These are lightning protection design documents for multiple buildings (Buildings 111, 112, 123) with detailed roof lightning protection plans for demolition and new work installations. The documents specify comprehensive requirements for lightning protection systems, including: air terminals must be placed around roof perimeters at 20'-0" maximum intervals, extending at least 10" above protected areas; mid-roof terminals on flat roofs shall be installed at maximum 50'-0" intervals; and all metal bodies within 6'-0" of lightning protection conductors must be bonded to the system. The installation must be performed by a certified lightning protection installation contractor and must meet NFPA 780 and UL96A requirements. Key technical specifications include using adhesive mounts for air terminals (avoiding screws to prevent frost heave), bonding hand/guardrails every 50 linear feet, and ensuring down conductors are properly grounded and connected to building structures. The documents include detailed electrical diagrams, ground rod installation guidelines, and specific mounting instructions for various building components.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING HVAC DUCTING
EXISTING HVAC DUCTING
Engineers Architects
# DEMO KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FULLY SPRINKLERED
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
111.E102
BUILDING 111 UPPER B WING ROOF,
LIGHTNING PROTECTION PLANS
13 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
NORTH
0 84 16
NORTH
0 84 16
Scale: 3/32" = 1'-0"1 BUILDING 111 UPPER B WING ROOF, DEMOLITION PLAN Scale: 3/32" = 1'-0"2 BUILDING 111 UPPER B WING ROOF LIGHTNING PROTECTION PLAN, NEW WORK
1 CLASS 2 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 REUSE EXISTING DOWN CONDUCTOR FROM
UPPER B WING ROOF DOWN TO UPPER A AND C
WING ROOF TOPS. TIE INTO NEW LIGHTNING
PROTECTION SYSTEM. CONTRACTOR SHALL
PERFORM A CONTINUITY TEST ON THE EXISTING
DOWN CONDUCTOR PRIOR TO INSTALLATION,
AND ON THE CONNECTION OF THE NEW
CONDUCTOR TO THE EXISTING CONDUCTOR
AFTER INSTALLATION TO ENSURE
PERFORMANCE.
3 MOUNT LIGHTNING PROTECTION AIR TERMINAL
TO EXISTING ANTENNA EQUIPMENT.
4 BOND EXISTING CABLE TRAY TO LIGHTNING
PROTECTION SYSTEM.
5 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TIE IN EXISTING
DOWN CONDUCTOR TO NEW CONDUCTOR.
CONTRACTOR SHALL PERFORM A CONTINUITY
TEST ON THE EXISTING THRU-ROOF CONDUCTOR
PRIOR TO INSTALLATION, AND ON THE
CONNECTION OF THE NEW CONDUCTOR TO THE
EXISTING CONDUCTOR AFTER INSTALLATION TO
ENSURE PERFORMANCE.
6 BOND EXISTING LADDER TO LIGHTNING
PROTECTION SYSTEM.
7 BOND EXISTING LIGHTING POLE TO LIGHTNING
PROTECTION SYSTEM.
8 BOND TO FRAME OF EXISTING ANTENNA
EQUIPMENT. COORDINATE WORK WITH COR TO
PREVENT EXCESSIVE RF/EMF RADIATION
EXPOSURE.
1 EXISTING LIGHTNING PROTECTION CONDUCTOR
TO BE DEMOLISHED. TYPICAL ALL DASHED LINES
THIS DEMOLITION ROOF PLAN.
2 EXISTING LIGHTNING PROTECTION AIR TERMINAL
TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS
THIS DEMOLITION ROOF PLAN.
3 EXISTING CONDUCTOR BOND TO BE
DEMOLISHED.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
DEVICES AND CONDUCTORS INDICATED WITH
HIDDEN/DASHED LINES ARE TO BE REMOVED,
UNLESS NOTED OTHERWISE. SEE ELECTRICAL
SYMBOLS LEGEND ON E-001 FOR REFERENCE.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET WALL USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
Docusign Envelope ID: FB232B3D-DB2C-480F-9397-58A7828991F7
8/19/2024
1 2
SEE SHEET 111.E102 FOR CONTINUATION OF WORK
4 4
4 4
4 4 4
4 4
Engineers Architects
# DEMO KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FULLY SPRINKLERED
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
111.E103
BUILDING 111 UPPER C WING ROOF,
LIGHTNING PROTECTION PLANS
14 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
NORTH
0 84 16
NORTH
0 84 16
Scale: 3/32" = 1'-0"1 BUILDING 111 UPPER C WING ROOF, DEMOLITION PLAN
Scale: 3/32" = 1'-0"2 BUILDING 111 UPPER C WING ROOF LIGHTNING PROTECTION PLAN, NEW WORK
1 CLASS 2 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 TIE IN DOWN CONDUCTORS FROM 111 UPPER B
WING INTO A WING LIGHTNING PROTECTION
SYSTEM. CONTRACTOR SHALL PERFORM A
CONTINUITY TEST ON THE EXISTING DOWN
CONDUCTOR PRIOR TO INSTALLATION, AND ON
THE CONNECTION OF THE NEW CONDUCTOR TO
THE EXISTING CONDUCTOR AFTER INSTALLATION
TO ENSURE PERFORMANCE.
3 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TIE IN EXISTING
DOWN CONDUCTOR TO NEW CONDUCTOR.
CONTRACTOR SHALL PERFORM A CONTINUITY
TEST ON THE EXISTING THRU-ROOF CONDUCTOR
PRIOR TO INSTALLATION, AND ON THE
CONNECTION OF THE NEW CONDUCTOR TO THE
EXISTING CONDUCTOR AFTER INSTALLATION TO
ENSURE PERFORMANCE.
4 BOND TO EXISTING FALL PROTECTION EVERY 50',
THE BEGINNING AND END OF THE FALL
PROTECTION, AND AT EACH CHANGE IN
DIRECTION.
1 EXISTING LIGHTNING PROTECTION CONDUCTOR
TO BE DEMOLISHED. TYPICAL ALL DASHED LINES
THIS DEMOLITION ROOF PLAN.
2 EXISTING LIGHTNING PROTECTION AIR TERMINAL
TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS
THIS DEMOLITION ROOF PLAN.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
DEVICES AND CONDUCTORS INDICATED WITH
HIDDEN/DASHED LINES ARE TO BE REMOVED,
UNLESS NOTED OTHERWISE. SEE ELECTRICAL
SYMBOLS LEGEND ON E-001 FOR REFERENCE.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET WALL USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
8 8
8 8
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FULLY SPRINKLERED
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
111.E104
BUILDING 111, FLOOR 2 AND 5 ROOF,
LIGHTNING PROTECTION PLAN, NEW
WORK
15 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
NORTH
0 84 16
1 CLASS 1 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 PROVIDE ROOF PENETRATION AND THRU-ROOF
DOWN CONDUCTOR. BOND CONDUCTOR TO
BUILDING STEEL.
3 MOUNT LIGHTNING PROTECTION AIR TERMIAL TO
TOP OF THE OUTSIDE FACE OF THE CONDENSER
TO PREVENT BUILD UP OF COPPER PATINA ON
TOP OF UNIT.
4 PROVIDE DOWN CONDUCTOR ALONG EXTERIOR
FACADE OF BUILDING AND CONNECT TO NEW
LIGHTNING PROTECTION SYSTEM ON SECOND
FLOOR ROOF. DOWN CONDUCTOR SHALL BE
FASTENED TO BUILDING FACADE WITH
FASTENERS DESIGNED FOR BUILDING’S
EXTERIOR MATERIAL. BUILDING ELEVATION IS
APPROXIMATELY 40FT ABOVE SECOND FLOOR
ROOF LEVEL.
6 PROVIDE DOWN CONDUCTOR ALONG EXTERIOR
FACADE OF BUILDING AND CONNECT TO NEW
PROVIDED GROUND ROD. DOWN CONDUCTOR
SHALL BE FASTENED TO BUILDING FACADE WITH
FASTENERS DESIGNED FOR BUILDING’S
EXTERIOR MATERIAL. CUT HARDSCAPE TO
CREATE TRENCH FOR DOWN CONDUCTOR AND
GROUND ROD. PROVIDE GROUND TESTING WELL
FOR FUTURE INSPECTION. CUT AREAS SHALL BE
REPAIRED WITH LIKE MATERIALS TO MATCH
EXISTING. GROUND WELL SHALL BE TIER 15
RATED. BUILDING ELEVATION IS APPROXIMATELY
25FT ABOVE GROUND LEVEL.
7 DOWN CONDUCTOR TO BE PROTECTED TO A
HEIGHT OF 6’ FROM GRADE WITH RIGID
SCHEDULE 80 PVC ATTACHED TO BUILDING.
PAINT PVC IN A COMPLIMENTARY COLOR TO THE
EXISTING FACADE. PROVIDE PAINT SAMPLES TO
COR TO VERIFY FINAL COLOR DECISION.
8 BOND TO EXISTING FALL PROTECTION EVERY 50',
THE BEGINNING AND END OF THE FALL
PROTECTION, AND AT EACH CHANGE IN
DIRECTION.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 3/32" = 1'-0"1 BUILDING 111, FLOOR 2 AND 5 ROOF, LIGHTNING PROTECTION PLAN, NEW WORK
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET WALL USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
7 7 7
4 4 4
Engineers Architects
# DEMO KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
112.E101
BUILDING 112 ROOF, LIGHTNING
PROTECTION PLANS
16 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
NORTH
0 105 20
Scale: 1" = 10'-0"1 BUILDING 112, ROOF DEMOLITION PLAN
Scale: 1" = 10'-0"2 BUILDING 112 ROOF LIGHTNING PROTECTION PLAN, NEW WORK
NORTH
0 105 20
1 CLASS 2 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 BOND CONDUCTOR TO EXISTING LADDER FRAME.
3 REUSE EXISTING ROOF PENETRATION AND RUN
NEW DOWN CONDUCTOR ALONG EXTERIOR OF
BUILDING FACADE. DOWN CONDUCTOR SHALL BE
FASTENED TO BUILDING FACADE WITH
FASTENERS DESIGNED FOR BUILDING’S
EXTERIOR MATERIAL. TIE IN NEW LPS
CONDUCTOR TO EXISTING THROUGH ROOF
PENETRATION CONDUCTOR AND NEW DOWN
CONDUCTOR ALONG BUILDING EXTERIOR.
CONTRACTOR SHALL PERFORM A LIGHTNING
PROTECTION TEST ON THE EXISTING DOWN
CONDUCTOR PRIOR TO INSTALLATION, AND ON
THE CONNECTION OF THE NEW CONDUCTOR TO
THE EXISTING CONDUCTOR AFTER INSTALLATION
TO ENSURE PERFORMANCE.
4 RUN NEW DOWN CONDUCTOR ALONG EXTERIOR
OF BUILDING FACADE. DOWN CONDUCTOR SHALL
BE FASTENED TO BUILDING FACADE WITH
FASTENERS DESIGNED FOR BUILDING’S
EXTERIOR MATERIAL.
5 CONNECT LPS CONDUCTOR TO GROUNDING BUS
AT MAIN DISTRIBUTION PANEL.
6 CONNECT LIGHTNING PROTECTION CONDUCTORS
TO EXISTING DOWN CONDUCTORS REUSING
EXISTING ROOF PENETRATION. VERIFY WATER
TIGHT SEAL AND RESEAL AS NECESSARY.
CONTRACTOR SHALL PERFORM A LIGHTNING
PROTECTION TEST ON THE EXISTING DOWN
CONDUCTOR PRIOR TO INSTALLATION, AND ON
THE CONNECTION OF THE NEW CONDUCTOR TO
THE EXISTING CONDUCTOR AFTER INSTALLATION
TO ENSURE PERFORMANCE.
7 DOWN CONDUCTOR TO BE PROTECTED TO A
HEIGHT OF 6’ FROM GRADE WITH RIGID
SCHEDULE 80 PVC ATTACHED TO BUILDING.
PAINT PVC IN A COMPLIMENTARY COLOR TO THE
EXISTING FACADE. PROVIDE PAINT SAMPLES TO
COR TO VERIFY FINAL COLOR DECISION.
8 BUILDING 112 UPPER LEVEL IS APPROXIMATELY
40 FEET ABOVE GROUND.
9 BUILDING 112 IS APPROXIMATELY 23-25 FEET
ABOVE GROUND IN THIS LOCATION.
1 EXISTING LIGHTNING PROTECTION CONDUCTOR
TO BE DEMOLISHED. TYPICAL ALL DASHED LINES
THIS DEMOLITION ROOF PLAN.
2 EXISTING LIGHTNING PROTECTION AIR TERMINAL
TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS
THIS DEMOLITION ROOF PLAN.
3 EXISTING CONDUCTOR BOND TO BE
DEMOLISHED. TYPICAL ALL CONDUCTOR BONDS
THIS DEMOLITION ROOF PLAN.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
DEVICES AND CONDUCTORS INDICATED WITH
HIDDEN/DASHED LINES ARE TO BE REMOVED,
UNLESS NOTED OTHERWISE. SEE ELECTRICAL
SYMBOLS LEGEND ON E-001 FOR REFERENCE.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET WALL USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
4 4
5 5
1.
NOTE:
EXISTING COOLING TOWER
CONSTRUCTED OF COMPOSITE
MATERIALS WHICH INCLUDES
THE STAIRS, HANDRAILS, AND
COOLING FAN SHROUDS.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
113.E101
BUILDING 113 ROOF, LIGHTNING
PROTECTION PLAN, NEW WORK
17 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
Scale: 1/8" = 1'-0"2 BUILDING 113 ROOF LIGHTNING PROTECTION PLAN, NEW WORK NORTH
0 84 16
1 CLASS 1 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 LIGHTNING PROTECTION DOWN CONDUCTOR TO
GROUND ROD. DOWN CONDUCTOR SHALL BE
FASTENED TO BUILDING FACADE WITH
FASTENERS DESIGNED FOR BUILDING’S
EXTERIOR MATERIAL. SEE DETAIL 5/E-501 FOR
MORE INFORMATION. BUILDING ELEVATION =
16FT.
3 LIGHTNING PROTECTION DOWN CONDUCTOR TO
GROUND ROD. DOWN CONDUCTOR SHALL BE
FASTENED TO BUILDING FACADE WITH
FASTENERS DESIGNED FOR BUILDING’S
EXTERIOR MATERIAL. SEE DETAIL 5/E-501 FOR
MORE INFORMATION. BUILDING ELEVATION =
30FT.
4 CUT HARDSCAPE TO CREATE TRENCH FOR DOWN
CONDUCTOR AND GROUND ROD. PROVIDE
GROUND TESTING WELL FOR FUTURE
INSPECTION. PROVIDE GROUND TESTING WELL
FOR FUTURE INSPECTION. CUT AREAS SHALL BE
REPAIRED WITH LIKE MATERIALS TO MATCH
EXISTING. GROUND WELL SHALL BE TIER 15
RATED.
5 DOWN CONDUCTOR TO BE PROTECTED TO A
HEIGHT OF 6’ FROM GRADE WITH RIGID
SCHEDULE 80 PVC ATTACHED TO BUILDING.
6 CONNECT LPS CONDUCTOR TO GROUNDING BUS
IN SWITCHGEAR ROOM. SEE DETAIL 6/E-502 FOR
MORE INFORMATION.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET CAPS USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL/CAP TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
AIR TERMINALS MOUNTED TO ROOF,
UNDER OVERHANG OF SOLAR ARRAY
AIR TERMINALS MOUNTED
TO SOLAR ARRAY
SEE SHEET 123.E105 FOR
CONTINUATION OF WORK
EXISTING
ANTENNA
SEE SHEET 123.E105 FOR
CONTINUATION OF WORK
EXISTING
ANTENNA
Engineers Architects
# DEMO KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FULLY SPRINKLERED
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
123.E101
BUILDING 123/A ROOF, LIGHTNING
PROTECTION PLANS
18 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
NORTH
0 8 16 32
Scale: 1/16" = 1'-0"1 BUILDING 123/A, ROOF DEMOLITION PLAN Scale: 1/16" = 1'-0"2 BUILDING 123/A ROOF LIGHTNING PROTECTION PLAN, NEW WORK
NORTH
0 8 16 32
1 CLASS 1 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 BOND LIGHTNING PROTECTION CONDUCTOR TO
EXISTING EQUIPMENT. TYPICAL ALL BONDS THIS
NEW WORK ROOF PLAN.
3 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TIE IN EXISTING
DOWN CONDUCTOR TO NEW CONDUCTOR.
CONTRACTOR SHALL PERFORM A CONTINUITY
TEST ON THE EXISTING THRU-ROOF CONDUCTOR
PRIOR TO INSTALLATION, AND ON THE
CONNECTION OF THE NEW CONDUCTOR TO THE
EXISTING CONDUCTOR AFTER INSTALLATION TO
ENSURE PERFORMANCE.
4 NEW AIR TERMINALS TO BE MOUNTED TO
EXISTING SOLAR WATER HEATER ARRAY. TIE IN
TO CONDUCTOR MOUNTED TO BACK FACE OF
PARAPET.
5 NEW AIR TERMINALS TO BE MOUNTED TO
PARAPET UNDER SOLAR ARRAY IN ORDER TO
PROVIDE BUILDING PROTECTION IN THE EVENT
THE SOLAR ARRAY IS REMOVED.
6 CONNECT THIS SECTION OF THE NEW LIGHTNING
PROTECTION SYSTEM TO THE NEW SYSTEM
LOCATED ON 123/E. SEE SHEET 123.E105 FOR
DESIGN OF BUILDING E.
1 EXISTING LIGHTNING PROTECTION CONDUCTOR
TO BE DEMOLISHED. TYPICAL ALL DASHED LINES
THIS DEMOLITION ROOF PLAN.
