This document is a window cleaning plan of service template for a federal contract opportunity. It outlines the type of window cleaning to be performed, such as post-construction or scheduled cleaning, and whether both sides or only outside or inside of windows will be cleaned. It requests information on the number of workers, lead person, equipment to be used like chemicals, ladders, lifts, and power washers. Locations where each piece of equipment will be used are to be described. Chemicals and personal protective equipment to be utilized are also to be listed. Potential safety hazards and solutions for each piece of equipment are to be identified. For high rise work, information on fall protection equipment, anchorage locations, and rescue plans is requested. Procedures for inclement weather and any special building requirements are to be outlined. The related federal contract opportunity is solicitation number 36C26123Q1020 for window cleaning services at medical centers and clinics for the VA Southern Nevada Health Care System with an opportunity type of solicitation from the Department of Veterans Affairs.

View the file

Other files

File Type Posted
36C26123Q1020 0003.docx DOCX document
36C26123Q1020 0002.docx DOCX document
Amendment 0001 Attachment - Questions from Vendors_08212023.pdf PDF
36C26123Q1020 0001.docx DOCX document
Window Count.pdf PDF
36C26123Q1020.docx DOCX document
Wage Determination No 2015-5593 Rev.23 07-31-2023.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix 1 Window Cleaning Plan of Service

Jobsite: Date:

Contact Person at Site:

Address:

City: State:

Type of Window Cleaning to be Performed

|_| Post Construction |_| Scheduled Normal Cleaning

Type of Service to be Provided

|_| Both sides all windows |_| Outside Only |_| Inside Only

Other Services Provided

On average, how many workers will be at the jobsite each day?

Name of lead person at the jobsite: Cell #:

Equipment to be used for Window Cleaning

|_| Chemicals |_| Safety Data Sheet Available

|_| Ladders |_| Sectional |_| Extension

|_| Mobile Lift |_| Rental Unit

|_| Tower Scaffold |_| Rental Unit

|_| Pressure Cleaner |_| Rental Unit

|_| Tucker (High Reach) Washer

|_| Razor Scrapers

|_| Extension Poles

|_| Descent Equipment |_| Roof Rig |_| Anchors on Roof

|_| Suspended Scaffolding |_| Rental Unit

|_| Permanent Installation |_| Building Provided Certificate of Occupation

|_| Barricades/Danger Signs

|_| Other Describe:

Describe Where on the Building Each Piece of Equipment will be Used:

Equipment: Location:

List the Chemicals That Will Be Used:

Location of SDS:

Type of Personal Protective Equipment to Be Used:

Describe Safety Hazards That May Be Encountered at Site for Each Piece of Equipment Being Used (Not High Rise) and List What Equipment or Method will be used to overcome the Hazard:

Equipment Hazard Location Solution

High Rise Section:

Height of Parapet Wall:

If Applicable, describe what fall protection equipment will be used:

Date of Last Inspection Provided by Building Management:

If Transportable Rigging Equipment is being Used, Identify Anchorages or System to be used for Rigging, Tie Backs, Lifelines, and their Location:

Permanently Installed Anchors Covering the Perimeter of Work Area? Yes No

Inspected on (Attach Copy) If no, the following must be Filled out:

Anchor Location

Has Bldg. Owner/Mgr. Verified Support Capability of above Listed Anchors? Yes No If Yes, Attach Copy:

If Transportable Rigging is not being Used, Identify Anchorages or System on Roof that will be used for Suspensions and Lifelines:

Permanently Installed Anchors Covering the Perimeter of Work Area? Yes No

Inspected on_____________________________ (Attach Copy) If No, the following must be filled out:

Anchor Location

5. Has Bldg. Owner/Mgr. verified support capability of above listed anchors? Yes No If yes, Attach Copy:

6. In the following space, draw a diagram that will mark the location of the anchor points to be used as described in sections three and four.

7. Roof sketch with identified anchor points, electrical supplies, restricted or dangerous areas and ground barricade locations: (attached)

8. Describe safety hazards that may be encountered and list what equipment or method will be used to overcome the hazard:

Equipment Hazard-Location Solution

Describe any or all rescue methods to be deployed in the event of an Emergency:

Describe an alternate plan if inclement weather affects safe working procedures:

Describe any special procedures required by the building owner/manager to follow during the operation:

Contractor Personnel completing form

Printed Name Signature Date

Signature of Government Representative completing form

Printed Name Signature Date

File details come from the government source that posted it. Updated .