S02 - 6 695-22-106 23-093-Q30 Drawings 100 20240820 2 of 2.pdf

PDF 5 MB Posted

Attached to
Z2DA--Install Building Lightning Protection Project# 695-22-106
Solicitation number
36C25225B0027
Issued by

About this file

These are lightning protection design documents for multiple buildings (Buildings 111, 112, 123) with detailed roof lightning protection plans for demolition and new work installations. The documents specify comprehensive requirements for lightning protection systems, including: air terminals must be placed around roof perimeters at 20'-0" maximum intervals, extending at least 10" above protected areas; mid-roof terminals on flat roofs shall be installed at maximum 50'-0" intervals; and all metal bodies within 6'-0" of lightning protection conductors must be bonded to the system. The installation must be performed by a certified lightning protection installation contractor and must meet NFPA 780 and UL96A requirements. Key technical specifications include using adhesive mounts for air terminals (avoiding screws to prevent frost heave), bonding hand/guardrails every 50 linear feet, and ensuring down conductors are properly grounded and connected to building structures. The documents include detailed electrical diagrams, ground rod installation guidelines, and specific mounting instructions for various building components.

View the file

Other files

File Type Posted
S06 - Bldg 111 grounding bus location.pdf PDF
36C25225B0027 0007.docx DOCX document
S06 - Bldg 70 MDP room locations.pdf PDF
S06 - Pre-Bid RFIs_695-22-106_Amendment 0007_1.14.26.xlsx XLSX spreadsheet
S06 - ATTACHMENT 1_VAAR 852.219-75_REQUIRED TO COMPLETE_0006.pdf PDF
S06 - Pre-Bid RFIs_695-22-106_Amendment 0006.xlsx XLSX spreadsheet
S06 - 695-22-106 FINAL SOW_1.6.2026_0006.pdf PDF
36C25225B0027 0006.docx DOCX document
S06 - WAGE DETERMINATION_efective 1.2.26_0006.pdf PDF
S06 - 695-22-106 Sign-In Sheet Second Bidders Walk Thru.pdf PDF
36C25225B0027 0005.docx DOCX document
36C25225B0027 0004.docx DOCX document
S06 - 0004_Wage Determination_eff 12.12.2025.pdf PDF
S06 - Q9-Q10_Roof Drawing for Open Areas.pdf PDF
S06 - Wage Determination_eff 12.5.2025.pdf PDF
S06 - Pre-Bid RFIs_695-22-106_final 12.4.25.xlsx XLSX spreadsheet
36C25225B0027 0003.docx DOCX document
S06 - Q13-Q15_Floor Plans Bldg 102_112_113.pdf PDF
36C25225B0027 0002.docx DOCX document
S04 - 695-22-106 Site Walk Through Roster 11.12.25.pdf PDF
36C25225B0027 0001.docx DOCX document
S02 - Wage Determination_eff 9.5.25.pdf PDF
S02 - 6 695-22-106 23-093-Q30 Drawings 100 20240820 1 of 2.pdf PDF
S02 - ATTACHMENT 1_VAAR 852.219-75 JAN2023_REQUIRED TO COMPLETE.pdf PDF
36C25225B0027_1.docx DOCX document
S02 - 6a 695-22-106 23-093-Q30 Specs 100 20240820.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING HVAC DUCTING

EXISTING HVAC DUCTING

Engineers Architects

# DEMO KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

111.E102

BUILDING 111 UPPER B WING ROOF,

LIGHTNING PROTECTION PLANS

13 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

NORTH

0 84 16

NORTH

0 84 16

Scale: 3/32" = 1'-0"1 BUILDING 111 UPPER B WING ROOF, DEMOLITION PLAN Scale: 3/32" = 1'-0"2 BUILDING 111 UPPER B WING ROOF LIGHTNING PROTECTION PLAN, NEW WORK

1 CLASS 2 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 REUSE EXISTING DOWN CONDUCTOR FROM

UPPER B WING ROOF DOWN TO UPPER A AND C

WING ROOF TOPS. TIE INTO NEW LIGHTNING

PROTECTION SYSTEM. CONTRACTOR SHALL

PERFORM A CONTINUITY TEST ON THE EXISTING

DOWN CONDUCTOR PRIOR TO INSTALLATION,

AND ON THE CONNECTION OF THE NEW

CONDUCTOR TO THE EXISTING CONDUCTOR

AFTER INSTALLATION TO ENSURE

PERFORMANCE.

3 MOUNT LIGHTNING PROTECTION AIR TERMINAL

TO EXISTING ANTENNA EQUIPMENT.

4 BOND EXISTING CABLE TRAY TO LIGHTNING

PROTECTION SYSTEM.

5 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TIE IN EXISTING

DOWN CONDUCTOR TO NEW CONDUCTOR.

CONTRACTOR SHALL PERFORM A CONTINUITY

TEST ON THE EXISTING THRU-ROOF CONDUCTOR

PRIOR TO INSTALLATION, AND ON THE

CONNECTION OF THE NEW CONDUCTOR TO THE

EXISTING CONDUCTOR AFTER INSTALLATION TO

ENSURE PERFORMANCE.

6 BOND EXISTING LADDER TO LIGHTNING

PROTECTION SYSTEM.

7 BOND EXISTING LIGHTING POLE TO LIGHTNING

PROTECTION SYSTEM.

8 BOND TO FRAME OF EXISTING ANTENNA

EQUIPMENT. COORDINATE WORK WITH COR TO

PREVENT EXCESSIVE RF/EMF RADIATION

EXPOSURE.

1 EXISTING LIGHTNING PROTECTION CONDUCTOR

TO BE DEMOLISHED. TYPICAL ALL DASHED LINES

THIS DEMOLITION ROOF PLAN.

2 EXISTING LIGHTNING PROTECTION AIR TERMINAL

TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS

THIS DEMOLITION ROOF PLAN.

