This document appears to be a set of construction drawings (CD Drawings) related to the federal contract opportunity "Y1DA--460-325 Construct Addition for Mental Health". The contract opportunity is a solicitation issued by the Department of Veterans Affairs Technology Acquisition Center Austin to completely renovate and in-fill the Auditorium at the Wilmington, Delaware VA Medical Center in order to expand the Mental Health program. The solicitation number is 36C77624R0086_1. No additional details about required products/services, response dates, award dates, pricing terms, set asides, incumbents, or other salient information are provided in this particular document.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA FORM 08 - 6231
CONTRACT DOCUMENTS
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
G001
TITLE SHEET
M-001 MECHANICAL GENERAL NOTES AND ABBREVIATIONS
M-002 MECHANICAL SYMBOL LEGENDS
MD-101 DEMOLITION - PARTIAL GROUND AND FIRST FLOOR PLANS - HVAC
M-101 NEW WORK - GROUND FLOOR PLAN - HVAC
M-102 NEW WORK - FIRST FLOOR PLAN - HVAC
M-103 NEW WORK - THIRD FLOOR PLAN - HVAC
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-701 TEMPERATURE CONTROLS
M-702 TEMPERATURE CONTROLS
M-801 HVAC RISER DIAGRAMS
P-001 PLUMBING GENERAL NOTES, SYMBOL LEGEND, AND SCHEDULE
PD-101 DEMOLITION - PLUMBING PLANS
P-101 PLUMBING PLANS
P-501 PLUMBING DETAILS
E-001 ELECTRICAL SYMBOL LEGEND AND GENERAL NOTES
ED-101 DEMOLITION - PARTIAL FLOOR PLANS - ELECTRICAL
E-101 NEW WORK - OVERALL SECOND FLOOR PLAN - POWER
E-102 NEW WORK - PARTIAL FLOOR PLANS - LIGHTING
E-103 NEW WORK - PARTIAL FLOOR PLANS - POWER
E-601 SINGLE-LINE DIAGRAM AND ELECTRICAL SCHEDULES
E-602 ELECTRICAL PANEL SCHEDULE
T-102 NEW WORK - PARTIAL FLOOR PLANS - TECHNOLOGY
T-501 TECHNOLOGY DETAILS
T-502 TECHNOLOGY DETAILS
T-503 TECHNOLOGY DETAILS
FA001 REFERENCE SHEET - FIRE ALARM
FA101 GROUND LEVEL DEMOLITION PLAN - FIRE ALARM
FA102 FIRST FLOOR DEMOLITION PLAN - FIRE ALARM
FA201 GROUND LEVEL NEW WORK PLAN - FIRE ALARM
FA202 FIRST FLOOR NEW WORK PLAN - FIRE ALARM
FA203 PARTIAL THIRD FLOOR NEW WORK PLAN - FIRE ALARM
FA501 DETAIL SHEET - FIRE ALARM
LS001 REFERENCE SHEET - LIFE SAFETY
LS101 GROUND FLOOR PLAN - LIFE SAFETY
LS102 FIRST FLOOR PLAN - LIFE SAFETY
FX001 REFERENCE SHEET - FIRE SUPPRESSION
FX101 GROUND LEVEL DEMOLITION PLAN - FIRE SUPPRESSION
FX102 FIRST FLOOR DEMOLITION PLAN - FIRE SUPPRESSION
FX201 GROUND LEVEL NEW WORK PLAN - FIRE SUPPRESSION
FX202 FIRST FLOOR NEW WORK PLAN - FIRE SUPPRESSION
FX203 PARTIAL THIRD FLOOR PLAN - FIRE SUPPRESSION
FX401 SECTIONS - FIRE SUPPRESSION
FX501 DETAIL SHEET - FIRE SUPPRESSION
G001 TITLE SHEET
G002 GENERAL INFORMATION
G003 PHASING PLAN - GROUND FLOOR
G004 PHASING PLAN - FIRST FLOOR
AD101 DEMOLITION PLAN - GROUND FLOOR
AD102 DEMOLITION PLAN - FIRST FLOOR
A101 SPACE PLAN - GROUND FLOOR
A102 SPACE PLAN - FIRST FLOOR
A103 SPACE PLAN - 3RD FLOOR / ROOF
A104 ACCESSIBILITY PLAN - GROUND FLOOR
A105 ACCESSIBILITY PLAN - FIRST FLOOR
A106 NEW WORK PLAN - GROUND FLOOR
A107 NEW WORK PLAN - FIRST FLOOR
A108 NEW WORK PLAN - 3RD FLOOR PLAN / ROOF
A109 FURNITURE & EQUIPMENT PLAN - GROUND FLOOR
A110 FURNITURE & EQUIPMENT PLAN - FIRST FLOOR
A111 T&E PLAN - GROUND FLOOR
A112 T&E PLAN - FIRST FLOOR
A113 REFLECTED CEILING PLAN - GROUND FLOOR
A114 REFLECTED CEILING PLAN - FIRST FLOOR
A200 EXTERIOR ELEVATIONS
A301 BUILDING SECTIONS
A401 INTERIOR ELEVATIONS
A402 INTERIOR ELEVATIONS
A403 INTERIOR ELEVATIONS
A404 INTERIOR ELEVATIONS
A405 INTERIOR ELEVATIONS
A406 INTERIOR ELEVATIONS
A407 INTERIOR ELEVATIONS
A408 INTERIOR ELEVATIONS
A409 INTERIOR ELEVATIONS
A410 ENLARGED STAIR PLANS AND SECTIONS
A501 MILLWORK & INTERIOR DETAILS
A601 DOOR & WINDOW SCHEDULES
A603 PARTITION TYPES & SCHEDULE
I101 FINISH SCHEDULE AND MATERIAL LEGEND
I102 SIGNAGE DETAILS
I103 FINISH FLOOR PLAN - GROUND FLOOR
I104 FINISH FLOOR PLAN - FIRST FLOOR
I105 FINISH CEILING PLAN - FIRST FLOOR
I106 PROPOSED PERSPECTIVES
I107 FINISH BOARD
S000 GENERAL NOTES - STRUCTURE
S001 DESIGN CRITERIA AND SCHEDULES
S002 SPECIAL INSPECTIONS
S003 SPECIAL INSPECTIONS
S100 FOUNDATION PLAN
S101 GROUND FLOOR PLAN
S102 FIRST FLOOR PLAN
S103 THIRD FLOOR / ROOF PLAN
S300 SECTIONS AND DETAILS-GROUND FLOOR AND FOUNDATION
S400 SECTIONS AND DETAILS- SUPERSTRUCTURE
S401 SECTIONS AND DETAILS - SUPERSTRUCTURE
S402 DUNNAGE PLAN AND DETAILS
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
G002
GENERAL INFORMATION
2'-0"
7"
-1
7 "-9 "
" M
A X.
" M
IN
" M
IN
1' -0
M
IN
17"-19" 6"8"
1 _ 2 " M
IN
7" - 9"
" t o
39" to 41"
12" MAX
" t o
" M
A X
TO
O
P E
R A
B
LE
P O
IN
T
54" MIN.
M
IN
2'-0" MIN
" M
A X.
>10-24" MAX
24" MAX.30"
" M
A X
" M
A X.
10" MAX. 30"
" M
IN
" M
A X.
" M
A X.
10" MAX
" M
A X.
" M
IN
" M
A X.
20" MAX
" M
A X.
>20-25" MAX
NOTE:
ICC/ANSI A117.1-2009, SECTION 904.5.1 - SELF-SERVICE SHELVES AND
DISPENSING DEVICES. SELF-SERVICE SHELVES AND DISPENSING DEVICES FOR
TABLEWARE, DISHWARE, CONDIMENTS, FOOD AND BEVERAGES SHALL COMPLY
WITH SECTION 308 FOR REACH RANGE.
INSULATE HOT WATER & DRAIN
PIPES
6" MAX. DEPTH x 30" MIN. WIDTH TOE
CLEARANCE
8" MIN. DEPTH x 30" MIN.
WIDTH KNEE SPACE
MIRROR MTD @ 40"
A.F.F. MAX TO BOTTOM
OF REFLECTING
SURFACE
48" S.S. GRAB BAR
36" S.S. GRAB BAR
33" MIN. TO 36"
MAX. TO TOP OF
GRIPPING
SURFACE
PAPER TOWEL DISPENSER
DRYER
T.S. COVER DISPENSER
SHALL
BE MOUNTED 1 1/2" (MIN.)
BELOW GRAB RAIL
18" VERTICAL S.S.
GRAB
BAR (IF RQ'D)
18" MIN A.F.F. FOR
OPERABLE
OPENING W/O
OBSTRUCTION
FROM GRAB BAR
NOTES:
1. TOP OF GRIPPING SURFACE
33" TO 36" MAX TO THE TOP OF
THE BAR.
2. 12" MINIMUM CLEAR
ABOVE GRAB BAR
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
ALUM ALUMINUM
ANOD ANODIZED
@ AT
BKLG BLOCKING
BOS BOTTOM OF SLAB
C CONCRETE
CAB CABINET
CCT CUBICLE CURTAIN TRACK
CG CORNER WALL GUARD
CLG CEILING
CLOS CLOSET
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CSS CLINICAL SERVICE SINK
CPT CARPET TILE
CT CERAMIC TILE
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DR DOOR
DRESS DRESSING
DWG DRAWING
DWR DRAWER
EA EACH
EG END WALL GUARD
ELEC ELECTRIC(AL)
ELEV ELEVATOR/ ELEVATION
EMER EMERGENCY
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FT FEET/ FOOT
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHS FIRE HOSE STATION
FHC FIRE HOSE CABINET
FLR FLOOR(ING)
FLUOR FLUORESCENT
FR FRAME/ FIRE RETARDANT
FVC FIRE VALVE CABINET
GALV GALVANIZE(D)
GB GRAB BAR / GYPSUM BOARD
GC GENERAL CONTRACTOR
GOVT GOVERNMENT
GWB GYPSUM WALLBOARD
HC HOLLOWCORE
HDW HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HW HARDWARE SET
IB INTEGRAL BASE
ID INSIDE DIAMETER
IN INCH(ES)
INT INTERIOR
INTEG INTEGRAL
INTLK INTERLOCK
LAM LAMINATE (D)
LAV LAVATORY
LB POUND
LG LENGTH
LH LEFT HAND
LHRB LEFT HAND REVERSE BEVEL
LOCK LOCKERS
LVR LOUVER
LVT LUXURY VINYL TILE
S SOUTH
SC HIGH BUILD GLAZED COATING
SCW SOLID CORE WOOD
SEAL SEALANT
SECT SECTION
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION(S)
SQ SQUARE
SSM SOLID SURFACE MATERIAL
S STL STAINLESS STEEL
SSV SEAMLESS SHEET VINYL
STL STEEL
STN STAIN
STOR STORAGE
STRUCT STRUCTURAL
SV SHEET VINYL
TC TERRA COTTA
TEL TELEPHONE
TEMP TEMPORARY
THK THICK(NESS)
TOC TOP OF CURB/ TOP OF CONC.
TOIL TOILET
TOS TOP OF SLAB/ TOP OF STEEL
TPTN TOILET PARTITION
TV TELEVISION
TW TOP OF WALL
TYP TYPICAL
TZ TERRAZZO
UON UNLESS OTHERWISE NOTED
VAC VACUUM
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VT VINYL TILE
VWC VINYL WALL COVERING
REVISION
REVISION
NUMBER
ELEVATION
NUMBER
1ST FLOOR
EL +100'-0"
DETAIL OR ENLARGED PLAN
NUMBER
SHEET ON WHICH
DETAIL OR ENLARGED PLAN
IS DRAWN
DARKENED POINTS
INDICATE THE
ELEVATION(S) DRAWN
SHEET ON WHICH
ELEVATION IS DRAWN
A500
PLAN NORTH
A500
A5005 A500
1 DEMOLITION NOTES1
PARTITION TYPE
IDENTIFICATION
ELEVATION REFERENCE
SECTION REFERENCE
SECTION NUMBER
SHEET ON WHICH
SECTION IS DRAWN
REVISION IDENTIFICATION
100 A DOOR AND WINDOW
IDENTIFICATION
NEW CONST.
RIGID INSULATION
UNDERBED MATERIAL
CONTINOUS WOOD
BLOCKING
DISCONTINOUS WOOD
BLOCKING
ALUMINUM
JUNCTION BOXJ
LED FIXTURES
EXST. FLUORESCENT
FIXTURES
CEILING GRILLE
DOWNLIGHT
EXIT LIGHT
WALL SCONCE
TELEPHONE OUTLET
DUPLEX OUTLET
QUADRAPLEX OUTLET
DECORATIVE DOWNLIGHT
ADDRESS: WILMINGTON VA MEDICAL CENTER
1601 KIRKWOOD HWY,
WILMINGTON, DE 19805
BUILDING DESCRIPTION: HOSPITAL
SCOPE OF WORK: IN-FILL EXISTING AUDITORIUM
CREATING A NEW FLOOR AT THE
LEVEL OF THE EXISTING FIRST
FLOOR.
USE GROUP: BUSINESS - B
CONSTRUCTION TYPE: I-A
FIRE SUPPRESSION: FULLY SPRINKLER PROTECTED
BUILDING STORIES: 8
RENOVATED AREAS: GROUND FLOOR - INFILL EXISTING
AUDITORIUM
FIRST FLOOR - EXPAND MENTAL
HEALTH SUITE
DATA OUTLET
MA MEDICAL AIR
MAX MAXIMUM
MED MEDICAL/MEDICATIONS
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N NORTH/ NITROGEN
NC NURSE CALL
NEG NEGATIVE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
O/OX OXYGEN
OPG OPENING
P PAINT
PL PLATE
PT PORCELAIN TILE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
PR PAIR
PTD PAINTED
PTN PARTITION
RB RESILIENT BASE
REQD REQUIRED
RES RESINOUS FLOORING
RESIL RESILIENT
REV REVISED
RH RIGHT HAND
RHRB RIGHT HAND REVERSE BEVEL
RO ROUGH OPENING
RWC RIGID VINYL WALL COVERING
W WEST
W/ WITH
WC WATERCLOSET/
WATER COOLER/
WALL COVERING
WD WOOD
WG WIRE GLASS
WH WALL HUNG
W/O WITHOUT
WP WATERPROOF(ING)
WR WATER RESISTANT
WS WEATHERSTRIPPING
WSCT WAINSCOT
WT WEIGHT
WWF WOVEN WIRE FABRIC
BUILDING CODE REFERENCE:
• 2021 INTERNATIONAL BUILDING CODE
• 2021 INTERNATIONAL EXISTING BUILDING CODE
• 2021 INTERNATIONAL PLUMBING CODE
• 2021 INTERNATIONAL MECHANICAL CODE
• NFPA NATIONAL FIRE CODES INCLUDING BUT NOT LIMITED TO:
• 2021 NFPA 1 FIRE CODE
• 2018 NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS
• 2019 NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
• 2019 NFPA 20 STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR
FIRE PROTECTION
• 2020 NFPA 70 NATIONAL ELECTRICAL CODE
• 2019 NFPA 72 NATIONAL FIRE ALARM & SIGNALING CODE
• 2021 NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND
VENTILATING SYSTEMS
• 2021 NFPA 99 HEALTH CARE FACILITY CODE
• 2021 NFPA 101 LIFE SAFETY CODE
• 2019 NFPA 110 STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS
• ENERGY POLICY ACT OF 2005 (EPAct)
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, & VA NATIONAL CAD
STANDARD APPLICATION GUIDE
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABASS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN GUID (PG-18-13)
• OSHA (OCCUPATIONAL, SAFETY & HEALTH ADMINISTRATION) STANDARDS
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• ASME BOILER & PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE
INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
(AISC)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL,
COMMERCIAL, AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDING AND NEW LOW-
RISE RESIDENTIAL & BUILDINGS, 10 CFR PARTS 433, 434, & 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE & SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL
REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1-2019
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15-2019
• OIT - INFRASTRUCTURE STANDARD FOR TELECOMUNICATIONS SPACES GUIDE
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
G003
PHASING PLAN - GROUND FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
G004
PHASING PLAN - FIRST FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
AD101
DEMOLITION PLAN - GROUND
FLOOR
1/4" = 1'-0"1 GROUND FLOOR DEMOLITION PLAN
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
AD102
DEMOLITION PLAN - FIRST FLOOR
1/4" = 1'-0"1 FIRST FLOOR DEMOLITION PLAN
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A101
SPACE PLAN - GROUND FLOOR
1/4" = 1'-0"1 SPACE PLAN - GROUND FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A102
SPACE PLAN - FIRST FLOOR
1/4" = 1'-0"1 SPACE PLAN - FIRST FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A103
SPACE PLAN - 3RD FLOOR / ROOF
1/4" = 1'-0"1 SPACE PLAN - THIRD FLOOR / ROOF
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A104
ACCESSIBILITY PLAN - GROUND
1/4" = 1'-0"1 ACCESSIBILITY PLAN - GROUND FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A105
ACCESSIBILITY PLAN - FIRST
1/4" = 1'-0"1 ACCESSIBILITY PLAN - FIRST FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A106
NEW WORK PLAN - GROUND
1/4" = 1'-0"1 NEW WORK PLAN - GROUND FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A107
NEW WORK PLAN - FIRST FLOOR
1/4" = 1'-0"1 NEW WORK PLAN - FIRST FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A108
NEW WORK PLAN - 3RD FLOOR
PLAN / ROOF
1/4" = 1'-0"1 NEW WORK PLAN - THIRD FLOOR / ROOF
1 1/2" = 1'-0"2 FLASHING DETAIL @ STEEL POST
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A109
FURNITURE & EQUIPMENT PLAN -
GROUND FLOOR
1/4" = 1'-0"1 FURNITURE & EQUIPMENT PLAN - GROUND FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A110
FURNITURE & EQUIPMENT PLAN -
FIRST FLOOR
1/4" = 1'-0"1 FURNITURE & EQUIPMENT PLAN - FIRST FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A111
T&E PLAN - GROUND FLOOR
1/4" = 1'-0"1 T & E PLAN - GROUND FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A112
T&E PLAN - FIRST FLOOR
1/4" = 1'-0"1 T & E PLAN - FIRST FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A113
REFLECTED CEILING PLAN -
GROUND FLOOR
1/4" = 1'-0"1 REFLECTED CEILING PLAN - GROUND FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A114
REFLECTED CEILING PLAN - FIRST
1/4" = 1'-0"1 REFLECTED CEILING PLAN - FIRST FLOOR
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A200
EXTERIOR ELEVATIONS
1/4" = 1'-0"1 NORTH ELEVATION
1/4" = 1'-0"2 WEST ELEVATION
1/4" = 1'-0"3 SOUTH ELEVATION
P
VA FORM 08 - 6231
CONTRACT DOCUMENTS
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A301
BUILDING SECTIONS
1/4" = 1'-0"1 Section 1
1/4" = 1'-0"2 Section 2
3/4" = 1'-0"3 ENLARGED WINDOW DETAIL
1 1/2" = 1'-0"4 WINDOW HEAD DETAIL
1 1/2" = 1'-0"5 WINDOW SILL DETAIL
3" = 1'-0"6 PRECAST SILL PROFILE
3/4" = 1'-0"7 SECTION AT EXTERIOR DOOR
1 1/2" = 1'-0"8 DOOR HEAD DETAIL
1 1/2" = 1'-0"9 DOOR SILL DETAIL
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A401
INTERIOR ELEVATIONS
1/2" = 1'-0"1 DRIVERS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"2 DRIVERS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"3 DRIVERS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"4 DRIVERS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"9 MY HEALTHE VET OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"10 MY HEALTHE VET OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"11 MY HEALTHE VET OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"12 MY HEALTHE VET OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"5 DRIVERS OFFICE - FLOOR PLAN
1/2" = 1'-0"6 MY HEALTHE VET OFFICE - FLOOR PLAN
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A402
INTERIOR ELEVATIONS
1/2" = 1'-0"2 MY HEALTHE VET TRAINING - INTERIOR ELEVATION
1/2" = 1'-0"1 MY HEALTHE VET TRAINING - FLOOR PLAN
1/2" = 1'-0"3 MY HEALTHE VET TRAINING - INTERIOR ELEVATION
1/2" = 1'-0"4 MY HEALTHE VET TRAINING - INTERIOR ELEVATION
1/2" = 1'-0"5 MY HEALTHE VET TRAINING - INTERIOR ELEVATION
1/2" = 1'-0"6 BENE - TRAVEL TRAINING - FLOOR PLAN
1/2" = 1'-0"7 BENE - TRAVEL TRAINING - INTERIOR ELEVATION
1/2" = 1'-0"9 BENE - TRAVEL TRAINING - INTERIOR ELEVATION
1/2" = 1'-0"8 VTS COORD. - INTERIOR ELEVATION
1/2" = 1'-0"10 VTS COORD. - INTERIOR ELEVATION
1/2" = 1'-0"11 VTS COORD. - INTERIOR ELEVATION
1/2" = 1'-0"12 VTS COORD. - INTERIOR ELEVATION
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A403
INTERIOR ELEVATIONS
1/2" = 1'-0"2 ASSISTANTS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"3 ASSISTANTS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"4 ASSISTANTS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"5 ASSISTANTS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"1 ASSISTANTS OFFICE - FLOOR PLAN
1/2" = 1'-0"7 SUPERVISORS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"8 SUPERVISORS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"9 SUPERVISORS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"10 SUPERVISORS OFFICE - INTERIOR ELEVATION
1/2" = 1'-0"6 SUPERVISORS OFFICE - FLOOR PLAN
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A404
INTERIOR ELEVATIONS
1/2" = 1'-0"5 CORRIDOR 104 - INTERIOR ELEVATION
1/2" = 1'-0"6 CORRIDOR 104 - INTERIOR ELEVATION
1/2" = 1'-0"1 MSA GROUND LEVEL - INTERIOR ELEVATION
1/2" = 1'-0"2 MSA GROUND LEVEL - INTERIOR ELEVATION
1/2" = 1'-0"3 MSA GROUND LEVEL - INTERIOR ELEVATION
1/2" = 1'-0"4 MSA GROUND LEVEL - INTERIOR ELEVATION
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A405
INTERIOR ELEVATIONS
1/2" = 1'-0"1 MSA GROUND LEVEL - INTERIOR ELEVATION FROM CORRIDOR
1/2" = 1'-0"2 MSA GROUND LEVEL - SECTION
1/2" = 1'-0"3 MSA FIRST LEVEL - INTERIOR ELEVATION FROM CORRIDOR
1/2" = 1'-0"4 MSA FIRST LEVEL - SECTION
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A406
INTERIOR ELEVATIONS
1/2" = 1'-0"2 OFFICE 1133G - INTERIOR ELEVATION
1/2" = 1'-0"3 OFFICE 1133G - INTERIOR ELEVATION
1/2" = 1'-0"4 OFFICE 1133G - INTERIOR ELEVATION
1/2" = 1'-0"5 OFFICE 1133G - INTERIOR ELEVATION
1/2" = 1'-0"1 OFFICE 1133G - FLOOR PLAN
1/2" = 1'-0"7 GROUP ROOM - INTERIOR ELEVATION
1/2" = 1'-0"8 GROUP ROOM - INTERIOR ELEVATION
1/2" = 1'-0"9 GROUP ROOM - INTERIOR ELEVATION
1/2" = 1'-0"10 GROUP ROOM - INTERIOR ELEVATION
1/2" = 1'-0"6 GROUP ROOM - FLOOR PLAN
5'
- 0
4'
- 0
9'
- 0
4'
- 0
5'
- 5
7'
- 2
4'
- 0
4'
- 0
EQ EQ
3' - 0 1/4"
2'
- 0
VA FORM 08 - 6231
CONTRACT DOCUMENTS
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A407
INTERIOR ELEVATIONS
1/2" = 1'-0"2 RESTROOM 1132 - INTERIOR ELEVATION
1/2" = 1'-0"3 RESTROOM 1132 - INTERIOR ELEVATION
1/2" = 1'-0"4 RESTROOM 1132 - INTERIOR ELEVATION
1/2" = 1'-0"1 RESTROOM 1132 STAFF - FLOOR PLAN
1/2" = 1'-0"5 RESTROOM 1132 - INTERIOR ELEVATION
1/2" = 1'-0"6 HAND SINK ALCOVE - FLOOR PLAN
1/2" = 1'-0"7 HAND SINK ALCOVE - ELEVATION
1/2" = 1'-0"8 RESTROOM 1126 PATIENTS - FLOOR PLAN
1/2" = 1'-0"10 RESTROOM 1126 PATIENTS - INTERIOR ELEVATION
1/2" = 1'-0"9 RESTROOM 1126 PATIENTS - INTERIOR ELEVATION
1/2" = 1'-0"12 RESTROOM 1126 PATIENTS - INTERIOR ELEVATION
1/2" = 1'-0"11 RESTROOM 1126 PATIENTS - INTERIOR ELEVATION
7'
- 6
9'
- 0
3'
- 0
4'
- 6
2' - 9" 2' - 6" 2' - 9" 2' - 9" 1 1/2" FILLER
2'
- 1
0" 1'
- 8
2'
- 6
7'
- 0
2' - 9" 2' - 6" 2' - 9" 2' - 9" 1 1/2" FILLER
VA FORM 08 - 6231
CONTRACT DOCUMENTS
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A408
INTERIOR ELEVATIONS
1/2" = 1'-0"1 CORRIDOR @ FIRST FLOOR
1/2" = 1'-0"2 CORRIDOR @ FIRST FLOOR
1/2" = 1'-0"3 CORRIDOR @ FIRST FLOOR
1/2" = 1'-0"4 CORRIDOR @ FIRST FLOOR
1/2" = 1'-0"5 MSA FIRST LEVEL - INTERIOR ELEVATION
1/2" = 1'-0"6 MSA FIRST LEVEL - INTERIOR ELEVATION
1/2" = 1'-0"7 MSA FIRST LEVEL - INTERIOR ELEVATION
1/2" = 1'-0"8 MSA FIRST LEVEL - INTERIOR ELEVATION
1/2" = 1'-0"9 STAFF BREAK ROOM 1129
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A409
INTERIOR ELEVATIONS
1/2" = 1'-0"1 FIRST FLOOR - CORRIDOR 202
1/2" = 1'-0"2 FIRST FLOOR - CORRIDOR 202
1/2" = 1'-0"3 FIRST FLOOR - CORRIDOR 202
1/2" = 1'-0"4 FIRST FLOOR - CORRIDOR 202
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A410
ENLARGED STAIR PLANS AND
SECTIONS
1/4" = 1'-0"1 ENLARGED STAIR PLAN -GROUND FLOOR
1/4" = 1'-0"2 ENLARGED STAIR PLAN -FIRST FLOOR
1/4" = 1'-0"3 STAIR SECTION
1 1/2" = 1'-0"5 GUARDRAIL/HANDRAIL
1 1/2" = 1'-0"6 RAILING DETAIL
1 1/2" = 1'-0"4 STAIR DETAIL
1 1/2" = 1'-0"7 TYPICAL RAILING ELEVATION
MFG.R. REQ'D
TO
M
AT
CH
E
XI
ST
IN
G
TO
M
AT
CH
E
XI
ST
IN
G
VA FORM 08 - 6231
CONTRACT DOCUMENTS
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A501
MILLWORK & INTERIOR DETAILS
1 1/2" = 1'-0"1 TYP Base Cabinet
3" = 1'-0"3 TYP. Wall Guard Plan 3" = 1'-0"4 TYP. Wall Guards Section
1 1/2" = 1'-0"2 TYP MSA Patient Counter 6" = 1'-0"5 Hardwood Chair Rail
1 1/2" = 1'-0"6 TYP Wall Mounted Cabinet 1 1/2" = 1'-0"7 TYP Sink Base Cabinet
1 1/2" = 1'-0"8 COLUMN SURROUND DETAIL
1 1/2" = 1'-0"9 COLUMN SURROUND DETAIL
1 1/2" = 1'-0"10 COLUMN SURROUND DETAIL
2"
PARTITION AS SCHEDULED
METAL RUNNER CHANNEL
SEALANT, TYP.
HOLLOW METAL FRAME AS
SCHEDULED
DOOR AS SCHEDULED
TY
P.4"
2"
PARTITION AS SCHEDULED
(2) 25 GA. METAL STUDS FLOOR
TO TOP OF WALL, BRACE TO
STRUCTURE
SEALANT, TYP.
HOLLOW METAL FRAME (AS
SCHEDULED)
DOOR AS SCHEDULED
ADJACENT
WALL
(3) ANCHORS PER JAMB,
PROVIDE SPOT GROUTING
VA FORM 08 - 6231
CONTRACT DOCUMENTS
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A601
DOOR & WINDOW SCHEDULES
NOTE 1:
OMIT BRACE WHEN "D" DIMENSION IS LESS THAN
2'-0" [610mm] FOR GYP. WALLBD. OR 16" [400mm] FOR
PLASTER PARTITION.
SECTION B
VERTICAL STUDS @ 2'-0" [610mm] MAX.
W/GYPSUM WALLBD. 1'-4" [406mm] W/GYPSUM
LATH & PLASTER DOUBLE STUDS FOR
SUPPORTING CONC. BACKER BOARD.
PROVIDE CONTINUOUS BRACING WHEN STUDS
EXCEED 10'-0" [3048mm] & ARE FINISHED BOTH
SIDES
JAMB ANCHOR CLIPS 3 PER SIDE -
COORDINATE W/HINGE REINFORCEMENT.
SEC.
B
GYPSUM WALLBD.
PANELS
CONTROL
JOINT
ISOMETRIC OF CONSTR.
JT.
ELEVATION AT DOOR FRAME
DETAIL
D
DETAIL
C
SECTION
A
DETAIL
C
CRIPPLE STUD DO
NOT ANCHOR TO
BEARING STUD
JAMB ANCHORS
(FURNISHED WITH FRAME)
ACOUSTICAL SEALANT,
BOTH SIDES
TOP OF STRUCTURE
5/8" GYP. BD.
3 5/8" METAL
STUD, 16" O.C.
CEILING AS SCHEDULED
3 1/2" SAB (.1/.2 WALLS ONLY)
SE
CT
IO
N
PL
AN
V
IE
W
SE
CT
IO
N
PARTITION TYPE A
N/AN/AN/AN/A
BOTTOM OF STRUCTURE
ACOUSTICAL SEALANT,
BOTH SIDES
TOP OF STRUCTURE
5/8" GYP. BD.
6" METAL STUD,
16" O.C.
CEILING AS SCHEDULED
SE
CT
IO
N
PL
AN
V
IE
W
SE
CT
IO
N
PARTITION TYPE B
FIRE RESISTANCE RATING = NONE
STC RATING = 49 (.1 WALLS ONLY)
STC RATING = 51 (.2 WALLS ONLY)
FIRE RESISTANCE RATING = NONE
STC RATING = 49 (.1 WALLS ONLY)
STC RATING = 51 (.2 WALLS ONLY)
N/AN/A
5 1/2" SAB
DEFLECTION TRACK
ACOUSTICAL SEALANT,
BOTH SIDES
BOTTOM OF STRUCTURE
DEFLECTION TRACK
ACOUSTICAL SEALANT,
BOTH SIDES
FIRE STOP AT CEILING
HIEGHT
FIRE STOP AT CEILING
HIEGHT
PARTITION TYPE C
FIRE RESISTANCE RATING = NONE
STC RATING = NONE
TYPICAL FURRING WALL
N/AN/AN/A N/A
BOTTOM OF STRUCTURE
ACOUSTICAL SEALANT,
BOTH SIDES
TOP OF STRUCTURE
5/8" GYP. BD.
EXISTING CONCRETE
ENCASE STEEL COLUMN
CEILING AS SCHEDULED
7/8" HAT TRACK
SE
CT
IO
N
PL
AN
V
IE
W
SE
CT
IO
N
3"49N/AN/A N/AN/A 49
N/A 5 1/2"
3"51N/AN/A ADDS 1/2" RESILIENT CHANNEL
RESILIENT CHANNEL (.2 WALLS ONLY)
N/AN/A 51 5 1/2"
5 1/2"
ADDS 1/2" RESILIENT CHANNEL
SINGLE SIDED GWB
RESILIENT CHANNEL (.2 WALLS ONLY)
ACOUSTICAL SEALANT,
BOTH SIDES
TOP OF STRUCTURE
5/8" GYP. BD.
3 5/8" METAL
STUD, 16" O.C.PL
AN
V
IE
W
SE
CT
IO
N
PARTITION TYPE D
N/AN/AN/AN/A
FIRE RESISTANCE RATING = NONE
N/AN/AN/AN/A SINGLE SIDED GWB
3'-1" FINISH HEIGHT
1" SOLID SURFACE WALL CAP
TYPICAL LOW WALL
SE
CT
IO
N
FIRE SEALANT, BOTH
SIDES
TOP OF STRUCTURE
(3) LAYERS 5/8" FIRE CODE X
GYP. BD.
25 GA 2 1/2" C-T
STUD, 24" O.C.
SE
CT
IO
N
PL
AN
V
IE
W
SE
CT
IO
N
PARTITION TYPE E
N/AN/AU4152 HR
FIRE RESISTANCE RATING = 2 HOUR
BOTTOM OF STRUCTURE
DEFLECTION TRACK
FIRE SEALANT,
BOTH SIDES
1" GYP. BD. SHAFT LINER
ACOUSTICAL SEALANT,
BOTH SIDES
TOP OF STRUCTURE
(2) LAYERS 5/8" FIRE CODE X GYP. BD.
3 5/8" METAL
STUD, 16" O.C.
CEILING AS SCHEDULED
3 1/2" SAB
SE
CT
IO
N
PL
AN
V
IE
W
SE
CT
IO
N
PARTITION TYPE F
U4191 HR
FIRE RESISTANCE RATING = 1 HOUR
STC RATING = 49
BOTTOM OF STRUCTURE
DEFLECTION TRACK
ACOUSTICAL SEALANT,
BOTH SIDES
FIRE STOP AT CEILING
HIEGHT
3"49
3/4" AC GRADE
FR PLYWOOD
(IN IT ROOM ONLY)
ACOUSTICAL SEALANT,
BOTH SIDES
TOP OF STRUCTURE
(2) LAYERS 5/8" FIRE CODE X GYP. BD.
EACH SIDE
6" METAL STUD,
16" O.C.
CEILING AS SCHEDULED
6" SAB
SE
CT
IO
N
PL
AN
V
IE
W
SE
CT
IO
N
PARTITION TYPE G
U4192 HR
FIRE RESISTANCE RATING = 2 HR
STC RATING = 50
BOTTOM OF STRUCTURE
DEFLECTION TRACK
ACOUSTICAL SEALANT,
BOTH SIDES
FIRE STOP AT CEILING HIEGHT
6"50
VA FORM 08 - 6231
CONTRACT DOCUMENTS
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
A603
PARTITION TYPES & SCHEDULE
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
I101
FINISH SCHEDULE AND MATERIAL
LEGEND
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
I102
SIGNAGE DETAILS
TYPE 2 TYPE 3TYPE 1
TYPE 4
Floor
Walls Ceiling
Base Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
VA FORM 08 - 6231
CONTRACT DOCUMENTS
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
I103
FINISH FLOOR PLAN - GROUND
Floor
Walls Ceiling
BaseFloor
Walls Ceiling
Base Floor
Walls Ceiling
Base Floor
Walls Ceiling
Base Floor
Walls Ceiling
BaseFloor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base Floor
Walls Ceiling
Base Floor
Walls Ceiling
Base Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base Floor
Walls Ceiling
Base Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
Floor
Walls Ceiling
Base
VA FORM 08 - 6231
CONTRACT DOCUMENTS
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
I104
FINISH FLOOR PLAN - FIRST
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
I105
FINISH CEILING PLAN - FIRST
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
I106
PROPOSED PERSPECTIVES
GROUND FLOOR - MSA AREA GROUND FLOOR - MY HEALTHE VET TRAINING
FIRST FLOOR - MSA AREA FIRST FLOOR - OFFICE FIRST FLOOR - CORRIDOR
GROUND FLOOR - MSA AREA INSIDE
SUBMISSION
Office of Construction and Facilities Management
ARCHITECT/ENGINEERCONSULTANT
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
I107
FINISH BOARD
ABV Above ADDL Additional ADH Adhesive ADJ Adjacent, Adjustment AESS Architecturally Exposed
Structural Steel AFF Above Finished Floor AGG Aggregate ALT Alternate ANCH Anchor APRX Approximate AR Anchor Rod ARCH Architect(ural) BOT, B Bottom B/ Bottom of B-B Back-to-Back BAL Balance BCE Bot Chord Extension BEL Below BF Braced Frame BLDG Building BLK(G) Block(ing) BM Beam BP Base Plate BR Brace(ing) BRDG Bridging BRG Bearing BRK Brick BRKT Bracket BS Both Sides BSMT Basement BT Bent BTWN Between BYD Beyond CAIS Caisson CANT. Cantilever CAP. Capacity C-C Center-to-Center CE Concrete Encased CHAM Chamfer CI Cast Iron CIP Cast In Place CJ Control/Contraction Joint CL Centerline CLG Ceiling CLR Clear CM Construction Manager CMU Concrete Masonry Unit COL Column COMB. Combined COMP Composite CONC Concrete COND Condition CONN Connection CONST Construction CONT Continuous CONTR Contractor COORD Coordinate COV Cover CP Cap Plate CSK Countersunk CTR Center(ed) CY Cubic Yard DBL Double DEMO, (D) Demolition/Demolish DEPR Depress(ed)/Depression DET(S) Detail(s) DEV Develop/Development DIA, Diameter DIAG Diagonal DIM(S). Dimension(s) DIR Direction DK Deck DL Dead Load DN Down
do. Ditto DP Deep DWG(S) Drawing(s) DWL Dowel
(E) Existing EA Each EE Each End EF Each Face EJ Expansion Joint EL Elevation ELEC Electrical ELEV Elevator EMBED Embedment/Embedded ENGR Engineer EOD Edge Of Deck EOS Edge Of Slab EQ Equal EQP Equipment ES Each Side EXCAV Excavate/Excavation EXP Expansion EXT Exterior EW Each Way F/ Face of FAB Fabricate FDN Foundation
STANDARD ABBREVIATIONS
FIN. Finish(ed) FL Floor FLG Flange FP Fireproofing FRMG Framing FRP Fiber-Reinforced Polymer FS Far Side FT Feet FTG Footing FUT Future GA Gage GALV Galvanize(d) GC General Contractor GR Grade GYP Gypsum HDR Header HEF Horizontal Each Face HGR Hanger HI. High HIF Horizontal Inside Face HK Hook(ed) HOF Horizontal Outside Face HORIZ Horizontal HP High Point HSB High Strength Bolt HT Height H&V Horizontal & Vertical HVAC Heating, Ventilating, & Air Conditioning I.D. Inside Diameter I.F. Inside Face INFO Information INSTL Install/Installation INSUL Insulation INT Interior JST(S) Joist(s) JT Joint k Kip (thousand pounds) KB Knee Brace LB, # Pound LDGR Ledger (board) LEN Length LG Long LL Live Load LLBB Long Legs Back to Back LLH Long-Leg Horizontal LLV Long-Leg Vertical LOCN Location LONGIT Longitudinal LP Low Point LSL Long-Slotted Hole, Laminated Strand Lumber LSV Long Side Vertical LVL Laminated Veneer Lumber LW Long Way LWC Light Weight Concrete M Moment MAS Masonry MATL Material MAX Maximum MECH Mechanical MFR Manufacturer MIN Minimum MISC Miscellaneous MO Masonry Opening MONO Monolithic MTL Metal NIC Not In Contract NO. Number NOM Nominal NS Near Side NTS Not To Scale NWC Normal Weight Concrete OC On Centers OD Outside Diameter O.F. Outside Face O-O Out-to-Out OPG Opening OPP Opposite OSB Oriented Strand Board OSL Outstanding Leg, Oriented Strand Lumber OVS Oversized-Hole PAF Powder Actuated Fastener PC Precast Concrete, Piece PCF Pounds per Cubic Foot PED Pedestal PERP Perpendicular PREFAB Prefabricate(d) PL Plate PLF Pounds per Lineal Foot PLYWD Plywood PMF Premolded Filler PROJ Project(ion) PSF Pounds per Square Foot PSI Pounds per Square Inch PSL Parallel Strand Lumber PT Preservative-Treated, Post-Tensioned PVC Polyvinyl Chloride QTY Quantity
R Radius RCMU Reinforced Concrete
Masonry Unit RD Roof Drain RDK Roof Deck REF Reference REINF Reinforce(d)/ Reinforcement REQ(D) Require(d) RET Retaining REV Revise(d)/Revision RO Rough Opening RQMT(S) Requirement(s) RXN Reaction SC Slip-Critical (connection) SCHED Schedule SECT Section SF Square Foot SFRM Spray-Applied Fire Resistant
Material SHRG Shoring SHTHG Sheathing SIM Similar SL Slope(d) SLBB Short Legs Back to Back SLV Sleeve SOD Slab On Deck SOG Slab On Grade SPA Space(s)/Spacing SPEC(S) Specification(s) SQ Square SS Stainless Steel SSL Short-Slotted Hole STD Standard STIFF Stiffener STIR. Stirrup STL Steel STRUC Structural SUPT Support SW Short Way SYM Symmetrical T Top T/ Top of T&B Top and Bottom TC Terra Cotta TCE Top Chord Extension TEMP Temporary, Temperature T&G Tongue and Groove THD Thread(ed) THK Thick(ness) TYP Typical UNO Unless Noted Otherwise U-P Underpinning V Shear VAR Varies VB Vapor Barrier VEF Vertical Each Face VERT Vertical VIF Vertical Inside Face, Verify In Field VOF Vertical Outside Face VR Vapor Retarder w/ With w/o Without WD Wood WI Wrought Iron WP Work Point, Waterproofing WT Weight WWF Welded Wire Fabric XS Extra Strong XXS Double Extra Strong ± Exist Dim or El (VIF)
SYMBOLS
FLOOR/ROOF CONSTRUCTION
SPAN DIRECTION w/ T/ SLAB
ELEVATION, SEE PLAN NOTES
LINTEL ABOVE (LOAD-
BEARING), SEE SCHEDULE
L_
SLOPE ARROW
SLAB STEP
SLAB SLOPE
SPOT ELEVATION
SEE PLAN NOTES.
6" SOD
RECTANGULAR BEAM WEB
PENETRATION SEE SCHEDULE
RWP#
CIRCULAR BEAM WEB
PENETRATION SEE SCHEDULE
CWP#
NEW GRID LINE
(E) GRID LINE
APPROXIMATE TEMPORARY
SHORE LOCATION
DIAGONAL OR HORIZ BRACE
DIMENSION. DOT SNAPS TO CL
OR GRIDS. TICK SNAPS TO EDGE
OR FACE OF OBJECT.
4" SOG CONCRETE SLAB ON GRADE
WITH TOP OF SLAB ELEVATION,
SEE PLAN NOTES.
L_ LINTEL MARK
INDICATES REINFORCE
EXISTING CONNECTION
SEE TYP DETAIL
RC
STRUCTURAL DRAWINGS LIST
SHEET
NUMBER DRAWING TITLE 25
D
ES
IG
N
SU
BM
IS
SI
ON
/11
/20
C
ON
ST
R
DO
CS
S
UB
MI
SS
IO
N
/28
/22
C
ON
ST
R
DO
CS
S
UB
MI
SS
IO
N
/02
0%
C
ON
ST
R
DO
CS
S
UB
MI
SS
IO
N
F
IN
AL
C
ON
ST
R
DO
CS
S
UB
MI
SS
IO
N
CO
NT
RA
CT
D
OC
UM
EN
TS
S
UB
MI
SS
IO
N
/12
/20
S000 GENERAL NOTES - STRUCTURE X X X X X
S001 DESIGN CRITERIA AND SCHEDULES X X X X X
S002 SPECIAL INSPECTIONS X X X X X
S003 SPECIAL INSPECTIONS X X X X X
S100 FOUNDATION PLAN X X X X
S101 GROUND FLOOR PLAN X X X X X X
S102 FIRST FLOOR PLAN X X X X X X
S103 THIRD FLOOR/ROOF PLAN X X X X X X
S300 SECTIONS AND DETAILS- GROUND FLOOR AND FOUNDATION X X X X X
S400 TYPICAL SECTIONS AND DETAILS- SUPERSTRUCTURE X X X X X
S401 SECTIONS AND DETAILS- SUPERSTRUCTURE X X X X X
S402 DUNNAGE PLAN AND DETAILS X X X X
KEAST & HOODC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONTRACT DOCUMENTS
SUBMISSION
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER STAMPCONSULTANT
321 4 5 6 7 8 9 10
1601 Kirkwood Hwy. Wilmington, DE 19805
12.12.2022
PTF TOM
VA Wilmington - Addition for Mental Health
FULLY SPRINKLERED
460-325
S000
GENERAL NOTES - STRUCTURE
GENERAL
1. These notes highlight but do not replace the specifications contained in the Project Manual.
2. The applicable building code is 2021 IBC.
3. Refer to the Design Loads and Factors table, this sheet, on sheet S001 for code required loads for the project.
4. Refer to the Special Inspections tables on sheets S002 & S003 and the Special Inspections forms for special inspection requirements for the project. Work the Special Inspections Table in conjunction with the specifications.
5. Contractor is solely responsible for means and methods during the course of the work. Do not damage or endanger the structural integrity of the Work or Existing Structure.
6. Contractor shall be responsible for the proper and safe design of shoring systems for trenches and excavations.
7. Notify Engineer in case of discrepancies between drawings, and these notes, and Project Manual before proceeding with the work.
8. Use architectural drawings and drawings of other disciplines in conjunction with the structural drawings to properly perform the work.
9. If conditions disclosed during excavation and demolition reveal unforeseen conditions, promptly request direction from Architect or Engineer before proceeding.
10. Contractor is responsible for coordinating between trades.
11. Do not scale drawings.
12. Field dimensions
A. If structural drawings are used for laying out column centers and wall lines, all dimensions shall first be verified with the architectural drawings. Layout shall be closed before work is begun.
B. Verify all dimensions and accurately locate all existing columns, bearing walls, and other structural members before beginning work or preparing shop drawings.
13. Sections and details shown, while drawn for specific locations, are intended to establish the general types of details to be used throughout.
14. The Engineer's review of a submittal shall not relieve the Contractor of their responsibility to follow the intent of the contract drawings.
DELEGATED DESIGN ITEMS
1. Employ or retain a licensed professional engineer in the project jurisdiction to design and detail the following performance specified structural components:
A. Concrete mix design B. Helical pile design C. Shoring / Scaffolding D. Temporary excavation support E. Cold formed steel framing F. Stairs and railings
2. See individual material sections for additional requirements.
EXISTING BUILDING/STRUCTURE NOTES
1. Existing building conditions have been established based on existing structural drawings prepared by Massena & DuPont
Architects & Engineers dated 11/15/1947. The contractor shall reference these drawings for existing structural information not shown. These drawings are available from the Owner upon request.
2. Utmost care shall be exercised at all times when working on existing structural members and masonry walls to avoid impairing the carrying capacity of the existing structure.
A. Should the Architect or Engineer determine that the carrying capacity of the existing structure has been impaired by, or as a result of, the operations of the Contractor, or is otherwise not in conformance with the contract documents, appropriate remedial work shall be required.
B. Any damage resulting from the operations of the Contractor shall be repaired as directed by the Owner's representative at no additional cost to the Owner.
3. Notify the Architect or Engineer before cutting or removal of any part of the existing structure not indicated to be modified or demolished.
SITE PREPARATION
1. Locate and mark all underground utility lines before starting work and call all local jurisdictions having authority and Miss Utility
800-282-8555.
2. Provide for the proper and safe design and installation of all sheeting and shoring excavation support systems. All sheeting and shoring systems shall be designed by a professional engineer engaged by the Contractor and registered in the state of the project. Submit signed and sealed shop drawings and calculations to the Engineer for review.
3. Permanent or abandoned timber lagging must be preservative treated prior to use to prevent insect infestation.
4. Submit plan for dewatering to the geotechnical engineer for review.
A. Construct and maintain a series of ditches and sumps to remove ground water from the working area.
B. Install a complete system of well points around the working area; this system to be kept in continuous operation during excavation and construction of foundations, slabs, and backfilling.
5. Discharge pumped water as directed by owner and in accordance with applicable federal, state & local regulations.
FOUNDATIONS
1. Foundations are designed for helical piles with an allowable axial compression of 15 tons (30 kips). Existing geotechnical test boring logs and test pile drawings dated 11/15/1947 will be provided. The helical piles shall be designed by the contractor's engineer.
2. Special inspector certified in geotechnical inspection shall inspect and report on adequacy of helical piles.
3. Foundations should be cast on the same day in which excavation for them is completed. If placing of concrete is delayed, foundation bottoms shall be trimmed to firm material immediately before casting.
4. Place concrete in dry excavations only. Note soil and water conditions as shown by borings and depths of foundations as shown on foundation plans. Pending approval by the Owner, Contractor may elect to conduct further subsurface investigations at their own expense.
5. Grade beam sides shall be formed; earthen sides are not permissible.
6. Refer to specifications and architectural drawings for waterproofing details and procedures.
7. Structural fill:
A. Shall be placed in maximum of 8" loose lift thickness and compacted to 95% of Standard Proctor in accordance with ASTM D698.
B. Tests shall be performed for each lift at a rate of two tests per lift minimum.
REINFORCED CONCRETE
1. Concrete construction shall follow requirements of the project specifications and ACI 301 "Specifications for Structural
Concrete".
2. Detail, fabricate and place reinforcing and bar supports in accordance with the provisions set forth by the American Concrete
Institute and the CRSI "Manual of Standard Practice."
3. Provide shop drawings showing full information for reinforcing placement. Develop all member elevations and sections with pertinent elevations given, to clearly indicate the position of the reinforcement and construction joints, without reproducing sections, plans, or elevations from the design drawings.
4. Reinforcing steel shall conform to ASTM A615, Grade 60. Reinforcement to be welded shall conform to ASTM A706.
5. Length of reinforcing bars, if shown, does not include hooks.
6. Mechanical splice couplers shall conform to ACI 318, Type 1, tension-compression type couplers. Coupler to be same material as reinforcing bar being spliced. Submit product information and ICC-ES Evaluation Report.
7. Welded wire fabric shall conform to ASTM A1064.
8. Concrete properties: See schedule on sheet S001.
9. Clear cover for cast-in-place concrete reinforcing: See schedule on sheet S001.
10. Reinforcement not shown on sections and plans is the same as that shown in similar sections and at similar locations.
11. Extend reinforcing through construction joints or provide dowels equal in size and number to bars in the doweled member.
Develop or splice dowels on each side of cold joint according to the reinforcing development length tables on S001 and respective typical details.
12. Use stirrup and tie bending radii for all #3 through #5 bars.
13. Ties and stirrups:
A. Provide closed stirrups in all beams.
B. Provide pedestal ties as scheduled.
14. Slabs on Grade:
A. Unless otherwise noted, slab on grade shall be reinforced with 6x6, W2.0 x W2.0 WWF, lapped 6" on all sides, set 1 1/2" below top of slab.
B. Provide premolded joint filler where slab abuts vertical surface ex: columns, pedestals.
15. Slabs on Deck:
A. See plan for supported slab on deck and reinforcement information.
B. Contractor shall make allowances for additional concrete required due to deflection of the steel deck from the dead weight of concrete and construction loading in accordance with SDI guidelines.
C. Use wet screed to obtain constant thickness of concrete above beams. Do not laser level or laser screed floor surface.
D. Do not install contraction joints in supported slabs.
16. Allow concrete (including concrete fill on metal decks) to dry as required by floor finish/adhesive manufacturer before installing finishes. Test slab for moisture content and/or moisture vapor evaporation rates per ASTM E 1907 to verify adequate dryness in accordance with the flooring manufacturer’s preparation requirements. Refer to ACI 302.1R and NRMCA CIP 28 for further discussion.
17. Contractor shall notify Owner's inspection agency before placement of concrete to allow for inspection of reinforcing placement, clearance, stud quantities on steel beams, and to confirm debris has been removed from forms.
18. Refer to ACI 301 and special inspections table for testing requirements.
STRUCTURAL STEEL
1. Detail, fabricate, and erect structural steel in accordance with AISC 360 and AISC 303 “Code of Standard Practice”.
2. Structural steel design is based on the Load and Resistance Factor Design (LRFD) methodology. All loads shown on drawings are factored loads, unless noted otherwise.
3. The structural steel detailer shall develop all elevations, plans, and sections without reproducing same from the design drawings.
Detailer shall adequately cross reference the structural drawings to the satisfaction of the engineer. All shop drawings shall be submitted for review and review comments incorporated prior to fabrication.
4. Materials shall conform to the following:
ASTM A36 Bars, rods, angles, channels and plates ASTM A992 W and WT shapes ASTM A53, Grade B Pipes ASTM A500, Grade C Hollow Structural Sections ASTM A325 High strength bolts ASTM F1554 Grade 36 Anchor Rods AWS A5.1 E70XX Welding electrodes ASTM A108, AWS D1.1, Type B Shear Connectors (headed) ASTM A36 All other structural shapes
5. All bolts shall be 3/4" dia., ASTM A325 high-strength bearing, type N bolts, unless noted otherwise.
6. All bolts, nuts, washers and related hardware for exterior and other galvanized steel construction shall be mechanically galvanized according to ASTM B695, Class 55.
7. Electrodes shall be suited to grade and weldability of base metal.
8. Remove galvanizing from steel in the area of field welding. Repair abraded surfaces and coat weld with zinc-rich coating.
9. Steel framing shall be properly guyed, aligned and plumbed within AISC tolerances before proceeding with final connections.
10. Provide 1/4" setting/leveling plates under all steel columns, unless otherwise noted.
11. Furnish anchor rods with leveling nuts when leveling plate is not utilized.
12. Base plates shall be shop welded to columns.
13. Provide a survey of in-place anchor bolt locations to the steel fabricator. Adjust anchor bolt holes accordingly before fabrication of column base plates and delivery to the site.
14. All cap plates shall match flange thickness of beam above (1/2" minimum thickness) for beams bearing on columns.
15. Cap all HSS and pipe columns with 1/4" plate.
16. Punch or drill holes for architectural and mechanical details in shop. See other drawings for location.
17. Field cutting or burning of structural steel is prohibited.
18. Steel deck shall be manufactured by a member firm of the Steel Deck Institute (SDI) and shall be detailed, fabricated and erected in accordance with SDI specifications.
A. See plans for steel deck type, depth and gauge.
B. Attach steel deck to supporting steel and fasten side laps in accordance with the specifications.
C. Deck gauges indicated are minimums based on three span conditions. Contractor shall verify all steel deck shoring requirements and provide temporary shoring in accordance with the steel deck manufacturer. The contractor may elect to provide heavier deck gauges to reduce temporary shoring requirements.
19. Structural steel to be encased in concrete shall be unpainted and wrapped with 6 x 6, W1.4 x W1.4 WWF.
20. See architectural drawings for additional steel not shown on structural drawings.
21. Cap all exterior HSS and pipe sections and galvanize. Seal weld to end of member. Fill all vent holes after galvanizing by plugging with zinc solder and filing off smooth Maintain permanent weep holes at the base of exposed columns and beams.
22. Galvanize exterior exposed steel in accordance with ASTM A 123. Repair scratched or abraded galvanized surfaces with zinc-rich coating. After galvanizing, straighten members to meet AISC standard mill tolerances.
23. Galvanize all lintels, shelf angles, beams and plates (including their associated shims, bolts and accessories) in direct contact with the exterior wythe of masonry. Additional members/assemblies shall be galvanized where noted on the drawings.
24. Where plates, angles or other miscellaneous members require welding (either field or shop) or slip-critical connections, mask connection surfaces prior to shop priming and touch-up with primer after completing connection.
MASONRY
1. Masonry shall be constructed in accordance with TMS 602.
2. All concrete masonry units shall conform to ASTM C90. Provide two-cell units, unless noted otherwise on plans.
3. Compressive strength (f'm) of all concrete unit masonry assemblies shall be 2000 psi at 28 days.
4. Concrete Unit Masonry Strength: Compressive strength of concrete unit masonry (f'm) may be determined either by strength or individual units, grout strength, and mortar type in accordance with TMS 602 article 1.4.B.2.b or by prism test method in accordance with TMS 602 article 1.4.B.3. Submit data and test results to validate masonry system strength via one of the two referenced methods.
5. Use ASTM C270, Type S mortar below grade.
6. Use ASTM C270, Type S mortar for CMU above grade.
7. Use ASTM C270, Type N mortar for veneer.
8. Lay CMU in piers, columns, pedestals and partially-grouted walls with face shells and webs fully bedded in mortar. Align vertical cells to be grouted. Fully-grouted walls may be bedded with face shells only.
9. Grout for masonry shall conform to ASTM C476 with a minimum 2000 psi compressive strength at 28 days. Provide coarse grout unless dimensions of grout spaces and pour heights dictate fine grout according to TMS 602/ACI 530.1/ASCE 6.
10. See architectural drawings for other masonry requirements.
11. Lintels for non-bearing walls are shown in loose lintel schedule on sheet S001.
12. Install ladder-type joint reinforcement at 8" o.c.. Discontinue joint reinforcing at control joints.
13. Provide adjustable wall ties to tie face wythe to masonry backup.
14. Rebuild masonry jambs when saw cutting new openings into existing masonry walls. Provide an allowance in bid/pricing for this work.
15. Coordinate control and expansion joints with architectural drawings and recommendations of the Brick Industry Association and the National Concrete Masonry Association.
16. Provide shop drawings showing full information for reinforcing steel placement.
A. Reinforcing steel detailer shall adequately cross reference the structural drawings to the…