S02 - Att 2 Drawings - Bid Set.pdf
PDF 13 MB Posted
- Solicitation number
- 36C25226B0009
About this file
This document is a comprehensive set of bid documents and construction drawings for a roofing replacement project at VA Edward Hines, located at 5000 5th Avenue, Hines, Illinois 60141. The project involves replacing second floor roofs in Building B200, identified as project 578-22-026. The work is being managed by the U.S. Department of Veterans Affairs Office of Construction and Facilities Management, with Guidon Design Inc. serving as the architect/engineer of record and Ernest Wright as the Contracting Officer's Representative.
The project encompasses demolition of existing 2-inch gypsum roof plank, interlocking steel channels, and edge of deck angles, followed by installation of new 1½-inch, 18-gauge galvanized wide-rib steel roof decking with 36/7 fastening patterns. The work is organized into four phased construction sequences to maintain building operations. Key specifications include structural steel fabrication and erection per ANSI/AISC 360, welding per ANSI/AWS D1.1, and bolted connections per ASTM A325/A490. Steel deck installation must comply with Steel Deck Institute specifications. The design incorporates wind uplift net pressures ranging from 23 PSF to 36 PSF depending on zone, a roof live load of 20 PSF, and snow load design of 53.2 PSF. All existing structural steel beams and columns remain in place. The bid documents include detailed framing plans, demolition plans, site plans with designated crane access and laydown areas, architectural and structural details, and phasing/infection control plans to coordinate work with occupied spaces. Contractors must coordinate all work with mechanical, electrical, and plumbing trades and verify existing conditions against original 1965 construction drawings and a 2010 assessment report prior to fabrication and erection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o fs
B
/1
.6
.1
A v
.r v t
/2
/2
:3
:3
A
M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE 2ND FLOOR ROOFS
B200
5000 5TH AVE, HINES, IL 60141
578-22-026
9/29/2025 ES LS
578-22-026
REPLACE 2ND FLOOR ROOFS B200
VA EDWARD HINES
5000 5TH AVE, HINES, IL 60141
BID DOCUMENTS
BID DOCUMENTS
FULLY SPRINKLERED
SHEET INDEX
SHEET NUMBER SHEET NAME PAGE #
GENERAL
GI000 COVER SHEET PAGE 1
GI001 PHASING AND INFECTION CONTROL PAGE 2
GI100 GROUND LEVEL PLAN PAGE 3
STRUCTURAL
S001 BID DEDUCT - GENERAL STRUCTURAL NOTES, LOAD MAP, &
TYPICAL DETAILS
SF101 BID DEDUCT - LOW ROOF FRAMING DEMOLITION PLANS PAGE 5
SF102 BID DEDUCT - LOW ROOF FRAMING PLANS PAGE 6
SF901 BID DEDUCT - ISOMETRIC VIEWS PAGE 7
ARCHITECTURAL
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS PAGE 8
AD101 ROOF DEMOLITION PLAN - OVERALL PAGE 9
AD101A ROOF DEMOLITION PLAN - AREA A PAGE 10
AD101B ROOF DEMOLITION PLAN - AREA B PAGE 11
AD101C ROOF DEMOLITION PLAN - AREA C PAGE 12
AD101D ROOF DEMOLITION PLAN - AREA D PAGE 13
AE101 ROOF PLAN - OVERALL PAGE 14
AE101A ROOF PLAN - AREA A PAGE 15
AE101B ROOF PLAN - AREA B PAGE 16
AE101C ROOF PLAN - AREA C PAGE 17
AE101D ROOF PLAN - AREA D PAGE 18
AE501 ROOF DETAILS PAGE 19
AE502 ENLARGED STAIR PLANS AND SECTIONS PAGE 20
STRUCTURAL
ENGINEER
OWNER ARCHITECT
AREA MAP
VICINITY MAP
CAMPUS MAP
VA EDWARD HINES
Contact:
Ernest Wright Contracting Officer's Representative
5000 5th Ave.
Hines, IL 60141 p: 708-202-8387 x 21147 e: Ernest.Wright@va.gov
GUIDON DESIGN INC.
Contact:
Morris Thomas Senior Project Manager
1221 North Pennsylvania Street Indianapolis, IN 46202 p: 317.800.6388 x 176 e: mthomas@guidon.com
GUIDON DESIGN INC.
Contact:
Mark Vanderwoude Director of Project Management
1221 North Pennsylvania Street Indianapolis, IN 46202 p: 317.800.6388 x 119 e: mvanderwoude@guidon.com
Revisions: Date:
N
N
PHASE 1
PHASE 2
PHASE 3
PHASE 4
F E D
PHASE 1
PHASE 2
PHASE 3
PHASE 4
F E D
1. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
CARD READER ACCESS FOR DEDUCT ALTERNATE 1.
2. PROVIDE TEMPORARY MODULAR INFECTION CONTROL BARRIER WALL
CONSTRUCTION FOR DEDUCT ALTERNATE 1.
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS AND SPECIFICATIONS AND DOOR HARDWARE
SCHEDULE FOR ADDITIONAL INFORMATION.
C. DEDUCT ALTERNATE 1 SHALL BE COMPLETED IN 5 PHASES.
D. COORDINATE FULL SCOPE OF WORK OF DEDUCT ALTERNATE 1 WITH
ENGINEERING DRAWINGS AND FIELD VERIFICATION. CONTRACTOR IS
RESPONSIBLE FOR SCOPE OF ABOVE CEILING WORK REQUIRED ABOVE AND
BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
E. FOR DEDUCT ALTERNATE 1, COORDINATE LOCATION OF TEMPORARY
INFECTION CONTROL (IC) BARRIER WALL CONSTRUCTION AND INFECTION
CONTROL (IC) MEASURES WITH COR AND PATIENT SAFETY/ INFECTION
CONTROL REPRESENTATIVE. TEMPORARY IC BARRIER WALL CONSTRUCTION
LOCATIONS IN DRAWINGS ARE APPROXIMATE. CONTRACTOR SHALL
PROVIDE DRAWING TO COR AND PATIENT SAFETY/ INFECTION CONTROL
REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN IS APPROVED.
F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR DEDUCT ALTERNATE 1 FOR ABOVE CEILING
WORK IN THE CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO
REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT
BOUNDARY.
G. ABOVE CEILING WORK FOR DEDUCT ALTERNATE 1 SHALL TAKE PLACE
BETWEEN THE HOURS OF 5:00 PM AND 5:00 AM. IN AREAS THAT REQUIRE
ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANOR UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR.
H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
J. FOR DEDUCT ALTERNATE 1, PROVIDE THE FOLLOWING INFECTION CONTROL
MEASURES, A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH
TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS
NECESSARY.
K. FOR DEDUCT ALTERNATE 1, PROVIDE THE VA AND OSHA REQUIRED
TEMPORARY SIGNAGE AT EACH TEMPORARY DOOR LOCATION.
L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
P. FOR DEDUCT ALTERNATE 1, PROVIDE CONTAINMENT CART FOR ABOVE
CEILING ACCESS OUTSIDE PROJECT BOUNDARY.
A. FOR DEDUCT ALTERNATE 1 THERE ARE PROJECT AREAS TO BE OCCUPIED
BY STAFF AND VETERANS THROUGHOUT CONSTRUCTION.
B. FOR DEDUCT ALTERNATE 1, PROJECT SHALL BE COMPLETED DURING NIGHT
SHIFTS, 5:00 PM TO 5:00 AM. COORDINATE WITH COR. ALL WORK TO BE
COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S
WORK.
C. FOR DEDUCT ALTERNATE 1, CONSTRUCTION WORK BEHIND TEMPORARY
CONSTRUCTION PARTITIONS SHALL BE COMPLETED DURING NIGHT SHIFTS,
5:00 PM TO 5:00 AM.
D. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
E. FOR DEDUCT ALTERNATE 1, DOORS TO BE USED FOR INFECTION CONTROL
TO HAVE PROPER TEMPORARY SIGNAGE RESTRICTING STAFF AND
VETERAN ACCESS DURING WORK.
PHASING GENERAL NOTES
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL GENERAL NOTES
IC / PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o fs
B
/1
.6
.1
A v
.r v t
/2
/2
:3
:5
A
M
GI001
PHASING AND INFECTION
CONTROLGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE 2ND FLOOR ROOFS
B200
5000 5TH AVE, HINES, IL 60141
578-22-026
9/29/2025 ES
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 1/16" = 1'-0"GI001
2 SECOND FLOOR PHASING PLAN - DEDUCT ALTERNATE 1
SCALE: 1/16" = 1'-0"GI001
1 ROOF PHASING PLAN - DEDUCT ALTERNATE 1
PROPOSED LAY DOWN OR CRANE ACCESS AREAS
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o fs
B
/1
.6
.1
A v
.r v t
/2
/2
:3
:5
A
M
GI100
GROUND LEVEL PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE 2ND FLOOR ROOFS
B200
5000 5TH AVE, HINES, IL 60141
578-22-026
9/29/2025 ES LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 50'-0"GI100
1 SITE PLAN
Revisions: Date:
NSCALE: 12" = 1'-0"
LAY DOWN SPACE IMAGES
WIND UPLIFT NET PRESSURE
HEIGHT
ZONE 1
PRESSURE
ZONE 3
PRESSURE
0 - 30' 23 PSF 29 PSF
NOTE: PERIMETER PRESSURE APPLIES BETWEEN ALL EXTERIOR WALLS
AND 5' IN FROM THE EXTERIOR WALLS.
ZONE 2
PRESSURE
29 PSF
36/7 PATTERN W/ SIDELAP
FASTENERS @ 18" O.C. MAX.
TYPICAL U.N.O.
NOTE:
1. 1 1/2", 18 GA. GALVANIZED WIDE RIB STEEL ROOF DECK. CLEAN, TREAT AND PRIME.
2. USE #10 TEK SCREW SIDELAP FASTENERS, U.N.O.
3. MECHANICAL FASTENERS SHALL BE USED IN LIEU OF WELDS.
4. USE THE FOLLOWING HILTI POWER ACTUATED FASTENERS:
X-HSN 24 FOR STRUCTURAL STEEL 1/8" ≤ 't' ≤ 3/8" X-ENP-19 L15 FOR STRUCTURAL STEEL 't' ≥ 1/4"
S-SLC 01 M HWH SIDELAP FASTENERS
ACCEPTABLE ALTERNATE: PNEUTEK AIR/SAFE FASTENING SYSTEM.
5. SUBMIT PROPOSED FASTENERS & TECHNICAL DATA FOR REVIEW.
6. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
7. REF. DECK TYPE ON THE FRAMING PLANS.R1.5
36" COVER
GALV. 16 GA. COVER PLATE FOR
OPENINGS GREATER THAN 6" &
LESS THAN 12" (SQUARE OR ROUND)
NOTE: HOLES LESS THAN 6" IN WIDTH
(ONE RIB REMOVED) DO NOT REQUIRE
REINFORCEMENT. REF. TYPICAL ROOF
OPENING FRAME DETAIL FOR OPENINGS
w/ MAX. DIMENSION EXCEEDING 12"
#8 TEK SCREWS -
FASTEN TO EACH RIB
NOTE: PROVIDE SIMILAR COVER
PLATE DETAIL COVER PLATE
DETAIL FOR SINGLE DAMAGED
RIB - CONSULT ENGINEER FOR
DIRECTION WHERE MORE THAN
ONE ADJACENT RIB IS DAMAGED
STEEL ROOF DECK
PER PLAN
COPE VERTICAL LEGS OF ANGLES
WITHIN 1" OF EDGE OF EX. JOIST
CHORD OR BEAM FLANGE
ANGLES TO BEAR A MIN. OF
3" ON JOIST TOP CHORD
OR BEAM TOP FLANGE
ROOF OPENING - COORD. SIZE &
LOC'N. W/ ARCHITECTURAL
DWGS. & MECHANICAL TRADES
EX. STEEL JOIST OR BEAM -
SIZE & SPACING PER PLAN
NEW L4x4x1/4 ANGLE FRAME
PROVIDE FOR ALL
OPENINGS W/ MAX.
DIMENSION EXCEEDING 12"
NOTES:
1. PROVIDE NEW ANGLE FRAME AS SHOWN FOR
ALL ROOF OPENINGS IN 1 1/2" WIDE-RIB DECK
WITH MAXIMUM DIMENSION EXCEEDING 1' - 0".
2. USE L4x4x1/4 TYPICAL.
3. COORDINATE LOCATION OF ROOF OPENINGS
WITH ARCHITECTURAL DRAWINGS &
MECHANICAL TRADES.
MAINTAIN COPE OF VERTICAL
LEG WITHIN 1" OF EDGE OF EX.
JOIST CHORD OR BEAM FLANGE
NEW L4x4x1/4 FRAME
COORD. W/ MECH.
ROOF OPENING
NEW 1 1/2" WIDE
RIB ROOF DECK
NEW L4x4x1/4 FRAME
ROOF OPENING-
COORD. SIZE W/
MECH. CONTR.
EX. STEEL JOIST
OR BEAM PER PLAN
EX. STEEL JOIST OR BEAM - SIZE PER PLAN
EX. STEEL JOIST OR BEAM - SIZE PER PLAN
ANGLES TO BEAR A MIN. OF
3" ON EX. JOIST TOP CHORD
OR BEAM TOP FLANGE
S E
E P
LA
N
F O
R S
P A
C
IN
G
1"
T/STEEL
FV
NEW CONTINUOUS PERIMETER ANGLE
OR BENT PLATE (DIAPHRAGM CHORD)
SIZE PER TYPICAL ROOF EDGE DETAIL
FASTEN DECK TO DIAPHRAGM CHORD w/ FUSION WELDS
OR MECHANICAL FASTENERS - MAINTAIN FASTENER
SPACING TO MATCH ATTACHMENT AT SUPPORTING
STRUCTURAL MEMBERS, I.E. 6" O.C. FOR 36/7 PATTERN
NEW STEEL ROOF
DECK PER PLAN
EX. STEEL BEAM
PER PLAN
EX. STEEL GIRDER
BEAM PER PLAN
INSPECT
WELD TO
BEAM FLANGE
EOD (PER PLAN) SHALL MATCH EXISTING
LOCATION & CONNECTION TO EX. WALLS. IF EOD
ANGLE/PLATE DOES NOT ATTACH TO EXISTING,
ALIGN NEW ANGLE WITH THE INSIDE FACE OF
GROUND SUPPORTED CMU & BE 1/2" FROM
OUTSIDE FACE OF BRICK/STUD WALLS AT THE
PERIMETER (VERIFY WALL LOCATIONS IN THE
FIELD).
NEW L5x3x3/8 FOR EOD ≤ 3" NEW L5x5x3/8 FOR 3" > EOD ≤ 6"
NEW 3/8" BENT PL FOR EOD > 6"
W/ HORIZ. LEG = EOD
EX. STEEL BEAM
PER PLAN
NEW STEEL ROOF DECK
(ORIENTATION VARIES -
SEE PLAN)
NEW 3/8" GUSSET PL @ 32" OC OFF
WEB OF STEEL BEAMS TO EDGE
OF BENT PLATE WHERE EOD > 12"
1/4 3 @ 12
EOD
NEW L5x3x3/8 FOR EOD ≤ 3" NEW L5x5x3/8 FOR 3" > EOD ≤ 6"
NEW 3/8" BENT PL FOR EOD > 6"
W/ HORIZ. LEG = EOD
EX. STEEL BEAM
PER PLAN
NEW STEEL ROOF DECK
(ORIENTATION VARIES -
SEE PLAN)
NEW 3/8" GUSSET PL @ 32" OC OFF
WEB OF STEEL BEAMS TO EDGE
OF BENT PLATE WHERE EOD > 12"
1/4 3" MIN.
