S02 Att02 IDIQ Abatement Services Schedule of Values.pdf

PDF 181 KB Posted

Attached to
Z1DA--578-26-004: IDIQ ACM Abatement Base
Solicitation number
36C25226B0020
Issued by

About this file

This is a Price Schedule template for the complete period of performance covering firestopping, asbestos abatement, operation and maintenance, and reinsulation services. The schedule contains five main items with unit pricing for various work tasks.

Item #1 addresses firestopping services with eleven line items priced per unit (either each, linear foot, or as specified), covering pipe and conduit wall and floor penetrations ranging from less than 2 inches to greater than 16 inches in diameter, ductwork and boiler breeching, beams and columns, firestopping at wall edges, and masonry and drywall cavity enclosures. Item #2 covers asbestos abatement using glove bag removal methods for pipe and fitting insulation in two diameter ranges (up to 6 inches and 7 to 12 inches), priced per linear foot or per each. Item #3 addresses full-containment asbestos abatement removal for pipe, fitting, tank, boiler, ductwork, suspended ceiling, drywall/plaster, debris, transite material, spray-on insulation, floor tile/mastic, carpet with contaminated flooring, and contaminated soil up to 3 inches deep. Item #4 covers operation and maintenance services including patch and repair work for pipe, fitting, boiler/tank, and ductwork insulation, plus cleanup and encapsulation services. Item #5 addresses reinsulation services for various pipe sizes, fittings, tanks, boilers, and ductwork. All line-item pricing must include temporary environmental controls and safety, office administration, project management, preconstruction and infection control risk assessments, interim life safety measures, submittals, testing, inspection, reports and manifests, material disposal, decontamination, temporary signage, daily and final cleaning, warranty, as-builts, and overhead and profit.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

Complete Period of Performance

ITEM #1 - FIRE STOPPING

DESCRIPTION UNIT PRICE

a. Pipe/conduit wall and floor penetration <2" dia. $___________Each.

b. Pipe/conduit wall and floor penetration >2" to <4" dia. $___________Each.

c. Pipe/conduit wall and floor penetration >4" to <8" dia. $___________Each.

d. Pipe/conduit wall and floor penetration >8" to <12" dia. $___________Each.

e. Pipe/conduit wall and floor penetration >12" to <16" dia. $___________Each.

f. Pipe/conduit wall and floor penetration >16" dia. $___________Each.

g. Ductwork and/or b\boiler breeching $___________Per Linear Foot.

h. Beams and/or columns $___________Per Linear Foot.

i. Firestopping top and/or edge of wall $___________Per Linear Foot.

j. Masonry wall - cavity enclosure $___________Per Linear Foot.

k. Drywall - cavity enclosure $___________Per Linear Foot.

ITEM #2 - ASBESTOS ABATEMENT, GLOVE BAG REMOVAL

DESCRIPTION UNIT PRICE

a. Insulation from pipe up to 6" dia. $___________Per Linear Foot.

b. Insulation from fitting up to 6" dia. $___________Each.

c. Insulation from pipe 7" to 12" dia. $___________Per Linear Foot.

d. Insulation from fitting 7" to 12" dia. $___________Each.

ITEM #3 - ASBESTOS ABATEMENT, FULL-CONTAINMENT REMOVAL

a. Insulation from pipe up to 6" dia. $___________ Per Linear Foot.

b. Insulation from fitting up to 6" dia. $___________ Each.

c. Insulation from pipe 7" to 12" dia. $___________ Per Linear Foot.

d. Insulation from fitting 7" to 12" dia. $___________ Each.

e. Insulation from tank, boiler, breaching $___________ Per Linear Foot.

f. Insulation from ductwork $___________ Per Linear Foot.

g. Contaminated suspended ceiling from grid $___________ Per Square Foot.

h. Contaminated drywall/plaster ceiling, walls, etc. $___________ Per Square Foot.

I. Contaminated debris from floor, ceiling, etc. $___________ Per Square Foot.

j. Contaminated transite material/panels $___________ Per Square Foot.

k. Contaminated spray-on insulation $___________ Per Square Foot.

l. Contaminated floor tile/mastic $___________ Per Square Foot.

m. Carpet with contaminated floor tile/mastic $___________ Per Square Foot.

n. Contaminated soil 3" deep & encapsulation/lock-down $___________ Per Cubic Feet.

ITEM #4 - OPERATION AND MAINTENANCE

DESCRIPTION UNIT PRICE

a. Pipe insulation - patch and repair $___________ Per Linear Foot.

b. Fitting insulation - patch and repair $___________ Each.

c. Boiler/tank insulation - patch and repair $___________ Per Linear Foot.

d. Ductwork insulation - patch and repair $___________ Per Linear Foot.

e. Clean-up, hepa vac and encapsulate/lock down $___________ Per Linear Foot.

ITEM #5 – REINSULATION

a. Reinsulation from pipe up to 6" dia. $___________ Per Linear Foot.

b. Reinsulation from fitting up to 6" dia. $___________ Each.

c. Reinsulation from pipe 7" to 12" dia. $___________ Per Linear Foot.

d. Reinsulation from fitting 7" to 12" dia. $___________ Each.

e. Reinsulation from tank, boiler, breaching $___________ Per Linear Foot.

f. Reinsulation from ductwork $___________ Per Linear Foot.

ITEM #5 – REINSULATION

a. Reinsulation from pipe up to 6" dia. $___________ Per Square Foot.

b. Reinsulation from fitting up to 6" dia. $___________ Each.

c. Reinsulation from pipe 7" to 12" dia. $___________ Per Linear Foot.

All line-item pricing shall include the following:

a. Temporary environmental controls and safety,

b. office administration,

c. project management,

d. preconstruction risk assessments (PCRA)

e. infection control risk assessment (ICRA)

f. interim, life safety measures,

g. submittals,

h. testing, inspection, reports and manifests, material disposal,

i. decontamination.

j. temporary signage,

k. daily clean-up, final cleaning, warranty,

l. as-builts, and

m. overhead and profit.

File details come from the government source that posted it. Updated .