3 EXISTING CONDUCTOR BOND TO BE

DEMOLISHED.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

DEVICES AND CONDUCTORS INDICATED WITH

HIDDEN/DASHED LINES ARE TO BE REMOVED,

UNLESS NOTED OTHERWISE. SEE ELECTRICAL

SYMBOLS LEGEND ON E-001 FOR REFERENCE.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET WALL USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

Docusign Envelope ID: FB232B3D-DB2C-480F-9397-58A7828991F7

8/19/2024

1 2

SEE SHEET 111.E102 FOR CONTINUATION OF WORK

4 4

4 4

4 4 4

4 4

Engineers Architects

# DEMO KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

111.E103

BUILDING 111 UPPER C WING ROOF,

LIGHTNING PROTECTION PLANS

14 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

NORTH

0 84 16

NORTH

0 84 16

Scale: 3/32" = 1'-0"1 BUILDING 111 UPPER C WING ROOF, DEMOLITION PLAN

Scale: 3/32" = 1'-0"2 BUILDING 111 UPPER C WING ROOF LIGHTNING PROTECTION PLAN, NEW WORK

1 CLASS 2 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 TIE IN DOWN CONDUCTORS FROM 111 UPPER B

WING INTO A WING LIGHTNING PROTECTION

SYSTEM. CONTRACTOR SHALL PERFORM A

CONTINUITY TEST ON THE EXISTING DOWN

CONDUCTOR PRIOR TO INSTALLATION, AND ON

THE CONNECTION OF THE NEW CONDUCTOR TO

THE EXISTING CONDUCTOR AFTER INSTALLATION

TO ENSURE PERFORMANCE.

3 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TIE IN EXISTING

DOWN CONDUCTOR TO NEW CONDUCTOR.

CONTRACTOR SHALL PERFORM A CONTINUITY

TEST ON THE EXISTING THRU-ROOF CONDUCTOR

PRIOR TO INSTALLATION, AND ON THE

CONNECTION OF THE NEW CONDUCTOR TO THE

EXISTING CONDUCTOR AFTER INSTALLATION TO

ENSURE PERFORMANCE.

4 BOND TO EXISTING FALL PROTECTION EVERY 50',

THE BEGINNING AND END OF THE FALL

PROTECTION, AND AT EACH CHANGE IN

DIRECTION.

1 EXISTING LIGHTNING PROTECTION CONDUCTOR

TO BE DEMOLISHED. TYPICAL ALL DASHED LINES

THIS DEMOLITION ROOF PLAN.

2 EXISTING LIGHTNING PROTECTION AIR TERMINAL

TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS

THIS DEMOLITION ROOF PLAN.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

DEVICES AND CONDUCTORS INDICATED WITH

HIDDEN/DASHED LINES ARE TO BE REMOVED,

UNLESS NOTED OTHERWISE. SEE ELECTRICAL

SYMBOLS LEGEND ON E-001 FOR REFERENCE.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET WALL USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

8 8

8 8

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

111.E104

BUILDING 111, FLOOR 2 AND 5 ROOF,

LIGHTNING PROTECTION PLAN, NEW

WORK

15 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

NORTH

0 84 16

1 CLASS 1 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 PROVIDE ROOF PENETRATION AND THRU-ROOF

DOWN CONDUCTOR. BOND CONDUCTOR TO

BUILDING STEEL.

3 MOUNT LIGHTNING PROTECTION AIR TERMIAL TO

TOP OF THE OUTSIDE FACE OF THE CONDENSER

TO PREVENT BUILD UP OF COPPER PATINA ON

TOP OF UNIT.

4 PROVIDE DOWN CONDUCTOR ALONG EXTERIOR

FACADE OF BUILDING AND CONNECT TO NEW

LIGHTNING PROTECTION SYSTEM ON SECOND

FLOOR ROOF. DOWN CONDUCTOR SHALL BE

FASTENED TO BUILDING FACADE WITH

FASTENERS DESIGNED FOR BUILDING’S

EXTERIOR MATERIAL. BUILDING ELEVATION IS

APPROXIMATELY 40FT ABOVE SECOND FLOOR

ROOF LEVEL.

6 PROVIDE DOWN CONDUCTOR ALONG EXTERIOR

FACADE OF BUILDING AND CONNECT TO NEW

PROVIDED GROUND ROD. DOWN CONDUCTOR

SHALL BE FASTENED TO BUILDING FACADE WITH

FASTENERS DESIGNED FOR BUILDING’S

EXTERIOR MATERIAL. CUT HARDSCAPE TO

CREATE TRENCH FOR DOWN CONDUCTOR AND

GROUND ROD. PROVIDE GROUND TESTING WELL

FOR FUTURE INSPECTION. CUT AREAS SHALL BE

REPAIRED WITH LIKE MATERIALS TO MATCH

EXISTING. GROUND WELL SHALL BE TIER 15

RATED. BUILDING ELEVATION IS APPROXIMATELY

25FT ABOVE GROUND LEVEL.

7 DOWN CONDUCTOR TO BE PROTECTED TO A

HEIGHT OF 6’ FROM GRADE WITH RIGID

SCHEDULE 80 PVC ATTACHED TO BUILDING.

PAINT PVC IN A COMPLIMENTARY COLOR TO THE

EXISTING FACADE. PROVIDE PAINT SAMPLES TO

COR TO VERIFY FINAL COLOR DECISION.

8 BOND TO EXISTING FALL PROTECTION EVERY 50',

THE BEGINNING AND END OF THE FALL

PROTECTION, AND AT EACH CHANGE IN

DIRECTION.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 3/32" = 1'-0"1 BUILDING 111, FLOOR 2 AND 5 ROOF, LIGHTNING PROTECTION PLAN, NEW WORK

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET WALL USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

7 7 7

4 4 4

Engineers Architects

# DEMO KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

112.E101

BUILDING 112 ROOF, LIGHTNING

PROTECTION PLANS

16 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

NORTH

0 105 20

Scale: 1" = 10'-0"1 BUILDING 112, ROOF DEMOLITION PLAN

Scale: 1" = 10'-0"2 BUILDING 112 ROOF LIGHTNING PROTECTION PLAN, NEW WORK

NORTH

0 105 20

1 CLASS 2 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 BOND CONDUCTOR TO EXISTING LADDER FRAME.

3 REUSE EXISTING ROOF PENETRATION AND RUN

NEW DOWN CONDUCTOR ALONG EXTERIOR OF

BUILDING FACADE. DOWN CONDUCTOR SHALL BE

FASTENED TO BUILDING FACADE WITH

FASTENERS DESIGNED FOR BUILDING’S

EXTERIOR MATERIAL. TIE IN NEW LPS

CONDUCTOR TO EXISTING THROUGH ROOF

PENETRATION CONDUCTOR AND NEW DOWN

CONDUCTOR ALONG BUILDING EXTERIOR.

CONTRACTOR SHALL PERFORM A LIGHTNING

PROTECTION TEST ON THE EXISTING DOWN

CONDUCTOR PRIOR TO INSTALLATION, AND ON

THE CONNECTION OF THE NEW CONDUCTOR TO

THE EXISTING CONDUCTOR AFTER INSTALLATION

TO ENSURE PERFORMANCE.

4 RUN NEW DOWN CONDUCTOR ALONG EXTERIOR

OF BUILDING FACADE. DOWN CONDUCTOR SHALL

BE FASTENED TO BUILDING FACADE WITH

FASTENERS DESIGNED FOR BUILDING’S

EXTERIOR MATERIAL.

5 CONNECT LPS CONDUCTOR TO GROUNDING BUS

AT MAIN DISTRIBUTION PANEL.

6 CONNECT LIGHTNING PROTECTION CONDUCTORS

TO EXISTING DOWN CONDUCTORS REUSING

EXISTING ROOF PENETRATION. VERIFY WATER

TIGHT SEAL AND RESEAL AS NECESSARY.

CONTRACTOR SHALL PERFORM A LIGHTNING

PROTECTION TEST ON THE EXISTING DOWN

CONDUCTOR PRIOR TO INSTALLATION, AND ON

THE CONNECTION OF THE NEW CONDUCTOR TO

THE EXISTING CONDUCTOR AFTER INSTALLATION

TO ENSURE PERFORMANCE.

7 DOWN CONDUCTOR TO BE PROTECTED TO A

HEIGHT OF 6’ FROM GRADE WITH RIGID

SCHEDULE 80 PVC ATTACHED TO BUILDING.

PAINT PVC IN A COMPLIMENTARY COLOR TO THE

EXISTING FACADE. PROVIDE PAINT SAMPLES TO

COR TO VERIFY FINAL COLOR DECISION.

8 BUILDING 112 UPPER LEVEL IS APPROXIMATELY

40 FEET ABOVE GROUND.

9 BUILDING 112 IS APPROXIMATELY 23-25 FEET

ABOVE GROUND IN THIS LOCATION.

1 EXISTING LIGHTNING PROTECTION CONDUCTOR

TO BE DEMOLISHED. TYPICAL ALL DASHED LINES

THIS DEMOLITION ROOF PLAN.

2 EXISTING LIGHTNING PROTECTION AIR TERMINAL

TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS

THIS DEMOLITION ROOF PLAN.

3 EXISTING CONDUCTOR BOND TO BE

DEMOLISHED. TYPICAL ALL CONDUCTOR BONDS

THIS DEMOLITION ROOF PLAN.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

DEVICES AND CONDUCTORS INDICATED WITH

HIDDEN/DASHED LINES ARE TO BE REMOVED,

UNLESS NOTED OTHERWISE. SEE ELECTRICAL

SYMBOLS LEGEND ON E-001 FOR REFERENCE.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET WALL USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

4 4

5 5

1.

NOTE:

EXISTING COOLING TOWER

CONSTRUCTED OF COMPOSITE

MATERIALS WHICH INCLUDES

THE STAIRS, HANDRAILS, AND

COOLING FAN SHROUDS.

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

113.E101

BUILDING 113 ROOF, LIGHTNING

PROTECTION PLAN, NEW WORK

17 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

Scale: 1/8" = 1'-0"2 BUILDING 113 ROOF LIGHTNING PROTECTION PLAN, NEW WORK NORTH

0 84 16

1 CLASS 1 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 LIGHTNING PROTECTION DOWN CONDUCTOR TO

GROUND ROD. DOWN CONDUCTOR SHALL BE

FASTENED TO BUILDING FACADE WITH

FASTENERS DESIGNED FOR BUILDING’S

EXTERIOR MATERIAL. SEE DETAIL 5/E-501 FOR

MORE INFORMATION. BUILDING ELEVATION =

16FT.

3 LIGHTNING PROTECTION DOWN CONDUCTOR TO

GROUND ROD. DOWN CONDUCTOR SHALL BE

FASTENED TO BUILDING FACADE WITH

FASTENERS DESIGNED FOR BUILDING’S

EXTERIOR MATERIAL. SEE DETAIL 5/E-501 FOR

MORE INFORMATION. BUILDING ELEVATION =

30FT.

4 CUT HARDSCAPE TO CREATE TRENCH FOR DOWN

CONDUCTOR AND GROUND ROD. PROVIDE

GROUND TESTING WELL FOR FUTURE

INSPECTION. PROVIDE GROUND TESTING WELL

FOR FUTURE INSPECTION. CUT AREAS SHALL BE

REPAIRED WITH LIKE MATERIALS TO MATCH

EXISTING. GROUND WELL SHALL BE TIER 15

RATED.

5 DOWN CONDUCTOR TO BE PROTECTED TO A

HEIGHT OF 6’ FROM GRADE WITH RIGID

SCHEDULE 80 PVC ATTACHED TO BUILDING.

6 CONNECT LPS CONDUCTOR TO GROUNDING BUS

IN SWITCHGEAR ROOM. SEE DETAIL 6/E-502 FOR

MORE INFORMATION.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET CAPS USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL/CAP TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

AIR TERMINALS MOUNTED TO ROOF,

UNDER OVERHANG OF SOLAR ARRAY

AIR TERMINALS MOUNTED

TO SOLAR ARRAY

SEE SHEET 123.E105 FOR

CONTINUATION OF WORK

EXISTING

ANTENNA

SEE SHEET 123.E105 FOR

CONTINUATION OF WORK

EXISTING

ANTENNA

Engineers Architects

# DEMO KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

123.E101

BUILDING 123/A ROOF, LIGHTNING

PROTECTION PLANS

18 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

NORTH

0 8 16 32

Scale: 1/16" = 1'-0"1 BUILDING 123/A, ROOF DEMOLITION PLAN Scale: 1/16" = 1'-0"2 BUILDING 123/A ROOF LIGHTNING PROTECTION PLAN, NEW WORK

NORTH

0 8 16 32

1 CLASS 1 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 BOND LIGHTNING PROTECTION CONDUCTOR TO

EXISTING EQUIPMENT. TYPICAL ALL BONDS THIS

NEW WORK ROOF PLAN.

3 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TIE IN EXISTING

DOWN CONDUCTOR TO NEW CONDUCTOR.

CONTRACTOR SHALL PERFORM A CONTINUITY

TEST ON THE EXISTING THRU-ROOF CONDUCTOR

PRIOR TO INSTALLATION, AND ON THE

CONNECTION OF THE NEW CONDUCTOR TO THE

EXISTING CONDUCTOR AFTER INSTALLATION TO

ENSURE PERFORMANCE.

4 NEW AIR TERMINALS TO BE MOUNTED TO

EXISTING SOLAR WATER HEATER ARRAY. TIE IN

TO CONDUCTOR MOUNTED TO BACK FACE OF

PARAPET.

5 NEW AIR TERMINALS TO BE MOUNTED TO

PARAPET UNDER SOLAR ARRAY IN ORDER TO

PROVIDE BUILDING PROTECTION IN THE EVENT

THE SOLAR ARRAY IS REMOVED.

6 CONNECT THIS SECTION OF THE NEW LIGHTNING

PROTECTION SYSTEM TO THE NEW SYSTEM

LOCATED ON 123/E. SEE SHEET 123.E105 FOR

DESIGN OF BUILDING E.

1 EXISTING LIGHTNING PROTECTION CONDUCTOR

TO BE DEMOLISHED. TYPICAL ALL DASHED LINES

THIS DEMOLITION ROOF PLAN.

2 EXISTING LIGHTNING PROTECTION AIR TERMINAL

TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS

THIS DEMOLITION ROOF PLAN.

3 EXISTING CONDUCTOR BOND TO BE

DEMOLISHED. TYPICAL ALL CONDUCTOR BONDS

THIS DEMOLITION ROOF PLAN.

4 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TYPICAL ALL

DOWN CONDUCTOR SYMBOLS COLLOCATED WITH

ROOF PENETRATION SYMBOLS THIS DEMOLITION

ROOF PLAN.

5 EXISTING BOND TO METAL ROOF FLASHING TO BE

DEMOLISHED.

6 EXISTING ROOF PENETRATION WITHOUT DOWN

CONDUCTOR. CONTRACTOR TO PREPARE

PENETRATION FOR USE WITH NEW SYSTEM.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

DEVICES AND CONDUCTORS INDICATED WITH

HIDDEN/DASHED LINES ARE TO BE REMOVED,

UNLESS NOTED OTHERWISE. SEE ELECTRICAL

SYMBOLS LEGEND ON E-001 FOR REFERENCE.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET WALL USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

SEE SHEET 123.E105

FOR CONTINUATION

OF WORK

EXISTING

ANTENNA

SEE SHEET 123.E105

FOR CONTINUATION

OF WORK

EXISTING

ANTENNA

2 6

Engineers Architects

# DEMO KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

123.E102

BUILDING 123/B ROOF, LIGHTNING

PROTECTION PLANS

19 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

NORTH

0 8 16 32

NORTH

0 8 16 32

Scale: 1/16" = 1'-0"1 BUILDING 123/B, ROOF DEMOLITION PLAN Scale: 1/16" = 1'-0"2 BUILDING 123/B ROOF LIGHTNING PROTECTION PLAN, NEW WORK

1 CLASS 1 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TIE IN EXISTING

DOWN CONDUCTOR TO NEW CONDUCTOR.

CONTRACTOR SHALL PERFORM A CONTINUITY

TEST ON THE EXISTING THRU-ROOF CONDUCTOR

PRIOR TO INSTALLATION, AND ON THE

CONNECTION OF THE NEW CONDUCTOR TO THE

EXISTING CONDUCTOR AFTER INSTALLATION TO

ENSURE PERFORMANCE.

3 BOND LIGHTNING PROTECTION CONDUCTOR TO

EXISTING EQUIPMENT. TYPICAL ALL BONDS THIS

NEW WORK ROOF PLAN.

4 NEW AIR TERMINALS TO BE MOUNTED TO

EXISTING SOLAR WATER HEATER ARRAY. TIE IN

TO CONDUCTOR MOUNTED TO BACK FACE OF

PARAPET.

5 NEW AIR TERMINALS TO BE MOUNTED TO

PARAPET UNDER SOLAR ARRAY IN ORDER TO

PROVIDE BUILDING PROTECTION IN THE EVENT

THE SOLAR ARRAY IS REMOVED.

6 CONNECT THIS SECTION OF THE NEW LIGHTNING

PROTECTION SYSTEM TO THE NEW SYSTEM

LOCATED ON 123/E. SEE SHEET 123.E105 FOR

DESIGN OF BUILDING E.

1 EXISTING LIGHTNING PROTECTION CONDUCTOR

TO BE DEMOLISHED. TYPICAL ALL DASHED LINES

THIS DEMOLITION ROOF PLAN.

2 EXISTING LIGHTNING PROTECTION AIR TERMINAL

TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS

THIS DEMOLITION ROOF PLAN.

3 EXISTING CONDUCTOR BOND TO BE

DEMOLISHED. TYPICAL ALL CONDUCTOR BONDS

THIS DEMOLITION ROOF PLAN.

4 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TYPICAL ALL

DOWN CONDUCTOR SYMBOLS COLLOCATED WITH

ROOF PENETRATION SYMBOLS THIS DEMOLITION

ROOF PLAN.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

DEVICES AND CONDUCTORS INDICATED WITH

HIDDEN/DASHED LINES ARE TO BE REMOVED,

UNLESS NOTED OTHERWISE. SEE ELECTRICAL

SYMBOLS LEGEND ON E-001 FOR REFERENCE.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET WALL USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

SEE SHEET 123.E104

OF WORK

AIR TERMINALS MOUNTED TO ROOF,

UNDER OVERHANG OF SOLAR ARRAY

AIR TERMINALS MOUNTED

TO SOLAR ARRAY

EXISTING

ANTENNA

SEE SHEET 123.E104

FOR CONTINUATION

OF WORK

Engineers Architects

# DEMO KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

123.E103

BUILDING 123/C ROOF, LIGHTNING

PROTECTION PLANS

20 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

NORTH

0 8 16 32

NORTH

0 8 16 32

Scale: 1/16" = 1'-0"1 BUILDING 123/C, ROOF DEMOLITION PLAN Scale: 1/16" = 1'-0"2 BUILDING 123/C ROOF LIGHTNING PROTECTION PLAN, NEW WORK

1 CLASS 1 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TIE IN EXISTING

DOWN CONDUCTOR TO NEW CONDUCTOR.

CONTRACTOR SHALL PERFORM A CONTINUITY

TEST ON THE EXISTING THRU-ROOF CONDUCTOR

PRIOR TO INSTALLATION, AND ON THE

CONNECTION OF THE NEW CONDUCTOR TO THE

EXISTING CONDUCTOR AFTER INSTALLATION TO

ENSURE PERFORMANCE.

3 NEW AIR TERMINALS TO BE MOUNTED TO

EXISTING SOLAR WATER HEATER ARRAY. TIE IN

TO CONDUCTOR MOUNTED TO BACK FACE OF

PARAPET.

4 NEW AIR TERMINALS TO BE MOUNTED TO

PARAPET UNDER SOLAR ARRAY IN ORDER TO

PROVIDE BUILDING PROTECTION IN THE EVENT

THE SOLAR ARRAY IS REMOVED.

5 CONNECT THIS SECTION OF THE NEW LIGHTNING

PROTECTION SYSTEM TO THE NEW SYSTEM

LOCATED ON 123/E. SEE SHEET 123.E105 FOR

DESIGN OF BUILDING E.

1 EXISTING LIGHTNING PROTECTION CONDUCTOR

TO BE DEMOLISHED. TYPICAL ALL DASHED LINES

THIS DEMOLITION ROOF PLAN.

2 EXISTING LIGHTNING PROTECTION AIR TERMINAL

TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS

THIS DEMOLITION ROOF PLAN.

3 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TYPICAL ALL

DOWN CONDUCTOR SYMBOLS COLLOCATED WITH

ROOF PENETRATION SYMBOLS THIS DEMOLITION

ROOF PLAN.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

DEVICES AND CONDUCTORS INDICATED WITH

HIDDEN/DASHED LINES ARE TO BE REMOVED,

UNLESS NOTED OTHERWISE. SEE ELECTRICAL

SYMBOLS LEGEND ON E-001 FOR REFERENCE.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET WALL USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

AIR TERMINALS MOUNTED

TO SOLAR ARRAY

AIR TERMINALS MOUNTED

TO SOLAR ARRAY

AIR TERMINALS MOUNTED TO ROOF,

UNDER OVERHANG OF SOLAR ARRAY

EXISTING

ANTENNA

Engineers Architects

# DEMO KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

123.E104

BUILDING 123/D ROOF, LIGHTNING

PROTECTION PLANS

21 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

NORTH

0 8 16 32

NORTH

0 8 16 32

Scale: 1/16" = 1'-0"1 BUILDING 123/D, ROOF DEMOLITION PLAN Scale: 1/16" = 1'-0"2 BUILDING 123/D ROOF LIGHTNING PROTECTION PLAN, NEW WORK

1 CLASS 1 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TIE IN EXISTING

DOWN CONDUCTOR TO NEW CONDUCTOR.

CONTRACTOR SHALL PERFORM A CONTINUITY

TEST ON THE EXISTING THRU-ROOF CONDUCTOR

PRIOR TO INSTALLATION, AND ON THE

CONNECTION OF THE NEW CONDUCTOR TO THE

EXISTING CONDUCTOR AFTER INSTALLATION TO

ENSURE PERFORMANCE.

3 NEW AIR TERMINALS TO BE MOUNTED TO

PARAPET UNDER SOLAR ARRAY IN ORDER TO

PROVIDE BUILDING PROTECTION IN THE EVENT

THE SOLAR ARRAY IS REMOVED.

4 NEW AIR TERMINALS TO BE MOUNTED TO

EXISTING SOLAR WATER HEATER ARRAY. TIE IN

TO CONDUCTOR MOUNTED TO BACK FACE OF

PARAPET.

5 EXISTING THRU-WALL PENETRATION TO BE

REUSED. SEE DETAIL 1/E-502 FOR MORE

INFORMATION. TYPICAL ALL THRU-WALL

PENETRATIONS THIS SHEET. CONTRACTOR SHALL

PERFORM A CONTINUITY TEST ON THE EXISTING

THRU-WALL CONDUCTOR PRIOR TO

INSTALLATION, AND ON THE CONNECTION OF THE

NEW CONDUCTOR TO THE EXISTING CONDUCTOR

AFTER INSTALLATION TO ENSURE

PERFORMANCE.

6 CONNECT THIS SECTION OF THE NEW LIGHTNING

PROTECTION SYSTEM TO THE NEW SYSTEM

LOCATED ON 123/E. SEE SHEET 123.E105 FOR

DESIGN OF BUILDING E.

1 EXISTING LIGHTNING PROTECTION CONDUCTOR

TO BE DEMOLISHED. TYPICAL ALL DASHED LINES

THIS DEMOLITION ROOF PLAN.

2 EXISTING LIGHTNING PROTECTION AIR TERMINAL

TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS

THIS DEMOLITION ROOF PLAN.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

DEVICES AND CONDUCTORS INDICATED WITH

HIDDEN/DASHED LINES ARE TO BE REMOVED,

UNLESS NOTED OTHERWISE. SEE ELECTRICAL

SYMBOLS LEGEND ON E-001 FOR REFERENCE.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET WALL USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

SEE SHEET 123.E101

OF WORK

SEE SHEET 123.E102

FOR CONTINUATION

OF WORK

SEE SHEET 123.E103

FOR CONTINUATION

OF WORK

SEE SHEET 123.E104

FOR CONTINUATION

OF WORK

EXISTING

ANTENNA

SEE SHEET 123.E101

FOR CONTINUATION

OF WORK

SEE SHEET 123.E102

FOR CONTINUATION

OF WORK

SEE SHEET 123.E103

FOR CONTINUATION

OF WORK

SEE SHEET 123.E104

FOR CONTINUATION

OF WORK

EXISTING

ANTENNA

Engineers Architects

# DEMO KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

123.E105

BUILDING 123/E ROOF, LIGHTNING

PROTECTION PLANS

22 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

NORTH

0 8 16 32

NORTH

0 8 16 32

Scale: 1/16" = 1'-0"1 BUILDING 123/E, ROOF DEMOLITION PLAN Scale: 1/16" = 1'-0"2 BUILDING 123/E ROOF LIGHTNING PROTECTION PLAN, NEW WORK

1 CLASS 1 LIGHTNING CONDUCTORS FASTENED

USING ADHESIVE TYPE FASTENERS EVERY 3' OC.

2 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TIE IN EXISTING

DOWN CONDUCTOR TO NEW CONDUCTOR.

CONTRACTOR SHALL PERFORM A CONTINUITY

TEST ON THE EXISTING THRU-ROOF CONDUCTOR

PRIOR TO INSTALLATION, AND ON THE

CONNECTION OF THE NEW CONDUCTOR TO THE

EXISTING CONDUCTOR AFTER INSTALLATION TO

ENSURE PERFORMANCE.

3 EXISTING THRU-WALL PENETRATION TO BE

REUSED. SEE DETAIL 1/E-502 FOR MORE

INFORMATION. TYPICAL ALL THRU-WALL

PENETRATIONS THIS SHEET. CONTRACTOR SHALL

PERFORM A CONTINUITY TEST ON THE EXISTING

THRU-WALL CONDUCTOR PRIOR TO

INSTALLATION, AND ON THE CONNECTION OF THE

NEW CONDUCTOR TO THE EXISTING CONDUCTOR

AFTER INSTALLATION TO ENSURE

PERFORMANCE.

4 CONNECT THIS SECTION OF THE NEW LIGHTNING

PROTECTION SYSTEM TO THE NEW SYSTEM

LOCATED ON 123/A. SEE SHEET 123.E101 FOR

DESIGN OF BUILDING A.

1 EXISTING LIGHTNING PROTECTION CONDUCTOR

TO BE DEMOLISHED. TYPICAL ALL DASHED LINES

THIS DEMOLITION ROOF PLAN.

2 EXISTING LIGHTNING PROTECTION AIR TERMINAL

TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS

THIS DEMOLITION ROOF PLAN.

3 EXISTING DOWN CONDUCTOR THROUGH ROOF

PENETRATION TO BE REUSED. TYPICAL ALL

DOWN CONDUCTOR SYMBOLS COLLOCATED WITH

ROOF PENETRATION SYMBOLS THIS DEMOLITION

ROOF PLAN.

4 EXISTING BOND TO METAL ROOF FLASHING TO BE

DEMOLISHED.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

LIGHTNING PROTECTION SYSTEM SHALL BE

INSTALLED BY A CERTIFIED LIGHTNING

PROTECTION INSTALLATION CONTRACTOR.

THE FINAL INSTALLATION SHALL MEET NFPA 780

AND UL96A REQUIREMENTS FOR LIGHTNING

PROTECTION SYSTEMS.

ACTUAL JOB SITE CONDITIONS MAY

NECESSITATE SLIGHT ALTERNATIONS OF AIR

TERMINAL AND GROUND LOCATIONS. ANY

ALTERATIONS SHALL BE APPROVED BY THE

COR PRIOR TO THEIR EXECUTION.

AIR TERMINALS SHALL BE PLACED AROUND THE

ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM

INTERVALS FOR 10" TO 24" AIR TERMINALS AND

EXTEND A MINIMUM OF 10” ABOVE THE OBJECT

OR AREA IT IS TO PROTECT.

AIR TERMINALS SHALL BE PLACED WITHIN 24"

FROM THE OUTSIDE EDGES OF THE OBJECT TO

BE PROTECTED.

MID-ROOF AIR TERMINALS ON FLAT OR GENTLY

SLOPING ROOFS SHALL BE INSTALLED AT

MAXIMUM 50'-0" INTERVALS.

ALL ROOF PROJECTIONS AND/OR OBJECTS

THAT ARE SUBJECT TO A DIRECT LIGHTNING

STRIKE SHALL BE PROVIDED WITH AIR

TERMINALS UNLESS THEY ARE LOCATED

WITHIN A ZONE OF PROTECTION.

METAL BODIES SITUATED WITHIN 6'-0" OF A

LIGHTNING PROTECTION CONDUCTOR SHALL

BE BONDED TO THE LIGHTNING PROTECTION

SYSTEM. HAND/GUARDRAILS SHALL BE

BONDED EVERY 50 LINEAR FEET AND AT

MINIMUM THE BEGINNING AND END OF THE

RAILING.

ELECTRICAL CONTRACTOR SHALL FOLLOW

SITE LOCK-OUT/TAG-OUT GUIDELINES TO

DEENERGIZE EQUIPMENT AS REQUIRED.

ELECTRICAL CONTRACTOR TO DISPOSE OF

REMOVED ELECTRICAL EQUIPMENT.

DEVICES AND CONDUCTORS INDICATED WITH

HIDDEN/DASHED LINES ARE TO BE REMOVED,

UNLESS NOTED OTHERWISE. SEE ELECTRICAL

SYMBOLS LEGEND ON E-001 FOR REFERENCE.

AIR TERMINALS ARE TO BE MOUNTED TO THE

PARAPET WALL USING ADHESIVE MOUNTS.

CONTRACTOR WILL NOT USE SCREWS OR

ANCHORS INTO WALL TO PREVENT FROST

HEAVE OF HARDWARE AND CRACKING OF

PARAPET.

RADIUS NO LESS THAN 8"

ANGLE NOT TO

EXCEED 90 DEGREES

STEP 1. FILE STRUCTURE CONNECTION AREA (3 IN. X 3. IN.

MIN) TO BARE SHINY METAL AND CLEAN.

1.

2.

GENERAL NOTES:

ALL CABLES AND WELDS SHALL BE MINIMUM 3 INCHES APART.

STANDARD WELD CARTRIDGES SHALL BE USED FOR STEEL SURFACES.

FOR DIP USE XF-19 WELD CARTRIDGES.

STEP 2. STRIP INSULATION FROM WIRE. ATTACH SLEEVE

(REQUIRED ON NO.4 AWG WIRE AND SMALLER).

STEP 3. HOLD MOLD FIRMLY WITH OPENING AWAY FROM

OPERATOR AND IGNITE WITH FLINT GUN.

STEP 4. REMOVE SLAG FROM CONNECTION AND PEEN

WELD FOR SOUNDNESS.

STEP 5. COVER CONNECTION AND EXPOSED STRUCTURE

SURFACE WITH AN EPOXY COATING.

HANDLE GRAPHITE COVER

STARTING POWDER

METAL WELDING POWDER

GRAPHITE MOLD

WIRE

PIPE WALL

METAL DISC

NO SLAG OR

DEFORMITIES

ALLOWED

EXOTHERMIC WELD

(THERMOWELD OR

EQUIVALENT). PARALLEL,

NO T-WELDS ALLOWED.

LIGHTNING PROTECTION

CONDUCTOR OR

EXTERIOR GROUNDING

CONDUCTOR

MINIMUM BENDING RADIUS

45 DEGREES, TYPICAL

LIGHTNING PROTECTION

CONDUCTOR

30° MAX.

FINISHED GRADE

GROUND ROD SHALL NOT BE ANGLED

MORE THAN 30° FROM VERTICAL.

3/4" DIAMETER COPPER CLAD

STEEL GROUND ROD 10' LONG.

AT LEAST 8' OF GROUND ROD IN

CONTACT WITH SOIL

GEC

1.

NOTE:

THIS DETAIL IS TO SHOW THE ALLOWABLE ANGLE OF THE GROUND ROD GOING

INTO THE GROUND. THE NUMBER OF GROUND RODS REQUIRED SHALL BE

DETERMINED ACCORDING TO THE LATEST EDITION OF THE NEC.

ECLEUL

AIR TERMINAL

1.

2.

3.

4.

5.

NOTES:

SEE SHEET E-001 FOR LEGEND.

ALL SPLICES BELOW GRADE SHALL BE THE EXOTHERMIC

WELD TYPE.

AIR TERMINALS SHALL EXTEND NO LESS THAN 10 INCHES

ABOVE THE ROOF OR EQUIPMENT BEING PROTECTED.

ALL METAL EQUIPMENT ON THE ROOF SHALL BE BONDED

TO THE LIGHTNING PROTECTION SYSTEM.

THRU ROOF FLASHING SHALL BE COPPER WITH 8 INCH

ROUND BASE AND VERTICAL TUBE WITH NEOPRENE SEAL.

FLASHING SHALL BE THE PRODUCT OF THE

MANUFACTURER OF THE LIGHTNING PROTECTION SYSTEM.

A MEMBRANE FLASHING SHALL BE PROVIDED OVER THE

THRU ROOF FLASHING.

MAIN CONDUCTOR

CLIP CABLE SUPPORT

SEALING WASHER

-2

4" (M

IN

PARAPET WALL

TYPICAL ADHESIVE

PARAPET AIR TERMINAL

PLACEMENT.

COPPER LIGHTNING PROTECTION SYSTEM CABLE DOWN TO

BUILDING LIGHTNING PROTECTION SYSTEM CONNECT TO

LIGHTNING PROTECTION SYSTEM.

AIR TERMINAL SUPPORT, 2" WIDE

ADJUSTABLE METAL BAND.

LIGHTNING PROTECTION

SYSTEM CABLE.

LOOP ATTACHEMENT

TO BOILER STACK.

DIAMETER EXHAUST

DISCHARGE STACK.

1/2" COPPER AIR TERMINALS. TWO PER

BOILER STACK. SHALL EXTEND AT LEAST

10" ABOVE STACK.

COMBINATION SPLICER

CABLE TO TERMINAL

1-HOLE LONG BARREL

CONNECTION LUG

BOLT TO

EQUIPMENT

CRIMP

LIGHTNING

PROTECTION CABLE

EQUIPMENT

ADHESIVE

6"

6"

METALLIC ENCLOSURE SUCH

AS HVAC UNIT ON ROOF

LIGHTNING

PROTECTION

CONDUCTOR

COMPRESSION LUG OR SCREW

LUG TO HOLD CONDUCTOR

METAL

SURFACE

BOLT TO METAL

System No. W-L-5029

INSULATED METAL PIPE THROUGH GYPSUM WALL ASSEMBLY

F-RATING = 1-HR., 2-HR., OR 3-HR.

T-RATING = 0-HR., 1/2-HR., OR 1-1/4-HR. (SEE UL FIRE RESISTANCE DIRECTORY)

L-RATING AT AMBIENT - 4 CFM/SQ-FT

L-RATING AT 400* F = LESS THAN 1CFM/SQ-FT

FRONT VIEW

A

A

SECTION A-A

1.

2.

3.

A.

B.

C.

4.

5.

A.

B.

6.

1.

2.

3.

4.

GYPSUM WALL ASSEMBLY (UL/cUL CLASSIFIED U300, U400, OR W400 SERIES) (1-HR., 2-HR., OR 3-HR. FIRE-RATING) (3-HR. SHOWN) (NOT SHOWN) WOOD STUDS TO CONSIST OF NOMINAL 2"x4" LUMBER. STEEL STUDS TO BE MINIMUM 2-1/2" (FOR 1-HR. OR 2-HR.

FIRE-RATING) OR 3-1/2" (FOR 3-HR. FIRE-RATING) WIDE.

PENETRATING ITEM TO BE ONE OF THE FOLLOWING:

MAXIMUM 12" NOMINAL DIAMETER STEEL PIPE (SCHEDULE 10 OR HEAVIER).

MAXIMUM 12" NOMINAL DIAMETER CAST OR DUCTILE IRON PIPE.

MAXIMUM 6" NOMINAL DIAMETER COPPER PIPE OR TUBING (FOR 3-HR. WALLS, COPPER PIPE OR TUBING SHALL BE MAXIMUM 4"

NOMINAL DIAMETER).

NOMINAL 1", 1-1/2", OR 2" THICK GLASS-FIBER PIPE INSULATION OR MAXIMUM 2" THICK CALCIUM SILICATE PIPE INSULATION (SEE

NOTE 4 BELOW).

HILTI FS-ONE MAX OR FS-ONE INTUMESCENT FIRESTOP SEALANT:

MAXIMUM 5/8" DEPTH REQUIRED FOR 1-HR. OR 2-HR. FIRE-RATING.

MINIMUM 1" DEPTH REQUIRED FOR 3-HR. FIRE-RATING.