2 EXISTING LIGHTNING PROTECTION AIR TERMINAL
TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS
THIS DEMOLITION ROOF PLAN.
3 EXISTING CONDUCTOR BOND TO BE
DEMOLISHED. TYPICAL ALL CONDUCTOR BONDS
THIS DEMOLITION ROOF PLAN.
4 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TYPICAL ALL
DOWN CONDUCTOR SYMBOLS COLLOCATED WITH
ROOF PENETRATION SYMBOLS THIS DEMOLITION
ROOF PLAN.
5 EXISTING BOND TO METAL ROOF FLASHING TO BE
DEMOLISHED.
6 EXISTING ROOF PENETRATION WITHOUT DOWN
CONDUCTOR. CONTRACTOR TO PREPARE
PENETRATION FOR USE WITH NEW SYSTEM.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
DEVICES AND CONDUCTORS INDICATED WITH
HIDDEN/DASHED LINES ARE TO BE REMOVED,
UNLESS NOTED OTHERWISE. SEE ELECTRICAL
SYMBOLS LEGEND ON E-001 FOR REFERENCE.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET WALL USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
SEE SHEET 123.E105
FOR CONTINUATION
OF WORK
EXISTING
ANTENNA
SEE SHEET 123.E105
FOR CONTINUATION
OF WORK
EXISTING
ANTENNA
2 6
Engineers Architects
# DEMO KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FULLY SPRINKLERED
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
123.E102
BUILDING 123/B ROOF, LIGHTNING
PROTECTION PLANS
19 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
NORTH
0 8 16 32
NORTH
0 8 16 32
Scale: 1/16" = 1'-0"1 BUILDING 123/B, ROOF DEMOLITION PLAN Scale: 1/16" = 1'-0"2 BUILDING 123/B ROOF LIGHTNING PROTECTION PLAN, NEW WORK
1 CLASS 1 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TIE IN EXISTING
DOWN CONDUCTOR TO NEW CONDUCTOR.
CONTRACTOR SHALL PERFORM A CONTINUITY
TEST ON THE EXISTING THRU-ROOF CONDUCTOR
PRIOR TO INSTALLATION, AND ON THE
CONNECTION OF THE NEW CONDUCTOR TO THE
EXISTING CONDUCTOR AFTER INSTALLATION TO
ENSURE PERFORMANCE.
3 BOND LIGHTNING PROTECTION CONDUCTOR TO
EXISTING EQUIPMENT. TYPICAL ALL BONDS THIS
NEW WORK ROOF PLAN.
4 NEW AIR TERMINALS TO BE MOUNTED TO
EXISTING SOLAR WATER HEATER ARRAY. TIE IN
TO CONDUCTOR MOUNTED TO BACK FACE OF
PARAPET.
5 NEW AIR TERMINALS TO BE MOUNTED TO
PARAPET UNDER SOLAR ARRAY IN ORDER TO
PROVIDE BUILDING PROTECTION IN THE EVENT
THE SOLAR ARRAY IS REMOVED.
6 CONNECT THIS SECTION OF THE NEW LIGHTNING
PROTECTION SYSTEM TO THE NEW SYSTEM
LOCATED ON 123/E. SEE SHEET 123.E105 FOR
DESIGN OF BUILDING E.
1 EXISTING LIGHTNING PROTECTION CONDUCTOR
TO BE DEMOLISHED. TYPICAL ALL DASHED LINES
THIS DEMOLITION ROOF PLAN.
2 EXISTING LIGHTNING PROTECTION AIR TERMINAL
TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS
THIS DEMOLITION ROOF PLAN.
3 EXISTING CONDUCTOR BOND TO BE
DEMOLISHED. TYPICAL ALL CONDUCTOR BONDS
THIS DEMOLITION ROOF PLAN.
4 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TYPICAL ALL
DOWN CONDUCTOR SYMBOLS COLLOCATED WITH
ROOF PENETRATION SYMBOLS THIS DEMOLITION
ROOF PLAN.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
DEVICES AND CONDUCTORS INDICATED WITH
HIDDEN/DASHED LINES ARE TO BE REMOVED,
UNLESS NOTED OTHERWISE. SEE ELECTRICAL
SYMBOLS LEGEND ON E-001 FOR REFERENCE.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET WALL USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
SEE SHEET 123.E104
OF WORK
AIR TERMINALS MOUNTED TO ROOF,
UNDER OVERHANG OF SOLAR ARRAY
AIR TERMINALS MOUNTED
TO SOLAR ARRAY
EXISTING
ANTENNA
SEE SHEET 123.E104
FOR CONTINUATION
OF WORK
Engineers Architects
# DEMO KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FULLY SPRINKLERED
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
123.E103
BUILDING 123/C ROOF, LIGHTNING
PROTECTION PLANS
20 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
NORTH
0 8 16 32
NORTH
0 8 16 32
Scale: 1/16" = 1'-0"1 BUILDING 123/C, ROOF DEMOLITION PLAN Scale: 1/16" = 1'-0"2 BUILDING 123/C ROOF LIGHTNING PROTECTION PLAN, NEW WORK
1 CLASS 1 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TIE IN EXISTING
DOWN CONDUCTOR TO NEW CONDUCTOR.
CONTRACTOR SHALL PERFORM A CONTINUITY
TEST ON THE EXISTING THRU-ROOF CONDUCTOR
PRIOR TO INSTALLATION, AND ON THE
CONNECTION OF THE NEW CONDUCTOR TO THE
EXISTING CONDUCTOR AFTER INSTALLATION TO
ENSURE PERFORMANCE.
3 NEW AIR TERMINALS TO BE MOUNTED TO
EXISTING SOLAR WATER HEATER ARRAY. TIE IN
TO CONDUCTOR MOUNTED TO BACK FACE OF
PARAPET.
4 NEW AIR TERMINALS TO BE MOUNTED TO
PARAPET UNDER SOLAR ARRAY IN ORDER TO
PROVIDE BUILDING PROTECTION IN THE EVENT
THE SOLAR ARRAY IS REMOVED.
5 CONNECT THIS SECTION OF THE NEW LIGHTNING
PROTECTION SYSTEM TO THE NEW SYSTEM
LOCATED ON 123/E. SEE SHEET 123.E105 FOR
DESIGN OF BUILDING E.
1 EXISTING LIGHTNING PROTECTION CONDUCTOR
TO BE DEMOLISHED. TYPICAL ALL DASHED LINES
THIS DEMOLITION ROOF PLAN.
2 EXISTING LIGHTNING PROTECTION AIR TERMINAL
TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS
THIS DEMOLITION ROOF PLAN.
3 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TYPICAL ALL
DOWN CONDUCTOR SYMBOLS COLLOCATED WITH
ROOF PENETRATION SYMBOLS THIS DEMOLITION
ROOF PLAN.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
DEVICES AND CONDUCTORS INDICATED WITH
HIDDEN/DASHED LINES ARE TO BE REMOVED,
UNLESS NOTED OTHERWISE. SEE ELECTRICAL
SYMBOLS LEGEND ON E-001 FOR REFERENCE.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET WALL USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
AIR TERMINALS MOUNTED
TO SOLAR ARRAY
AIR TERMINALS MOUNTED
TO SOLAR ARRAY
AIR TERMINALS MOUNTED TO ROOF,
UNDER OVERHANG OF SOLAR ARRAY
EXISTING
ANTENNA
Engineers Architects
# DEMO KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FULLY SPRINKLERED
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
123.E104
BUILDING 123/D ROOF, LIGHTNING
PROTECTION PLANS
21 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
NORTH
0 8 16 32
NORTH
0 8 16 32
Scale: 1/16" = 1'-0"1 BUILDING 123/D, ROOF DEMOLITION PLAN Scale: 1/16" = 1'-0"2 BUILDING 123/D ROOF LIGHTNING PROTECTION PLAN, NEW WORK
1 CLASS 1 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TIE IN EXISTING
DOWN CONDUCTOR TO NEW CONDUCTOR.
CONTRACTOR SHALL PERFORM A CONTINUITY
TEST ON THE EXISTING THRU-ROOF CONDUCTOR
PRIOR TO INSTALLATION, AND ON THE
CONNECTION OF THE NEW CONDUCTOR TO THE
EXISTING CONDUCTOR AFTER INSTALLATION TO
ENSURE PERFORMANCE.
3 NEW AIR TERMINALS TO BE MOUNTED TO
PARAPET UNDER SOLAR ARRAY IN ORDER TO
PROVIDE BUILDING PROTECTION IN THE EVENT
THE SOLAR ARRAY IS REMOVED.
4 NEW AIR TERMINALS TO BE MOUNTED TO
EXISTING SOLAR WATER HEATER ARRAY. TIE IN
TO CONDUCTOR MOUNTED TO BACK FACE OF
PARAPET.
5 EXISTING THRU-WALL PENETRATION TO BE
REUSED. SEE DETAIL 1/E-502 FOR MORE
INFORMATION. TYPICAL ALL THRU-WALL
PENETRATIONS THIS SHEET. CONTRACTOR SHALL
PERFORM A CONTINUITY TEST ON THE EXISTING
THRU-WALL CONDUCTOR PRIOR TO
INSTALLATION, AND ON THE CONNECTION OF THE
NEW CONDUCTOR TO THE EXISTING CONDUCTOR
AFTER INSTALLATION TO ENSURE
PERFORMANCE.
6 CONNECT THIS SECTION OF THE NEW LIGHTNING
PROTECTION SYSTEM TO THE NEW SYSTEM
LOCATED ON 123/E. SEE SHEET 123.E105 FOR
DESIGN OF BUILDING E.
1 EXISTING LIGHTNING PROTECTION CONDUCTOR
TO BE DEMOLISHED. TYPICAL ALL DASHED LINES
THIS DEMOLITION ROOF PLAN.
2 EXISTING LIGHTNING PROTECTION AIR TERMINAL
TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS
THIS DEMOLITION ROOF PLAN.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
DEVICES AND CONDUCTORS INDICATED WITH
HIDDEN/DASHED LINES ARE TO BE REMOVED,
UNLESS NOTED OTHERWISE. SEE ELECTRICAL
SYMBOLS LEGEND ON E-001 FOR REFERENCE.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET WALL USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
SEE SHEET 123.E101
OF WORK
SEE SHEET 123.E102
FOR CONTINUATION
OF WORK
SEE SHEET 123.E103
FOR CONTINUATION
OF WORK
SEE SHEET 123.E104
FOR CONTINUATION
OF WORK
EXISTING
ANTENNA
SEE SHEET 123.E101
FOR CONTINUATION
OF WORK
SEE SHEET 123.E102
FOR CONTINUATION
OF WORK
SEE SHEET 123.E103
FOR CONTINUATION
OF WORK
SEE SHEET 123.E104
FOR CONTINUATION
OF WORK
EXISTING
ANTENNA
Engineers Architects
# DEMO KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FULLY SPRINKLERED
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
123.E105
BUILDING 123/E ROOF, LIGHTNING
PROTECTION PLANS
22 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
NORTH
0 8 16 32
NORTH
0 8 16 32
Scale: 1/16" = 1'-0"1 BUILDING 123/E, ROOF DEMOLITION PLAN Scale: 1/16" = 1'-0"2 BUILDING 123/E ROOF LIGHTNING PROTECTION PLAN, NEW WORK
1 CLASS 1 LIGHTNING CONDUCTORS FASTENED
USING ADHESIVE TYPE FASTENERS EVERY 3' OC.
2 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TIE IN EXISTING
DOWN CONDUCTOR TO NEW CONDUCTOR.
CONTRACTOR SHALL PERFORM A CONTINUITY
TEST ON THE EXISTING THRU-ROOF CONDUCTOR
PRIOR TO INSTALLATION, AND ON THE
CONNECTION OF THE NEW CONDUCTOR TO THE
EXISTING CONDUCTOR AFTER INSTALLATION TO
ENSURE PERFORMANCE.
3 EXISTING THRU-WALL PENETRATION TO BE
REUSED. SEE DETAIL 1/E-502 FOR MORE
INFORMATION. TYPICAL ALL THRU-WALL
PENETRATIONS THIS SHEET. CONTRACTOR SHALL
PERFORM A CONTINUITY TEST ON THE EXISTING
THRU-WALL CONDUCTOR PRIOR TO
INSTALLATION, AND ON THE CONNECTION OF THE
NEW CONDUCTOR TO THE EXISTING CONDUCTOR
AFTER INSTALLATION TO ENSURE
PERFORMANCE.
4 CONNECT THIS SECTION OF THE NEW LIGHTNING
PROTECTION SYSTEM TO THE NEW SYSTEM
LOCATED ON 123/A. SEE SHEET 123.E101 FOR
DESIGN OF BUILDING A.
1 EXISTING LIGHTNING PROTECTION CONDUCTOR
TO BE DEMOLISHED. TYPICAL ALL DASHED LINES
THIS DEMOLITION ROOF PLAN.
2 EXISTING LIGHTNING PROTECTION AIR TERMINAL
TO BE DEMOLISHED. TYPICAL ALL AIR TERMINALS
THIS DEMOLITION ROOF PLAN.
3 EXISTING DOWN CONDUCTOR THROUGH ROOF
PENETRATION TO BE REUSED. TYPICAL ALL
DOWN CONDUCTOR SYMBOLS COLLOCATED WITH
ROOF PENETRATION SYMBOLS THIS DEMOLITION
ROOF PLAN.
4 EXISTING BOND TO METAL ROOF FLASHING TO BE
DEMOLISHED.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED BY A CERTIFIED LIGHTNING
PROTECTION INSTALLATION CONTRACTOR.
THE FINAL INSTALLATION SHALL MEET NFPA 780
AND UL96A REQUIREMENTS FOR LIGHTNING
PROTECTION SYSTEMS.
ACTUAL JOB SITE CONDITIONS MAY
NECESSITATE SLIGHT ALTERNATIONS OF AIR
TERMINAL AND GROUND LOCATIONS. ANY
ALTERATIONS SHALL BE APPROVED BY THE
COR PRIOR TO THEIR EXECUTION.
AIR TERMINALS SHALL BE PLACED AROUND THE
ROOF PERIMETER OR RIDGE AT 20'-0" MAXIMUM
INTERVALS FOR 10" TO 24" AIR TERMINALS AND
EXTEND A MINIMUM OF 10” ABOVE THE OBJECT
OR AREA IT IS TO PROTECT.
AIR TERMINALS SHALL BE PLACED WITHIN 24"
FROM THE OUTSIDE EDGES OF THE OBJECT TO
BE PROTECTED.
MID-ROOF AIR TERMINALS ON FLAT OR GENTLY
SLOPING ROOFS SHALL BE INSTALLED AT
MAXIMUM 50'-0" INTERVALS.
ALL ROOF PROJECTIONS AND/OR OBJECTS
THAT ARE SUBJECT TO A DIRECT LIGHTNING
STRIKE SHALL BE PROVIDED WITH AIR
TERMINALS UNLESS THEY ARE LOCATED
WITHIN A ZONE OF PROTECTION.
METAL BODIES SITUATED WITHIN 6'-0" OF A
LIGHTNING PROTECTION CONDUCTOR SHALL
BE BONDED TO THE LIGHTNING PROTECTION
SYSTEM. HAND/GUARDRAILS SHALL BE
BONDED EVERY 50 LINEAR FEET AND AT
MINIMUM THE BEGINNING AND END OF THE
RAILING.
ELECTRICAL CONTRACTOR SHALL FOLLOW
SITE LOCK-OUT/TAG-OUT GUIDELINES TO
DEENERGIZE EQUIPMENT AS REQUIRED.
ELECTRICAL CONTRACTOR TO DISPOSE OF
REMOVED ELECTRICAL EQUIPMENT.
DEVICES AND CONDUCTORS INDICATED WITH
HIDDEN/DASHED LINES ARE TO BE REMOVED,
UNLESS NOTED OTHERWISE. SEE ELECTRICAL
SYMBOLS LEGEND ON E-001 FOR REFERENCE.
AIR TERMINALS ARE TO BE MOUNTED TO THE
PARAPET WALL USING ADHESIVE MOUNTS.
CONTRACTOR WILL NOT USE SCREWS OR
ANCHORS INTO WALL TO PREVENT FROST
HEAVE OF HARDWARE AND CRACKING OF
PARAPET.
RADIUS NO LESS THAN 8"
ANGLE NOT TO
EXCEED 90 DEGREES
STEP 1. FILE STRUCTURE CONNECTION AREA (3 IN. X 3. IN.
MIN) TO BARE SHINY METAL AND CLEAN.
1.
2.
GENERAL NOTES:
ALL CABLES AND WELDS SHALL BE MINIMUM 3 INCHES APART.
STANDARD WELD CARTRIDGES SHALL BE USED FOR STEEL SURFACES.
FOR DIP USE XF-19 WELD CARTRIDGES.
STEP 2. STRIP INSULATION FROM WIRE. ATTACH SLEEVE
(REQUIRED ON NO.4 AWG WIRE AND SMALLER).
STEP 3. HOLD MOLD FIRMLY WITH OPENING AWAY FROM
OPERATOR AND IGNITE WITH FLINT GUN.
STEP 4. REMOVE SLAG FROM CONNECTION AND PEEN
WELD FOR SOUNDNESS.
STEP 5. COVER CONNECTION AND EXPOSED STRUCTURE
SURFACE WITH AN EPOXY COATING.
HANDLE GRAPHITE COVER
STARTING POWDER
METAL WELDING POWDER
GRAPHITE MOLD
WIRE
PIPE WALL
METAL DISC
NO SLAG OR
DEFORMITIES
ALLOWED
EXOTHERMIC WELD
(THERMOWELD OR
EQUIVALENT). PARALLEL,
NO T-WELDS ALLOWED.
LIGHTNING PROTECTION
CONDUCTOR OR
EXTERIOR GROUNDING
CONDUCTOR
MINIMUM BENDING RADIUS
45 DEGREES, TYPICAL
LIGHTNING PROTECTION
CONDUCTOR
30° MAX.
FINISHED GRADE
GROUND ROD SHALL NOT BE ANGLED
MORE THAN 30° FROM VERTICAL.
3/4" DIAMETER COPPER CLAD
STEEL GROUND ROD 10' LONG.
AT LEAST 8' OF GROUND ROD IN
CONTACT WITH SOIL
GEC
1.
NOTE:
THIS DETAIL IS TO SHOW THE ALLOWABLE ANGLE OF THE GROUND ROD GOING
INTO THE GROUND. THE NUMBER OF GROUND RODS REQUIRED SHALL BE
DETERMINED ACCORDING TO THE LATEST EDITION OF THE NEC.
ECLEUL
AIR TERMINAL
1.
2.
3.
4.
5.
NOTES:
SEE SHEET E-001 FOR LEGEND.
ALL SPLICES BELOW GRADE SHALL BE THE EXOTHERMIC
WELD TYPE.
AIR TERMINALS SHALL EXTEND NO LESS THAN 10 INCHES
ABOVE THE ROOF OR EQUIPMENT BEING PROTECTED.
ALL METAL EQUIPMENT ON THE ROOF SHALL BE BONDED
TO THE LIGHTNING PROTECTION SYSTEM.
THRU ROOF FLASHING SHALL BE COPPER WITH 8 INCH
ROUND BASE AND VERTICAL TUBE WITH NEOPRENE SEAL.
FLASHING SHALL BE THE PRODUCT OF THE
MANUFACTURER OF THE LIGHTNING PROTECTION SYSTEM.
A MEMBRANE FLASHING SHALL BE PROVIDED OVER THE
THRU ROOF FLASHING.
MAIN CONDUCTOR
CLIP CABLE SUPPORT
SEALING WASHER
-2
4" (M
IN
PARAPET WALL
TYPICAL ADHESIVE
PARAPET AIR TERMINAL
PLACEMENT.
COPPER LIGHTNING PROTECTION SYSTEM CABLE DOWN TO
BUILDING LIGHTNING PROTECTION SYSTEM CONNECT TO
LIGHTNING PROTECTION SYSTEM.
AIR TERMINAL SUPPORT, 2" WIDE
ADJUSTABLE METAL BAND.
LIGHTNING PROTECTION
SYSTEM CABLE.
LOOP ATTACHEMENT
TO BOILER STACK.
DIAMETER EXHAUST
DISCHARGE STACK.
1/2" COPPER AIR TERMINALS. TWO PER
BOILER STACK. SHALL EXTEND AT LEAST
10" ABOVE STACK.
COMBINATION SPLICER
CABLE TO TERMINAL
1-HOLE LONG BARREL
CONNECTION LUG
BOLT TO
EQUIPMENT
CRIMP
LIGHTNING
PROTECTION CABLE
EQUIPMENT
ADHESIVE
6"
6"
METALLIC ENCLOSURE SUCH
AS HVAC UNIT ON ROOF
LIGHTNING
PROTECTION
CONDUCTOR
COMPRESSION LUG OR SCREW
LUG TO HOLD CONDUCTOR
METAL
SURFACE
BOLT TO METAL
System No. W-L-5029
INSULATED METAL PIPE THROUGH GYPSUM WALL ASSEMBLY
F-RATING = 1-HR., 2-HR., OR 3-HR.
T-RATING = 0-HR., 1/2-HR., OR 1-1/4-HR. (SEE UL FIRE RESISTANCE DIRECTORY)
L-RATING AT AMBIENT - 4 CFM/SQ-FT
L-RATING AT 400* F = LESS THAN 1CFM/SQ-FT
FRONT VIEW
A
A
SECTION A-A
1.
2.
3.
A.
B.
C.
4.
5.
A.
B.
6.
1.
2.
3.
4.
GYPSUM WALL ASSEMBLY (UL/cUL CLASSIFIED U300, U400, OR W400 SERIES) (1-HR., 2-HR., OR 3-HR. FIRE-RATING) (3-HR. SHOWN) (NOT SHOWN) WOOD STUDS TO CONSIST OF NOMINAL 2"x4" LUMBER. STEEL STUDS TO BE MINIMUM 2-1/2" (FOR 1-HR. OR 2-HR.
FIRE-RATING) OR 3-1/2" (FOR 3-HR. FIRE-RATING) WIDE.
PENETRATING ITEM TO BE ONE OF THE FOLLOWING:
MAXIMUM 12" NOMINAL DIAMETER STEEL PIPE (SCHEDULE 10 OR HEAVIER).
MAXIMUM 12" NOMINAL DIAMETER CAST OR DUCTILE IRON PIPE.
MAXIMUM 6" NOMINAL DIAMETER COPPER PIPE OR TUBING (FOR 3-HR. WALLS, COPPER PIPE OR TUBING SHALL BE MAXIMUM 4"
NOMINAL DIAMETER).
NOMINAL 1", 1-1/2", OR 2" THICK GLASS-FIBER PIPE INSULATION OR MAXIMUM 2" THICK CALCIUM SILICATE PIPE INSULATION (SEE
NOTE 4 BELOW).
HILTI FS-ONE MAX OR FS-ONE INTUMESCENT FIRESTOP SEALANT:
MAXIMUM 5/8" DEPTH REQUIRED FOR 1-HR. OR 2-HR. FIRE-RATING.
MINIMUM 1" DEPTH REQUIRED FOR 3-HR. FIRE-RATING.
MINIMUM 1/2" BEAD HILTI FS-ONE MAX OR FS-ONE INTUMESCENT FIRESTOP SEALANT APPLIED AT POINT OF CONTACT.
NOTES:
MAXIMUM DIAMETER OF OPENING = 18-5/8".
ANNULAR SPACE (FOR 1-HR. OR 2-HR. FIRE-RATING) = MINIMUM 0", MAXIMUM 1-7/8".
ANNULAR SPACE (FOR 3-HR. FIRE-RATING) = MINIMUM 0", MAXIMUM 1-1/4".
WHEN CALCIUM SILICATE PIPE INSULATION IS USED, SECURE INSULATION TO PIPE WITH STAINLESS STEEL BANDS OR MINIMUM 18
AWG STAINLESS STEEL WIRE AT MAXIMUM 12" O.C.
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
70, 91, 102, 111, 112, 113, & 123
8/
/2
:4 1:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 3-
3-
Q
-V A
M ilw au ke e- In st l L tn g
Pr ot
-W I_
R
_w re ed R
G 8R
E.
rv t
E-501
ELECTRICAL DETAILS
23 24WSR
INSTALL LIGHTNING
PROTECTION
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 AUGUST 20, 2024
100% CONSTRUCTION DOCUMENTS
695-22-10623-093
KTK
Scale: No Scale1 BONDING CONDUCTOR BEND RADIUS
Scale: No Scale2 EXOTHERMIC WELD - WIRE TO PIPE
Scale: No Scale3 EXOTHERMIC WELD - WIRE TO WIRE
Scale: No Scale5 GROUND ROD DETAIL
Scale: No Scale4 LIGHTNING PROTECTION MECHANICAL BOND
Scale: No Scale6 LIGHTNING PROTECTION AIR TERMINAL
Scale: No Scale7 LIGHTNING PROTECTION AIR TERMINAL
Scale: No Scale8 LIGHTNING PROTECTION AIR PARAPET
Scale: No Scale10 EXHAUST DISCHARGE STACK LIGHTNING PROTECTION SYSTEM DETAIL
Scale: No Scale11 MECHANICAL CLAMP LIGHTNING PROTECTION FITTING CONNECTION TO EQUIPMENT
Scale: No Scale9 METALIC ENCLOSURE TERMINATIONS Scale: No Scale12 UL PENETRATION DETAIL W-L-5029 (HILTI B.O.D)
REMOVABLE COVER. COVER
SHALL BE REMOVABLE BY
HAND. NO TOOLS SHALL BE
REQUIRED FOR REMOVAL
6" OF CRUSHED ROCK
ON EACH SIDE OF
INSPECTION SLEEVE
LIGHTNING
PROTECTION
CONDUCTOR
3" OF CRUSHED ROCK
BELOW WELD. WELD
SHALL REMAIN VISIBLE
3/4" DIA. COPPER CLAD
STEEL GROUND ROD 10'
LONG
42" LONG X 6" DIA. WHITE
PVC SLEEVE
EXOTHERMIC WELD TO
GROUND ROD
FINISHED GRADE
PVC CABLE PROTECTOR FASTENED
AT 3' OC MINIMUM SPACING.
INSTALL 1' BELOW GRADE TO 6' OR
MORE ABOVE GRADE.
LIGHTNING PROTECTION
DOWN CONDUCTOR FROM
ROOF/PROTECTED AREA
GROUND ROD CLAMP
GROUND ROD (3/4" X 10')
2'-0" MIN.
3'-0" MIN.
GROUND LEVEL
NOTE:
METAL V.T.R WITHIN 6' OF A LIGHTNING
PROTECTION CONDUCTOR ARE
REQUIRED TO BE BONDED.
PIPE BONDING STRAP
#6 AWG BONDING CONDUCTOR.
CIRCUIT TO LIGHTNING
PROTECTION SYSTEM. SPLICE INTO
LIGHTNING PROTECTION
CONDUCTOR USING A UL
APPROVED COMBINATION SPLICER.
LIGHTNING CONDUCTOR CONTINUES
DOWN FACADE OF BUILDING.
SECURE TO BUILDING EVERY 3' OC
USING FASTENERS DESIGNED FOR
BUILDING’S EXTERIOR MATERIAL.
ADHESIVE MOUNT MECHANICAL
BOND TO DOWN CONDUCTOR
ROOF
COPPER CONDUCTOR
CONNECT TO ROOF
CONDUCTOR
THRU-ROOF ROD
ROOF FLASHING PROVIDED
BY THE ROOFING
CONTRACTOR
BRASS CONNECTOR
COPPER CONDUCTOR
THRU-ROOF ROD
SEAL PVC CONDUIT WITH
SILICONE SEALANT TO
PREVENT INGRESS OF
WATER
THRU-ROOF ROD
ROOF CONDUCTOR
PROPER ROOF FLASHING
(FURNISHED AND
INSTALLED BY THE
ROOFING CONTRACTOR)
COLUMN/EXTERIOR WALL
FLOOR SLAB
CONNECT CONDUCTOR TO
BUILDING STEEL USING AN
APPROVED CONNECTION
METHOD
System No. C-AJ-1575
ANSI/UL1479 (ASTM E814)
F Ratings - 2 and 3 Hr (See Item 4B)
T Rating - 0 Hr
W Rating - Class 1 (See Item 4)
A
A
3 4B
SECTION A-A
1.
a.
A.
a.
b.
2.
3.
A.
B.
C.
D.
E.
F.
Floor or Wall Assembly - Min. 2-1/2" (64mm) thick reinforced lightweight or normal weight (100-150 pcf or 1600-2400 kg/m3.) concrete. wall may also be constructed of any UL Classified Concrete Blocks*. Floor may also be constructed of any min. 6" (152 mm) thick UL Classified hollow core Precast Concrete Units*. Max diameter of opening is 30-7/8" (784 mm) when concrete floor or wall is used and max 7" (178 mm) when precast concrete units are used.
See Concrete Blocks (CAZT) and Precast Concrete Units (CFTV) categories in the Fire Resistance Directory for names and manufacturers.
Floor Assembly - (Optional, Not Shown) - The fire rated unprotective concrete and steel floor assembly shall be constructed of the materials and in the manner specified in the individual D900 Series designs in the UL Fire…