This document appears to be a set of responses to questions related to a federal contract opportunity for the construction of an addition for mental health at the Wilmington, Delaware VA Medical Center. The key details are:

The contract opportunity involves renovating and infilling an auditorium to create administrative space to support the expansion of the mental health program at the VA medical center. The project includes demolition, construction, HVAC, electrical, and other associated work. The solicitation number is 36C77624R0086_1 and it is being issued by the VA Technology Acquisition Center in Austin. The document provides clarifications and additional information in response to over 100 questions from potential offerors covering topics such as construction materials, equipment, phasing, project requirements, and contractor responsibilities. It also references a deductive bid item for partially shelling the ground floor. Overall, the document provides comprehensive technical details and responses to address inquiries from contractors interested in this federal construction project opportunity.

View the file

Other files

File Type Posted
Amend 0006 - 36C77624R0086 0006.pdf PDF
Amend 0006 - 014529 Testing Laboratory Services.pdf PDF
Amend 0005 - Contents of Zip File.docx DOCX document
Amend 0005 - Response Attachments.zip ZIP file
Amend 0005 - 36C77624R0086 0005.pdf PDF
Amend 0005 - Wage Det 8.15.24.pdf PDF
Amend 0004 - 36C77624R0086 0004.pdf PDF
Amend 0003 - 36C77624R0086 0003.pdf PDF
Amend 0002 - 21-1302 VA Wilmington Final.pdf PDF
Amend 0002 - Limitations on Subcontracting.docx DOCX document
Amend 0002 - Technical Responses.pdf PDF
Amend 0002 - 36C77624R0086 0002.pdf PDF
Amend 0002 - Wage Determination 7.29.24.pdf PDF
Amend 0002 - Sign-in Sheet Rear.pdf PDF
Amend 0002 - 071352 Built Up Bituminous Waterproofing.docx DOCX document
Amend 0002 - ICRA.pdf PDF
Amendment 0001 - 36C77624R0086 0001.pdf PDF
Amendment 0001 - Wage Determination 7.16.24.pdf PDF
Amendment 0001 - Site Visit Sign-In Sheet.pdf PDF
S02 - Att 02 - Specs Vol 2 6.25.24 - Mental Health Addition.pdf PDF
S02 - Att 01 - Specs Vol 1 6.25.24 - Mental Health Addition.pdf PDF
S02 - Att 06 - Wage Determination 6.25.24.pdf PDF
S02 - Att 07 - CD Drawings.pdf PDF
S02 - Att 03 - CD Submission Design Report - Mental Health Add - Wilmington.pdf PDF
S02 - Att 04 - SOW 6.25.24 - Construct - Mental Health Addition.docx DOCX document
S02 - Att 05 - Limitations on Subcontracting.docx DOCX document
S02 - 36C77624R0086_1 6.26.24.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Key: Revised Responses 8/15/24

#QuestionAnswer
1There are plans for Polished Concrete floors, but there isn't much detail provided about them. Could you please provide more information about your expectations for this project.The rooms that are scheduled with P-CONC as a finish are maintenance type spaces that need a floor that is sealed and dust free and meet minimum criteria as noted in te VA.Til.
2For rooms 164 and 165D – what is base RMB-1?This has been corrected to read "RB-1"
3Drawing I103 - Rooms 164 & 165D – finish schedule & finish box state flooring to be LVT1, however graphic shows CPT1. What is correct flooring?Room 164 is to have CPT-1 as the floor finish. 165 D is to have LVT1 as the floor finish.
4Window type A is to match existing; do we know the spec for the existing windows?The specifications, ground and 1st floor window drawings is included for clarification
5What is the basis of design for window types C and D? The section detail 2/A501 says to refer to the plan for the window spec, but the plan does not specify anything.Window types C & D are for the MSA, it needs to slide as shown on the interior elevations, per VA comments. No cutsheets exist. This is a Wilmington VA standard.
6Should we assume that Window type B is a hollow metal frame?Window Type B is a HM frame
7Document “S02 – Att 05 - Limitations on Subcontracting” references “Construct Community Living Center” in the header of the document, not “Addition for Mental Health”.PCAC: An updated Att05 has been included with the correct project name "Addition for Mental Health"
8Drawing I102 – The type “4” sign detail is obscuring the 2nd signage schedulePettit Group has corrected this issue an will reissue this sheet
9Drawings A402, A404, A407, A408, A409 – WC-1? Is this supposed to be AWC-1?Correct - the finish should be AWC-1
10Spec. Section 07 27 27 – Fluid Applied Membrane Air Barriers, Vapor Retarding. Please provide more information on where tis is being applied? Is this the same as the polyethylene vapor retarder shown on detail A/S300?Spec Section 07 27 27 would be applicable where portions of the facades are being infilled. This is not the same as the polyethylene vapor retarder shown on detail A/S300. Refer to attached specification for the polysthlyene vapor barrier.
11Confirm that there are no auto door operators included in this project. For reference, the description for door hardware type 12C in spec section 08 71 00 states that “ALL HARDWARE BY SECTION 08 17 10, INTEGRATED DOOR ASSEMBLIES AUTO DOOR OPERATOR AND CONTROLS BY SECTION 08 71 13, AUTOMATIC DOOR OPERATORS.” However, the description for door hardware type 12C in spec section 08 17 10 doesn’t include door operators. Please advise.Door opertaors are required for this project. Doors 1120 on the first floor leading into the consult room area.
12Please provide more information regarding the Deductive Item #1 scope of work: a. Are all interior walls that extend from the Ground Floor to the 1st floor still being demolished? b. Will stairwell 166 be constructed? c. Will new Ground Floor windows, including window sills (precast and solid surface) and window treatments, still be installed?All interior and perimeter walls and all associated mechanical, electrical and plumbing components whithin the ground floor auditorium will be demolished. However, all supporting structural framing, piles, footing etc. that supports the construction and framing of the 1st floor will need to be maintained/constructed. It is the intention of Bid Deduct #1 to completely demolish all of the non-essential components of the ground floor that does not support framing or bearing support of the 1st floor. This scope will still include Infilling the ground floor so it is leveled (not sloped towards the west side and level with the corridor), apply perimeter drywall (finished, fire rated as required and insulated along colums H, P and 9), lighting, HVAC, sprinkler system, constructing a finish barrier between ground floor ceiling and the 1st floor, and providing a double door entrance into the shelled space. Additionally, the new stairway (166) from the 1st floor to the ground floor is still required along with the associated exterior entrance. Windows on the ground floor elevation is not required as part of this Deduct. To be clear, this bid deduct does not eliminate any scope on the 1st floor.
13Where in the mechanical room is the tar vapor barrier located that is mentioned in the Hazardous Material Survey Report?After reviewing the chains of custodies (COC), versus the analysis report for the referenced tar vapor barrier,it was noted that the COC line for 09-18 was blank, so the third-party lab likely assumed that it was ’ditto’ to the previous line for sample 08-17. The main entrance to the mechanical room location appears to be referring to the door caulk 08-17 and 08-16; hence the main entrance description. Vapor barrier located in mechanical room 3092 for sample 09-20 has the positive results (8%). So, 09-19 is inconsequential from a results and location standpoint since it’s homogeneous to the 09-20 sample, which was positive for asbestos. Without seeing the material by being onsite since 2021 we cannot 100% guarantee that the vapor barrier is a black coating on the mechanical room walls. But, from our experiences, a tar vapor barrier is a building material coated on walls and floors and rarely but occasionally on ceilings. The bidding contractors will have to be advised of any black tar vapor barriers in the MER that they have to penetrate for equipment installation or old equipment demo will have to be removed by an abatement contractor prior to impact. The other equipment’s samples all appear as non-asbestos materials. We train our inspectors to specifically identify and describe the materials if it’s on equipment. Vapor barriers are not a mechanical equipment material. But we would not quote that in an RFI. So, in general all black tar barriers found in the MER 3092 need to be addressed as ACM.
14Would the lead paint also mentioned in the Hazardous Material Survey Report be considered Lead In Construction?Yes
15Drawing T-501 – Technology Symbols calls for a wireless panic button. The hospital standard is a panic button hardwired into the existing Lenel or Bosch Intrusion System.Provide hard-wired panic buttons that are compatible with the hospitals existing duress system. This hardwired system needed to be compatible with the Hospital's exisiting LENEL physical security system.
16Does the existing Lenel Access Control Panel have room for expansion?Depending on the quantity of new access card location an expansion may be needed.
17Drawing T-502 – The camera spec is not clear (cameras are labeled as A1)Refer to Figure 1 below`
18Drawing T-502 – Does this project require new NVR?New cameras will need to be on Avigilon system, new NVR for the renovated 1st floor will be required.
19Drawing T-502 - Is Security Cabling required to be in conduit?Where inaccessible, such as walls or above gyp board ceilings, conduits shall be provided. Conduits/sleeves shall also be provided at penetrations. EC to provide conduits & sleeves
20Solicitation Section 2.13 states “Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements.” a. What is the badging process at the VAMC? b. Is there any cost to the contractor associated with badging?Prime contractors should have PIV badging since they work with the government on multiple projects. Subcontractors and their employees can check in with VA Polcie on a daily basis and be provided with a temporary "DAY BADGE".
21Spec Section 01 00 00 1.11C states “A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA Medical Center.” Can the referenced soil report be provided?No Soil Report exists
22Spec 01 00 00 1.18 states “Contractor will not be allowed the use of existing elevators. Outside type hoist shall be used by Contractor for transporting materials and equipment.”In addition to an outside hoist the freight elevator can be utilized.
23Is the contractor permitted to use existing elevators to access the second-floor work areas? If so, which existing elevators is the contractor permitted to use? If not, how is the contractor to access the work area?Freight Elevator will be available for usage.
24Spec section 01 00 00-1.24.E discusses equipment furnished by the government that requires partial assembly. What equipment is the government providing that requires assembly by the contractor?No GFE schedule equipment is included in the construction set of documents.
25Spec section 01 00 00 1.27 Photographic Documentation requires detailed project photos by an experienced commercial photographer or subcontractor. Is this required?YES, this is required for existing conditions in the future.
26Spec 01 33 23 1.6E states “Provide electronic documents over 5MB through an electronic FTP file sharing system.” Is Procore acceptable?YES, ProCore is used by the VA on multiple projects.
27Spec section 01 35 26 1.7C states “the SSHO has to be a separate qualified individual from the Prime Contractor’s Superintendent and/or Quality Control Manager with duties only as the SSHO.” Please confirm this project requires a full-time superintendent on-site and a separate full-time SSHO on-site.YES, that is the requirement.
28Spec section 01 35 26 1.9B requires monthly inspections by a CSP. Please confirm this is required.YES.
29Spec section 01 35 26 1.12 is missing a designated ICRA class. What is the ICRA classification for this project?The Infection Control Risk Assessment (ICRA) was included in the submitted Design Report (Cat. III/IV) . Refer to attached copy.
30Spec section 01 45 00 requires the CQC System Manager to be on site at all times during construction. It also requires the CQC Manager to have completed the Construction Quality Management (CQM) for Construction course. Is the project superintendent permitted to act as the CQC System Manager? Please confirm the CQC Manager is required to have completed the Construction Quality Management (CQM) for construction course.Superintendent can fill both roles. Superintendent must have completed the CQM course prior to starting the project.
31Spec section 01 45 29 3.9 states “approximate number of tests required,” however, the quantities are left blank. Can this information be provided?Keast & Hood - Quantities will be infilled in the next submission.
32Spec section 01 45 35 1.4H describes when a Special Inspector of Record (SIOR) is required. Is an SIOR required for this project?YES.
33G002 General Note #15 states “Contractor to submit shop drawings prepared by licensed professional engineer which is retained by prime contractor at no additional cost to the government.” What PE stamped shop drawings are required for this project?All Structural design, Fire suppression and Fire Alarm

Keast & Hood - Concrete mix designs, helical piles, cold-formed steel framing, stairs & railings, shoring & scaffolding, and temporary excavation bracing.

34AD101 General Note R states “IC permit required prior to start of any demo.” Is there any anticipated cost to the contractor in acquiring this permit?NO.
35AD101 General Note T states “Contractor is responsible for all temporary lighting as needed.” What temporary lighting is needed?Temporary lighting for a safe work area per OSHA guidelines is required.
36AD101 General Note A states “All work to be completed following Class III infection control guidelines.” However, A106 General Note A states “All work to be completed following class III/IV infection control guidelines.” What is the ICRA classification for this project?Same answer as question #29. This will likely be a Level III/IV ICRA
37A109 includes a furniture schedule and a divider schedule. a. Are these items to be furnished and installed by the contractor? b. If so, can a basis of design be provided for these items?No
38Spec 12 24 00 does not provide a basis of design. Can a basis of design be provided for the roller shades shown on A113?Window Shade - Manuf.: Mecho Shade Systems Slyle: M5 Manual Chain Operated Fabric: 0813 Silver Birch ( Blackout)
39At the site visit there were pallets and boxes in the ground floor auditorium. a. Are these items to be removed prior to the start of this project? b. If not, how is the contractor to handle these items?All pallets and boxes will be removed by the VA prior to construction start.
40Where will the contractor be permitted to place a dumpster? How far will it be from the demolition area?Dumpster will be adjacent to building by the old Valet Entrance.
41When the rear exterior of the auditorium is marked off as a construction zone, are there any traffic control requirements for the access road adjacent to the auditorium? What are those requirements?One lane vehicular traffic shall be maintained at all times. In the event of a necessary shutdown, this shall be coordinated with the VA staff TWO weeks in advance.
42Is there a Hazmat Report or other document that details asbestos/vermiculite/lead paint locations?Full Report was provided in the Design Report. See attached Copy
43Please confirm that the Offerors response to Volume I Technical Proposal and associated Factor 1 Technical Experience, is limited to the prior projects data specifically detailed in Sections 2.8.C and 2.8.E.PCAC: We are confiming that offeror responses must adhere to the data oulined within the instructions to offerors and evaluation factors.
44Tempered Glazing is noted on the Door Schedule (Drawing A601) for the following opening numbers of Door Panel Type D: 165E, 165G, 165J, 165L, 1127, and 1128. What Glazing type is required for the following opening numbers of Door Panel Type D: 163, 164, 165, 165I, 165K, and 1129? Please advise.Tempered Glazing is required for pening numbers of Door Panel Type D: 163, 164, 165, 165I, 165K
45Elevations of Window Type 103 appear to possibly indicate trim (9/A401, 4/A402, A601). Please provide frame profiles or sections.No trim is required
46Numerous Specification Sections reference “Section 09 06 00, Schedule for Finishes” for, amongst other things, “Basis of Design”. This Section is not found within the documents. Please advise.Pettit Group reccommends the Wilmington VA furnish the GC wit the Design Narrative which contains this information.
47The scope of Exterior Windows, (Types 100, 101, and 102) includes Drawing reference to “Match Existing”. Please provide specification data.See answer to question # 4. Specification is provided.
48Please confirm that Floor Finishes shall be provided as scheduled on Finish Schedule and Material Legend, Drawing I101, and also scheduled on Finish Floor Plans, Drawings I103 and I104, and not necessarily that indicated by the “Flooring Material Legend” on Finish Floor Plans, Drawings I103 and I104, for example, Rooms 164 and 165D (poche inconsistency).GC to follow the responses above for any conflicts in graphpic and written descrition. Any other cases where graphic and written finish do not match should be brought to the attention of the A/E for further clarification.
49Please confirm that there is no Floor Finish Treatment required for Room 1132B, Shaft / Mechanical Area.The finish in this area is to be P-CONC
50Finish Schedule and Material Legend, Drawing I101, indicates Ceiling Type AEC for Room 164, VE Supervisor, however, Reflected Ceiling Plan, Drawing A113, indicates Ceiling Type ACT-1. Please advise.The ceiling finish in this room is to be ACT-1
51Please confirm that there is no Ceiling Finish Treatment required for Room 162, HAC, Room 166, Stairwell, Room 181A, Electrical Room, Room 233, Stairwell, Room 233, FHC, Room 1132B, Shaft / Mechanical Area, and Room 301, Mechanical Room.Confirmed, exposed structure/ceiling/open ceiling for rooms 162, HAC, Room 166, Stairwell, Room 181A, Electrical Room, Room 233, Stairwell, Room 233, FHC, Room 1132B, Shaft / Mechanical Area, and Room 301, Mechanical Room.
52How does Drawing I105, Finish Ceiling Plan – First Floor, differ from Drawing A114, Reflected Ceiling Plan – First Floor, relative to Ceiling Finish requirements?I105 locates the specialty ceiling tile (SKY FACTORY PANELS) graphically for the end user
53Reflected Ceiling Plan Keynote Number 1 is indicated at 4 of the new Window locations on Drawing A113. Reflected Ceiling Plan Keynote Number 1 is NOT indicated at any of the 9 new Window locations on Drawing A114. Please confirm requirements.A113 RCP Keynote #1 is applicable to all windows on A114 RCP.
54Sign Type 4 on Drawing I102, Signage Details, is covering a significant portion of the Signage Schedule. Please advise.DUPLICATE
55Please confirm that the WC-1 designation shown on Elevation Detail 9/A402 pertains to a wainscot finish.DUPLICATE
56Please advise if WC-1, AWC-1, HR-1, or RB-1 are required at the North Walls of Room 165D, Bene-Travel Training.RB-1 is to be installed
57Please confirm WC-2 or AWC-2 at the West end of Elevation 5 at Corridor 104, Drawing A404.The finish is AWC-2
58Please confirm WC-2 at the West end of Elevation 3 at Corridor 202, Drawing A409.The finish is AWC-1
59The Room Finish Schedule on Drawing I101 indicates “AWC-1” for Wainscoting at Corridor 161, however Elevations 5 and 6 on Drawing A404 indicate “WC-1”. Please advise.DUPLICATE
60The Room Finish Schedule on Drawing I101 indicates “AWC-1” for Wainscoting at Corridor 1124, however Elevations 1, 2, 3, and 4 on Drawing A408 indicate “WC-1”. Please advise.DUPLICATE
61Elevation 3 on Drawing A405 and Elevation 7 on Drawing A408 indicate finish “AWC-1” however Elevation 8 on Drawing A408 indicates “WC-1”. Please advise.DUPLICATE
62The “Schedule For Finishes” on Drawing I101 does not include data for Finish “WC-1”. Please advise.DUPLICATE
63Closet 165B on Drawing A110 is not identified as “SH-1” please confirm.Shelving is not required in room 165B
64Please confirm that the following Furniture items indicated and scheduled on Drawings A109 and A110 are Provided (Furnished and Installed) by the VA, “Type Mark”: F-1, F-2, F-3, F-4, F-5, F-6, F-7, F-8, F-9, and W-1.Confirmed. The Wilmington VA is supplying furniture. No installation is required by the contractor
65Would you identify a location for a temporary construction trailer with access to electrical.Adjacent to the West Wing of the nursing home.
66Would you identify a location for a temporary laydown, storage, porta-john, etc.Adjacent to the West Wing of the nursing home.
67If there is a conflict between the drawings, specs, and design report, what is the order of precedence?Pettit - per VA TIL guidelines 1st specs, 2nd dwgs, 3rd design report
68Is a fire watch required while the fire sprinkler system is down within the construction area? The smoke detectors will stay in operation at all times.Coordinated with VA Safety department. While hot work is ongoing fire watch is required. After hours, weekends and Holidays VA police will provide the fire watch.
69What is the ICRA risk classification? In Section 01 35 26, at the last line of page 17, the Class is blank. However the 100% CD Design Report shows Class III/IV. Is this Class correct?Same answer as question #29. This will likely be a Level III/IV, ICRA.
70Will demolition and building permits from the Town of Elsmere or New Castle County be required?NO.
71Can a second site visit for subcontractors be held?PCAC: It is not the VAs intent to hold a second site visit at this time.
72Could the RFI submittal deadline be extend by another week?PCAC: The official period for technical questions has closed and will not be reopened. Additional technical questions may be forwarded to the CS and CO, however any questions received after the past deadline will be answered at the discretion of the VA.
73In the Solicitation the Contractor must take into account FAR 52.229-3; “Federal, State and Local Taxes” and its Special Note in their pricing. Based on this section the project is NOT exempt from local, state or federal taxes.Correct
74Is the general contractor responsible to pay for the third-party testing agencies?YES
75Are there any restriction to working standard working hours of 7 am to 4:00 pm?NO.
76Will the contractor be required to provide site security or is this up to the contractor to provide.NO.
77Is there a designated location for contractor parking.All Non Lettered POV's shall park on Kirkwood Highway
78The specs mention vermiculite whereas the asbestos report does not. We will price only what is identified in the asbestos report.
79Please verify that there is no asbestos abatement or Lead abatement required in Phase 4 (room numbers in asbestos report do not match room numbers on drawings).Any abatement here would have been completed in the earlier phases. Room numbers were changed by the VA in the final submission. This is why room numbers do not match the report.
80What are the materials that makes up the existing auditorium ceiling?The existing auditorium ceiling is a combination of GWB and prismatic lenses from our site survey observations.
81Will that portion of the existing Ground Floor that will be infilled need any leveling material? The note on drawing AD101 calls out for leveling after demolition.Allow for leveling material as noted on AD101
82The new windows on the first floor and along column line P could be used for pumping concrete and for disposal of demolition. If Deduct Alternate #2 is accepted these new opening will not be constructed. Will it be acceptable to create a temporary opening in the wall for these purposes?There is no issue with creating a temporary opening as long as it is approved by the Wilmington VAMC
83Are there any materials to be salvaged other than the ductwork, ceiling and lights in the Eligibility and Enrollment Suite?Outside of Security components no additional material is being requested to be salvaged.
84Will use of existing stairs and elevator be allowed for workers and materials?Yes. Freight elevator
85Can Phase 4 demo and construction activities access the first floor using the new stairway?YES
86Phase 4, item a. says to relocate the Mental Health Suite to the completed Ground Floor. Will this be done by the VA? If not please provide a detailed scope of work.VA staff will corrdinate and is responsible for the relocation effort.
87Phase 4, item f. states to relocate furniture from the temporary ground floor Metal Health Suite to the completed First Floor Mental Health Suite. Will this be done by the VA? If not please provide a detailed scope of work.VA staff will corrdinate and is responsible for the relocation effort.
88The Cast-In-Place Concrete Properties Schedule on drawing S001 does not match the design report.The concrete properties indicated on drawing S001 are correct.
89Phase 2a, item b says to reinforce all columns outside the work area. Drawing S101 shows only one column to be braced and it is not outside the work area. Please clarify.The drawings are correct. Only column K-1 requires bracing.
90It is difficult to remove ceiling grid and tiles without some damage, and replacing some tiles may not match. Would you consider complete replacement of the ceiling grid and tiles?YES, within reason.
91For the relocation of the Eligibility and Enrollment Suite is there any other work in this space other than what is shown on detail 2/G003, described in Phase 2 notes and work required to brace one column?All required work is indicated on drawings. This phasing plan was reviewed in detail with the Wilmington VAMC team during the development of the design and documentation.
92Where will the ACT grid/tiles, lights, diffusers, ductwork be stored? Phase 2 note a. says the Wilmington VAMC to determine. For equal bids this information should be provided.The contractor will need to set aside a section of the construction area (e.g., the ground floor auditorium space) to store materials, or account for an alternate off-site location or placement of a conex box within an approved location on the wilmington Campus.
93The notes on detail E/S300 describe the size and depth of the helical piles to use for estimating. Should this be used for the bid? If not, we need he soils report to size the helical piles for the bid, which will be based on an axial compression of 15 tons.The depth of piles should be used for bid. We do not have a soils report for this project.
94On Drawing A601, the Window Schedule says that Type A is to match existing; do we know the spec for the existing windows?DUPLICATE
95The Aluminum Window specification section 08 71 13, subsection 2.3 A. says to see the SCHEDULE FOR FINISHES on the drawing (I101) for the Basis of Design. But the “I” drawings do not contain any product information.This information is conatined in the Design Narrative/Report
96The section detail 2/A501 says to refer to the plan for the window spec, but the plan does not provide this information. What is the basis of design for the interior windows window types B, C and D? Are these to be hollow metal or aluminum?DUPLICATE
97Drawing A601, Window Note 4 states that all glazing is to be blast resistant. Does this requirement apply to all the windows, interior and exterior?EXTERIOR WINDOWS ONLY
98Please confirm that ALL wiring associated with the Direct-Digital Controls System for HVAC is to be installed on conduit raceways per the site standard.correct all control wiring shall be in conduit.
99Please confirm that the new Direct-Digital Controls System for HVAC is to be an extension of the existing Facilities Explorer by ModernControls building automation system located in the facilities office at the Wilmington VA site.Incorrect. It is not an EXTENSION of the Facilities Explorer building automation system. It will however need to interface with said system.
100Drawing A114, Keynote one (1) is not shown on any of the new or existing windows. Is this correct?This note applies to all window locations.
101Drawing A301, Detail 8, How should the roller shades be mounted: 1) to the window mullion or 2) to the underside of the window head with blocking installed in the metal stud?Underside of the window head with blocking.
102There are no drawings/specifications that reference Deductive Item #1. The only reference made to Deductive Item #1 is in section A.3 Price/Cost Schedule in the Solicitation. All work items included in the original questions are indicated on the project drawings.Bid Deduct is discussed in the SOW and price schedule. Since this deduct shells the entire ground floor space this deduct would just be the completion of phase 2a and proceed to first floor phasing.
103Should the contractor include the cost of soils investigation for final design of helical pile, and the engineering for the final design?Yes.
104Please confirm what type of kickplates the new doors are to receive. The drawings indicate Acrovyn while the specifications indicate metal.Metal kickplates to match exsiting throughout the facility.
105Please provide more information of the fireproofing scope of work. Are we to just patch the existing fireproofing that needs to be removed for steel connections or are there any new areas that will receive new fireproofing?Patch any area that is disturbed during construction and apply NEW fireproofing to all areas as require per VA guidelines.
106If Deductive Item #1 is accepted, where will the existing Mental Health Suite on the First floor move to since there will be no Ground Floor fit out space to move into for Phase 4?The VA will coordinate reloaction of the mental health suite outside of this project.
107
108