MINIMUM 1/2" BEAD HILTI FS-ONE MAX OR FS-ONE INTUMESCENT FIRESTOP SEALANT APPLIED AT POINT OF CONTACT.

NOTES:

MAXIMUM DIAMETER OF OPENING = 18-5/8".

ANNULAR SPACE (FOR 1-HR. OR 2-HR. FIRE-RATING) = MINIMUM 0", MAXIMUM 1-7/8".

ANNULAR SPACE (FOR 3-HR. FIRE-RATING) = MINIMUM 0", MAXIMUM 1-1/4".

WHEN CALCIUM SILICATE PIPE INSULATION IS USED, SECURE INSULATION TO PIPE WITH STAINLESS STEEL BANDS OR MINIMUM 18

AWG STAINLESS STEEL WIRE AT MAXIMUM 12" O.C.

Engineers Architects Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

70, 91, 102, 111, 112, 113, & 123

8/

/2

:4 1:

P

M C

:\U se rs \w re ed

\D oc um en ts \E

_2 3-

3-

Q

-V A

M ilw au ke e- In st l L tn g

Pr ot

-W I_

R

_w re ed R

G 8R

E.

rv t

E-501

ELECTRICAL DETAILS

23 24WSR

INSTALL LIGHTNING

PROTECTION

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 AUGUST 20, 2024

100% CONSTRUCTION DOCUMENTS

695-22-10623-093

KTK

Scale: No Scale1 BONDING CONDUCTOR BEND RADIUS

Scale: No Scale2 EXOTHERMIC WELD - WIRE TO PIPE

Scale: No Scale3 EXOTHERMIC WELD - WIRE TO WIRE

Scale: No Scale5 GROUND ROD DETAIL

Scale: No Scale4 LIGHTNING PROTECTION MECHANICAL BOND

Scale: No Scale6 LIGHTNING PROTECTION AIR TERMINAL

Scale: No Scale7 LIGHTNING PROTECTION AIR TERMINAL

Scale: No Scale8 LIGHTNING PROTECTION AIR PARAPET

Scale: No Scale10 EXHAUST DISCHARGE STACK LIGHTNING PROTECTION SYSTEM DETAIL

Scale: No Scale11 MECHANICAL CLAMP LIGHTNING PROTECTION FITTING CONNECTION TO EQUIPMENT

Scale: No Scale9 METALIC ENCLOSURE TERMINATIONS Scale: No Scale12 UL PENETRATION DETAIL W-L-5029 (HILTI B.O.D)

REMOVABLE COVER. COVER

SHALL BE REMOVABLE BY

HAND. NO TOOLS SHALL BE

REQUIRED FOR REMOVAL

6" OF CRUSHED ROCK

ON EACH SIDE OF

INSPECTION SLEEVE

LIGHTNING

PROTECTION

CONDUCTOR

3" OF CRUSHED ROCK

BELOW WELD. WELD

SHALL REMAIN VISIBLE

3/4" DIA. COPPER CLAD

STEEL GROUND ROD 10'

LONG

42" LONG X 6" DIA. WHITE

PVC SLEEVE

EXOTHERMIC WELD TO

GROUND ROD

FINISHED GRADE

PVC CABLE PROTECTOR FASTENED

AT 3' OC MINIMUM SPACING.

INSTALL 1' BELOW GRADE TO 6' OR

MORE ABOVE GRADE.

LIGHTNING PROTECTION

DOWN CONDUCTOR FROM

ROOF/PROTECTED AREA

GROUND ROD CLAMP

GROUND ROD (3/4" X 10')

2'-0" MIN.

3'-0" MIN.

GROUND LEVEL

NOTE:

METAL V.T.R WITHIN 6' OF A LIGHTNING

PROTECTION CONDUCTOR ARE

REQUIRED TO BE BONDED.

PIPE BONDING STRAP

#6 AWG BONDING CONDUCTOR.

CIRCUIT TO LIGHTNING

PROTECTION SYSTEM. SPLICE INTO

LIGHTNING PROTECTION

CONDUCTOR USING A UL

APPROVED COMBINATION SPLICER.

LIGHTNING CONDUCTOR CONTINUES

DOWN FACADE OF BUILDING.

SECURE TO BUILDING EVERY 3' OC

USING FASTENERS DESIGNED FOR

BUILDING’S EXTERIOR MATERIAL.

ADHESIVE MOUNT MECHANICAL

BOND TO DOWN CONDUCTOR

ROOF

COPPER CONDUCTOR

CONNECT TO ROOF

CONDUCTOR

THRU-ROOF ROD

ROOF FLASHING PROVIDED

BY THE ROOFING

CONTRACTOR

BRASS CONNECTOR

COPPER CONDUCTOR

THRU-ROOF ROD

SEAL PVC CONDUIT WITH

SILICONE SEALANT TO

PREVENT INGRESS OF

WATER

THRU-ROOF ROD

ROOF CONDUCTOR

PROPER ROOF FLASHING

(FURNISHED AND

INSTALLED BY THE

ROOFING CONTRACTOR)

COLUMN/EXTERIOR WALL

FLOOR SLAB

CONNECT CONDUCTOR TO

BUILDING STEEL USING AN

APPROVED CONNECTION

METHOD

System No. C-AJ-1575

ANSI/UL1479 (ASTM E814)

F Ratings - 2 and 3 Hr (See Item 4B)

T Rating - 0 Hr

W Rating - Class 1 (See Item 4)

A

A

3 4B

SECTION A-A

1.

a.

A.

a.

b.

2.

3.

A.

B.

C.

D.

E.

F.

Floor or Wall Assembly - Min. 2-1/2" (64mm) thick reinforced lightweight or normal weight (100-150 pcf or 1600-2400 kg/m3.) concrete. wall may also be constructed of any UL Classified Concrete Blocks*. Floor may also be constructed of any min. 6" (152 mm) thick UL Classified hollow core Precast Concrete Units*. Max diameter of opening is 30-7/8" (784 mm) when concrete floor or wall is used and max 7" (178 mm) when precast concrete units are used.

See Concrete Blocks (CAZT) and Precast Concrete Units (CFTV) categories in the Fire Resistance Directory for names and manufacturers.

Floor Assembly - (Optional, Not Shown) - The fire rated unprotective concrete and steel floor assembly shall be constructed of the materials and in the manner specified in the individual D900 Series designs in the UL Fire…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .