Amend 0002 - Technical Responses.pdf
PDF 597 KB Posted
- Solicitation number
- 36C77624R0086_1
About this file
This document appears to be a set of questions and answers related to a federal contract opportunity for the Wilmington, Delaware VA Medical Center to construct an addition for mental health services. The key details include:
The contract is to completely renovate and infill the existing auditorium space to create administrative space for the expansion of the mental health program. The contract requires the contractor to provide information on topics such as finishes, materials, windows, HVAC controls, asbestos abatement, phasing, and logistics. The solicitation number is 36C77624R0086_1 and the contract is being issued by the VA Technology Acquisition Center in Austin. No specific response or award dates are provided. The contractor will be responsible for providing a variety of specified construction, demolition, and relocation work in phases to support the mental health program expansion.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT 460-325 PETTIT GROUP RESPONSES WILMINGTON VAMC ADDITION FOR MENTAL HEALTH (AUDITORIUM INFILL)
# Question Answer
There are plans for Polished Concrete floors, but there isn't much detail provided about them. Could you please provide more information about your expectations for this project.
The rooms that are scheduled with P-CONC as a finish are maintenance type spaces that need a floor that is sealed and dust free and meet minimum criteria as noted in te VA.Til.
2 For rooms 164 and 165D – what is base RMB-1? This has been corrected to read "RB-1"
Drawing I103 - Rooms 164 & 165D – finish schedule & finish box state flooring to be LVT1, however graphic shows CPT1. What is correct flooring? Room 164 is to have CPT-1 as the floor finish. 165 D is to have LVT1 as the floor finish.
Window type A is to match existing; do we know the spec for the existing windows?
A/E does not have the manufacturer's information for the existing window. Wilmington VA should have this information on file from when the project was constructed.
What is the basis of design for window types C and D?
The section detail 2/A501 says to refer to the plan for the window spec, but the plan does not specify anything.
Window types C & D are for the MSA, it needs to slide as shown on the interior elevations, per VA comments. No cutsheets exist. This is a Wilmington VA standard.
Should we assume that Window type B is a hollow metal frame? Window Type B is a HM frame
Document “S02 – Att 05 - Limitations on Subcontracting” references “Construct Community Living Center” in the header of the document, not “Addition for Mental Health”. PCAC: An updated Att05 has been included with the correct project name "Addition for Mental Health"
Drawing I102 – The type “4” sign detail is obscuring the 2nd signage schedule Pettit Group has corrected this issue an will reissue this sheet
Drawings A402, A404, A407, A408, A409 – WC-1? Is this supposed to be AWC-1? Correct - the finish should be AWC-1
Spec. Section 07 27 27 – Fluid Applied Membrane Air Barriers, Vapor Retarding. Please provide more information on where tis is being applied? Is this the same as the polyethylene vapor retarder shown on detail A/S300?
Spec Section 07 27 27 would be applicable where portions of the facades are being infilled. This is not the same as the polyethylene vapor retarder shown on detail A/S300. Refer to attached specification for the polysthlyene vapor barrier.
Confirm that there are no auto door operators included in this project. For reference, the description for door hardware type 12C in spec section 08 71 00 states that
“ALL HARDWARE BY SECTION 08 17 10, INTEGRATED
DOOR ASSEMBLIES AUTO DOOR OPERATOR AND
CONTROLS BY SECTION 08 71 13, AUTOMATIC DOOR
OPERATORS.” However, the description for door hardware type 12C in spec section 08 17 10 doesn’t include door operators. Please advise. Door opertaors are required for this project. Doors 1102 on the first floor leading into the consult room area.
Please provide more information regarding the Deductive Item #1 scope of work: a. Are all interior walls that extend from the Ground Floor to the 1st floor still being demolished? b. Will stairwell 166 be constructed?
c. Will new Ground Floor windows, including window sills (precast and solid surface) and window treatments, still be installed?
Please provide more information regarding your reference to Deductive item #1 (drawings/specifications to which you are referring)
Where in the mechanical room is the tar vapor barrier located that is mentioned in the Hazardous Material Survey Report?
After reviewing the chains of custodies (COC), versus the analysis report for the referenced tar vapor barrier,it was noted that the COC line for 09-18 was blank, so the third-party lab likely assumed that it was ’ditto’ to the previous line for sample 08-17. The main entrance to the mechanical room location appears to be referring to the door caulk 08-17 and 08-16; hence the main entrance description. Vapor barrier located in mechanical room 3092 for sample 09-20 has the positive results (8%). So, 09-19 is inconsequential from a results and location standpoint since it’s homogeneous to the 09-20 sample, which was positive for asbestos. Without seeing the material by being onsite since 2021 we cannot 100% guarantee that the vapor barrier is a black coating on the mechanical room walls. But, from our experiences, a tar vapor barrier is a building material coated on walls and floors and rarely but occasionally on ceilings. The bidding contractors will have to be advised of any black tar vapor barriers in the MER that they have to penetrate for equipment installation or old equipment demo will have to be removed by an abatement contractor prior to impact. The other equipment’s samples all appear as non-asbestos materials. We train our inspectors to specifically identify and describe the materials if it’s on equipment. Vapor barriers are not a mechanical equipment material. But we would not quote that in an RFI. So, in general all black tar barriers found in the MER 3092 need to be addressed as ACM.
Would the lead paint also mentioned in the Hazardous Material Survey Report be considered Lead In Construction?
Yes
Drawing T-501 – Technology Symbols calls for a wireless panic button. The hospital standard is a panic button hardwired into the existing Lenel or Bosch Intrusion System.
Provide hard-wired panic buttons that are compatible with the hospitals existing duress system. (Will need additional information from the owner to provide further direction)
Does the existing Lenel Access Control Panel have room for expansion?
It was assumed there were spare inputs. (Wilmington Technology staff to confirm)
Drawing T-502 – The camera spec is not clear (cameras are labeled as A1)
Refer to Figure 1 below
18 Drawing T-502 – Does this project require new NVR?
NVR is existing to remain. New cameras shall be tied into the existing NVR.
Drawing T-502 - Is Security Cabling required to be in conduit?
Where inaccessible, such as walls or above gyp board ceilings, conduits shall be provided. Conduits/sleeves shall also be provided at penetrations. EC to provide conduits & sleeves
Solicitation Section 2.13 states “Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements.” a.
What is the badging process at the VAMC? b. Is there any cost to the contractor associated with badging?
Prime contractors should have PIV badging since they work with the government on multiple projects. Subcontractors and their employees can check in with VA Polcie on a daily basis and be provided with a temporary "DAY BADGE".
Spec Section 01 00 00 1.11C states “A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA Medical Center.” Can the referenced soil report be provided? No Soil Report exists
Spec 01 00 00 1.18 states “Contractor will not be allowed the use of existing elevators. Outside type hoist shall be used by Contractor for transporting materials and equipment.” Correct. NO use of existing VA elevators.
7/25/2024
PROJECT 460-325 PETTIT GROUP RESPONSES WILMINGTON VAMC ADDITION FOR MENTAL HEALTH (AUDITORIUM INFILL)
Is the contractor permitted to use existing elevators to access the second-floor work areas? If so, which existing elevators is the contractor permitted to use? If not, how is the contractor to access the work area? NO us of existing VA elevators
Spec section 01 00 00-1.24.E discusses equipment furnished by the government that requires partial assembly. What equipment is the government providing that requires assembly by the contractor? The Wilmington VAMC will need to provide this information as they are procurring the furniture
Spec section 01 00 00 1.27 Photographic Documentation requires detailed project photos by an experienced commercial photographer or subcontractor. Is this required? YES, this is required for existing conditions in the future.
Spec 01 33 23 1.6E states “Provide electronic documents over 5MB through an electronic FTP file sharing system.” Is Procore acceptable? YES, ProCore is used by the VA on multiple projects.
Spec section 01 35 26 1.7C states “the SSHO has to be a separate qualified individual from the Prime Contractor’s Superintendent and/or Quality Control Manager with duties only as the SSHO.” Please confirm this project requires a full-time superintendent on-site and a separate full-time SSHO on-site. YES, that is the requirement.
Spec section 01 35 26 1.9B requires monthly inspections by a CSP. Please confirm this is required. YES.
Spec section 01 35 26 1.12 is missing a designated ICRA class. What is the ICRA classification for this project? The Infection Control Risk Assessment (ICRA) was included in the submitted Design Report . Refer to attached copy.
Spec section 01 45 00 requires the CQC System Manager to be on site at all times during construction. It also requires the CQC Manager to have completed the Construction Quality Management (CQM) for Construction course. Is the project superintendent permitted to act as the CQC System Manager? Please confirm the CQC Manager is required to have completed the Construction Quality Management (CQM) for construction course. Superintendent can fill both roles. Superintendent must have completed the CQM course prior to starting the project.
Spec section 01 45 29 3.9 states “approximate number of tests required,” however, the quantities are left blank. Can this information be provided? Keast & Hood - Quantities will be infilled in the next submission.
Spec section 01 45 35 1.4H describes when a Special Inspector of Record (SIOR) is required. Is an SIOR required for this project? YES.
G002 General Note #15 states “Contractor to submit shop drawings prepared by licensed professional engineer which is retained by prime contractor at no additional cost to the government.” What PE stamped shop drawings are required for this project?
KEAST & HOOD, GPD, GHD TO CONFIRM (STRUCTURAL WORK, FIRE SUPPRESSION & FIRE ALARM) Keast & Hood - Concrete mix designs, helical piles, cold-formed steel framing, stairs & railings, shoring & scaffolding, and temporary excavation bracing.
AD101 General Note R states “IC permit required prior to start of any demo.” Is there any anticipated cost to the contractor in acquiring this permit? NO.
AD101 General Note T states “Contractor is responsible for all temporary lighting as needed.” What temporary lighting is needed? Temporary lighting for a safe work area per OSHA guidelines is required.
AD101 General Note A states “All work to be completed following Class III infection control guidelines.”
However, A106 General Note A states “All work to be completed following class III/IV infection control guidelines.” What is the ICRA classification for this project? Same answer as question #29. This will likely be a Level III, ICRA.
A109 includes a furniture schedule and a divider schedule. a. Are these items to be furnished and installed by the contractor? b. If so, can a basis of design be provided for these items? ESCAPE Acoustical Desk Divider DS-Desktop Mounted Acoustical Privacy Screen 18” High x 29” Wide, Color: TBD
Spec 12 24 00 does not provide a basis of design. Can a basis of design be provided for the roller shades shown on A113?
Window Shade - Manuf.: Mecho Shade Systems Slyle: M5 Manual Chain Operated Fabric: 0813 Silver Birch ( Blackout)
At the site visit there were pallets and boxes in the ground floor auditorium. a. Are these items to be removed prior to the start of this project? b. If not, how is the contractor to handle these items? All pallets and boxes will be removed by the VA prior to construction start.
Where will the contractor be permitted to place a dumpster? How far will it be from the demolition area? Dumpster will be adjacent to building by the old Valet Entrance.
When the rear exterior of the auditorium is marked off as a construction zone, are there any traffic control requirements for the access road adjacent to the auditorium? What are those requirements?
One lane vehicular traffic shall be maintained at all times. In the event of a necessary shutdown, this shall be coordinated with the VA staff TWO weeks in advance.
Is there a Hazmat Report or other document that details asbestos/vermiculite/lead paint locations? Full Report was provided in the Design Report. See attached Copy
Please confirm that the Offerors response to Volume I Technical Proposal and associated Factor 1 Technical Experience, is limited to the prior projects data specifically detailed in Sections 2.8.C and 2.8.E.
PCAC: We are confiming that offeror responses must adhere to the data oulined within the instructions to offerors and evaluation factors.
Tempered Glazing is noted on the Door Schedule (Drawing A601) for the following opening numbers of Door Panel Type D: 165E, 165G, 165J, 165L, 1127, and 1128. What Glazing type is required for the following opening numbers of Door Panel Type D: 163, 164, 165, 165I, 165K, and 1129? Please advise. Tempered Glazing is required for pening numbers of Door Panel Type D: 163, 164, 165, 165I, 165K
Elevations of Window Type 103 appear to possibly indicate trim (9/A401, 4/A402, A601). Please provide frame profiles or sections. No trim is required
PROJECT 460-325 PETTIT GROUP RESPONSES WILMINGTON VAMC ADDITION FOR MENTAL HEALTH (AUDITORIUM INFILL)
Numerous Specification Sections reference “Section 09 06 00, Schedule for Finishes” for, amongst other things, “Basis of Design”. This Section is not found within the documents. Please advise. Pettit Group reccommends the Wilmington VA furnish the GC wit the Design Narrative which contains this information.
The scope of Exterior Windows, (Types 100, 101, and
102) includes Drawing reference to “Match Existing”.
Please provide specification data.
A/E does not have the manufacturer's information for the existing window. Wilmington VA should have this information on file from when the project was constructed.
Please confirm that Floor Finishes shall be provided as scheduled on Finish Schedule and Material Legend, Drawing I101, and also scheduled on Finish Floor Plans, Drawings I103 and I104, and not necessarily that indicated by the “Flooring Material Legend” on Finish Floor Plans, Drawings I103 and I104, for example, Rooms 164 and 165D (poche inconsistency).
GC to follow the responses above for any conflicts in graphpic and written descrition. Any other cases where graphic and written finish do not match should be brought to the attention of the A/E for further clarification.
Please confirm that there is no Floor Finish Treatment required for Room 1132B, Shaft / Mechanical Area. The finish in this area is to be P-CONC
Finish Schedule and Material Legend, Drawing I101, indicates Ceiling Type AEC for Room 164, VE Supervisor, however, Reflected Ceiling Plan, Drawing A113, indicates Ceiling Type ACT-1. Please advise. The ceiling finish in this room is to be ACT-1
Please confirm that there is no Ceiling Finish Treatment required for Room 162, HAC, Room 166, Stairwell, Room 181A, Electrical Room, Room 233, Stairwell, Room 233, FHC, Room 1132B, Shaft / Mechanical Area, and Room 301, Mechanical Room.
Confirmed, exposed structure/ceiling/open ceiling for rooms 162, HAC, Room 166, Stairwell, Room 181A, Electrical Room, Room 233, Stairwell, Room 233, FHC, Room 1132B, Shaft / Mechanical Area, and Room 301, Mechanical Room.
How does Drawing I105, Finish Ceiling Plan – First Floor, differ from Drawing A114, Reflected Ceiling Plan – First Floor, relative to Ceiling Finish requirements? I105 locates the specialty ceiling tile (SKY FACTORY PANELS) graphically for the end user
Reflected Ceiling Plan Keynote Number 1 is indicated at 4 of the new Window locations on Drawing A113.
Reflected Ceiling Plan Keynote Number 1 is NOT indicated at any of the 9 new Window locations on Drawing A114. Please confirm requirements. A113 RCP Keynote #1 is applicable to all windows on A114 RCP.
Sign Type 4 on Drawing I102, Signage Details, is covering a significant portion of the Signage Schedule. Please advise. DUPLICATE
Please confirm that the WC-1 designation shown on Elevation Detail 9/A402 pertains to a wainscot finish. DUPLICATE
Please advise if WC-1, AWC-1, HR-1, or RB-1 are required at the North Walls of Room 165D, Bene-Travel Training. RB-1 is to be installed
Please confirm WC-2 or AWC-2 at the West end of Elevation 5 at Corridor 104, Drawing A404. The finish is AWC-2
Please confirm WC-2 at the West end of Elevation 3 at Corridor 202, Drawing A409. The finish is AWC-1
The Room Finish Schedule on Drawing I101 indicates “AWC-1” for Wainscoting at Corridor 161, however Elevations 5 and 6 on Drawing A404 indicate “WC-1”.
Please advise. DUPLICATE
The Room Finish Schedule on Drawing I101 indicates “AWC-1” for Wainscoting at Corridor 1124, however Elevations 1, 2, 3, and 4 on Drawing A408 indicate “WC- 1”. Please advise. DUPLICATE
Elevation 3 on Drawing A405 and Elevation 7 on Drawing A408 indicate finish “AWC-1” however Elevation 8 on Drawing A408 indicates “WC-1”. Please advise. DUPLICATE
The “Schedule For Finishes” on Drawing I101 does not include data for Finish “WC-1”. Please advise. DUPLICATE
Closet 165B on Drawing A110 is not identified as “SH-1” please confirm. Please clarify this comment. Not clear what is meant by "not identified as “SH-1” please confirm"
Please confirm that the following Furniture items indicated and scheduled on Drawings A109 and A110 are Provided (Furnished and Installed) by the VA, “Type Mark”: F-1, F-2, F-3, F-4, F-5, F-6, F-7, F-8, F-9, and W-1.
The Wilmington VA is supplying furniture. The Wilmington VA will have to respond as to who is responsible for insallation.
Would you identify a location for a temporary construction trailer with access to electrical. Adjacent to the West Wing of the nursing home.
Would you identify a location for a temporary laydown, storage, porta-john, etc. Adjacent to the West Wing of the nursing home.
If there is a conflict between the drawings, specs, and design report, what is the order of precedence? Pettit - per VA TIL guidelines 1st specs, 2nd dwgs, 3rd design report
Is a fire watch required while the fire sprinkler system is down within the construction area? The smoke detectors will stay in operation at all times.
Coordinated with VA Safety department. While hot work is ongoing fire watch is required. After hours, weekends and Holidays VA police will provide the fire watch.
What is the ICRA risk classification? In Section 01 35 26, at the last line of page 17, the Class is blank. However the 100% CD Design Report shows Class III/IV. Is this Class correct? Same answer as question #29. This will likely be a Level III, ICRA.
Will demolition and building permits from the Town of Elsmere or New Castle County be required? NO.
71 Can a second site visit for subcontractors be held? PCAC: It is not the VAs intent to hold a second site visit at this time.
Could the RFI submittal deadline be extend by another week?
PCAC: The official period for technical questions has closed and will not be reopened. Additional technical questions may be forwarded to the CS and CO, however any questions received after the past deadline will be answered at the discretion of the VA.
In the Solicitation the Contractor must take into account FAR 52.229-3; “Federal, State and Local Taxes” and its Special Note in their pricing. Based on this section the project is NOT exempt from local, state or federal taxes. Correct
PROJECT 460-325 PETTIT GROUP RESPONSES WILMINGTON VAMC ADDITION FOR MENTAL HEALTH (AUDITORIUM INFILL)
Is the general contractor responsible to pay for the third-party testing agencies? YES
Are there any restriction to working standard working hours of 7 am to 4:00 pm? NO.
Will the contractor be required to provide site security or is this up to the contractor to provide. NO.
77 Is there a designated location for contractor parking. All Non Lettered POV's shall park on Kirkwood Highway
The specs mention vermiculite whereas the asbestos report does not. We will price only what is identified in the asbestos report.
Please verify that there is no asbestos abatement or Lead abatement required in Phase 4 (room numbers in asbestos report do not match room numbers on drawings).
Any abatement here would have been completed in the earlier phases. Room numbers were changed by the VA in the final submission. This is why room numbers do not match the report.
What are the materials that makes up the existing auditorium ceiling? The existing auditorium ceiling is a combination of GWB and prismatic lenses from our site survey observations.
Will that portion of the existing Ground Floor that will be infilled need any leveling material? The note on drawing AD101 calls out for leveling after demolition. Allow for leveling material as noted on AD101
The new windows on the first floor and along column line P could be used for pumping concrete and for disposal of demolition. If Deduct Alternate #2 is accepted these new opening will not be constructed.
Will it be acceptable to create a temporary opening in the wall for these purposes? Pettit Group has no issue with creating a temporary opening as long as it is approved by the Wilmington VAMC
Are there any materials to be salvaged other than the ductwork, ceiling and lights in the Eligibility and Enrollment Suite?
This questions should be answered by the Wilmington VAMC team as they would know what they intend to salvage and reuse.
Will use of existing stairs and elevator be allowed for workers and materials? NO.
Can Phase 4 demo and construction activities access the first floor using the new stairway? YES
Phase 4, item a. says to relocate the Mental Health Suite to the completed Ground Floor. Will this be done by the VA? If not please provide a detailed scope of work. VA staff will corrdinate the relocation effort.
Phase 4, item f. states to relocate furniture from the temporary ground floor Metal Health Suite to the completed First Floor Mental Health Suite. Will this be done by the VA? If not please provide a detailed scope of work. VA staff will corrdinate the relocation effort.
The Cast-In-Place Concrete Properties Schedule on drawing S001 does not match the design report. The concrete properties indicated on drawing S001 are correct.
Phase 2a, item b says to reinforce all columns outside the work area. Drawing S101 shows only one column to be braced and it is not outside the work area. Please clarify. The drawings are correct. Only column K-1 requires bracing.
It is difficult to remove ceiling grid and tiles without some damage, and replacing some tiles may not match.
Would you consider complete replacement of the ceiling grid and tiles? YES, within reason.
For the relocation of the Eligibility and Enrollment Suite is there any other work in this space other than what is shown on detail 2/G003, described in Phase 2 notes and work required to brace one column?
All required work is indicated on drawings. This phasing plan was reviewed in detail with the Wilmington VAMC team during the development of the design and documentation.
Where will the ACT grid/tiles, lights, diffusers, ductwork be stored? Phase 2 note a. says the Wilmington VAMC to determine. For equal bids this information should be provided.
This questions should be answered by the Wilmington VAMC team as they will know what space is available during this phase.
The notes on detail E/S300 describe the size and depth of the helical piles to use for estimating. Should this be used for the bid? If not, we need he soils report to size the helical piles for the bid, which will be based on an axial compression of 15 tons. The depth of piles should be used for bid. We do not have a soils report for this project.
On Drawing A601, the Window Schedule says that Type A is to match existing; do we know the spec for the existing windows? DUPLICATE
The Aluminum Window specification section 08 71 13, subsection 2.3 A. says to see the SCHEDULE FOR FINISHES on the drawing (I101) for the Basis of Design.
But the “I” drawings do not contain any product information. This information is conatined in the Design Narrative/Report
The section detail 2/A501 says to refer to the plan for the window spec, but the plan does not provide this information. What is the basis of design for the interior windows window types B, C and D? Are these to be hollow metal or aluminum? DUPLICATE
Drawing A601, Window Note 4 states that all glazing is to be blast resistant. Does this requirement apply to all the windows, interior and exterior? EXTERIOR WINDOWS ONLY
Please confirm that ALL wiring associated with the Direct- Digital Controls System for HVAC is to be installed on conduit raceways per the site standard. correct all control wiring shall be in conduit.
Please confirm that the new Direct-Digital Controls System for HVAC is to be an extension of the existing Facilities Explorer by ModernControls building automation system located in the facilities office at the Wilmington VA site.
Incorrect. It is not an EXTENSION of the Facilities Explorer building automation system. It will however need to interface with said system.
PROJECT 460-325 PETTIT GROUP RESPONSES WILMINGTON VAMC ADDITION FOR MENTAL HEALTH (AUDITORIUM INFILL)