EOD
EOD (PER PLAN) SHALL MATCH EXISTING
LOCATION & CONNECTION TO EX. WALLS. IF EOD
ANGLE/PLATE DOES NOT ATTACH TO EXISTING,
ALIGN NEW ANGLE WITH THE INSIDE FACE OF
GROUND SUPPORTED CMU & BE 1/2" FROM
OUTSIDE FACE OF BRICK/STUD WALLS AT THE
PERIMETER (VERIFY WALL LOCATIONS IN THE
FIELD).
T/STEEL
FV
T/STEEL
FV
182.4 PSF
53.2 PSF
21' - 7 3/4"
E D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o fs
B
/1
.6
.1
S v
.r v t
/2
/2
:3
:4
P
M
SI001
BID DEDUCT - GENERAL
STRUCTURAL NOTES, LOAD MAP,
& TYPICAL DETAILSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE 2ND FLOOR ROOFS
B200
5000 5TH AVE, HINES, IL 60141
578-22-026
09/29/2025 ADK LKB
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
GENERAL
THE STRUCTURE HAS BEEN DESIGNED FOR THE IN-SERVICE LOADS ONLY. THE METHODS, MEANS, PROCEDURES, AND SEQUENCES OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER THE BUILDING IS COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE ERECTION PROCEDURES AND SEQUENCE TO INSURE SAFETY OF THE BUILDING AND ITS COMPONENTS DURING ERECTION. THIS INCLUDES THE ADDITION OF
NECESSARY SHORING, SHEETING, TEMPORARY BRACING, GUYS, TIEDOWNS, ETC.
THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS AND SPECIFICATIONS.
THE GENERAL NOTES ON THE DRAWINGS ARE TO BE USED IN CONJUNCTION WITH THE FULL WRITTEN MATERIAL SPECIFICATIONS (IF ANY) FOR THE PROJECT. IF A DISCREPANCY OCCURS BETWEEN THE NOTES AND THE FULL SPECIFICATIONS, THE MORE STRINGENT
REQUIREMENT SHALL APPLY.
NO PENETRATIONS THROUGH STRUCTURAL ELEMENTS, OTHER THAN THOSE SHOWN ON THE DRAWINGS, SHALL BE MADE WITHOUT
THE APPROVAL OF THE STRUCTURAL ENGINEER.
CONTRACTOR TO COORDINATE ALL EQUIPMENT, ROOF DRAINS, CHASES, AND OTHER ITEMS CONNECTED TO THE STRUCTURE BEFORE
FABRICATION BEGINS.
SHOP DRAWING SUBMITTALS
THE CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS TO ENABLE HIM TO FABRICATE, ERECT AND CONSTRUCT ALL PARTS OF THE WORK IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS. THESE SHOP DRAWINGS WILL BE REVIEWED FOR GENERAL COMPLIANCE WITH THE DESIGN INTENT ONLY. THE CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS, ACCURACY AND FIT OF WORK.
ALL SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE STRUCTURAL ENGINEER. DRAWINGS
SUBMITTED WITHOUT CONTRACTOR'S REVIEW WILL BE RETURNED UNCHECKED.
SUBMIT ELECTRONIC VERSIONS OF SHOP DRAWINGS. SUBMIT SHOP DRAWINGS IN PDF FORMAT.
SUBMIT SHOP DRAWINGS FOR EACH OF THE FOLLOWING ITEMS:
1. STRUCTURAL STEEL (INCLUDING DESIGN CALCULATIONS SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE PROJECT IS CONSTRUCTED FOR ALL CONNECTIONS NOT SPECIFICALLY DETAILED ON THE DRAWINGS)
2. STEEL DECK
STRUCTURAL STEEL
STRUCTURAL STEEL DETAILING, FABRICATION AND ERECTION SHALL CONFORM TO THE ANSI/AISC 360 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, LATEST EDITION WITH AMENDMENTS, AND THE AISC 303 CODE OF STANDARD PRACTICE FOR
STEEL BUILDINGS AND BRIDGES, LATEST EDITION WITH AMENDMENTS.
STRUCTURAL STEEL WIDE FLANGE SHAPES SHALL CONFORM TO ASTM A992, 50 KSI.
STRUCTURAL STEEL PLATES AND ROLLED SHAPES OTHER THAN WIDE-FLANGE SHAPES SHALL CONFORM TO ASTM A36, UNLESS NOTED
OTHERWISE.
BOLTED CONNECTIONS SHALL CONFORM TO THE SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS, APPROVED BY THE RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS OF THE ENGINEERING FOUNDATION. BOLTED CONNECTIONS
SHALL BE TIGHTENED TO THE SNUG TIGHT CONDITION.
WELDING PROCEDURES SHALL CONFORM TO THE LATEST EDITION OF THE AMERICAN WELDING SOCIETY'S STRUCTURAL WELDING
CODE FOR STEEL ANSI/AWS D1.1.
WELDED CONNECTIONS USING ASTM A992 STEEL AS A BASE METAL SHALL BE MADE WITH E70XX LOW HYDROGEN ELECTRODES.
UNLESS OTHERWISE SHOWN OR NOTED ON THE DRAWINGS, OTHER WELDED CONNECTIONS MAY BE MADE WITH STANDARD E70XX
ELECTRODES.
STRUCTURAL STEEL SHALL BE SHOP-PRIMED WITH A RUST-INHIBITING PRIMER, UNLESS NOTED OTHERWISE ON THE DRAWINGS.
CONTRACTOR SHALL VERIFY PRIMER IS COMPATIBLE WITH FINISH COAT SYSTEM SPECIFIED BY THE ARCHITECT. COORDINATE FINISH
PAINTING REQUIREMENTS WITH THE ARCHITECT.
STRUCTURAL STEEL NOTED TO BE GALVANIZED OR EXPOSED SHALL BE HOT-DIP GALVANIZED IN CONFORMANCE WITH ASTM A123.
DO NOT PAINT OR GALVANIZE THE FOLLOWING SURFACES:
1. SURFACES TO BE WELDED.
2. SURFACES TO RECEIVE SPRAYED-ON FIREPROOFING.
ALL ABRASIONS TO GALVANIZED SURFACES OR SURFACES TO RECEIVE AN ARCHITECTURAL FINISH COAT SHALL BE TOUCHED-UP AFTER ERECTION IS COMPLETE. FOR PAINTED STEEL, USE A PRIMER EQUIVALENT TO THE SHOP PAINT. FOR GALVANIZED STEEL, USE
A ZINC-RICH COLD-GALVANIZING PAINT.
DESIGN CONNECTIONS NOT SHOWN IN ACCORDANCE WITH THE ASD SPECIFICATION AND MANUAL OF STEEL CONSTRUCTION. UNLESS NOTED OTHERWISE ON THE DRAWINGS, DESIGN BEAM CONNECTIONS NOT SHOWN, TO SUPPORT A MINIMUM OF A 10 KIP SHEAR REACTION. PROVIDE NO LESS THAN 2 BOLTS IN ANY SINGLE LINE OF BOLTS, UNLESS SPECIFICALLY INDICATED ON THE DRAWINGS.
PROVIDE L4X4X1/4 FRAMED OPENINGS FOR ALL ROOF PENETRATIONS 12 INCHES OR LARGER ALONG ANY SIDE, UNLESS LARGER FRAMING IS INDICATED. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR PENETRATIONS. COORDINATE FRAMED OPENING SIZES
AND LOCATIONS WITH THE MECHANICAL AND PLUMBING CONTRACTORS.
STEEL ROOF DECK
PROVIDE AND ERECT STEEL DECK IN ACCORDANCE WITH THE LATEST EDITION OF THE STEEL DECK INSTITUTE'S SPECIFICATIONS AND
CODE OF STANDARD PRACTICE.
DECK MANUFACTURER SHALL PROVIDE ALL ROOF DECK ACCESSORIES, INCLUDING CLOSURES, SUPPLEMENTARY FRAMING, AND SUMP
PANS, WHETHER OR NOT SUCH ITEMS ARE DETAILED ON THE CONTRACT DOCUMENTS.
FASTEN ROOF DECK TO STEEL SUPPORTS AS INDICATED ON THE DRAWINGS. PERFORM WELDING IN ACCORDANCE WITH ANSI/AWS D1.3.
ROOF DECK SHALL BE INSTALLED IN A MINIMUM THREE SPAN CONDITION WHERE POSSIBLE.
DO NOT SUSPEND ANY ITEMS, SUCH AS DUCTWORK, MECHANICAL, AND ELECTRICAL FIXTURES, CEILINGS, ETC. FROM STEEL DECK.
DESIGN DATA
THE BUILDING STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH THE 2021 INTERNATIONAL BUILDING CODE & ASCE 7-22.
RISK CATEGORY = IV
SUPERIMPOSED ROOF DEAD LOAD = 10 PSF
(DEAD LOAD IN ADDITION TO THE SELF WEIGHT OF THE PRIMARY STRUCTURAL SYSTEM)
ROOF LIVE LOAD = 20 PSF
SNOW LOAD DESIGN DATA
1. GROUND SNOW LOAD (Pg) = 76 PSF
2. LOW-SLOPE ROOF SNOW LOAD (Pf) = 53.2 PSF
3. MINIMUM ROOF SNOW LOAD UPPER LIMIT (Pm,max) = 40 PSF
4. MINIMUM ROOF SNOW LOAD (Pm) = 40 PSF
5. SNOW EXPOSURE FACTOR (Ce) = 1.0
6. THERMAL FACTOR (Ct) = 1.0
7. SNOW DRIFT PER LOAD MAP A/SI001
WIND LOAD DESIGN DATA
1. BASIC WIND SPEED, V = 119 MPH
2. ASD WIND SPEED, Vasd = 92 MPH
3. WIND EXPOSURE CATEGORY = C
4. INTERNAL PRESSURE COEFFICIENT (GCpi) = ±0.18
5. WIND UPLIFT NET PRESSURE PER ADJACENT TABLE
EARTHQUAKE LOAD DESIGN DATA
1. SEISMIC IMPORTANCE FACTOR (Ie) = 1.5
2. SITE CLASSIFICATION = D
3. SEISMIC DESIGN CATEGORY = C
4. SHORT MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETER (SS) = 0.160
5. 1-SECOND MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETER (S1) = 0.071
6. SHORT DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETER (SDS) = 0.130
7. 1-SECOND DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETER (SD1) = 0.100
8. BASIC STRUCTURAL SYSTEM / SEISMIC RESISTING SYSTEM: H - STEEL SYSTEMS NOT SPECIFICALLY DETAILED FOR SEISMIC
RESISTANCE, EXCLUDING CANTILEVER COLUMN SYSTEMS
9. ANALYSIS PROCEDURE UTILIZED = EQUIVALENT LATERAL FORCE PROCEDURE
10. RESPONSE MODIFICATION COEFFICIENT (R) = 3.0
11. SEISMIC RESPONSE COEFFICIENT (CS) = 0.065
RENOVATION (EXISTING CONDITIONS)
INFORMATION SHOWN FOR THE EXISTING STRUCTURE ON THESE DRAWINGS WAS TAKEN FROM DRAWINGS THAT WERE PREPARED FOR THE VETERANS ADMINISTRATION HOSPITAL, BUILDING 200, DATED 10-29-1965 AND AN ASSESSMENT REPORT ENTITLED EVALUATION AT
EAST SUNDECK ROOF DECK DATED 07-08-2010.
WORK SHOWN ON THESE PLANS ASSUMES THAT THE ORIGINAL CONSTRUCTION WAS PERFORMED IN ACCORDANCE WITH THE ABOVE INDICATED ORIGINAL DRAWINGS INCLUDING (BUT NOT LIMITED TO) DIMENSIONS, ELEVATIONS, MEMBER SIZES, MATERIALS, DETAILS, ETC. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE CONDITIONS RELATING TO THE EXISTING STRUCTURE AND TO
NOTIFY THE STRUCTURAL ENGINEER IMMEDIATELY OF ANY DISCREPANCIES OR CONFLICTS.
WHERE NEW WORK IS TO BE FITTED TO OLD WORK, THE CONTRACTOR SHALL CHECK ALL DIMENSIONS AND CONDITIONS IN THE FIELD, AND REPORT ANY ERRORS OR DISCREPANCIES TO THE STRUCTURAL ENGINEER PRIOR TO THE FABRICATION AND ERECTION OF ANY
NEW MEMBERS.
EXISTING MATERIALS TO BE REMOVED AND REINSTALLED AS PART OF THE PROJECT, THAT BECOME DAMAGED, SHALL BE REPLACED
WITH NEW MATERIAL OF EQUAL QUALITY AND APPEARANCE, AT THE CONTRACTORS EXPENSE.
ALL WORK SHALL BE PREFORMED WITHOUT DAMAGE TO ADJACENT RETAINED WORK. ADJACENT EXISTING CONSTRUCTION SHALL BE
PROTECTED FROM DUST, DIRT, AND DEBRIS ACCUMULATION AT ALL TIMES.
STRUCTURAL ABBREVIATIONS
A/E ARCHITECT/ENGINEER
ACI AMERICAN CONCRETE INSTITUTE
ACP AUGER CAST PILE
ADDL ADDITIONAL
ADJ ADJACENT
AGGR AGGREGATE
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APA AMERICAN PLYWOOD ASSOCIATION
APPROX APPROXIMATE
AR ANCHOR ROD
ARCH ARCHITECTURAL
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWS AMERICAN WELDING SOCIETY
B/ BOTTOM OF
BAL BALANCE
BD BOARD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOTT BOTTOM
BRG BEARING
BTWN BETWEEN
C STANDARD CHANNEL
CANT CANTILEVER
CC CENTER TO CENTER
CF COLD FORMED
CG CENTER OF GRAVITY
CIP CAST-IN-PLACE
CJ CONTROL JOINT OR CONSTRUCTION JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEARANCE, CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CTR CENTER
CTRD CENTERED
CU FT CUBIC FEET
CU IN CUBIC INCH
CYD CUBIC YARD
CW CONCRETE WALL
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIAPH DIAPHRAGM
DIM DIMENSION
DN DOWN
DO DITTO
DWG DRAWING
DWL DOWELS
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
EL, ELEV ELEVATION
ELEC ELECTRICAL
ENCL ENCLOSURE
ENGR ENGINEER
EOD EDGE OF DECK
EOJ EDGE OF JOIST
EOS EDGE OF SLAB
EQ EQUAL
EQPT EQUIPMENT
ES EACH SIDE
EW EACH WAY
EX EXISTING
EXP EXPANSION
EXT EXTERIOR
FAB FROM ADJACENT BEAM
FD FLOOR DRAIN
FDN FOUNDATION
FIN FINISH
FLG FLANGE
FLR FLOOR
FS FOOTING STEP
FT FEET
FTG FOOTING
FTGD FOOTING DRAIN
FV FIELD VERIFY
GA GAUGE
GALV GALVANIZED
GLULAM GLUE LAMINATED WOOD
GRND GROUND
GT GIRDER TRUSS
HAS, HS HEADED ANCHOR STUD
HDG HOT-DIP GALVANIZED
HK HOOK
HORIZ HORIZONTAL
HP HIGH POINT
HS HOLLOW STRUCTURAL SECTION
HT HIP TRUSS
HVAC HEATING, VENTILATION, AIR CONDITIONING
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH
INCL INCLUDE
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
J/BRG JOIST BEARING
JST JOIST
STRUCTURAL ABBREVIATIONS
JT JOINT
KB KNEE BRACE
KIP, K 1,000 POUNDS
KSI KIPS PER SQUARE INCH
L ANGLE OR LENGTH
LAB LABRATORY
LB POUND
LF LINEAL FOOT
LIN LINEAL, LINEAR
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONGIT LONGITUDINAL
LP LOW POINT
LSLT LONG SLOTTED HOLE
LTWT LIGHT WEIGHT
LVL LAMINATED VENEER LUMBER
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MC MISCELLANEOUS CHANNEL
MECH MECHANICAL
MEMB MEMBRANE
MEP MECHANICAL/ ELECTRICAL/ PLUMBING
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MULT MULTIPLE
N/A NOT APPLICABLE
NDS NATIONAL DESIGN SPECIFICATION FOR WOOD
NO NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OPPHD OPPOSITE HAND
ORIG ORIGINAL
OVS OVERSIZED HOLE
P PIER
PAF POWER-ACTUATED FASTENER
PC PIER CAP OR PRECAST
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PJP PARTIAL JOINT PENETRATION
PL PLATE
PLF POUNDS PER LINEAL FOOT
PLYWD PLYWOOD
PPT PRESSURE PRESERVATIVE TREATED
PREFAB PREFABRICATED
PREL PRELIMINARY
PREP PREPARATION, PREPARE
PROJ PROJECTION
PS PRESTRESSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
R RADIUS
RD ROOF DRAIN
REF REFERENCE
REINF REINFORCEMENT, REINFORCE
REQD REQUIRED
RO ROUGH OPENING
SCH SCHEDULE
SECT SECTION
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SL SLOPE
SL-DN SLOPE DOWN
SL-UP SLOPE UP
SOG SLAB-ON-GRADE
SPA SPACES, SPACE
SPECS SPECIFICATIONS
SPF SPRUCE-PINE-FIR
SQ SQUARE
SS STAINLESS STEEL
SSLT SHORT SLOTTED HOLE
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUC STRUCTURAL
SYM SYMMETRICAL
T & B TOP AND BOTTOM
T&G TONGUE & GROOVE
T/ TOP OF
TEMP TEMPERATURE
TF TRENCH FOOTING
THRU THROUGH
TPI TRUSS PLATE INSTITUTE
TRANS TRANSVERSE
TYP TYPICAL
UL UNDERWRITERS' LABORATORY INC.
UNO UNLESS NOTED OTHERWISE
UT ULTRA-SONIC TEST
VERT VERTICAL
W WIDE FLANGE
W/ WITH
W/O WITHOUT
WD WOOD
WF WALL FOOTING
WP WORK POINT
WTCA WOOD TRUSS COUNCIL OF AMERICA
WWF WELDED WIRE FABRIC
NOT TO SCALESI001
6 1 1/2" WIDE-RIB STEEL ROOF DECK
NOT TO SCALESI001
5 TYPICAL SMALL ROOF OPENING DETAIL
NOT TO SCALESI001
4 TYPICAL ROOF OPENING DETAIL
NOT TO SCALESI001
2 TYPICAL CONTINUOUS ROOF PERIMETER DETAIL
NOT TO SCALESI001
1 TYPICAL ROOF EDGE DETAILS
NOT TO SCALESI001
3 SNOW DRIFT LOAD MAP
STRUCTURAL SHEET INDEX
SHEET NUMBER SHEET NAME
SI001 BID DEDUCT - GENERAL STRUCTURAL NOTES, LOAD MAP, &
TYPICAL DETAILS
SF101 BID DEDUCT - LOW ROOF FRAMING DEMOLITION PLANS
SF102 BID DEDUCT - LOW ROOF FRAMING PLANS
SF901 BID DEDUCT - ISOMETRIC VIEWS
EX. STEEL COLUM
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
D2.0
AREA B
AREA A
A R
E A
A
A R
E A
D
AREA C
AREA D
A R
E A
B
A R
E A
C
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
(F V
/4
(F
V
1/
4" E
O D
F
V
3 1/2" EOD (FV) 4" EOD (FV)
(FV)
5' - 10 3/4"
(FV)
5' - 10 3/4"
(FV)
5' - 4"
(FV)
5' - 4"
(FV)
5' - 4"
(FV)
5' - 4"
EX. STEEL BEAM TO REMAIN
FD
E D CFGH
B A
21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8"
21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8"
OVERALL SCOPE OF WORK
33' - 8 5/8"
O V
E R
A
LL
S C
O P
E O
F W
O R
K
OVERALL SCOPE OF WORK
33' - 8 5/8"
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL BEAM TO REMAIN
D2.0
EX. STEEL BEAM TO REMAIN
AREA B
AREA A
A R
E A
A
A R
E A
D
AREA C
AREA D
A R
E A
B
A R
E A
C
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
1/
4" E
O D
F
V
/4
(F V
(F
V
(F V
3 1/2" EOD (FV) 4" EOD (FV)
(FV)
5' - 10 3/4"
(FV)
5' - 10 3/4"
(FV)
5' - 4"
(FV)
5' - 4"
(FV)
5' - 4"
(FV)
5' - 4"
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
FD
E D CFGH
B A
21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8"
OVERALL SCOPE OF WORK
33' - 8 5/8"
OVERALL SCOPE OF WORK
33' - 8 5/8"
O V
E R
A
LL
S C
O P
E O
F W
O R
K
N
A
BC
D
A. ALL EXISTING BUILDING COMPONENTS SHOWN IN PLAN AND/OR SECTION
WERE DERIVED FROM EXISTING DRAWINGS AND A PREVIOUS ASSESSMENT
REPORT AND MUST BE FIELD VERIFIED. IF ANY DISCREPANCIES ARE
DISCOVERED BETWEEN INFORMATION SHOWN ON THE DRAWINGS AND
ACTUAL CONDITIONS, IMMEDIATELY CONTACT THE ARCHITECT AND/OR
ENGINEER FOR DIRECTION BEFORE PROCEEDING WITH THE WORK.
B. ALL CONTRACTORS ARE REQUIRED TO COORDINATE THEIR WORK WITH
ALL DISCIPLINES TO AVOID CONFLICTS. ARCHITECTURAL, MECHANICAL,
ELECTRICAL, AND PLUMBING ASPECTS ARE NOT IN THE SCOPE OF THESE
DRAWINGS. THEREFORE, ALL REQUIRED MATERIALS AND WORK MAY NOT
BE INDICATED.
C. DIMENSIONS SHOWN FOR BUILDING COMPONENTS ARE APPROXIMATE AND
INTENDED TO GIVE A GENERAL SCOPE OF WORK. COORDINATE
DEMOLITION WORK WITH DESIGN INTENT OF NEW CONSTRUCTION.
D. EXTENTS OF DEMOLITION, SIZES AND LOCATIONS OF ROOF OPENINGS,
AND ALL DIMENSIONS SHALL BE COORDINATED WITH THE ARCHITECTURAL
DRAWINGS AND VERIFIED IN THE FIELD. CONTRACTOR SHALL VERIFY ALL
DIMENSIONS PRIOR TO CONSTRUCTION AND IMMEDIATELY NOTIFY
ARCHITECT/ENGINEER OF ANY DISCREPANCIES.
ROOF FRAMING DEMOLITION GENERAL NOTESROOF FRAMING DEMOLITION LEGEND
AREA NOT IN CONTRACT
D2.0
EX. 2" GYPSUM ROOF PLANK,
INTERLOCKING STEEL CHANNELS, &
EOD ANGLES/PLATES TO BE REMOVED.
EX. ROOF OPENING FRAMING
TO BE REMOVED. EX. STEEL
SUPPORT BEAMS TO REMAIN.
FD
FLOOR DRAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o fs
B
/1
.6
.1
S v
.r v t
/2
/2
:3
:4
P
M
SF101
BID DEDUCT - LOW ROOF
FRAMING DEMOLITION PLANSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE 2ND FLOOR ROOFS
B200
5000 5TH AVE, HINES, IL 60141
578-22-026
09/29/2025 ADK LKB
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/32" = 1'-0"SF101
1 LOW ROOF FRAMING DEMOLITION PLAN - AREA A
SCALE: 3/32" = 1'-0"SF101
2 LOW ROOF FRAMING DEMOLITION PLAN - AREA B
NO SCALE
KEY PLAN
N N
SEE ARCHITECTURAL DRAWINGS FOR
SCOPE OF ARCHITECTURAL WORK
SEE ARCHITECTURAL DRAWINGS FOR
SCOPE OF ARCHITECTURAL WORK
A
BC
D
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
R1.5
AREA B
AREA A
A R
E A
A
A R
E A
D
AREA C
AREA D
A R
E A
B
A R
E A
C
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
1/
4" E
O D
F
V
4" EOD (FV)3 1/2" EOD (FV)
(F V
/4
(F
V
(FV)
5' - 10 3/4"
(FV)
5' - 10 3/4"
(FV)
5' - 4"
(FV)
5' - 4"
(FV)
5' - 4"
(FV)
5' - 4"
FD
E D CFGH
B A
21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8"
21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8"
OVERALL SCOPE OF WORK
33' - 8 5/8"
O V
E R
A
LL
S C
O P
E O
F W
O R
K
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL COLUM
N
TO REM
AIN
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
R1.5
AREA B
AREA A
A R
E A
A
A R
E A
D
AREA C
AREA D
A R
E A
B
A R
E A
C
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
EX. STEEL BEAM TO REMAIN
4" EOD (FV)3 1/2" EOD (FV)
1/
4" E
O D
F
V
/4
(F V
(F
V
(F V
(FV)
5' - 10 3/4"
(FV)
5' - 10 3/4"
(FV)
5' - 4"
(FV)
5' - 4"
(FV)
5' - 4"
(FV)
5' - 4"
EX. STEEL BEAM TO REMAIN
FD
E D CFGH
B A
21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8" 21' - 8"
OVERALL SCOPE OF WORK
33' - 8 5/8"
O V
E R
A
LL
S C
O P
E O
F W
O R
K
A. ALL EXISTING BUILDING COMPONENTS SHOWN IN PLAN AND/OR SECTION
WERE DERIVED FROM EXISTING DRAWINGS AND A PREVIOUS ASSESSMENT
REPORT AND MUST BE FIELD VERIFIED. IF ANY DISCREPANCIES ARE
DISCOVERED BETWEEN INFORMATION SHOWN ON THE DRAWINGS AND
ACTUAL CONDITIONS, IMMEDIATELY CONTACT THE ARCHITECT AND/OR
ENGINEER FOR DIRECTION BEFORE PROCEEDING WITH THE WORK.
B. ALL CONTRACTORS ARE REQUIRED TO COORDINATE THEIR WORK WITH ALL
DISCIPLINES TO AVOID CONFLICTS. ARCHITECTURAL, MECHANICAL,
ELECTRICAL, AND PLUMBING ASPECTS ARE NOT IN THE SCOPE OF THESE
DRAWINGS. THEREFORE, ALL REQUIRED MATERIALS AND WORK MAY NOT
BE INDICATED.
C. DIMENSIONS SHOWN FOR NEW CONSTRUCTION ARE APPROXIMATE AND
ARE INTENDED TO GIVE A GENERAL SCOPE OF WORK. COORDINATE
DEMOLITION WORK WITH DESIGN INTENT OF NEW CONSTRUCTION.
D. EXTENTS OF NEW CONSTRUCTION, SIZES AND LOCATIONS OF ROOF
OPENINGS, AND ALL DIMENSIONS SHALL BE COORDINATED WITH THE
ARCHITECTURAL DRAWINGS AND VERIFIED IN THE FIELD. CONTRACTOR
SHALL VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION AND
IMMEDIATELY NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES.
ROOF FRAMING GENERAL NOTESROOF FRAMING LEGEND
AREA NOT IN CONTRACT
NEW 1 1/2", 18 GA. WIDE-RIB, GALVANIZED
STEEL ROOF DECK PER DETAIL 6/SI001 &
NEW EOD ANGLES/PLATES PER DETAILS
1 & 2/SI001.
R1.5
EX. ROOF OPENING W/ NEW STEEL
SUPPORT PER DETAILS 4 & 5/SI001
FD
FLOOR DRAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o fs
B
/1
.6
.1
S v
.r v t
/2
/2
:3
:4
P
M
SF102
BID DEDUCT - LOW ROOF
FRAMING PLANSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE 2ND FLOOR ROOFS
B200
5000 5TH AVE, HINES, IL 60141
578-22-026
09/29/2025 ADK LKB
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
NO SCALE
KEY PLAN
SCALE: 3/32" = 1'-0"SF102
1 LOW ROOF FRAMING PLAN - AREA A
SCALE: 3/32" = 1'-0"SF102
2 LOW ROOF FRAMING PLAN - AREA B
N N
SEE ARCHITECTURAL DRAWINGS FOR
SCOPE OF ARCHITECTURAL WORK
SEE ARCHITECTURAL DRAWINGS FOR
SCOPE OF ARCHITECTURAL WORK
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o fs
B
/1
.6
.1
S v
.r v t
/2
/2
:3
:4
P
M
SF901
BID DEDUCT - ISOMETRIC VIEWS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE 2ND FLOOR ROOFS
B200
5000 5TH AVE, HINES, IL 60141
578-22-026
09/29/2025 ADK LKB
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
NOT TO SCALESF901
1 ISOMETRIC VIEW LOOKING NORTHWEST
NOT TO SCALESF901
2 ISOMETRIC VIEW LOOKING SOUTHWEST
UP
UP
UP
UP
UP
UP
UP
DN
UP
DN
UP
UP
UP
UP
N
A
BC
D
Q
P O N M L K J I
11111111
11 11 11 11
H G F E D C B A
T Y
P
TYP.
21' - 8"
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
ARCHITECTURAL ROOF PLAN AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION. ABANDONED VENTILATOR CURBS, AS
CONFIRMED BY COR, ARE TO BE REMOVED, INFILLED, AND REPAIRED TO
MATCH ADJACENT EXISTING.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
J. EXISTING ROOF IS OVERGROWN WITH WEEDS. REMOVE WEEDS ENTIRELY
FROM ALL ROOF AREAS WITHIN PROJECT SCOPE WHICH ARE EXISTING TO
REMAIN.
K. CONTRACTOR SHALL REMOVE AND REPLACE EXISTING ROOF TILES AS
SHOWN ON PLANS.
L. LIGHTNING PROTECTION SHALL BE EXISTING TO REMAIN. WHERE
DISTURBED, CONTRACTOR SHALL RETURN SYSTEM TO PREVIOUS
CONDITION.
M. CONTRACTOR SHALL REMOVE ALL DEBRIS AND CONSTRUCTION MATERIALS
WHICH HAVE BEEN ABANDONED ON THE ROOF.
1. REMOVE UNUSED STEEL SUPPORTS AND STRUCTURAL ELEMENTS TO
EXTENT TO MAINTAIN EXISTING WARRANY ON ROOF SYSTEM FOR
MECHANICAL UNITS WHICH ARE ABANDONED.
2. EXISTING ROOF TILES. SEE GENERAL NOTES FOR REMOVAL OF
VEGETATION AND ROOF TILE REPLACEMENT.
3. EXISTING EQUIPMENT AND ANY ASSOCIATED STRUCTURE / ACCESSORIES
TO REMAIN.
4. EXHAUST FAN TO BE REFLASHED.
5. REMOVE EXISTING WOOD STAIRS IN THEIR ENTIRETY. SEE NEW WORK FOR
REPLACEMENT OF STAIRS.
6. EXISTING ISOLATION EXHAUST FAN TO REMAIN.
7. REMOVE EXISTING LADDER AND PREP WALKWAY FOR NEW METAL STAIR.
8. REMOVE EXISTING METAL GUARDRAIL, PATCH AREAS OF EXISTING MOUNTS.
9. EXISTING LIGHTNING PROTECTION TO BE REMOVED AND REPLACED.
10. ROOFTOP EXHAUST FAN AND ANY ASSOCIATED STRUCTURE / ACCESSORIES
TO REMAIN.
11. EXISTING ROOF DRAIN TO BE CLEANED OUT AND REPLACED WITH CAST
IRON DRAIN GUARDS.
12. PILES OF DEBRIS TO BE REMOVED OR UTILIZED.
13. ABANDONED PIPE INCLUDING VERTICAL SECTION TO BE REMOVED AND
CAPPED.
14. REPLACE ROOF DRAIN AND REPAIR ANY DAMAGED FLASHING.
15. REMOVE FRAME, REPLACE FLASHING ATOP CURB.
16. REPAIR FLASHING OF ROOFTOP UNIT AND REPAIR ANY DAMAGED ROOF
SYSTEM SURROUNDING UNIT.
17. REMOVE ABANDONED VENTILATOR CURB, INFILL OPENING AND PATCH
ROOF TO MATCH EXISTING.
18. SEAL AROUND EXISTING 2" CONDUIT AT ROOF DRAINAGE PLANE.
DEMOLITION GENERAL NOTES
DEMOLITION PLAN NOTES
REGION LEGEND
AREA NOT IN CONTRACT
AREA OF TILES TO BE
REMOVED/REPLACED
AREA OF ALTERNATE
DEDUCT 1, SEE NARRATIVE
SYMBOL LEGEND
PHOTO LOCATION AND
DIRECTION#
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o fs
B
/1
.6
.1
A v
.r v t
/2
/2
:3
:5
A
M
AD101
ROOF DEMOLITION PLAN -
OVERALLGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE 2ND FLOOR ROOFS
B200
5000 5TH AVE, HINES, IL 60141
578-22-026
9/29/2025 ES NL
BID DOCUMENTS
FULLY SPRINKLERED
NO SCALE
KEY PLAN
N
SCALE: 1/16" = 1'-0"AD101
1 SECOND FLOOR ROOF PLAN - OVERALL
Revisions: Date:
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
ARCHITECTURAL ROOF PLAN AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION. ABANDONED VENTILATOR CURBS, AS
CONFIRMED BY COR, ARE TO BE REMOVED, INFILLED, AND REPAIRED TO
MATCH ADJACENT EXISTING.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
J. EXISTING ROOF IS OVERGROWN WITH WEEDS. REMOVE WEEDS ENTIRELY
FROM ALL ROOF AREAS WITHIN PROJECT SCOPE WHICH ARE EXISTING TO
REMAIN.
K. CONTRACTOR SHALL REMOVE AND REPLACE EXISTING ROOF TILES AS
SHOWN ON PLANS.
L. LIGHTNING PROTECTION SHALL BE EXISTING TO REMAIN. WHERE
DISTURBED, CONTRACTOR SHALL RETURN SYSTEM TO PREVIOUS
CONDITION.
M. CONTRACTOR SHALL REMOVE ALL DEBRIS AND CONSTRUCTION MATERIALS
WHICH HAVE BEEN ABANDONED ON THE ROOF.
1. REMOVE UNUSED STEEL SUPPORTS AND STRUCTURAL ELEMENTS TO
EXTENT TO MAINTAIN EXISTING WARRANY ON ROOF SYSTEM FOR
MECHANICAL UNITS WHICH ARE ABANDONED.
2. EXISTING ROOF TILES. SEE GENERAL NOTES FOR REMOVAL OF
VEGETATION AND ROOF TILE REPLACEMENT.
3. EXISTING EQUIPMENT AND ANY ASSOCIATED STRUCTURE / ACCESSORIES
TO REMAIN.
4. EXHAUST FAN TO BE REFLASHED.
5. REMOVE EXISTING WOOD STAIRS IN THEIR ENTIRETY. SEE NEW WORK FOR
REPLACEMENT OF STAIRS.
6. EXISTING ISOLATION EXHAUST FAN TO REMAIN.
7. REMOVE EXISTING LADDER AND PREP WALKWAY FOR NEW METAL STAIR.
8. REMOVE EXISTING METAL GUARDRAIL, PATCH AREAS OF EXISTING MOUNTS.
9. EXISTING LIGHTNING PROTECTION TO BE REMOVED AND REPLACED.
10. ROOFTOP EXHAUST FAN AND ANY ASSOCIATED STRUCTURE / ACCESSORIES
TO REMAIN.
11. EXISTING ROOF DRAIN TO BE CLEANED OUT AND REPLACED WITH CAST
IRON DRAIN GUARDS.
12. PILES OF DEBRIS TO BE REMOVED OR UTILIZED.
13. ABANDONED PIPE INCLUDING VERTICAL SECTION TO BE REMOVED AND
CAPPED.
14. REPLACE ROOF DRAIN AND REPAIR ANY DAMAGED FLASHING.
15. REMOVE FRAME, REPLACE FLASHING ATOP CURB.
16. REPAIR FLASHING OF ROOFTOP UNIT AND REPAIR ANY DAMAGED ROOF
SYSTEM SURROUNDING UNIT.
17. REMOVE ABANDONED VENTILATOR CURB, INFILL OPENING AND PATCH
ROOF TO MATCH EXISTING.
18. SEAL AROUND EXISTING 2" CONDUIT AT ROOF DRAINAGE PLANE.
DEMOLITION GENERAL NOTES
DEMOLITION PLAN NOTES
REGION LEGEND
AREA NOT IN CONTRACT
AREA OF TILES TO BE
REMOVED/REPLACED
AREA OF ALTERNATE
DEDUCT 1, SEE NARRATIVE
SYMBOL LEGEND
PHOTO LOCATION AND
DIRECTION#
N
A
BC
D
/1 AD101B
A D
D
1111111111
33333
1515151515
1111111111
H G F E D C B A
1313131313
1818181818
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o fs
B
/1
.6
.1
A v
.r v t
/2
/2
:3
:5
A
M
AD101A
ROOF DEMOLITION PLAN - AREA A
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE 2ND FLOOR ROOFS
B200
5000 5TH AVE, HINES, IL 60141
578-22-026
9/29/2025 ES NL
BID DOCUMENTS
FULLY SPRINKLERED
NO SCALE
KEY PLAN
N
SCALE: 3/32" = 1'-0"AD101A
1 CONCEPTUAL ROOF PLAN - AREA A
NO SCALE
AREA A PHOTOS
UP
DN
UP
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
ARCHITECTURAL ROOF PLAN AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION. ABANDONED VENTILATOR CURBS, AS
CONFIRMED BY COR, ARE TO BE REMOVED, INFILLED, AND REPAIRED TO
MATCH ADJACENT EXISTING.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
J. EXISTING ROOF IS OVERGROWN WITH WEEDS. REMOVE WEEDS ENTIRELY
FROM ALL ROOF AREAS WITHIN PROJECT SCOPE WHICH ARE EXISTING TO
REMAIN.
K. CONTRACTOR SHALL REMOVE AND REPLACE EXISTING ROOF TILES AS
SHOWN ON PLANS.
L. LIGHTNING PROTECTION SHALL BE EXISTING TO REMAIN. WHERE
DISTURBED, CONTRACTOR SHALL RETURN SYSTEM TO PREVIOUS
CONDITION.
M. CONTRACTOR SHALL REMOVE ALL DEBRIS AND CONSTRUCTION MATERIALS
WHICH HAVE BEEN ABANDONED ON THE ROOF.
1. REMOVE UNUSED STEEL SUPPORTS AND STRUCTURAL ELEMENTS TO
EXTENT TO MAINTAIN EXISTING WARRANY ON ROOF SYSTEM FOR
MECHANICAL UNITS WHICH ARE ABANDONED.
2. EXISTING ROOF TILES. SEE GENERAL NOTES FOR REMOVAL OF
VEGETATION AND ROOF TILE REPLACEMENT.
3. EXISTING EQUIPMENT AND ANY ASSOCIATED STRUCTURE / ACCESSORIES
TO REMAIN.
4. EXHAUST FAN TO BE REFLASHED.
5. REMOVE EXISTING WOOD STAIRS IN THEIR ENTIRETY. SEE NEW WORK FOR
REPLACEMENT OF STAIRS.
6. EXISTING ISOLATION EXHAUST FAN TO REMAIN.
7. REMOVE EXISTING LADDER AND PREP WALKWAY FOR NEW METAL STAIR.
8. REMOVE EXISTING METAL GUARDRAIL, PATCH AREAS OF EXISTING MOUNTS.
9. EXISTING LIGHTNING PROTECTION TO BE REMOVED AND REPLACED.
10. ROOFTOP EXHAUST FAN AND ANY ASSOCIATED STRUCTURE / ACCESSORIES
TO REMAIN.
11. EXISTING ROOF DRAIN TO BE CLEANED OUT AND REPLACED WITH CAST
IRON DRAIN GUARDS.
12. PILES OF DEBRIS TO BE REMOVED OR UTILIZED.
13. ABANDONED PIPE INCLUDING VERTICAL SECTION TO BE REMOVED AND
CAPPED.
14. REPLACE ROOF DRAIN AND REPAIR ANY DAMAGED FLASHING.
15. REMOVE FRAME, REPLACE FLASHING ATOP CURB.
16. REPAIR FLASHING OF ROOFTOP UNIT AND REPAIR ANY DAMAGED ROOF
SYSTEM SURROUNDING UNIT.
17. REMOVE ABANDONED VENTILATOR CURB, INFILL OPENING AND PATCH
ROOF TO MATCH EXISTING.
18. SEAL AROUND EXISTING 2" CONDUIT AT ROOF DRAINAGE PLANE.
DEMOLITION GENERAL NOTES
DEMOLITION PLAN NOTES
REGION LEGEND
AREA NOT IN CONTRACT
AREA OF TILES TO BE
REMOVED/REPLACED
AREA OF ALTERNATE
DEDUCT 1, SEE NARRATIVE
SYMBOL LEGEND
PHOTO LOCATION AND
DIRECTION#
N
A
BC
D
/1 AD101A
A D
C
AE502
11 11
11 11
11 11
11 11
11 11
1212121212
1212121212
H G F E D C B A
1414141414
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o fs
B
/1
.6
.1
A v
.r v t
/2
/2
:3
:0
A
M
AD101B
ROOF DEMOLITION PLAN - AREA
BGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE 2ND FLOOR ROOFS
B200
5000 5TH AVE, HINES, IL 60141
578-22-026
9/29/2025 ES NL
BID DOCUMENTS
FULLY SPRINKLERED
NO SCALE
KEY PLAN
N
SCALE: 3/32" = 1'-0"AD101B
1 CONCEPTUAL ROOF PLAN - AREA B
SCALE: 12" = 1'-0"
AREA B PHOTOS
UP
UP
UP
UP
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
ARCHITECTURAL ROOF PLAN AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION. ABANDONED VENTILATOR CURBS, AS
CONFIRMED BY COR, ARE TO BE REMOVED, INFILLED, AND REPAIRED TO
MATCH ADJACENT EXISTING.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
J. EXISTING ROOF IS OVERGROWN WITH WEEDS. REMOVE WEEDS ENTIRELY
FROM ALL ROOF AREAS WITHIN PROJECT SCOPE WHICH ARE EXISTING TO
REMAIN.
K. CONTRACTOR SHALL REMOVE AND REPLACE EXISTING ROOF TILES AS
SHOWN ON PLANS.
L. LIGHTNING PROTECTION SHALL BE EXISTING TO REMAIN. WHERE
DISTURBED, CONTRACTOR SHALL RETURN SYSTEM TO PREVIOUS
CONDITION.
M. CONTRACTOR SHALL REMOVE ALL DEBRIS AND CONSTRUCTION MATERIALS
WHICH HAVE BEEN ABANDONED ON THE ROOF.
1. REMOVE UNUSED STEEL SUPPORTS AND STRUCTURAL ELEMENTS TO
EXTENT TO MAINTAIN EXISTING WARRANY ON ROOF SYSTEM FOR
MECHANICAL UNITS WHICH ARE ABANDONED.
2. EXISTING ROOF TILES. SEE GENERAL NOTES FOR REMOVAL OF
VEGETATION AND ROOF TILE REPLACEMENT.
3. EXISTING EQUIPMENT AND ANY ASSOCIATED STRUCTURE / ACCESSORIES
TO REMAIN.
4. EXHAUST FAN TO BE REFLASHED.
5. REMOVE EXISTING WOOD STAIRS IN THEIR ENTIRETY. SEE NEW WORK FOR
REPLACEMENT OF STAIRS.
6. EXISTING ISOLATION EXHAUST FAN TO REMAIN.
7. REMOVE EXISTING LADDER AND PREP WALKWAY FOR NEW METAL STAIR.
8. REMOVE EXISTING METAL GUARDRAIL, PATCH AREAS OF EXISTING MOUNTS.
9. EXISTING LIGHTNING PROTECTION TO BE REMOVED AND REPLACED.
10. ROOFTOP EXHAUST FAN AND ANY ASSOCIATED STRUCTURE / ACCESSORIES
TO REMAIN.
11. EXISTING ROOF DRAIN TO BE CLEANED OUT AND REPLACED WITH CAST
IRON DRAIN GUARDS.
12. PILES OF DEBRIS TO BE REMOVED OR UTILIZED.
13. ABANDONED PIPE INCLUDING VERTICAL SECTION TO BE REMOVED AND
CAPPED.
14. REPLACE ROOF DRAIN AND REPAIR ANY DAMAGED FLASHING.
15. REMOVE FRAME, REPLACE FLASHING ATOP CURB.
16. REPAIR FLASHING OF ROOFTOP UNIT AND REPAIR ANY DAMAGED ROOF
SYSTEM SURROUNDING UNIT.
17. REMOVE ABANDONED VENTILATOR CURB, INFILL OPENING AND PATCH
ROOF TO MATCH EXISTING.
18. SEAL AROUND EXISTING 2" CONDUIT AT ROOF DRAINAGE PLANE.
DEMOLITION GENERAL NOTES
DEMOLITION PLAN NOTES
REGION LEGEND
AREA NOT IN CONTRACT
AREA OF TILES TO BE
REMOVED/REPLACED
AREA OF ALTERNATE
DEDUCT 1, SEE NARRATIVE
SYMBOL LEGEND
PHOTO LOCATION AND
DIRECTION#
N
A
BC
D
Q
P O N M L K J I
A D
B
/1 AD101D
11 11 11
11 11 11
11 11 11
11 11 11
11 11 11
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/1
.6
.1
R e p la c e n d F lo o r R o o…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .