 23' - 7 3/4" 6"
8'
24' - 0" 6" 23' - 7 3/4" 6" 24' - 0"
2 2
1 1
1 1 1
A502
Sim
A502
Sim
A502
Sim
A502
Sim
N
PATIENT LIFT LEGEND
FIXED RAIL
MOVABLE RAIL
EXISTING LIGHT
FIXTURE
EXISTING CUBICLE
CURTAIN TRACK
TO REMAIN.
EXISTING HVAC
GRILLES
EXISTING IV TRACK
EXAM TABLE / BED
TEMPORARY
BARRIER
1. PROVIDE EDGE GUARD ICRA BARRIER.
2. PROVIDE NEW RAILS WITH END CAPS TO CREATE 3 EQUARL LENGTH OF
RAILS W/ END CAPS. PROVIDE 3 TRANSVERSE RAILS AND MOTORS. SEE
DETAIL FOR MORE INFORMATION.
PHASING PLAN NOTES
1. REMOVE EXIST. SURFACE RAILS. TURN OVER TO OWNER. STRUCTURAL
SUPPORTS SHALL BE REUSED. DIMENSIONS ARE FOR REFERENCE ONLY.
DEMOLITION PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .