This is a Statement of Work (SOW) for asbestos abatement and lead paint removal services across multiple locations in Building 1 and Building 200.
The project consists of six tasks spanning two buildings. Tasks 1 and 2 cover Building 1, Floor 3 (Rooms D333, D335, and D335A) with 8 calendar days, 6 abatement days, and 8 monitoring days. Tasks 3, 4, and 5 cover Building 1, Floor 4 (Rooms D405, D407, D407A, D409, and D409A) with 10 calendar days, 8 abatement days, and 10 monitoring days. Task 6 addresses Building 200 Stone space with 34 calendar days, 32 abatement days, and 34 monitoring days. Work scope includes abating all lead-based paint (excluding windows, with contractor assuming all paint is lead-based), abating asbestos-containing materials (ACM) including floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows, and re-insulating all abated piping components. All work must be completed during Monday-Friday day shift hours. The document includes floor plans identifying specific work areas and existing conditions photographs for reference.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tasks 1 and 2 Bldg 1 – Floor 3, Room D333, D335, and D335A
Calendar Days = 8 Abatement Days = 6 Monitoring Days = 8
• Abate all lead paint – excluding all windows – contractor shall assume all paint is lead based paint.
• Abate all ACM floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows
• Re-insulate all abated piping, pipe fittings, and pipe elbows.
• This work can be completed during Monday-Friday day shift hours
Tasks 3, 4, and 5 Bldg 1 – Floor 4, Room D405, D407, D407A, D409 and D409A
• Abate all lead paint – excluding all windows – contractor shall assume all paint is lead based paint.
• Abate all ACM floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows
• Re-insulate all abated piping, pipe fittings, and pipe elbows.
• This work can be completed during Monday-Friday day shift hours
Calendar Days = 10 Abatement Days = 8 Monitoring Days = 10
Tasks 6 Bldg. 200 Stone space – Example of an existing condition
Calendar Days = 34 Abatement Days = 32 Monitoring Days = 34
• Abate all ACM pipe insulation, pipe fittings, and pipe elbows
• Re-insulate all abated piping, pipe fittings, and pipe elbows.
• This work can be completed during Monday-Friday day shift hours