S02 - 585-19-118 - Att - Drawings Revised.pdf

PDF 30 MB Posted

Attached to
Z1DA--Project# 585-19-118 Upgrade to Potable Water Risers Construction
Solicitation number
36C25221B0032
Issued by

About this file

This pre-solicitation notice describes a federal contract opportunity for construction services. The Oscar G. Johnson VA Medical Center is seeking a contractor to complete project #585-19-118 to upgrade potable water risers and install new isolation valves at its facility in Iron Mountain, Michigan. The project value is estimated between $1 million and $5 million, and work must be completed within 270 calendar days of the notice to proceed. The solicitation will be posted to SAM.gov on October 7, 2021, with bid opening scheduled for December 2, 2021. A pre-bid conference will be held the week of October 25-29. This opportunity is set aside solely for service-disabled veteran-owned small businesses, which must represent their status at time of bid submission and award.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOOD

BLOCKING

METAL

STUDS

SAWCUT BLOCKING

TO RECEIVE METAL

STUD FLANGE

WIDTH TO SUIT

HEIGHT

TO SUIT

USE WHERE ITEM BEING

MOUNTED EXERTS A

DOWNWARD TWISTING FORCE

(FOLDING COUNTER BRACKETS,

TV BRACKETS, ETC.)

USE WHERE ITEM BEING

MOUNTED DOES NOT

EXERT A DOWNWARD

FORCE (CABINETS, GRAB

BARS, VIEW BOXES,

MARKER BOARDS ETC.)

SPECIAL

VERTICAL BLOCKING

STANDARD

HORIZONTAL BLOCKING

4'-0"

MINIMUM

1 1/2"

1 1/2"

NOTE:

FIRETREATED 2X12

BLOCKING, TYPICAL

WHERE (2) STUD MOUNTED

DEVICES ARE SCHEDULED,

ALIGN HEIGHTS OF FINISHED

PRODUCT.

WHERE MULTIPLE DEVICES

ARE SCHEDULED TO OCCUR

WITHIN 16" OF EACH OTHER

HORIZONTALLY, ALIGN

DEVICES VERTICALLY ON

(1) FACE OF STUD

STUDS

DOOR

WHERE MULTIPLE DEVICES ARE SCHEDULED ALONG

A DOOR, DEVICES SHALL BE ALIGNED ON (1) FACE

OF METAL STUD AND SHALL OCCUR AT SWING/

LATCH SIDE OF DOOR. EXCLUDES THERMOSTATS

ROOM

CORRIDOR

WHERE MULTIPLE DEVICES

ARE SCHEDULED IN CLOSE

PROXIMITY IN HEIGHT, ALIGN

DEVICES.

POSITION ROOM THERMOSTAT ADJACENT TO

LIGHT SWITCH. ALIGN TOP OF THERMOSTAT

WITH LIGHT SWITCH COVER PLATE

WHERE MULTIPLE DEVICES ARE

SCHEDULED IN CLOSE PROXIMITY IN

HEIGHT, ALIGN DEVICES.

4' -0

" T O

T O

P

STANDARD PARTITION TYPES

(UNLESS NOTED ON PLANS OTHERWISE):

1. ALL SINGLE LAYER GYPSUM BOARD PARTITIONS SHALL BE

TYPE GE. INDICATED ON PLANS AS THUS

INTERIOR GYPSUM BOARD SHALL BE AS LISTED IN THE ORDER OF

IMPORTANCE AS FOLLOWS:

1.

AT FIRE RATED PARTITIONS, GYPSUM BOARD SHALL

COMPLY WITH THE INDICATED UL DESIGN NUMBER OR

OTHER SIMILAR THIRD PARTY TESTED ASSEMBLY.

A.

AS LISTED IN THE TILE COUNCIL OF NORTH AMERICA (TCNA)

NUMBER AS INDICATED IN SPECIFICATION

B.

GLASS MESH CEMENT BOARD TILE BACKER MATERIAL

AT ALL WALLS AND CEILINGS OF TOILET ROOMS WITH

SHOWERS. PROVIDE MOLD AND MOISTURE RESISTANT

TYPE "X" GYSPUM BOARD ABOVE TILE TO HEIGHT

SHOWN ON DRAWINGS.

1.

GLASS MESH CEMENT BOARD BEHIND TERRAZZO BASE.C.

PROVIDE MOLD AND MOISTURE RESISTANT TYPE "X" GYPSUM

BOARD AT THE FOLLOWING LOCATIONS:

D.

1. 4'-0" MINIMUM ALL SIDES OF THE CENTER LINE OF

PLUMBING FIXTURES.

ALL GYPSUM BOARD SHALL BE TYPE "X"E.

ALL DIMENSIONS LOCATING INTERIOR PARTITIONS ARE TO FACE OF

CONCRETE BLOCK, OR FACE OF OUTER LAYER OF GYPSUM BOARD.

DIMENSIONS ON PLANS IGNORE APPLIED FINISHES.

2.

FOR HEAD OF WALL CONDITION AT NON RATED GYPSUM BOARD

AND METAL STUD PARTITIONS SEE:

3.

(UNLESS NOTED OTHERWISE):

GENERAL INTERNAL PARTITION NOTES4 1/4"

3" ACOUSTICAL

INSULATION

3 5/8" METAL

STUDS

5/8" GYPSUM

BOARD

ACOUSTICAL

SEALANT AT

NON-RATED

PARTITIONS

CEILING

TYPE AS

SCHEDULED

GE

E8 G001

CONDITION AT FLAT SLAB OR WALLS PARALLEL WITH

JOISTS OF THE PAN AND JOIST SYSTEM

CONDITION AT WALLS

PERPENDICULAR TO THE JOISTS

OF THE PAN AND JOIST SYSTEM.

EXISTING TOP SLAB OF PAN AND

JOIST FLOOR SYSTEM

PA

N

A N

D J

O

IS

T

FL

O O

R S

YS

TE

M

1/2" ACOUSTICAL

SEALANT JOINT

TYPICAL WHERE

GYPSUM BOARD MEETS

JOISTS AND TOP SLAB

(STATIC JOINT)

BOTTOM OF JOISTS

1 1/2" ACOUSTICAL SEALANT JOINT - VERIFY

JOINT SIZE WITH MOVEMENT CAPABILITIES

DEEP LEG TRACK (2" MINIMUM)

ATTACH TO BOTTOM OF JOIST

2 1/2" MINIMUM AT 2ND FLOOR

METAL STUDS CUT IN 3/4" LESS IN

HEIGHT THAN ASSEMBLY, 1 1/4"

AT 2ND FLOOR

PROVIDE TEMPORARY MEANS OF

SUPPORTING STUDS IN VERTICAL

POSITION WITHOUT SECURING

STUDS TO TOP TRACK

SEE SPECIFICATION

FOR TYPE OF

CONNECTION TO

STRUCTURE ABOVE

ATTACH GYPSUM

BOARD TO METAL

STUDS AT THIS

POINT

1 1/2" ACOUSTICAL

SEALANT JOINT,

VERIFY JOINT SIZE

WITH MOVEMENT

CAPABILITIES OF

ACOUSTICAL

SEALANT

DEEP LEG TRACK

(2" MINIMUM), 2 1/2"

AT 2ND FLOOR

METAL STUDS CUT

3/4" LESS IN HEIGHT

THAN ASSEMBLY, 1

1/4" AT 2ND FLOOR

PROVIDE TEMPORARY MEANS OF

SUPPORTING STUDS IN VERTICAL

POSITION WITHOUT SECURING

STUDS TO TOP TRACK

SEE SPECIFICATION

FOR TYPE OF

CONNECTION TO

STRUCTURE ABOVE

ATTACH GYPSUM

BOARD TO METAL

STUDS AT THIS

POINT

JOINT SHALL ALLOW FOR 1/2"

STRUCTURAL MOVEMENT IN

COMPRESSION OR EXTENSION

EACH WAY AT 1ST FLOOR AND

BASEMENT FLOOR. JOINT SHALL

ACCOMODATE 1" COMPRESSION

OR EXTENSION EACH WAY AT

2ND FLOOR

COVER SHEET

G001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

OCTOBER 20, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

100% DESIGN SUBMITTAL

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

DPD JAP

UPGRADE POTABLE WATER RISERS,

OSCAR G. JOHNSON VA MEDICAL CENTER

IRON MOUNTAIN, MI 49801

100% DESIGN SUBMITTAL

AUGUST 23, 2021

SHEET INDEXGENERAL NOTES

DIRECTOR

ASSOCIATE DIRECTOR

ASSOCIATE DIRECTOR FOR N&PCS

CHIEF OF POLICE

CHIEF OF ENGINEERING

INFECTION CONTROL NURSE

PATIENT SAFETY

A.F.G.E.

INDUSTRIAL HYGIENIST

APPROVALS

CHIEF OF STAFF

SAFETY

VERIFY ALL DIMENSIONS RELATING NEW CONSTRUCTION TO EXISTING CONSTRUCTION.1.

GENERAL TRADE SHALL PATCH HOLES IN SLABS, PARTITIONS, AND CEILINGS CAUSED BY ANY TRADE AS FOLLOWS:2.

A). AT REMOVED DUCTWORK, CONDUIT, AND PIPING

B). AT NEW DUCTWORK, CONDUIT AND PIPING IN EXISTING PARTITIONS

C). AT ADDED OR REMOVED PARTITION MOUNTED ITEMS

WHERE EXPOSED TO VIEW, PATCHED SURFACES SHALL MATCH ADJACENT FINISHES. WORK SHALL MAINTAIN EXISTING

SEPARATION RATINGS.

3.

GENERAL TRADE SHALL REMOVE ACOUSTICAL TILE [AND PLASTER CEILINGS] [GYPSUM BOARD] WHERE REQUIRED FOR MECHANICAL OR ELECTRICAL TRADES. REINSTALL ACOUSTICAL TILE [AND PATCH PLASTER] WHEN WORK ABOVE CEILING

HAS BEEN COMPLETED.

4.

CONSTRUCTION IN SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT IS CURRENTLY IN PROGRESS. ACTUAL

EXISTING CONDITIONS MAY VARY FROM CONDITIONS INDICATED ON THESE DRAWINGS.

5.

SEE SPECIFICATION SECTION 01 35 26 FOR INFECTION CONTROL. SEE SPECIFICATION SECTION 01 00 00 FOR PHASING AND WORK

TIME LIMITATIONS

6.

PROVIDE BLOCKING FOR ALL PARTITION MOUNTED ITEMS INCLUDING THOSE SHOWN ON THESE DRAWINGS TO BE PROVIDED

UNDER SEPARATE CONTRACT, SEE

7.

CORNER GUARDS INDICATED THUS (CG, CG1, CG2) ON FLOOR PLANS, ARE TO BE SURFACE MOUNTED. [FROM TOP OF BASE

TO CEILING]. [ UNLESS NOTED OTHERWISE IN ROOM ELEVATIONS OR PLANS].

8.

CHAIRRAILS INDICATED THUS (CR) ON FLOOR PLANS, SHALL BE AS SPECIFIED AND INSTALLED AT 2'-10" TO THE TOP OF CHAIRRAIL. PROVIDE BLOCKING IN NEW METAL STUD PARTITIONS AT ALL CHAIRRAILS. TERMINATE CHAIRRAILS WITHIN 2" OF

ALL DOOR FRAMES, CORNERS, AND CORNER GUARDS.

9.

HANDRAILS INDICATED THUS (HR) ON FLOOR PLANS, SHALL BE AS SPECIFIED AND INSTALLED AT 2'-10" TO THE TOP OF HANDRAIL. PROVIDE BLOCKING IN NEW METAL STUD PARTITIONS AT ALL HANDRAILS. TERMINATE HANDRAILS WITHIN 2" OF

ALL DOOR FRAMES, CORNERS, AND CORNER GUARDS.

10.

FOR MOUNTING HEIGHTS AND LOCATIONS OF DEVICES PROVIDED BY OTHER TRADES, SEE11.

WHERE MECHANICAL EQUIPMENT DOES NOT ALLOW STUDS TO EXTEND TO STRUCTURE, PROVIDE STRUCTURAL METAL STUD BOX HEADER BENEATH ALL EQUIPMENT. BOX HEADER SHALL BE CONSTRUCTED OF (2) STRUCTURAL STUDS LAID ON THEIR BACK SIDE UTILIZING THE SAME DIMENSION STUDS AS THE WALL BE CONSTRUCTED (IE, 3 5/8"). OPENINGS BETWEEN 8'-0" AND 12'-0" SHALL UTILIZE .0451 THICKNESS STUDS. OPENINGS LESS THAN 8'-0" SHALL UTILIZE .0346 THICKNESS STUDS.

12.

THE SEALANT SCHEDULE LISTED ON THIS SHEET IN NO WAY LISTS EVERY SEALANT JOINT CONDITION REQUIRED ON THIS PROJECT AND DOES NOT RELIEVE THE CONTRACTOR RESPONSIBILITY TO CAULK ITEMS AS INDICATED IN DETAILS. REFERENCE DETAILS AND NOTES FOR REQUIRED SEALANT LOCATIONS. UNLESS NOTED OTHERWISE PROVIDE SEALANT PER THE SCHEDULE ON THIS SHEET APPROVED FOR USE WITH MATERIAL INSTALLED AGAINST (USE M-MORTAR, G-GLASS, A-ALUMINUM, O-OTHER (LIST ACCEPTABLE SUBSTRATES AND PREPARATIONS). PRIOR TO INSTALLATION OF SEALANT, CONTRACTOR SHALL PROVIDE A SEALANT SCHEDULE SHOWING PRODUCT SELECTION, MANUFACTURER'S APPROVAL FOR MATERIAL USAGE (PROVIDE PRIMER IF REQUIRED) AND WITH MANUFACTURERS FULL SELECTION OF COLORS SUBMITTED TO THE ARCHITECT FOR REVIEW FOR EACH APPLICATION.

ALL CONTRACTORS UTILIZING ELECTRONIC DRAWING SETS ARE RESPONSIBLE TO CONFIRM DRAWINGS ARE PRINTED/INSERTED INTO OTHER SOFTWARE TO SCALE. CONSTRUCTION DRAWINGS ON FULL SIZE SHEETS ARE TO BE 24" X 36" OR 30" X 42" WHEN PRINTED AT 1:1. A SCALE VERIFICATION IS PROVIDED FOR YOUR VERIFICATION IN THE MATERIALS AND SYMBOLS SCHEDULE ON THE

COVER SHEET OF THIS PROJECT.

13.

14.

G001

B9 WOOD BLOCKING ISOMETRIC

1" = 1'-0"

B9 G001

G001

B8 DEVICE MOUNTING SCHEDULE

1/4" = 1'-0"

B8 G001

G001

E8 HEAD OF WALL CONDITION

3" = 1'-0"

DWG. 1 OF 59

2"0" 1" 4" 6"

OWNER REQUIRES CONTRACTOR TO BE ESCORTED IN CERTAIN AREAS OF THE PROJECT. CONTRACTOR TO COORDINATE WITH

OWNER LOCATIONS AND TIMES.

15.

SEALANT SCHEDULE

SILICONE - 50% MOVEMENT -

CLASS 50

SILICONE - 25%

MOVEMENT/MILDEW

RESISTANT - CLASS

SINGLE

COMPONENT

URETHANE - 35%

MOVEMENT -

CLASS 35

MULTI-COMPONENT

URETHANE - 50%

MOVEMENT - CLASS

LATEX - NO MOVEMENT -

CLASS 12.5

ACOUSTICAL

SEALANT -

NON-HEAD OF

WALL - 12.5%

MOVEMENT

ACOUSTICAL SEALANT

- HEAD OF WALL -

EXPANSION JOINTS -

33% MOVEMENT

BUILDING

INTERIOR

JOINT BETWEEN SILLS AND

EXTERIOR FENESTRATIONS:

GRADE NS

JOINTS BETWEEN

PLUMBING FIXTURES

AND ADJOINING

MATERIALS: GRADE

NS

CONTROL JOINTS

SCHEDULED TO

BE CAULKED:

GRADE NS

EXPANSION JOINTS

NOT EXPOSED TO

UV: GRADE NS -

VERTICAL (AND

CEILING), GRADE P,

USE T - HORIZONTAL

INTERIOR DOOR FRAMES

NOT EXPOSED TO UV, AT

INTERSECTION OF WALL

AND FRAME: GRADE NS, P

TYPICAL. USE SINGLE

COMPONENT URETHANE

SEALANT GRADE NS, T AT

FLOOR INTERSECTION

WALL

PERIMETERS

HEAD OF WALL JOINTS

JOINT BETWEEN INTEGRAL

BASE AND DOOR FRAMES:

GRADE NS

VERTICAL JOINTS AT

INSIDE CORNERS OF

CERAMIC TILE

CONDITIONS: GRADE

NS

PENETRATIONS

OF MECHANICAL

EQUIPMENT IN

SMOKE TIGHT

WALLS: GRADE

NS

JOINTS WHERE NO

MOVEMENT IS EXPECTED:

GRADE NS

SMOKE RESISTANT

EXPANSION JOINTS

(WHERE SILICONE

SEALANTS ARE NOT

UTILIZED)

EXPANSION JOINTS EXPOSED

TO UV: GRADE NS VERTICAL,

GRADE P USE T - HORIZONTAL

JOINT BETWEEN

TILED FLOOR AND

WALL

INTERSECTIONS:

