This document outlines the scope of work for a construction project and related federal contract opportunity. The construction project involves installing new potable water risers and associated valves at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. Work includes new distribution piping, an emergency bypass, minor architectural elements, and testing and balancing of the hot water return system. The period of performance is 270 calendar days from notice to proceed.
The related federal contract opportunity is a 100% Service-Disabled Veteran-Owned Small Business set-aside to furnish all labor, materials, and equipment to complete the construction project. The pre-solicitation notice provides project details, the solicitation posting date on SAM.gov, an estimated pricing range between $1-5 million, the NAICS code, and information on the pre-bid conference. The bid opening is scheduled for December 2, 2021. Offerors must be CVE-verified SDVOSBs under the assigned NAICS size standard at time of submission and award.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
9/7/2021
Project Data
Title: Upgrade Potable Water Risers
Location: Oscar G. Johnson VA Medical Center, Iron Mountain, MI
Project No: 585-19-118
COR: Andre Hanna
Contractor: TBD
Scope of Work
Contractor shall provide for and furnish all labor, superintendence, materials, tools, equipment, transportation, licenses, certificates, insurance, temporary protection, and other items designated under the provisions of this contract for the Upgrade Potable Water Risers, Project# 585-19-118, at the Oscar G. Johnson VA Medical Center Located in Iron Mountain, Michigan as outlined in the contract specifications and as shown on the contract drawings. The work involves the installation of new potable risers and associated isolation valves to the cold, hot and hot water return piping. In addition, new water distribution system in several areas of the main facility to promote re-circulation and to improve maintenance capabilities. Project also include an emergency by-pass from the south water feed, minor architectural work and a complete Test and
Balance of the hot water return system. Installation shall be as outlined in the contract specifications and as shown on the drawings.
Attachments Drawings and Specifications provided by BSA.
Period of Performance will be 270 calendar days from the Notice to Proceed (NTP)