GRADE NS, USE T

JOINT BETWEEN

WALLS AND

ACOUSTICAL

GRID: GRADE NS

JOINTS BETWEEN DIS-SIMILAR

MATERIALS SUBJECT TO UV

EXPOSURE: GRADE NS

BETWEEN

COUNTERTOP AND

WALL SURFACES:

GRADE NS

JOINTS BETWEEN

DIS-SIMILAR

MATERIALS NOT

SUBJECT TO UV

EXPOSURE:

GRADE NS

SEALANTS:

1. SUBMIT SEALANT SCHEDULE PRIOR TO INSTALLATION OF SEALANTS INDICATING WHERE SEALANT IS SCHEDULED TO BE INSTALLED FOR APPROVAL. PROVIDE ACTUAL SAMPLES FOR COLOR SELECTION FROM FULL RANGE OF COLORS FOR EACH SEALANT SCHEDULED TO BE INSTALLED. SEALANTS MUST BE FROM ONE OF THE PRODUCTS LISTED BELOW

2. SILICONE SEALANT

2.1. DOW CORNING CORPORATION: 795 SILICONE BUILDING SEALANT

2.2. MOMENTIVE PERFORMANCE MATERIALS (GE): SILPRUF NB SCS9000

2.3. PECORA CORPORATION: 890 NST SILICONE SEALANT

2.4. TREMCO: SPECTREM 1

3. URETHANE JOINT SEALANTS

3.1. BASF BUILDING SYSTEMS (SONNEBORN): SONOLASTIC NP-1

3.2. BOSTIK, INC.: CHEM-CALK 2020

3.3. SIKA CORPORATION: SIKAFLEX-1A

4. MULTI-COMPONENT NON-SAG URETHANE

4.1. DYNATROL II

4.2. TREMCO DYMERIC 240/240FC

5. ACOUSTICAL SEALANT (EXCEPT HEAD OF WALL)

5.1. PECORA AC-20 FTR

5.2. USG SHEETROCK ACOUSTICAL SEALANT

6. ACOUSTICAL SEALANT (HEAD OF WALL)

6.1. FIRE JOINT SPRAY (CFS-SP WB), MANUFACTURED BY HILTI INC., TULSA, OKLAHOMA, PHONE: 800-879-6000

6.2. RECTORSEAL SMOKE AND ACOUSTIC SEALANT, MANUFACTURED BY RECTORSEAL, HOUSTON, TEXAS, PHONE: 800-231-3345

7. TAMPER RESISTANT URETHANE (POLYURETHANE) SEALANT

7.1. PECORA DYNAFLEX

7.2. BASF MASTERSEAL CR 195

7.3. SIKAFLEX 2C NS TG

8. TAMPER PROOF EPOXY SEALANT

8.1. PECORA DYNAPOXY EP-1200

CEILING REMOVAL & REPLACEMENT - (FIRE PROTECTION)

IN AREAS AFFECTED UNDER THE SCOPE OF THE PROJECT WORK, THE GENERAL

TRADE SHALL REMOVE AND REINSTALL EXISTING CEILING TILE SYSTEM TO ALLOW

FOR THE REMOVAL AND INSTALLATION OF THE FIRE PROTECTION SYSTEM - SEE

PROJECT MANUAL (GENERAL TRADE TO VERIFY CEILING TILE SYSTEM). THE

GENERAL TRADE SHALL TEMPORARILY ADJUST/SUPPORT EXISTING LIGHT FIXTURE(S),

SMOKE DETECTOR(S), PAGING SPEAKER(S), AND NURSE CALL DEVICE(S) AS

REQUIRED TO ACCOMODATE THE FIRE PROTECTION INSTALLATION. REINSTALL

FIXTURE(S) AND DEVICE(S) TO THEIR ORIGINAL LOCATIONS UPON FIRE PROTECTION

INSTALLATION COMPLETION. IN ROOM CONTAINING PLASTER CEILING, OPENINGS

SHALL BE CUT BY THE GENERAL TRADE. NEW ACCESS PANEL(S) (24"x 24") SHALL BE

SUPPLIED BY THE FIRE PROTECTION TRADE FOR INSTALLATION BY THE GENERAL

TRADE AS REQUIRED. FIRE PROTECTION TRADE TO COORDINATE QUANTITY AND

LOCATION OF ACCESS PANEL(S) WITH GENERAL TRADE.

Sheet Number Sheet Title

GENERAL

G001 COVER SHEET

ARCHITECTURAL

AE102 BASEMENT PLAN - WEST

AE103 BASEMENT PLAN - EAST

AE104 FIRST FLOOR PLAN - WEST

AE105 FIRST FLOOR PLAN - EAST

AE106 SECOND FLOOR PLAN - WEST

AE107 SECOND FLOOR PLAN - EAST

AE108 THIRD FLOOR PLAN - WEST

AE109 THIRD FLOOR PLAN - EAST

AE110 FOURTH FLOOR PLAN

AE111 FIFTH FLOOR PLAN

AE112 SIXTH FLOOR PLAN

FIRE PROTECTION

F101 BASEMENT FLOOR PLANS

PLUMBING

PD101 SUB-BASEMENT SUPPLY PIPING PLAN - DEMOLITION

PD102 BASEMENT SUPPLY PIPING PLAN - WEST - DEMOLITION

PD103 BASEMENT SUPPLY PIPING PLAN - EAST - DEMOLITION

PD104 FIRST FLOOR SUPPLY PIPING PLAN - WEST - DEMOLITION

PD105 FIRST FLOOR SUPPLY PIPING PLAN - EAST - DEMOLITION

PD106 SECOND FLOOR SUPPLY PIPING PLAN - WEST - DEMOLITION

PD107 SECOND FLOOR SUPPLY PIPING PLAN - EAST - DEMOLITION

PD108 THIRD FLOOR SUPPLY PIPING PLAN - WEST - DEMOLITION

PD109 THIRD FLOOR SUPPLY PIPING PLAN - EAST - DEMOLITION

PD110 FOURTH FLOOR SUPPLY PIPING PLAN - DEMOLITION

PD111 FIFTH FLOOR SUPPLY PIPING PLAN - DEMOLITION

PD112 SIXTH AND SEVENTH FLOOR SUPPLY PIPING PLANS - DEMOLITION

PP101 SUB-BASEMENT SUPPLY PIPING PLAN - NEW WORK

PP102 BASEMENT SUPPLY PIPING PLAN - WEST - NEW WORK

PP103 BASEMENT SUPPLY PIPING PLAN - EAST - NEW WORK

PP104 FIRST FLOOR SUPPLY PIPING PLAN - WEST - NEW WORK

PP105 FIRST FLOOR SUPPLY PIPING PLAN - EAST - NEW WORK

PP106 SECOND FLOOR SUPPLY PIPING PLAN - WEST - NEW WORK

PP107 SECOND FLOOR SUPPLY PIPING PLAN - EAST - NEW WORK

PP108 THIRD FLOOR SUPPLY PIPING PLAN - WEST - NEW WORK

PP109 THIRD FLOOR SUPPLY PIPING PLAN - EAST - NEW WORK

PP110 FOURTH FLOOR SUPPLY PIPING PLAN - NEW WORK

PP111 FIFTH FLOOR SUPPLY PIPING PLAN - NEW WORK

PP112 SIXTH AND SEVENTH FLOOR SUPPLY PIPING PLANS - NEW WORK

PP113 DETAILS AND SUB-BASEMENT WATER PIPING DIAGRAM

PP114 WATER PIPING DIAGRAM - WEST RISER

PP115 WATER PIPING DIAGRAM - EAST RISER

HVAC

M101 BASEMENT PLAN - EAST

M102 FIRST FLOOR PLAN - WEST

M103 FIRST FLOOR PLAN - EAST

M104 SECOND FLOOR PLAN - WEST

M105 SECOND FLOOR PLAN - EAST

M106 THIRD FLOOR PLAN - WEST

M107 THIRD FLOOR PLAN - EAST

M108 FOURTH FLOOR PLAN

M501 SCHEDULES AND DETAILS

ELECTRICAL

ED101 SUB-BASEMENT DEMOLITION

ED102 BASEMENT DEMOLITION PLAN - EAST

ED103 FIRST FLOOR DEMOLITION PLAN - WEST

ED104 FIRST FLOOR DEMOLITION PLAN - EAST

ED105 THIRD FLOOR DEMOLITION PLAN

E101 SUB-BASEMENT NEW WORK PLAN

E102 BASEMENT NEW WORK PLAN - EAST

E103 FIRST FLOOR NEW WORK PLAN

E104 FIRST FLOOR NEW WORK PLAN - EAST

E105 THIRD FLOOR NEW WORK PLAN

AutoCAD SHX Text S

LAUNDRY

CHUTE ABOVE

FD

COIL

CABINET

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

E1

IN

FL

OO

R

SC

AL

E

MAIL ROOM

B107A

CORRIDOR

B199A-1

CBOC

STORAGE

B187

ENGINEER

SUPERVISORY

B072

ENGINEER

GENERAL

B074

ENGINEER

GENERAL

B076

ENGINEER

CHIEF

B070

OFFICER

ADMIN.

B069

GEMS

I.H. &

B067

ROOM

CONFERENCE

B077

TOILET

B075A

ROOM

FILE

B075

SHOP

CARPENTER

B062

SHOP

MACHINE

B060

ROOM

ELECTRICAL

B028

EQUIPMENT

ELECTRICAL

B027A

SHOP

ELECTRONICS

B027

& EMER. MNGT.

ENGINEERING

B023

KITCHEN

CANTEEN

B175

STORAGE

CANTEEN

B175A

SERVING

CANTEEN

B192

LOCKER ROOM

MENS

B021

& WORK LEADER

M&R SUPERVISOR

B022

SHOP/OFFICE

MAINTENANCE

B014

VESTIBULE

B018A

SPCECIALIST

AQUISITION

B019

TOILET

MENS

B021A

MED/ELECTRNICS

SUPRVSR, BIO-

B009

STORAGE

HSKG

B122

& SUPPLIES

NESS EQUIP. &

B129

ROOM

MECHANICAL

B129A

WASH

CART

B129B

UNIFORMS

B191

TELE-DIETICIAN

B120

STORE

RETAIL

B174

CANTEEN

CHIEF,

B174A

TOILET

WOMENS

B196

LOUNGE

WOMENS

B196B

LOCKER

WOMENS

B196A

ASSISTANT

PROGRAM

B066

HSKG

B006

HSKG

B004

TEMP. STORAGE

NESS

B008

TEMP. STORAGE

NESS

B010

TOILET

B008A

SANITATION

B186A

STORAGE

MAINT.

B018B

CLOSET

DATA

B117

TEMP. STORAGE

NESS

B010

CORRIDOR

B199A-1

CORRIDOR

B199B-1

CORRIDOR

B099A-1

CORRIDOR

B099D-1

B0

B-

CO

RR

ID

OR

CORRIDOR

B018

CORRIDOR

B099C-1

CHASE

B002A

MECH

B002

ROOM

MECHANICAL

B079

SHOPS

SHARED

B087

ROOM

MECHANICAL

B018C

AND RECEIVING

CANTEEN STORAGE

B119

RECORDS

MEDICAL

B082

VAULT

B081A

CACHE

PHARMACY

B081

MNGT. STOR/OFFICE

SUPPLY CHAIN

B083

SPLY CHN MNGT.

ASS'T CHIEF

B084

PHONE

DATA &

B085

ADMIN

LOGISTICS

B086

CHAIN MNGT.

CHIEF, SUPPLY

B086A

OFFICE

SHOP

B088

ELECTRONICS

BIOMED &

B089

LOCKSMITH

B020

ENGINEER

GENERAL

B068

ROOM

DINING

B172

ELECTRONICS

BIOMED &

B009A

HOLDING AREA

SOILED LINEN

B003

ADMIN

LOGISTICS

B086B

OFFICE

CARPENTER SHOP

B062A

LOCKERS

STAFF

B194

MANAGER

SAFETY

B023A CORRIDOR

B199C-1

SUPERVISORS

HOUSEKEEPING

B129C

OFFICE

NESS

B123

NESS

CHIEF,

B121

BASEMENT PLAN - WEST

AE102

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

OCTOBER 20, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

100% DESIGN SUBMITTAL

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

AE102

F1 BASEMENT PLAN - WEST

1/8" = 1'-0"

KEYPLAN

NO SCALE

N

N

4'0" 2' 8' 12'

DWG. 2 OF 59

GENERAL NOTES

1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/

PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,

OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,

WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT

ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH

AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE

RATING REQUIREMENTS

3. SEE COVER SHEET FOR PARTITION SCHEDULE

2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

NEW WORK KEYED NOTES:

1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER

COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.

REPLACE ALL DAMAGED ACT WITH NEW ACT

DPD JAP

AutoCAD SHX Text

UP

AutoCAD SHX Text K-4330

AutoCAD SHX Text

KINGSTON

AutoCAD SHX Text

C_TOILETS

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text K-4330

AutoCAD SHX Text

KINGSTON

AutoCAD SHX Text

C_TOILETS

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

FE

FD FDFD

HYDRAULIC POWER

UNIT

FD

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

SERVICE

ELEVATOR

PASSENGER

ELEVATOR

D-4 D-5

LAUNDRY

CHUTE ABOVE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

AMBIENT

DISPOSABLE &

NOURISHMENT

STORAGE

B186G

ROUGH

PREP.

B186H

ELECTRICAL

ROOM

B269

EMERGENCY

ELECTRICAL

ROOM

B267

STAFF

WORK ROOM

B186D

FOOD SERVICE

MANAGERS

OFFICE

B186E

DIETETICS

OFFICE

B186F

CORRIDOR

B299D-1

VESTIBULE

B107

MAIL ROOM

B107A

CORRIDOR

B299A-1

CORRIDOR

B199A-1

ADMIN.

OFFICES

B107B

WAN

ROOM

B105

CBOC

STORAGE

B187

KITCHEN

CANTEEN

B175

UNIFORMS

B191

WASH

CART

B186B

UTILITY

B186C

FREEZER 1

B186L

COOLER 4

B186N

FREEZER 2

B186M

COOLER 3

B186P

KITCHEN

MAIN

B186

& BEVERAGE STOR.

CANTEEN VENDING

B185

EQUIPMENT

TELEPHONE

B103

ROOM

HOLMAN

B201

TOILET

WOMENS

B204

TOILET

MENS

B205

LOBBY

ELEVATOR

B224

CHIEF, SPS

B291A

SURGERY CASE CART

PRI. SUPPLY/

B291

BREAKOUT

STOCK /

B287

DECONTAMINATION

B295

PACKAGING

PREPARATION

B291B

STERLIZER

B291C

RECEIVING

SHIPPING &

B274

SHREDDER RM.

RECYCLING &

B278

STORAGE

WAREHOUSE

B298

EQUIP.

NON-EXP

B298A

LOGISTICS

STORAGE

B231

MECH. RM.

B202

SPACE

SWING

B203

SANITATION

B186A

CHASE

PIPE

B284

ROOM

MECH.

B224C

EQUIPMENT

ELEVATOR

B224B

ROOM

MECHANICAL

B224A

LOCKERS

B297

LAUNDRY

B230

ACCESS

MECH.

B227

ACCESS

MECH.

B295A

ROOM

MECH.

B231B

ROOM

MECH.

B231A

MECH. ROOM

B231C

DATA

B296

CO

RR

ID

OR

B2

C-

VESTIBULE

B276

CORRIDOR

B299B-1

PASSAGE

B226

MENS LOCKER

B228B

MENS SHOWER

B228C

UNISEX BREAKROOM

B228

COOLER

MORGUE

B273

COOLER 2

FOOD BANK

B186Q

COOLER 1

RETHERM

B186R

O2 STOR

B268

EQUIP. RM.

ELECTRICAL

B278A

STORAGE

BULK MEDICAL

B231D

LOGISTICS

OFFICE

B298B

ROOM

MECH.

B107D

DOCK

LOADING

B271

B272

GE

GE

FINISHES

FLOOR: VINYL TILE

BASE: RUBBER

WALL: PAINT

CEILING: ACT/GYPSUM

FINISHES

FLOOR: SHEET VINYL

BASE: INTEGRAL

WALL: TILE

CEILING: ACT

BASEMENT PLAN - EAST

AE103

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

OCTOBER 20, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

100% DESIGN SUBMITTAL

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

AE103

F7 BASEMENT PLAN - EAST

1/8" = 1'-0"

KEYPLAN

NO SCALE

N

N

4'0" 2' 8' 12'

DWG. 3 OF 59

REMOVE CEILING TILES AND GRID FOR TRADES WORK. SALVAGE

TILES AND USE FOR NEW SOFFIT IN ROOM B107A. AFTER COMPLETION

OF WORK, INSTALL NEW 2X2 ACOUSTICAL TILE CEILING CENTERED IN

ROOM AT A HEIGHT OF 8'-6" ABOVE FINISHED FLOOR.

EXISTING ACOUSTICAL TILE SOFFIT AT 8'-2" ABOVE FINISHED FLOOR

TO REMAIN.

ADD ADDITIONAL ACOUSTICAL TILE SOFFIT AT 8'-2" ABOVE FINISHED

FLOOR TO MATCH EXISTING. EXTENT OF SOFFIT TO BE AS REQUIRED

TO ENCLOSE NEW PIPING ABOVE. MODIFY EXISTING CEILING AS

REQUIRED. SEE PLUMBING DRAWINGS FOR EXTENT OF WORK.

GENERAL NOTES

1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/

PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,

OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,

WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT

ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH

AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE

RATING REQUIREMENTS

3. SEE COVER SHEET FOR PARTITION SCHEDULE

2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

NEW WORK KEYED NOTES:

1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER

COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.

REPLACE ALL DAMAGED ACT WITH NEW ACT

3 LOCATE WALLS AS REQUIRED TO ENCLOSE PIPES. WALL FINISH TO

MATCH EXISTING ADJACENT SURFACES. ADD/PATCH BASE AND

FLOORING TO MATCH EXISTING. MODIFY CEILING TO ACCOMMODATE

NEW WALL

13 REMOVE HARD CEILING AS REQUIRED FOR TRADES WORK. UPON

COMPLETION OF WORK, PATCH CEILING TO MATCH EXISTING

DPD JAP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

MA

TC

HL

INE

MA

TC

HL

INE

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

SERVICE

ELEVATOR PASSENGER

ELEVATOR

MA

TC

HL

INE

MA

TC

HL

INE

RESIDENT

KITCHEN

1116B

STORAGE

1116A

PHYSICAL

THERAPY

SATELLITE CLINIC

UNISEX

TOILET

ADL OT AREA/

BEDROOM

OCCUPATIONAL

THERAPY OFFICE

1165A

OXYGEN

STORAGE

RESIDENT DINING

& RECREATION

AREA

NURSE

PRACTITIONER

1111A

SOCIAL

WORKER

1109A EQUIPMENT

STORAGE

OFFICE

CLOTHING

STORAGE

CORRIDOR

C1-11

STAIR 7

NURSE

STATION

ALCOVE

CLEAN

STORAGE

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1036A

TOILET

1040A

TOILET

1044A

TOILET

1042A

TOILET

1038A

MECH.

SHAFT

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1028A

TOILET

1024A

TOILET

1020A

STORAGE

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1029A

TOILET

1025A

TOILET

1009A

TOILET

1005A

TOILET

1052A

STAFF

TOILET

UTILITY

CLEAN

LINEN

DAY

ROOM

NURSE

STATION

NURSE

STATION

CLEAN

LINEN

ELECT.

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1008A

TOILET

1010A

TOILET

1006A

TOILET

1002A

EQUIPMENT

STORAGE

STAFF

TOILET

1148B

LOCKER

ROOM

1148A

STAFF

LOUNGE

RECR.

THER.

STORAGE

PHYSICIAN

OFFICE

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1051A TOILET

1055A

MECH.

CHASE

BATHING/

SPA

1053 RECREATION

THERAPY

OFFICE

1147A

ACTIVITY/

GROUP

ROOM

CORRIDOR

EQUIP.

STOR.

STAIR 1

LINEN

CHUTE

MAIN

NURSE

STATION

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1028A

TOILET

1032A

TOILET

1036A

PROGRAM

ASSISTANT

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1027A

TOILET

1031A

TOILET

1035A

NURSE

STATION

NURSE

MANAGER

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1166A

TOILET

1170A

STAIR 5

IV

STOR.

MDS/

RESTORATIVE

COORDINATOR

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1175A

TOILET

1171A

ADL.

BATH

1165B

MEDS

ROOM

DATA

CLOSET

CLEAN

LINEN

UTILITY

CLOSET

UTILITY

CLOSET

CHAPLAIN

OFFICE

1182 CLOSET

1182A

CLOSET

1182B

POLICE

PIV

ROOM

ENROLLMENT

ELIGIBILITY

AMERICAN

LEGION/

DAV

PURPLE

HEART

LOBBY

LOCKERS

1105A

VESTIBULE

1100A

KITCH.

GE

FINISHES

FLOOR: VINYL TILE

BASE: RUBBER

WALL: WALL PRO & PAINT

CEILING: NONE

1 1

FIRST FLOOR PLAN - WEST

AE104

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

OCTOBER 20, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

100% DESIGN SUBMITTAL

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

AE104

F1 FIRST FLOOR PLAN - WEST

1/8" = 1'-0"

KEYPLAN

NO SCALE

N

N

4'0" 2' 8' 12'

DWG. 4 OF 59

GENERAL NOTES

1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/

PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,

OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,

WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT

ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH

AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE

RATING REQUIREMENTS

3. SEE COVER SHEET FOR PARTITION SCHEDULE

2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

NEW WORK KEYED NOTES:

3 LOCATE WALLS AS REQUIRED TO ENCLOSE PIPES. WALL FINISH TO

MATCH EXISTING ADJACENT SURFACES. ADD/PATCH BASE AND

FLOORING TO MATCH EXISTING. MODIFY CEILING TO ACCOMMODATE

NEW WALL

13 REMOVE HARD CEILING AS REQUIRED FOR TRADES WORK. UPON

COMPLETION OF WORK, PATCH CEILING TO MATCH EXISTING

1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER

COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.

REPLACE ALL DAMAGED ACT WITH NEW ACT

SEE GENERAL NOTE 2 FOR

THIS AREA. VA PROJECT

585-17-114 (UPGRADE CLC

PATIENT ROOM DESIGN).

DPD JAP

HL

INE

MA

TC

HL

INE

BASEMENT ROOF

FD

FIRE

EQUIP

LO

CK

ER

S

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

FE FE

PASSENGER

ELEVATOR

D-4 D-5

MA

TC

HL

INE

MA

TC

HL

INE

BLOOD DRAW

LAB/EKG

BLOOD DRAW

LAB/EKG

PATIENT

TOILET

1267B

SOILED

UTILITY

1267A

MENTAL HEALTH

SOCIAL WORKER

CLERK

AREA

WAITING

AREA

ENROLLMENT

& ELIGIBILITY

HSKP

CLOSET

CHAPEL

CHAPEL

1284A

WAITING

ROOM

TRAVEL

OFFICE

1286A

WAITING

ROOM

AGENT

CASHIER

1288A

CHIEF,

POLICE

EVIDENCE

1201A

HOLDING

1201B

MAIN

OFFICE

LOBBY

WEAPONS

1201C

MENS

TOILET

VESTIBULE

WOMENS

TOILET

STAIR 2

PHARMACY

SUPPLY

CLINICAL

PHARMACIST

CORRIDOR

1299A

PHARMACY

CONSULTING

CONSULTING

1218B

CONSULTING

1218C

1218A

OUTPATIENT

DISPENSING

MEDS

CAROUSAL

COAT

ROOM

TOILET

1224A

PHARMACY

OFFICE

SECURE

MED PREP

VAULT

1228A

PHARMACY

MED

PREP

NON-HAZ./

CLEAN

RM.

1233B

HAZARD

HOOD

RM.

1233A

IV

ROOM

LOUNGE

PHARMACY

CHIEF

1238MED

PREP &

OFFICES

STAIR 3

VESTIBULE

DATA &

PHONE

MENTAL

HEALTH

PSYCHOLOGIST

MENTAL

HEALTH

GROUP ROOM

EXAM

ROOM

1275 ALCOVE

PROCEDURE

ROOM

STAIR 4

PATIENT

TOILET

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

NURSE

WORKROOM

1348 EXAM

ROOM

1344 STAFF

TOILET

1340A

BREAK

ROOM/

LOCKERS

ELEVATOR

LOBBY

ALCOVE

MENTAL

HEALTH

OFFICE

CLINICAL

PHARM

MEDICATION

FIRE ALARM/

SECURITY

RM.

ELECTRICAL

MENS

TOILET

WOMENS

TOILET

HSKP.

EXAM

ROOM

STAFF

TOILET

PATIENT

TOILET

EXAM

ROOM

EXAM

ROOM

NURSE

WORKROOM

PATIENT

TOILET

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

PT. ED./

CONS.

CLEAN

SUPPLY

STERILE

SUPPLY

PYXIS

ALCOVE

DECON

ROOM

MEDICATION

SOILED

UTILITY

PATIENT

TOILET

TREATMENT

ROOM

TREATMENT

ROOM

TREATMENT

ROOM

EQUIPMENT

CHA.

ROOM

1304C

CHA.

ROOM

1304B

MRI

VESTIBULE

1304 MRI

VESTIBULE

1304A

ED

WAITING

AREA

TRIAGE

ELEVATOR

EQUIPMENT

PATIENT

TOILET

1312B

TREATMENT/

ISOLATION

SECURE

TREATMENT

WHEELCHAIR

STORAGE

ANTE

ROOM

1312A

WAITING

AREA

NURSE

STATION

DICTATION

EXAM

ROOM

TRIAGE

NURSE

WORKROOM

EXAM

ROOM

SCALE

ALCOVE

CLERKS

STAIR 8

NURSE

WORKROOM

CLINICAL

PHARM

CLINICAL

PHARM

CONNECTION

SUB-WAIT

AMBULANCE

GARAGE

PATIENT

TOILET

PATIENT

TOILET

1417 HSKP

ELECTRICAL

ROOM

IT ROOM (VA)

CORRIDOR

CORRIDOR

EXAM

EXAM

EXAM

EXAM

CLEAN

UTILITY

SOILED

HOLDING

GE

1 1 1

1 1 1

V

ER

IF

Y

W

IT

H T

R

AD

ES

V

ER

IF

Y W

IT

H

T R

AD

ES

C10

AE105

C10

AE105

FINISHES

FLOOR: VINYL TILE

BASE: RUBBER

WALL: PAINT

CEILING: ACT

FINISHES

FLOOR: SHEET VINYL

BASE: RINTEGRAL

WALL: PAINT

CEILING: ACT

FINISHES

FLOOR: CARPET

BASE: RUBBER

WALL: VWC

CEILING: ACT

4" (M

IN

4"

5/8" GYPSUM

BOARD

MODIFY

EXISTING

CEILING

3 5/8" METAL

STUDS

FIRST FLOOR PLAN - EAST

AE105

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

OCTOBER 20, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

100% DESIGN SUBMITTAL

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

AE105

F5 FIRST FLOOR PLAN - EAST

1/8" = 1'-0"

KEYPLAN

NO SCALE

N

N

4'0" 2' 8' 12'

AE105

C10 GYPSUM BOARD SOFFIT

1 1/2" = 1'-0" 4"0" 2" 8" 12"

DWG. 5 OF 59

LOCATE WALLS AS REQUIRED TO ENCLOSE PIPES. WALL FINISH TO

MATCH EXISTING ADJACENT SURFACES. ADD/PATCH BASE AND

FLOORING TO MATCH EXISTING. MODIFY CEILING, CUBICLE TRACK

AND WOOD TRIM TO ACCOMMODATE NEW WALL.

GENERAL NOTES

1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/

PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,

OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,

WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT

ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH

AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE

RATING REQUIREMENTS

3. SEE COVER SHEET FOR PARTITION SCHEDULE

2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

NEW WORK KEYED NOTES:

1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER

COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.

REPLACE ALL DAMAGED ACT WITH NEW ACT

2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON

COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL

PROTECTION, BASE AND FLOORING AS REQUIRED

8 NEW 8'-0" ABOVE FINISH FLOOR GYPSUM BOARD SOFFIT. PAINT TO

MATCH ADJACENT GYPSUM BOARD SOFFIT

EXPANSION JOINT TO MATCH LOCATION AND WIDTH OF EXISTING

FLOOR JOINT. JOINT TO HAVE CONTINUOUS EXTRUDED ALUMINUM

FRAME WITH CONTINUOUS EXTRUDED FLEXIBLE GASKET INSTALLED

PER MANUFACTURER RECOMMENDATION.

MODIFY EXISTING 8'-4" CEILING AND TRADES EQUIPMENT TO

ACCOMMODATE NEW SOFFIT.

SEE GENERAL NOTE 2 FOR

THIS AREA. VA PROJECT

585-336 (EXPAND PRIMARY

CARE ADDITION).

13 REMOVE HARD CEILING AS REQUIRED FOR TRADES WORK. UPON

COMPLETION OF WORK, PATCH CEILING TO MATCH EXISTING

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

FD FD FD

DWV

ELEC

CABINET

FD

DN

UP

DN

UP

UP

DN

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

1st. FLOOR ROOF

MECH.

SHAFT

SUB-STERILIZER

MECH SPACE

MECH. RM. 1400

ROOF

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

FIRST FLOOR ROOF

BASEMENT ROOF

FD

BASEMENT ROOF

STAIR 1

STAIR 2

STAIR 5

EQUIP.

STORAGE

SEMI-RESTRICTED

CORRIDOR

ANESTHESIA

WORK ROOM

SOILED

UTILITY

MALE LOCKER/

SHOWER ROOM

SCRUB

2105A

SUB-STERILE

2101A

ROOM - WEST

OPERATING

ROOM - EAST

OPERATING

SUPPLY

STERILE

ROOM

TREATMENT

ENDOSCOPY

SUPPLY

CLEAN

ALCOVE

WHEELCHAIR

MEN'S

FEMALE

2112A MALE

2111A

WOMEN

CLOSET

HSKG

BED #8

PACU

2129K

BED #9

PACU

2129L

SUPERVISOR

OR

ALCOVE

GOWNING

BED #3

PRE/POST

2129C

BED #4

PRE/POST

2129D

STORAGE

EQUIP.

UTILITY

SOILED

TOILET

PT.

ROOM

WAITING

BED #2

PRE/POST

2129B

TREATMENT

ROOM

TREATMENT

ROOM

TREATMENT

ROOM

TREATMENT

SUPPLY

CLEAN

ROOM

TREATMENT

CLOSET

HSKG

BED #7

PRE/POST

2129G

VIEW

PACS

STATION

NURSE

SUPPLY

STERILE

2171A

TOILET

UTILITY

SOILED

CLERKS

CHECK-IN

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

LOUNGE

STAFF

TOILET

2143A

CHUTE

LAUNDRY

ROOM

TREATMENT

ROOM

WORK

2145A

DATA

BIOMED

BED #5

PRE/POST

2129E

BED #6

PRE/POST

2129F

STATION

NURSING

SUPPLY

STERILE

ENDOSCOPY

SHOWER RM.

FEMALE LCKR/

SUPPLY

CLEAN

PT. TOILET

TUBE COMP

PNUEMATIC

PHONE

DATA &

CORRIDOR

2299H

TREATMENT

HALLWAY

CORRIDOR

PRE/POST

CORRIDOR

CL

EA

N

CO

RR

ID

OR

RE

ST

RI

CT

ED

2299B

CORRIDOR

2129A

PRE/POST

BED #1

PACS

WORK STATION

2176A

PT.

TOILET

2110A

CART

ALCOVE2110C

CART

ALCOVE

2110D

BLANKET

WARMER

FINISHES

FLOOR: SHEET VINYL

BASE: INTEGRAL

WALL: WALL PRO & PAINT

CEILING: ACT

SECOND FLOOR PLAN - WEST

AE106

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

OCTOBER 20, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

100% DESIGN SUBMITTAL

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

AE106

F3 SECOND FLOOR PLAN - WEST

1/8" = 1'-0"

KEYPLAN

NO SCALE

N

N

4'0" 2' 8' 12'

DWG. 6 OF 59

GENERAL NOTES

1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/

PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,

OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,

WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT

ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH

AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE

RATING REQUIREMENTS

3. SEE COVER SHEET FOR PARTITION SCHEDULE

2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

NEW WORK KEYED NOTES:

1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER

COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.

REPLACE ALL DAMAGED ACT WITH NEW ACT

2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON

COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL

PROTECTION, BASE AND FLOORING AS REQUIRED

FIRST FLOOR ROOF

FD

UP

DN

UP

DN

ROOF

MECH

CHASE

PASSENGER

ELEVATOR

DN

UP

OPEN TO FIRST

FLOOR

MECH.

SHAFT

CHASE

CHASE

PASSENGER

ELEVATOR

MECH.

SHAFT

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

FOLDING

WALL

FIRST FLOOR ROOF

FIRST FLOOR ROOF

STAIR 3

STAIR 4

VIEWING

PACS

ROOM

CONTROL

2242A

FLUOROSCOPY

RADIOLOGY

TEST

STRESS

TOILET

PATIENT

ULTRASOUND

2237 ROOM

TECH. WORK

UNLTRASOUND

TOILET

PT.

2242B

& LOUNGE

STAFF LOUNGE

SUPPLY

CLEAN

VIEWING

PACS

TOILET

PT.

ROOM

CHANGING

TOILET

STAFF

HSKG

CONTROL

CT SCAN

CT SCAN

TOILET

PT.

HOT LAB

2254A

MEDICINE

NUCLEAR

DENSITY

BONE

CHUTE

LAUNDRY

UTILITY

ROOM

CONTROL

2263A

COMPUTERS

PACS

2215A

RADIOLOGY

SCANNER

GE CT

STORAGE

2263B

CHIEF

IMAGING

CLEAN

STERILE

ENDOSCOPY

CYSTOSCOPY

CLOSET

HSKG

MECHANICAL

MECHANICAL

2307A

LOBBY

ELEVATOR

TUBE COMP

PNUEMATIC

PHONE

DATA &

ROOM

CHANGING

2245A

ALCOVE

EQUIP.

2230A

CORRIDOR

2230P

ROOM

TECH WORK

C2-2

CORRIDOR

SOCIAL

WORKER

ACCUPUNCTURE

EXAM ROOM

DATA

CLOSET

ACCUPUNCTURE

EXAM ROOM

EYE PRE-

TREATMENT

EYE PRE-

TREATMENT

OFFICE

STAFF

LOUNGE

STERILE

SUPPLY

CLEAN

SUPPLY

SOCIAL

WORKER

SUB-WAIT

AREA

2335A

PATIENT

TOILET

CHEMOTHERAPY

MENTAL HEALTH

EXAM

HSKG CLST

ELECTRICAL

ROOM

LANE

ROOM

LANE

ROOM

LANE

ROOM

EYE

INSTRUMENTS

TELE-HEALTH

EXAM RM

TELE-HEALTH

EXAM RM

TELE-HEALTH

OFFICE

TELE-HEALTH

EXAM RM

TELE-HEALTH

EXAM RM

MENS

TOILET

WAITING

AREA

MEETING

ROOM

MEETING

ROOM

WOMENS

TOILET

CLERKS

AREA

2374A

STAFF

WORK AREA

NEUROLOGY

EXAM RM.

NEUROLOGY

EXAM RM. 2365

NEUROLOGY

EXAM RM.

CORRIDOR

STAFF

TOILET

SUB-WAIT

AREA

WOMENS

HEALTH EXAM 2352

TOILET

WOMENS

HEALTH EXAM

WOMENS

HEALTH EXAM

WOMENS

HEALTH EXAM

WOMENS

HEALTH EXAM

FAMILY

LOUNGE

2338A

FAMILY

RESTROOM

ONOCOLOGY

EXAM/OFFICE

ONOCOLOGY

EXAM/PROC.

SOILED

LINEN

2261A

CONTROL

ROOM

PACS

WORK STATION

CLERK

CHECK-IN

WAITING

AREA

FEMALE

TOILET

MALE

TOILET

C2-1

CORRIDOR

AREA

DUMBWAITER

/CART ALCOVE

2110B

SCRUB

ALCOVE

2252P

CORRIDOR

2230B

EQUIP

ALCOVE

CORRIDOR

SUB-WAIT

HALLWAY

CORRIDOR

STAFF

TOILET

STAFF

TOILET

IT ROOM

(VENDOR)

ELECTRICAL

ROOM

IT ROOM (VA)

SECOND FLOOR PLAN - EAST

AE107

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

OCTOBER 20, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

100% DESIGN SUBMITTAL

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

AE107

F1 SECOND FLOOR PLAN - EAST

1/8" = 1'-0"

KEYPLAN

NO SCALE

N

N

4'0" 2' 8' 12'

DWG. 7 OF 59

GENERAL NOTES

1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/

PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,

OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,

WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT

ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH

AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE

RATING REQUIREMENTS

3. SEE COVER SHEET FOR PARTITION SCHEDULE

2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

NEW WORK KEYED NOTES:

1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER

COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.

REPLACE ALL DAMAGED ACT WITH NEW ACT

2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON

COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL

PROTECTION, BASE AND FLOORING AS REQUIRED

SEE GENERAL NOTE 2 FOR

THIS AREA. VA PROJECT

585-336 (EXPAND PRIMARY

CARE ADDITION).

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

B.H. NURSING,

AUDIOLOGY

WAITING ROOM

RECEPTION

CLERKS

3105A

CORRIDOR

3299A-1

WOMEN

B.H. CHECK-OUT

CLERKS

PSYCHIATRIST

B.H.

SOCIAL

WORKER

PSYCHOLOGIST

B.H.

VOC

REHAB

B.H.

PEER

MENS

TOILET

WOMENS

TOILET

B.H.

TELE-HEALTH

SUPPLY

CLOSET

SUPPLY

DATA &

PHONE

PSYCHOLOGIST

INTERNS

B.H.

PEERS

B.H.

B.H.

PHARMACIST

B.H.

PSYCHIATRIST

SOCIAL

WORKER

CLEAN

LINEN

B.H.

ADMIN

TOILET

MEDIA

STORAGE

HSKG

UTILITY

3142A

PSYCHOLOGIST

B.H.

ADMIN

SOCIAL

WORKER

SOCIAL

WORKER

PSYCHOLOGIST

SOCIAL

WORKER

PSYCHOLOGIST

3147 SOCIAL

WORKER

3145 SOILED

LINEN

STORAGE

B.H.

CONFERENCE

ROOM

SOCIAL

WORKER

PSYCHOLOGIST

PSYCHOLOGIST

/ ASST.

CHIEF,

B.H.

PSYCHOLOGIST

/ CHIEF,

B.H.

B.H.

ADMIN

SUPPORT

SOCIAL

WORKER

ADMIN

OFFICER

BREAK

ROOM

SOCIAL

WORKER

SOCIAL

WORKER

B.H.

TELE-HEALTH

B.H.

TELE-HEALTH

B.H.

GROUP

ROOM

B.H.

GROUP

ROOM

WHOLE

HEALTH

ROOM

3286 TELE-HEALTH

EXAM

ROOM

TOILET

HSKG

HSKG

STORAGE

DATA &

PHONE

TOILET

3225A

MEN

AUDIOLOGY

CHECK-IN

3184C

AUDIOLOGY

WAITING

AUDIOLOGY

WAITING

3184B

AUDIOLOGY

OFFICE

3184A

CORRIDOR

HEARING

TESTING

AUDIOLOGY

OFFICE

3280A

SPEECH

THERAPY

GE

1 1 1

1 1

FINISHES

FLOOR: CARPET

BASE: RUBBER

WALL: PAINT

CEILING: GYPSUM

THIRD FLOOR PLAN - WEST

AE108

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

OCTOBER 20, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

100% DESIGN SUBMITTAL

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

KEYPLAN

NO SCALE

N

N

4'0" 2' 8' 12'

AE108

F1 THIRD FLOOR PLAN - WEST

1/8" = 1'-0"

DWG. 8 OF 59

GENERAL NOTES

1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/

PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,

OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,

WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT

ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH

AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE

RATING REQUIREMENTS

3. SEE COVER SHEET FOR PARTITION SCHEDULE

2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

NEW WORK KEYED NOTES:

1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER

COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.

REPLACE ALL DAMAGED ACT WITH NEW ACT

11 ALIGN NEW WALL WITH EDGE OF SOFFIT ABOVE, LENGTH TO BE AS

REQUIRED TO ENCLOSE PIPES. WALL FINISH TO MATCH EXISTING

ADJACENT SURFACES. ADD/PATCH BASE AND FLOORING TO MATCH

EXISTING. RELOCATE WALL CLOCK AS REQUIRED

13 REMOVE HARD CEILING AS REQUIRED FOR TRADES WORK. UPON

COMPLETION OF WORK, PATCH CEILING TO MATCH EXISTING

DPD JAP

2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON

COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL

PROTECTION, BASE AND FLOORING AS REQUIRED

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

C_LAVATORY

AutoCAD SHX Text

KINGSTON

K-2005

FIRST FLOOR ROOF

FIRST FLOOR ROOF

DUCT

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

WOMEN

WHOLE

HEALTH

ROOM

3286 TELE-HEALTH

EXAM

ROOM

TOILET

NURSE

MANAGER

TELE-HEALTH

TELE-HEALTH

CORRIDOR

HSKG

HSKG

STORAGE

DATA &

PHONE

BIO-MED

CLOSET

STAFF

LOUNGE &

LOCKERS

MSA

OFFICE

TELE-HEALTH

STAFF

OFFICE

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

SOILED

UTILITY

CLEAN

SUPPLY

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

STERILE

SUPPLY

CORRIDOR

MECH

3244A

NURSE

EDUCATION

TRAINING

ROOM

NURSE

EDUCATION

TRAINING

ROOM

TOILET

3246A

TOILET

3250A

PASSAGEWAY

NURSE

EDUCATION

OFFICE

NURSE

EDUCATION

CONFERENCE

ROOM

3245STORAGE

X-RAY

CONTROL

3228A

OPERATORY

OPERATORY

OPERATORY

SOILED

CLEAN

STORAGE

STERILE

LAB

OPERATORY

OPERATORY

OPERATORY

CHIED,

DENTAL

PASSAGE

PASSAGE

3237A

WAITING

ROOM

CLERK

/ WORK

TOILET

3225A

MEN

WAITING

AREA

HEARING

TESTING

AUDIOLOGY

OFFICE

3280A

SPEECH

THERAPY

1 1

THIRD FLOOR PLAN - EAST

AE109

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

OCTOBER 20, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

100% DESIGN SUBMITTAL

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

AE109

F1 THIRD FLOOR PLAN - EAST

1/8" = 1'-0"

KEYPLAN

NO SCALE

N

N

4'0" 2' 8' 12'

DWG. 9 OF 59

GENERAL NOTES

1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/

PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,

OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,

WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT

ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH

AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE

RATING REQUIREMENTS

3. SEE COVER SHEET FOR PARTITION SCHEDULE

2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

NEW WORK KEYED NOTES:

1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER

COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.

REPLACE ALL DAMAGED ACT WITH NEW ACT

2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON

COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL

PROTECTION, BASE AND FLOORING AS REQUIRED

SEE GENERAL NOTE 2 FOR

THIS AREA. VA PROJECT

585-336 (EXPAND PRIMARY

CARE ADDITION).

DPD JAP

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

C_LAVATORY

AutoCAD SHX Text

KINGSTON

K-2005

2ND FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

MECH

SHAFT

DUMB

WAITER

DN

STAIR 5

DN

UP

STAIR 2

DN

STAIR 4

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

SERVICE

ELEVATOR

UPUP

DN

UP

STAIR 1 STAIR 3

UP

DN

LDRY

CHUT

MECH

SHAFT

MECH

SHAFT

3RD FLOOR ROOF

FIRE

EQUIP

MECH

SHAFT

PASSENGER

ELEVATOR

K-4330KINGSTONC_TOILETSVITREOUS CHINA K-4330KINGSTONC_TOILETSVITREOUS CHINA

K-4330KINGSTONC_TOILETSVITREOUS CHINA

MECH

SHAFT

PIPE

SHAFT

MED/SURG

WAITING ROOM

FAMILY

BREAK AREA

4107A

TOILET

CORRIDOR

4205C

ISOLATION

LOCKER RM.

STAFF

LOUNGE

STAFF

CLOSET

HSKPG

RM.

NURSING

4116A TOILET

TEST

STRESS

GAS

BLOOD

PFL

CHART ROOM

EDUCATION/

RESP./CARDIO.

CHIEF,

ROOM

DRESSING

4282A

LOCKER

4282WAITING

CARDIO-P

4280 EQUIPMENT

4212 TOILET

4216A

STA

NURSE

PHONE

DATA &

NOURISH

COMMUNICATOR

MEDS

MED/SURG BED

MED/SURG BED

MED/SURG BED

TOILET

4268A

TOILET

4270A

CONFERENCE

ALCOVE

CART

ROOM

CONSULT.

4260 HSKPG

TOILET

4262A

LOBBY

ELEVATOR

TOILET

4250A

TOILET

4251A

TOILET

4245A

STORAGE

EQUIP.

MED/SURG #11

MED/SURG #10

MED/SURG #9

STATION

NURSE

STORAGE

LINEN

CLEAN

MED/SURG #8

MED/SURG #7

MED/SURG #6

BARIATRIC M/S #5

BARIATRIC M/S #4

TOILET

4230A

TOILET

4234A

TOILET

4236A

TOILET

4237A

TOILET

4233A

STA

NURSE

ROOM

TUB

MANAGER

NURSE

SUPPLY

STERILE

TOILET

STAFF

WORKER

SOCIAL

OFFICE

PHYS CHART

MED/SURG #2

TOILET

4215A

TOILET

4211A

OBSERVATION

SEMI-PRIVATE

ANTI-RM

TOILET

PT.

4205A

TOILET

MENS

TOILET

WOMENS

4113CHIEF

PM&R

CLERKS

CHECK-IN

PHONE

DATA &

& WORKSTATIONS

CHECK-IN CLERKS

ASSEMBLY

RECEIVING &

STORAGE

PROTHESTICS

THERAPIST

RESPIRATORY

ALCOVE

SUPPLY

4134A

UTILITY

SOILED

PROSTHETICS

CHIEF,

THERAPY RM.

RESP.

LOBBY

ELEVATOR

PASSAGE

4280P

CORR.

4129P

WAITING AREA

PM&R

CORRIDOR

4205C

CORRIDOR

4260C

PASSAGE

4242P

PASSAGE

4230P

LAUNDRY

SOILED

MED/SURG #3

CORRIDOR

4212C

TREATMENT

TREATMENT

TREATMENT

TREATMENT

HALLWAY

4143P

TREATMENT

CHIRO

TREATMENT

CHIRO

4146 TOILET

ADL

4142A

TREATMENT

ADL

STORAGE

EQUIPMENT

STORAGE

PT/RT

GYMNASIUM

PHYS. THERAPY

ROOM

TECH WORK

SUPPLY

CLEAN

ALCOVE

STORAGE

THERAPY

SPEECH

SUPPLY

STERILE

TOILET

SLEEP ROOM

4271A

MOD ROOM

STATION

NURSE

4260D

TOILET

PATIENT

4269A

ROOM

PATIENT

ROOM, ISO.

PATIENT

TOILET

PATIENT

4267A

ANTE

FINISHES

FLOOR: CARPET

BASE: RUBBER

WALL: PAINT

CEILING: GYPSUM

1 1 1

FOURTH FLOOR PLAN

AE110

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

OCTOBER 20, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

100% DESIGN SUBMITTAL

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

AE110

F1 FOURTH FLOOR PLAN

1/8" = 1'-0"

N

4'0" 2' 8' 12'

KEYPLAN

NO SCALE

N

DWG. 10 OF 59

REMOVE AND SALVAGE CASEWORK AND PLUMBING FOR WORK

BEHIND WALL. REINSTALL UPON COMPLETION OF WORK.

GENERAL NOTES

1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/

PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,

OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,

WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT

ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH

AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE

RATING REQUIREMENTS

3. SEE COVER SHEET FOR PARTITION SCHEDULE

2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

NEW WORK KEYED NOTES:

1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER

COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.

REPLACE ALL DAMAGED ACT WITH NEW ACT

2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON

COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL

PROTECTION, BASE AND FLOORING AS REQUIRED

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

DUCT

INTAKE

4TH FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

3RD FLOOR ROOF

2ND FLOOR ROOF

DN

UP

RAMP

UP

FLOOR RAISED 9"

STEP

UP

DUMB

WAITER

DN

STAIR 5

LDRY

CHUT

FIRE

EQUIP

STAIR 1 STAIR 3

STEP

UP

DN

UP

STAIR 2

DN

STAIR 4

DUCT

INTAKE

UP

DN

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

SERVICE

ELEVATOR

MECH.

SHAFT

LDRY

CHUT

PIPE

SHAFT

WORKSTATIONS

OPEN

STORAGE

STORAGE

SPECIALISTS

COMPUTER

SERVERS

STORAGE

5281A

SPECIALISTS

COMPUTER

RECEPTION

STORAGE

CONFERENCE

EQUIP

BIOMED

ROOM

CONFERENCE

IMPROVEMENT ADMIN.

PERFORMANCE

OFFICER

COMPLIANCE

IMPROVEMENT

CHIEF, PERFORMANCE

AREA

PRINTER

STORAGE

PI/QA

STATIONS

PI/QA WORK

ROOM

CONFERENCE

DIRECTOR

HSS TO

OF STAFF

CHIEF

STORAGE

5243 OF NURSING

DIRECTOR

SECRETARY'S

NURSING & DIRECTOR'S

CREDENTIALS

ASSOC. DIRECTOR

HHS TO

AD, COS, AND PRI.CARE

ADMIN SUPPORT FOR

PRI CARE / NURS.

ADMIN SUPPORT

PROGRAM MNGR.

WOMEN VETERAN

ADMIN NURSING

HHS TO COS &

PHONE

DATA &

ROOM

MECH

5281B

LOUNGE

STAFF

TOILET

WOMENS

CORRIDOR

5299B-1

CO

RR

ID

OR

D-

CORRIDOR

5199E-1

CO

RR

ID

OR

C-

CO

RR

ID

OR

C-

CORRIDOR

5199A-1

STORAGE

AFFAIRS

PUBLIC

OF NURSING

ASST. CHIEF

OFFICE

DIRECTORS

DIRECTOR

ASSOCIATE

CORRIDOR

5299E-1

CORRIDOR

5180-1

LOBBY

ELEVATOR

5299A-1

CORRIDOR

PI/QA

5299F

MENS TOILET

OFFICE

5209A

OFFICE

5209B

OFFICE

5209C

OFFICE

5209D

LOUNGE

DRIVERS

5205A

OFFICE

5205B

RECEPTION

WORKROOM

STORAGE

5105A

MANAGER

VTS

5107A

COORDINATOR

VTS

MEDICINE

CHIEF OF

5111C

OFFICE

5111D

CLERK

P.A.S.

OFFICE

P.A.S.

5111A

OFFICE

P.A.S.

5111B

MENS TOILET

TOILET

WOMENS

OFFICE CLERK

FISCAL

FISCAL

ASST. CHIEF

FISCAL

CHIEF,

STATIONS

FISCAL WORK

MULTIPURPOSE

FISCAL

STATIONS

FISCAL WORK

STORAGE

FILE

GROUP ROOM

FISCAL

CENTER

CONFERENCE

LOUNGE

STAFF

OFFICER

PRIVACY

OFFICER

COMPLIANCE

ASSISTANT

PROGRAM

HR

CHIEF

CHIEF HR

ASSISTANT

WO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .