S02 - 585-19-118 - Att - Drawings Revised.pdf
PDF 30 MB Posted
- Solicitation number
- 36C25221B0032
About this file
This pre-solicitation notice describes a federal contract opportunity for construction services. The Oscar G. Johnson VA Medical Center is seeking a contractor to complete project #585-19-118 to upgrade potable water risers and install new isolation valves at its facility in Iron Mountain, Michigan. The project value is estimated between $1 million and $5 million, and work must be completed within 270 calendar days of the notice to proceed. The solicitation will be posted to SAM.gov on October 7, 2021, with bid opening scheduled for December 2, 2021. A pre-bid conference will be held the week of October 25-29. This opportunity is set aside solely for service-disabled veteran-owned small businesses, which must represent their status at time of bid submission and award.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOOD
BLOCKING
METAL
STUDS
SAWCUT BLOCKING
TO RECEIVE METAL
STUD FLANGE
WIDTH TO SUIT
HEIGHT
TO SUIT
USE WHERE ITEM BEING
MOUNTED EXERTS A
DOWNWARD TWISTING FORCE
(FOLDING COUNTER BRACKETS,
TV BRACKETS, ETC.)
USE WHERE ITEM BEING
MOUNTED DOES NOT
EXERT A DOWNWARD
FORCE (CABINETS, GRAB
BARS, VIEW BOXES,
MARKER BOARDS ETC.)
SPECIAL
VERTICAL BLOCKING
STANDARD
HORIZONTAL BLOCKING
4'-0"
MINIMUM
1 1/2"
1 1/2"
NOTE:
FIRETREATED 2X12
BLOCKING, TYPICAL
WHERE (2) STUD MOUNTED
DEVICES ARE SCHEDULED,
ALIGN HEIGHTS OF FINISHED
PRODUCT.
WHERE MULTIPLE DEVICES
ARE SCHEDULED TO OCCUR
WITHIN 16" OF EACH OTHER
HORIZONTALLY, ALIGN
DEVICES VERTICALLY ON
(1) FACE OF STUD
STUDS
DOOR
WHERE MULTIPLE DEVICES ARE SCHEDULED ALONG
A DOOR, DEVICES SHALL BE ALIGNED ON (1) FACE
OF METAL STUD AND SHALL OCCUR AT SWING/
LATCH SIDE OF DOOR. EXCLUDES THERMOSTATS
ROOM
CORRIDOR
WHERE MULTIPLE DEVICES
ARE SCHEDULED IN CLOSE
PROXIMITY IN HEIGHT, ALIGN
DEVICES.
POSITION ROOM THERMOSTAT ADJACENT TO
LIGHT SWITCH. ALIGN TOP OF THERMOSTAT
WITH LIGHT SWITCH COVER PLATE
WHERE MULTIPLE DEVICES ARE
SCHEDULED IN CLOSE PROXIMITY IN
HEIGHT, ALIGN DEVICES.
4' -0
" T O
T O
P
STANDARD PARTITION TYPES
(UNLESS NOTED ON PLANS OTHERWISE):
1. ALL SINGLE LAYER GYPSUM BOARD PARTITIONS SHALL BE
TYPE GE. INDICATED ON PLANS AS THUS
INTERIOR GYPSUM BOARD SHALL BE AS LISTED IN THE ORDER OF
IMPORTANCE AS FOLLOWS:
1.
AT FIRE RATED PARTITIONS, GYPSUM BOARD SHALL
COMPLY WITH THE INDICATED UL DESIGN NUMBER OR
OTHER SIMILAR THIRD PARTY TESTED ASSEMBLY.
A.
AS LISTED IN THE TILE COUNCIL OF NORTH AMERICA (TCNA)
NUMBER AS INDICATED IN SPECIFICATION
B.
GLASS MESH CEMENT BOARD TILE BACKER MATERIAL
AT ALL WALLS AND CEILINGS OF TOILET ROOMS WITH
SHOWERS. PROVIDE MOLD AND MOISTURE RESISTANT
TYPE "X" GYSPUM BOARD ABOVE TILE TO HEIGHT
SHOWN ON DRAWINGS.
1.
GLASS MESH CEMENT BOARD BEHIND TERRAZZO BASE.C.
PROVIDE MOLD AND MOISTURE RESISTANT TYPE "X" GYPSUM
BOARD AT THE FOLLOWING LOCATIONS:
D.
1. 4'-0" MINIMUM ALL SIDES OF THE CENTER LINE OF
PLUMBING FIXTURES.
ALL GYPSUM BOARD SHALL BE TYPE "X"E.
ALL DIMENSIONS LOCATING INTERIOR PARTITIONS ARE TO FACE OF
CONCRETE BLOCK, OR FACE OF OUTER LAYER OF GYPSUM BOARD.
DIMENSIONS ON PLANS IGNORE APPLIED FINISHES.
2.
FOR HEAD OF WALL CONDITION AT NON RATED GYPSUM BOARD
AND METAL STUD PARTITIONS SEE:
3.
(UNLESS NOTED OTHERWISE):
GENERAL INTERNAL PARTITION NOTES4 1/4"
3" ACOUSTICAL
INSULATION
3 5/8" METAL
STUDS
5/8" GYPSUM
BOARD
ACOUSTICAL
SEALANT AT
NON-RATED
PARTITIONS
CEILING
TYPE AS
SCHEDULED
GE
E8 G001
CONDITION AT FLAT SLAB OR WALLS PARALLEL WITH
JOISTS OF THE PAN AND JOIST SYSTEM
CONDITION AT WALLS
PERPENDICULAR TO THE JOISTS
OF THE PAN AND JOIST SYSTEM.
EXISTING TOP SLAB OF PAN AND
JOIST FLOOR SYSTEM
PA
N
A N
D J
O
IS
T
FL
O O
R S
YS
TE
M
1/2" ACOUSTICAL
SEALANT JOINT
TYPICAL WHERE
GYPSUM BOARD MEETS
JOISTS AND TOP SLAB
(STATIC JOINT)
BOTTOM OF JOISTS
1 1/2" ACOUSTICAL SEALANT JOINT - VERIFY
JOINT SIZE WITH MOVEMENT CAPABILITIES
DEEP LEG TRACK (2" MINIMUM)
ATTACH TO BOTTOM OF JOIST
2 1/2" MINIMUM AT 2ND FLOOR
METAL STUDS CUT IN 3/4" LESS IN
HEIGHT THAN ASSEMBLY, 1 1/4"
AT 2ND FLOOR
PROVIDE TEMPORARY MEANS OF
SUPPORTING STUDS IN VERTICAL
POSITION WITHOUT SECURING
STUDS TO TOP TRACK
SEE SPECIFICATION
FOR TYPE OF
CONNECTION TO
STRUCTURE ABOVE
ATTACH GYPSUM
BOARD TO METAL
STUDS AT THIS
POINT
1 1/2" ACOUSTICAL
SEALANT JOINT,
VERIFY JOINT SIZE
WITH MOVEMENT
CAPABILITIES OF
ACOUSTICAL
SEALANT
DEEP LEG TRACK
(2" MINIMUM), 2 1/2"
AT 2ND FLOOR
METAL STUDS CUT
3/4" LESS IN HEIGHT
THAN ASSEMBLY, 1
1/4" AT 2ND FLOOR
PROVIDE TEMPORARY MEANS OF
SUPPORTING STUDS IN VERTICAL
POSITION WITHOUT SECURING
STUDS TO TOP TRACK
SEE SPECIFICATION
FOR TYPE OF
CONNECTION TO
STRUCTURE ABOVE
ATTACH GYPSUM
BOARD TO METAL
STUDS AT THIS
POINT
JOINT SHALL ALLOW FOR 1/2"
STRUCTURAL MOVEMENT IN
COMPRESSION OR EXTENSION
EACH WAY AT 1ST FLOOR AND
BASEMENT FLOOR. JOINT SHALL
ACCOMODATE 1" COMPRESSION
OR EXTENSION EACH WAY AT
2ND FLOOR
COVER SHEET
G001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
OCTOBER 20, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
100% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
DPD JAP
UPGRADE POTABLE WATER RISERS,
OSCAR G. JOHNSON VA MEDICAL CENTER
IRON MOUNTAIN, MI 49801
100% DESIGN SUBMITTAL
AUGUST 23, 2021
SHEET INDEXGENERAL NOTES
DIRECTOR
ASSOCIATE DIRECTOR
ASSOCIATE DIRECTOR FOR N&PCS
CHIEF OF POLICE
CHIEF OF ENGINEERING
INFECTION CONTROL NURSE
PATIENT SAFETY
A.F.G.E.
INDUSTRIAL HYGIENIST
APPROVALS
CHIEF OF STAFF
SAFETY
VERIFY ALL DIMENSIONS RELATING NEW CONSTRUCTION TO EXISTING CONSTRUCTION.1.
GENERAL TRADE SHALL PATCH HOLES IN SLABS, PARTITIONS, AND CEILINGS CAUSED BY ANY TRADE AS FOLLOWS:2.
A). AT REMOVED DUCTWORK, CONDUIT, AND PIPING
B). AT NEW DUCTWORK, CONDUIT AND PIPING IN EXISTING PARTITIONS
C). AT ADDED OR REMOVED PARTITION MOUNTED ITEMS
WHERE EXPOSED TO VIEW, PATCHED SURFACES SHALL MATCH ADJACENT FINISHES. WORK SHALL MAINTAIN EXISTING
SEPARATION RATINGS.
3.
GENERAL TRADE SHALL REMOVE ACOUSTICAL TILE [AND PLASTER CEILINGS] [GYPSUM BOARD] WHERE REQUIRED FOR MECHANICAL OR ELECTRICAL TRADES. REINSTALL ACOUSTICAL TILE [AND PATCH PLASTER] WHEN WORK ABOVE CEILING
HAS BEEN COMPLETED.
4.
CONSTRUCTION IN SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT IS CURRENTLY IN PROGRESS. ACTUAL
EXISTING CONDITIONS MAY VARY FROM CONDITIONS INDICATED ON THESE DRAWINGS.
5.
SEE SPECIFICATION SECTION 01 35 26 FOR INFECTION CONTROL. SEE SPECIFICATION SECTION 01 00 00 FOR PHASING AND WORK
TIME LIMITATIONS
6.
PROVIDE BLOCKING FOR ALL PARTITION MOUNTED ITEMS INCLUDING THOSE SHOWN ON THESE DRAWINGS TO BE PROVIDED
UNDER SEPARATE CONTRACT, SEE
7.
CORNER GUARDS INDICATED THUS (CG, CG1, CG2) ON FLOOR PLANS, ARE TO BE SURFACE MOUNTED. [FROM TOP OF BASE
TO CEILING]. [ UNLESS NOTED OTHERWISE IN ROOM ELEVATIONS OR PLANS].
8.
CHAIRRAILS INDICATED THUS (CR) ON FLOOR PLANS, SHALL BE AS SPECIFIED AND INSTALLED AT 2'-10" TO THE TOP OF CHAIRRAIL. PROVIDE BLOCKING IN NEW METAL STUD PARTITIONS AT ALL CHAIRRAILS. TERMINATE CHAIRRAILS WITHIN 2" OF
ALL DOOR FRAMES, CORNERS, AND CORNER GUARDS.
9.
HANDRAILS INDICATED THUS (HR) ON FLOOR PLANS, SHALL BE AS SPECIFIED AND INSTALLED AT 2'-10" TO THE TOP OF HANDRAIL. PROVIDE BLOCKING IN NEW METAL STUD PARTITIONS AT ALL HANDRAILS. TERMINATE HANDRAILS WITHIN 2" OF
ALL DOOR FRAMES, CORNERS, AND CORNER GUARDS.
10.
FOR MOUNTING HEIGHTS AND LOCATIONS OF DEVICES PROVIDED BY OTHER TRADES, SEE11.
WHERE MECHANICAL EQUIPMENT DOES NOT ALLOW STUDS TO EXTEND TO STRUCTURE, PROVIDE STRUCTURAL METAL STUD BOX HEADER BENEATH ALL EQUIPMENT. BOX HEADER SHALL BE CONSTRUCTED OF (2) STRUCTURAL STUDS LAID ON THEIR BACK SIDE UTILIZING THE SAME DIMENSION STUDS AS THE WALL BE CONSTRUCTED (IE, 3 5/8"). OPENINGS BETWEEN 8'-0" AND 12'-0" SHALL UTILIZE .0451 THICKNESS STUDS. OPENINGS LESS THAN 8'-0" SHALL UTILIZE .0346 THICKNESS STUDS.
12.
THE SEALANT SCHEDULE LISTED ON THIS SHEET IN NO WAY LISTS EVERY SEALANT JOINT CONDITION REQUIRED ON THIS PROJECT AND DOES NOT RELIEVE THE CONTRACTOR RESPONSIBILITY TO CAULK ITEMS AS INDICATED IN DETAILS. REFERENCE DETAILS AND NOTES FOR REQUIRED SEALANT LOCATIONS. UNLESS NOTED OTHERWISE PROVIDE SEALANT PER THE SCHEDULE ON THIS SHEET APPROVED FOR USE WITH MATERIAL INSTALLED AGAINST (USE M-MORTAR, G-GLASS, A-ALUMINUM, O-OTHER (LIST ACCEPTABLE SUBSTRATES AND PREPARATIONS). PRIOR TO INSTALLATION OF SEALANT, CONTRACTOR SHALL PROVIDE A SEALANT SCHEDULE SHOWING PRODUCT SELECTION, MANUFACTURER'S APPROVAL FOR MATERIAL USAGE (PROVIDE PRIMER IF REQUIRED) AND WITH MANUFACTURERS FULL SELECTION OF COLORS SUBMITTED TO THE ARCHITECT FOR REVIEW FOR EACH APPLICATION.
ALL CONTRACTORS UTILIZING ELECTRONIC DRAWING SETS ARE RESPONSIBLE TO CONFIRM DRAWINGS ARE PRINTED/INSERTED INTO OTHER SOFTWARE TO SCALE. CONSTRUCTION DRAWINGS ON FULL SIZE SHEETS ARE TO BE 24" X 36" OR 30" X 42" WHEN PRINTED AT 1:1. A SCALE VERIFICATION IS PROVIDED FOR YOUR VERIFICATION IN THE MATERIALS AND SYMBOLS SCHEDULE ON THE
COVER SHEET OF THIS PROJECT.
13.
14.
G001
B9 WOOD BLOCKING ISOMETRIC
1" = 1'-0"
B9 G001
G001
B8 DEVICE MOUNTING SCHEDULE
1/4" = 1'-0"
B8 G001
G001
E8 HEAD OF WALL CONDITION
3" = 1'-0"
DWG. 1 OF 59
2"0" 1" 4" 6"
OWNER REQUIRES CONTRACTOR TO BE ESCORTED IN CERTAIN AREAS OF THE PROJECT. CONTRACTOR TO COORDINATE WITH
OWNER LOCATIONS AND TIMES.
15.
SEALANT SCHEDULE
SILICONE - 50% MOVEMENT -
CLASS 50
SILICONE - 25%
MOVEMENT/MILDEW
RESISTANT - CLASS
SINGLE
COMPONENT
URETHANE - 35%
MOVEMENT -
CLASS 35
MULTI-COMPONENT
URETHANE - 50%
MOVEMENT - CLASS
LATEX - NO MOVEMENT -
CLASS 12.5
ACOUSTICAL
SEALANT -
NON-HEAD OF
WALL - 12.5%
MOVEMENT
ACOUSTICAL SEALANT
- HEAD OF WALL -
EXPANSION JOINTS -
33% MOVEMENT
BUILDING
INTERIOR
JOINT BETWEEN SILLS AND
EXTERIOR FENESTRATIONS:
GRADE NS
JOINTS BETWEEN
PLUMBING FIXTURES
AND ADJOINING
MATERIALS: GRADE
NS
CONTROL JOINTS
SCHEDULED TO
BE CAULKED:
GRADE NS
EXPANSION JOINTS
NOT EXPOSED TO
UV: GRADE NS -
VERTICAL (AND
CEILING), GRADE P,
USE T - HORIZONTAL
INTERIOR DOOR FRAMES
NOT EXPOSED TO UV, AT
INTERSECTION OF WALL
AND FRAME: GRADE NS, P
TYPICAL. USE SINGLE
COMPONENT URETHANE
SEALANT GRADE NS, T AT
FLOOR INTERSECTION
WALL
PERIMETERS
HEAD OF WALL JOINTS
JOINT BETWEEN INTEGRAL
BASE AND DOOR FRAMES:
GRADE NS
VERTICAL JOINTS AT
INSIDE CORNERS OF
CERAMIC TILE
CONDITIONS: GRADE
NS
PENETRATIONS
OF MECHANICAL
EQUIPMENT IN
SMOKE TIGHT
WALLS: GRADE
NS
JOINTS WHERE NO
MOVEMENT IS EXPECTED:
GRADE NS
SMOKE RESISTANT
EXPANSION JOINTS
(WHERE SILICONE
SEALANTS ARE NOT
UTILIZED)
EXPANSION JOINTS EXPOSED
TO UV: GRADE NS VERTICAL,
GRADE P USE T - HORIZONTAL
JOINT BETWEEN
TILED FLOOR AND
WALL
INTERSECTIONS:
GRADE NS, USE T
JOINT BETWEEN
WALLS AND
ACOUSTICAL
GRID: GRADE NS
JOINTS BETWEEN DIS-SIMILAR
MATERIALS SUBJECT TO UV
EXPOSURE: GRADE NS
BETWEEN
COUNTERTOP AND
WALL SURFACES:
GRADE NS
JOINTS BETWEEN
DIS-SIMILAR
MATERIALS NOT
SUBJECT TO UV
EXPOSURE:
GRADE NS
SEALANTS:
1. SUBMIT SEALANT SCHEDULE PRIOR TO INSTALLATION OF SEALANTS INDICATING WHERE SEALANT IS SCHEDULED TO BE INSTALLED FOR APPROVAL. PROVIDE ACTUAL SAMPLES FOR COLOR SELECTION FROM FULL RANGE OF COLORS FOR EACH SEALANT SCHEDULED TO BE INSTALLED. SEALANTS MUST BE FROM ONE OF THE PRODUCTS LISTED BELOW
2. SILICONE SEALANT
2.1. DOW CORNING CORPORATION: 795 SILICONE BUILDING SEALANT
2.2. MOMENTIVE PERFORMANCE MATERIALS (GE): SILPRUF NB SCS9000
2.3. PECORA CORPORATION: 890 NST SILICONE SEALANT
2.4. TREMCO: SPECTREM 1
3. URETHANE JOINT SEALANTS
3.1. BASF BUILDING SYSTEMS (SONNEBORN): SONOLASTIC NP-1
3.2. BOSTIK, INC.: CHEM-CALK 2020
3.3. SIKA CORPORATION: SIKAFLEX-1A
4. MULTI-COMPONENT NON-SAG URETHANE
4.1. DYNATROL II
4.2. TREMCO DYMERIC 240/240FC
5. ACOUSTICAL SEALANT (EXCEPT HEAD OF WALL)
5.1. PECORA AC-20 FTR
5.2. USG SHEETROCK ACOUSTICAL SEALANT
6. ACOUSTICAL SEALANT (HEAD OF WALL)
6.1. FIRE JOINT SPRAY (CFS-SP WB), MANUFACTURED BY HILTI INC., TULSA, OKLAHOMA, PHONE: 800-879-6000
6.2. RECTORSEAL SMOKE AND ACOUSTIC SEALANT, MANUFACTURED BY RECTORSEAL, HOUSTON, TEXAS, PHONE: 800-231-3345
7. TAMPER RESISTANT URETHANE (POLYURETHANE) SEALANT
7.1. PECORA DYNAFLEX
7.2. BASF MASTERSEAL CR 195
7.3. SIKAFLEX 2C NS TG
8. TAMPER PROOF EPOXY SEALANT
8.1. PECORA DYNAPOXY EP-1200
CEILING REMOVAL & REPLACEMENT - (FIRE PROTECTION)
IN AREAS AFFECTED UNDER THE SCOPE OF THE PROJECT WORK, THE GENERAL
TRADE SHALL REMOVE AND REINSTALL EXISTING CEILING TILE SYSTEM TO ALLOW
FOR THE REMOVAL AND INSTALLATION OF THE FIRE PROTECTION SYSTEM - SEE
PROJECT MANUAL (GENERAL TRADE TO VERIFY CEILING TILE SYSTEM). THE
GENERAL TRADE SHALL TEMPORARILY ADJUST/SUPPORT EXISTING LIGHT FIXTURE(S),
SMOKE DETECTOR(S), PAGING SPEAKER(S), AND NURSE CALL DEVICE(S) AS
REQUIRED TO ACCOMODATE THE FIRE PROTECTION INSTALLATION. REINSTALL
FIXTURE(S) AND DEVICE(S) TO THEIR ORIGINAL LOCATIONS UPON FIRE PROTECTION
INSTALLATION COMPLETION. IN ROOM CONTAINING PLASTER CEILING, OPENINGS
SHALL BE CUT BY THE GENERAL TRADE. NEW ACCESS PANEL(S) (24"x 24") SHALL BE
SUPPLIED BY THE FIRE PROTECTION TRADE FOR INSTALLATION BY THE GENERAL
TRADE AS REQUIRED. FIRE PROTECTION TRADE TO COORDINATE QUANTITY AND
LOCATION OF ACCESS PANEL(S) WITH GENERAL TRADE.
Sheet Number Sheet Title
GENERAL
G001 COVER SHEET
ARCHITECTURAL
AE102 BASEMENT PLAN - WEST
AE103 BASEMENT PLAN - EAST
AE104 FIRST FLOOR PLAN - WEST
AE105 FIRST FLOOR PLAN - EAST
AE106 SECOND FLOOR PLAN - WEST
AE107 SECOND FLOOR PLAN - EAST
AE108 THIRD FLOOR PLAN - WEST
AE109 THIRD FLOOR PLAN - EAST
AE110 FOURTH FLOOR PLAN
AE111 FIFTH FLOOR PLAN
AE112 SIXTH FLOOR PLAN
FIRE PROTECTION
F101 BASEMENT FLOOR PLANS
PLUMBING
PD101 SUB-BASEMENT SUPPLY PIPING PLAN - DEMOLITION
PD102 BASEMENT SUPPLY PIPING PLAN - WEST - DEMOLITION
PD103 BASEMENT SUPPLY PIPING PLAN - EAST - DEMOLITION
PD104 FIRST FLOOR SUPPLY PIPING PLAN - WEST - DEMOLITION
PD105 FIRST FLOOR SUPPLY PIPING PLAN - EAST - DEMOLITION
PD106 SECOND FLOOR SUPPLY PIPING PLAN - WEST - DEMOLITION
PD107 SECOND FLOOR SUPPLY PIPING PLAN - EAST - DEMOLITION
PD108 THIRD FLOOR SUPPLY PIPING PLAN - WEST - DEMOLITION
PD109 THIRD FLOOR SUPPLY PIPING PLAN - EAST - DEMOLITION
PD110 FOURTH FLOOR SUPPLY PIPING PLAN - DEMOLITION
PD111 FIFTH FLOOR SUPPLY PIPING PLAN - DEMOLITION
PD112 SIXTH AND SEVENTH FLOOR SUPPLY PIPING PLANS - DEMOLITION
PP101 SUB-BASEMENT SUPPLY PIPING PLAN - NEW WORK
PP102 BASEMENT SUPPLY PIPING PLAN - WEST - NEW WORK
PP103 BASEMENT SUPPLY PIPING PLAN - EAST - NEW WORK
PP104 FIRST FLOOR SUPPLY PIPING PLAN - WEST - NEW WORK
PP105 FIRST FLOOR SUPPLY PIPING PLAN - EAST - NEW WORK
PP106 SECOND FLOOR SUPPLY PIPING PLAN - WEST - NEW WORK
PP107 SECOND FLOOR SUPPLY PIPING PLAN - EAST - NEW WORK
PP108 THIRD FLOOR SUPPLY PIPING PLAN - WEST - NEW WORK
PP109 THIRD FLOOR SUPPLY PIPING PLAN - EAST - NEW WORK
PP110 FOURTH FLOOR SUPPLY PIPING PLAN - NEW WORK
PP111 FIFTH FLOOR SUPPLY PIPING PLAN - NEW WORK
PP112 SIXTH AND SEVENTH FLOOR SUPPLY PIPING PLANS - NEW WORK
PP113 DETAILS AND SUB-BASEMENT WATER PIPING DIAGRAM
PP114 WATER PIPING DIAGRAM - WEST RISER
PP115 WATER PIPING DIAGRAM - EAST RISER
HVAC
M101 BASEMENT PLAN - EAST
M102 FIRST FLOOR PLAN - WEST
M103 FIRST FLOOR PLAN - EAST
M104 SECOND FLOOR PLAN - WEST
M105 SECOND FLOOR PLAN - EAST
M106 THIRD FLOOR PLAN - WEST
M107 THIRD FLOOR PLAN - EAST
M108 FOURTH FLOOR PLAN
M501 SCHEDULES AND DETAILS
ELECTRICAL
ED101 SUB-BASEMENT DEMOLITION
ED102 BASEMENT DEMOLITION PLAN - EAST
ED103 FIRST FLOOR DEMOLITION PLAN - WEST
ED104 FIRST FLOOR DEMOLITION PLAN - EAST
ED105 THIRD FLOOR DEMOLITION PLAN
E101 SUB-BASEMENT NEW WORK PLAN
E102 BASEMENT NEW WORK PLAN - EAST
E103 FIRST FLOOR NEW WORK PLAN
E104 FIRST FLOOR NEW WORK PLAN - EAST
E105 THIRD FLOOR NEW WORK PLAN
AutoCAD SHX Text S
LAUNDRY
CHUTE ABOVE
FD
COIL
CABINET
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
E1
IN
FL
OO
R
SC
AL
E
MAIL ROOM
B107A
CORRIDOR
B199A-1
CBOC
STORAGE
B187
ENGINEER
SUPERVISORY
B072
ENGINEER
GENERAL
B074
ENGINEER
GENERAL
B076
ENGINEER
CHIEF
B070
OFFICER
ADMIN.
B069
GEMS
I.H. &
B067
ROOM
CONFERENCE
B077
TOILET
B075A
ROOM
FILE
B075
SHOP
CARPENTER
B062
SHOP
MACHINE
B060
ROOM
ELECTRICAL
B028
EQUIPMENT
ELECTRICAL
B027A
SHOP
ELECTRONICS
B027
& EMER. MNGT.
ENGINEERING
B023
KITCHEN
CANTEEN
B175
STORAGE
CANTEEN
B175A
SERVING
CANTEEN
B192
LOCKER ROOM
MENS
B021
& WORK LEADER
M&R SUPERVISOR
B022
SHOP/OFFICE
MAINTENANCE
B014
VESTIBULE
B018A
SPCECIALIST
AQUISITION
B019
TOILET
MENS
B021A
MED/ELECTRNICS
SUPRVSR, BIO-
B009
STORAGE
HSKG
B122
& SUPPLIES
NESS EQUIP. &
B129
ROOM
MECHANICAL
B129A
WASH
CART
B129B
UNIFORMS
B191
TELE-DIETICIAN
B120
STORE
RETAIL
B174
CANTEEN
CHIEF,
B174A
TOILET
WOMENS
B196
LOUNGE
WOMENS
B196B
LOCKER
WOMENS
B196A
ASSISTANT
PROGRAM
B066
HSKG
B006
HSKG
B004
TEMP. STORAGE
NESS
B008
TEMP. STORAGE
NESS
B010
TOILET
B008A
SANITATION
B186A
STORAGE
MAINT.
B018B
CLOSET
DATA
B117
TEMP. STORAGE
NESS
B010
CORRIDOR
B199A-1
CORRIDOR
B199B-1
CORRIDOR
B099A-1
CORRIDOR
B099D-1
B0
B-
CO
RR
ID
OR
CORRIDOR
B018
CORRIDOR
B099C-1
CHASE
B002A
MECH
B002
ROOM
MECHANICAL
B079
SHOPS
SHARED
B087
ROOM
MECHANICAL
B018C
AND RECEIVING
CANTEEN STORAGE
B119
RECORDS
MEDICAL
B082
VAULT
B081A
CACHE
PHARMACY
B081
MNGT. STOR/OFFICE
SUPPLY CHAIN
B083
SPLY CHN MNGT.
ASS'T CHIEF
B084
PHONE
DATA &
B085
ADMIN
LOGISTICS
B086
CHAIN MNGT.
CHIEF, SUPPLY
B086A
OFFICE
SHOP
B088
ELECTRONICS
BIOMED &
B089
LOCKSMITH
B020
ENGINEER
GENERAL
B068
ROOM
DINING
B172
ELECTRONICS
BIOMED &
B009A
HOLDING AREA
SOILED LINEN
B003
ADMIN
LOGISTICS
B086B
OFFICE
CARPENTER SHOP
B062A
LOCKERS
STAFF
B194
MANAGER
SAFETY
B023A CORRIDOR
B199C-1
SUPERVISORS
HOUSEKEEPING
B129C
OFFICE
NESS
B123
NESS
CHIEF,
B121
BASEMENT PLAN - WEST
AE102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
OCTOBER 20, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
100% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
AE102
F1 BASEMENT PLAN - WEST
1/8" = 1'-0"
KEYPLAN
NO SCALE
N
N
4'0" 2' 8' 12'
DWG. 2 OF 59
GENERAL NOTES
1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/
PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,
OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,
WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT
ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH
AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE
RATING REQUIREMENTS
3. SEE COVER SHEET FOR PARTITION SCHEDULE
2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
NEW WORK KEYED NOTES:
1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER
COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.
REPLACE ALL DAMAGED ACT WITH NEW ACT
DPD JAP
AutoCAD SHX Text
UP
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
FE
FD FDFD
HYDRAULIC POWER
UNIT
FD
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
PASSENGER
ELEVATOR
D-4 D-5
LAUNDRY
CHUTE ABOVE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
AMBIENT
DISPOSABLE &
NOURISHMENT
STORAGE
B186G
ROUGH
PREP.
B186H
ELECTRICAL
ROOM
B269
EMERGENCY
ELECTRICAL
ROOM
B267
STAFF
WORK ROOM
B186D
FOOD SERVICE
MANAGERS
OFFICE
B186E
DIETETICS
OFFICE
B186F
CORRIDOR
B299D-1
VESTIBULE
B107
MAIL ROOM
B107A
CORRIDOR
B299A-1
CORRIDOR
B199A-1
ADMIN.
OFFICES
B107B
WAN
ROOM
B105
CBOC
STORAGE
B187
KITCHEN
CANTEEN
B175
UNIFORMS
B191
WASH
CART
B186B
UTILITY
B186C
FREEZER 1
B186L
COOLER 4
B186N
FREEZER 2
B186M
COOLER 3
B186P
KITCHEN
MAIN
B186
& BEVERAGE STOR.
CANTEEN VENDING
B185
EQUIPMENT
TELEPHONE
B103
ROOM
HOLMAN
B201
TOILET
WOMENS
B204
TOILET
MENS
B205
LOBBY
ELEVATOR
B224
CHIEF, SPS
B291A
SURGERY CASE CART
PRI. SUPPLY/
B291
BREAKOUT
STOCK /
B287
DECONTAMINATION
B295
PACKAGING
PREPARATION
B291B
STERLIZER
B291C
RECEIVING
SHIPPING &
B274
SHREDDER RM.
RECYCLING &
B278
STORAGE
WAREHOUSE
B298
EQUIP.
NON-EXP
B298A
LOGISTICS
STORAGE
B231
MECH. RM.
B202
SPACE
SWING
B203
SANITATION
B186A
CHASE
PIPE
B284
ROOM
MECH.
B224C
EQUIPMENT
ELEVATOR
B224B
ROOM
MECHANICAL
B224A
LOCKERS
B297
LAUNDRY
B230
ACCESS
MECH.
B227
ACCESS
MECH.
B295A
ROOM
MECH.
B231B
ROOM
MECH.
B231A
MECH. ROOM
B231C
DATA
B296
CO
RR
ID
OR
B2
C-
VESTIBULE
B276
CORRIDOR
B299B-1
PASSAGE
B226
MENS LOCKER
B228B
MENS SHOWER
B228C
UNISEX BREAKROOM
B228
COOLER
MORGUE
B273
COOLER 2
FOOD BANK
B186Q
COOLER 1
RETHERM
B186R
O2 STOR
B268
EQUIP. RM.
ELECTRICAL
B278A
STORAGE
BULK MEDICAL
B231D
LOGISTICS
OFFICE
B298B
ROOM
MECH.
B107D
DOCK
LOADING
B271
B272
GE
GE
FINISHES
FLOOR: VINYL TILE
BASE: RUBBER
WALL: PAINT
CEILING: ACT/GYPSUM
FINISHES
FLOOR: SHEET VINYL
BASE: INTEGRAL
WALL: TILE
CEILING: ACT
BASEMENT PLAN - EAST
AE103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
OCTOBER 20, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
100% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
AE103
F7 BASEMENT PLAN - EAST
1/8" = 1'-0"
KEYPLAN
NO SCALE
N
N
4'0" 2' 8' 12'
DWG. 3 OF 59
REMOVE CEILING TILES AND GRID FOR TRADES WORK. SALVAGE
TILES AND USE FOR NEW SOFFIT IN ROOM B107A. AFTER COMPLETION
OF WORK, INSTALL NEW 2X2 ACOUSTICAL TILE CEILING CENTERED IN
ROOM AT A HEIGHT OF 8'-6" ABOVE FINISHED FLOOR.
EXISTING ACOUSTICAL TILE SOFFIT AT 8'-2" ABOVE FINISHED FLOOR
TO REMAIN.
ADD ADDITIONAL ACOUSTICAL TILE SOFFIT AT 8'-2" ABOVE FINISHED
FLOOR TO MATCH EXISTING. EXTENT OF SOFFIT TO BE AS REQUIRED
TO ENCLOSE NEW PIPING ABOVE. MODIFY EXISTING CEILING AS
REQUIRED. SEE PLUMBING DRAWINGS FOR EXTENT OF WORK.
GENERAL NOTES
1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/
PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,
OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,
WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT
ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH
AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE
RATING REQUIREMENTS
3. SEE COVER SHEET FOR PARTITION SCHEDULE
2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
NEW WORK KEYED NOTES:
1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER
COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.
REPLACE ALL DAMAGED ACT WITH NEW ACT
3 LOCATE WALLS AS REQUIRED TO ENCLOSE PIPES. WALL FINISH TO
MATCH EXISTING ADJACENT SURFACES. ADD/PATCH BASE AND
FLOORING TO MATCH EXISTING. MODIFY CEILING TO ACCOMMODATE
NEW WALL
13 REMOVE HARD CEILING AS REQUIRED FOR TRADES WORK. UPON
COMPLETION OF WORK, PATCH CEILING TO MATCH EXISTING
DPD JAP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
MA
TC
HL
INE
MA
TC
HL
INE
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
SERVICE
ELEVATOR PASSENGER
ELEVATOR
MA
TC
HL
INE
MA
TC
HL
INE
RESIDENT
KITCHEN
1116B
STORAGE
1116A
PHYSICAL
THERAPY
SATELLITE CLINIC
UNISEX
TOILET
ADL OT AREA/
BEDROOM
OCCUPATIONAL
THERAPY OFFICE
1165A
OXYGEN
STORAGE
RESIDENT DINING
& RECREATION
AREA
NURSE
PRACTITIONER
1111A
SOCIAL
WORKER
1109A EQUIPMENT
STORAGE
OFFICE
CLOTHING
STORAGE
CORRIDOR
C1-11
STAIR 7
NURSE
STATION
ALCOVE
CLEAN
STORAGE
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1036A
TOILET
1040A
TOILET
1044A
TOILET
1042A
TOILET
1038A
MECH.
SHAFT
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1028A
TOILET
1024A
TOILET
1020A
STORAGE
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1029A
TOILET
1025A
TOILET
1009A
TOILET
1005A
TOILET
1052A
STAFF
TOILET
UTILITY
CLEAN
LINEN
DAY
ROOM
NURSE
STATION
NURSE
STATION
CLEAN
LINEN
ELECT.
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1008A
TOILET
1010A
TOILET
1006A
TOILET
1002A
EQUIPMENT
STORAGE
STAFF
TOILET
1148B
LOCKER
ROOM
1148A
STAFF
LOUNGE
RECR.
THER.
STORAGE
PHYSICIAN
OFFICE
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1051A TOILET
1055A
MECH.
CHASE
BATHING/
SPA
1053 RECREATION
THERAPY
OFFICE
1147A
ACTIVITY/
GROUP
ROOM
CORRIDOR
EQUIP.
STOR.
STAIR 1
LINEN
CHUTE
MAIN
NURSE
STATION
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1028A
TOILET
1032A
TOILET
1036A
PROGRAM
ASSISTANT
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1027A
TOILET
1031A
TOILET
1035A
NURSE
STATION
NURSE
MANAGER
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1166A
TOILET
1170A
STAIR 5
IV
STOR.
MDS/
RESTORATIVE
COORDINATOR
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1175A
TOILET
1171A
ADL.
BATH
1165B
MEDS
ROOM
DATA
CLOSET
CLEAN
LINEN
UTILITY
CLOSET
UTILITY
CLOSET
CHAPLAIN
OFFICE
1182 CLOSET
1182A
CLOSET
1182B
POLICE
PIV
ROOM
ENROLLMENT
ELIGIBILITY
AMERICAN
LEGION/
DAV
PURPLE
HEART
LOBBY
LOCKERS
1105A
VESTIBULE
1100A
KITCH.
GE
FINISHES
FLOOR: VINYL TILE
BASE: RUBBER
WALL: WALL PRO & PAINT
CEILING: NONE
1 1
FIRST FLOOR PLAN - WEST
AE104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
OCTOBER 20, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
100% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
AE104
F1 FIRST FLOOR PLAN - WEST
1/8" = 1'-0"
KEYPLAN
NO SCALE
N
N
4'0" 2' 8' 12'
DWG. 4 OF 59
GENERAL NOTES
1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/
PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,
OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,
WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT
ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH
AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE
RATING REQUIREMENTS
3. SEE COVER SHEET FOR PARTITION SCHEDULE
2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
NEW WORK KEYED NOTES:
3 LOCATE WALLS AS REQUIRED TO ENCLOSE PIPES. WALL FINISH TO
MATCH EXISTING ADJACENT SURFACES. ADD/PATCH BASE AND
FLOORING TO MATCH EXISTING. MODIFY CEILING TO ACCOMMODATE
NEW WALL
13 REMOVE HARD CEILING AS REQUIRED FOR TRADES WORK. UPON
COMPLETION OF WORK, PATCH CEILING TO MATCH EXISTING
1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER
COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.
REPLACE ALL DAMAGED ACT WITH NEW ACT
SEE GENERAL NOTE 2 FOR
THIS AREA. VA PROJECT
585-17-114 (UPGRADE CLC
PATIENT ROOM DESIGN).
DPD JAP
HL
INE
MA
TC
HL
INE
BASEMENT ROOF
FD
FIRE
EQUIP
LO
CK
ER
S
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
FE FE
PASSENGER
ELEVATOR
D-4 D-5
MA
TC
HL
INE
MA
TC
HL
INE
BLOOD DRAW
LAB/EKG
BLOOD DRAW
LAB/EKG
PATIENT
TOILET
1267B
SOILED
UTILITY
1267A
MENTAL HEALTH
SOCIAL WORKER
CLERK
AREA
WAITING
AREA
ENROLLMENT
& ELIGIBILITY
HSKP
CLOSET
CHAPEL
CHAPEL
1284A
WAITING
ROOM
TRAVEL
OFFICE
1286A
WAITING
ROOM
AGENT
CASHIER
1288A
CHIEF,
POLICE
EVIDENCE
1201A
HOLDING
1201B
MAIN
OFFICE
LOBBY
WEAPONS
1201C
MENS
TOILET
VESTIBULE
WOMENS
TOILET
STAIR 2
PHARMACY
SUPPLY
CLINICAL
PHARMACIST
CORRIDOR
1299A
PHARMACY
CONSULTING
CONSULTING
1218B
CONSULTING
1218C
1218A
OUTPATIENT
DISPENSING
MEDS
CAROUSAL
COAT
ROOM
TOILET
1224A
PHARMACY
OFFICE
SECURE
MED PREP
VAULT
1228A
PHARMACY
MED
PREP
NON-HAZ./
CLEAN
RM.
1233B
HAZARD
HOOD
RM.
1233A
IV
ROOM
LOUNGE
PHARMACY
CHIEF
1238MED
PREP &
OFFICES
STAIR 3
VESTIBULE
DATA &
PHONE
MENTAL
HEALTH
PSYCHOLOGIST
MENTAL
HEALTH
GROUP ROOM
EXAM
ROOM
1275 ALCOVE
PROCEDURE
ROOM
STAIR 4
PATIENT
TOILET
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
NURSE
WORKROOM
1348 EXAM
ROOM
1344 STAFF
TOILET
1340A
BREAK
ROOM/
LOCKERS
ELEVATOR
LOBBY
ALCOVE
MENTAL
HEALTH
OFFICE
CLINICAL
PHARM
MEDICATION
FIRE ALARM/
SECURITY
RM.
ELECTRICAL
MENS
TOILET
WOMENS
TOILET
HSKP.
EXAM
ROOM
STAFF
TOILET
PATIENT
TOILET
EXAM
ROOM
EXAM
ROOM
NURSE
WORKROOM
PATIENT
TOILET
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
PT. ED./
CONS.
CLEAN
SUPPLY
STERILE
SUPPLY
PYXIS
ALCOVE
DECON
ROOM
MEDICATION
SOILED
UTILITY
PATIENT
TOILET
TREATMENT
ROOM
TREATMENT
ROOM
TREATMENT
ROOM
EQUIPMENT
CHA.
ROOM
1304C
CHA.
ROOM
1304B
MRI
VESTIBULE
1304 MRI
VESTIBULE
1304A
ED
WAITING
AREA
TRIAGE
ELEVATOR
EQUIPMENT
PATIENT
TOILET
1312B
TREATMENT/
ISOLATION
SECURE
TREATMENT
WHEELCHAIR
STORAGE
ANTE
ROOM
1312A
WAITING
AREA
NURSE
STATION
DICTATION
EXAM
ROOM
TRIAGE
NURSE
WORKROOM
EXAM
ROOM
SCALE
ALCOVE
CLERKS
STAIR 8
NURSE
WORKROOM
CLINICAL
PHARM
CLINICAL
PHARM
CONNECTION
SUB-WAIT
AMBULANCE
GARAGE
PATIENT
TOILET
PATIENT
TOILET
1417 HSKP
ELECTRICAL
ROOM
IT ROOM (VA)
CORRIDOR
CORRIDOR
EXAM
EXAM
EXAM
EXAM
CLEAN
UTILITY
SOILED
HOLDING
GE
1 1 1
1 1 1
V
ER
IF
Y
W
IT
H T
R
AD
ES
V
ER
IF
Y W
IT
H
T R
AD
ES
C10
AE105
C10
AE105
FINISHES
FLOOR: VINYL TILE
BASE: RUBBER
WALL: PAINT
CEILING: ACT
FINISHES
FLOOR: SHEET VINYL
BASE: RINTEGRAL
WALL: PAINT
CEILING: ACT
FINISHES
FLOOR: CARPET
BASE: RUBBER
WALL: VWC
CEILING: ACT
4" (M
IN
4"
5/8" GYPSUM
BOARD
MODIFY
EXISTING
CEILING
3 5/8" METAL
STUDS
FIRST FLOOR PLAN - EAST
AE105
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
OCTOBER 20, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
100% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
AE105
F5 FIRST FLOOR PLAN - EAST
1/8" = 1'-0"
KEYPLAN
NO SCALE
N
N
4'0" 2' 8' 12'
AE105
C10 GYPSUM BOARD SOFFIT
1 1/2" = 1'-0" 4"0" 2" 8" 12"
DWG. 5 OF 59
LOCATE WALLS AS REQUIRED TO ENCLOSE PIPES. WALL FINISH TO
MATCH EXISTING ADJACENT SURFACES. ADD/PATCH BASE AND
FLOORING TO MATCH EXISTING. MODIFY CEILING, CUBICLE TRACK
AND WOOD TRIM TO ACCOMMODATE NEW WALL.
GENERAL NOTES
1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/
PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,
OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,
WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT
ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH
AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE
RATING REQUIREMENTS
3. SEE COVER SHEET FOR PARTITION SCHEDULE
2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
NEW WORK KEYED NOTES:
1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER
COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.
REPLACE ALL DAMAGED ACT WITH NEW ACT
2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON
COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL
PROTECTION, BASE AND FLOORING AS REQUIRED
8 NEW 8'-0" ABOVE FINISH FLOOR GYPSUM BOARD SOFFIT. PAINT TO
MATCH ADJACENT GYPSUM BOARD SOFFIT
EXPANSION JOINT TO MATCH LOCATION AND WIDTH OF EXISTING
FLOOR JOINT. JOINT TO HAVE CONTINUOUS EXTRUDED ALUMINUM
FRAME WITH CONTINUOUS EXTRUDED FLEXIBLE GASKET INSTALLED
PER MANUFACTURER RECOMMENDATION.
MODIFY EXISTING 8'-4" CEILING AND TRADES EQUIPMENT TO
ACCOMMODATE NEW SOFFIT.
SEE GENERAL NOTE 2 FOR
THIS AREA. VA PROJECT
585-336 (EXPAND PRIMARY
CARE ADDITION).
13 REMOVE HARD CEILING AS REQUIRED FOR TRADES WORK. UPON
COMPLETION OF WORK, PATCH CEILING TO MATCH EXISTING
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
FD FD FD
DWV
ELEC
CABINET
FD
DN
UP
DN
UP
UP
DN
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
1st. FLOOR ROOF
MECH.
SHAFT
SUB-STERILIZER
MECH SPACE
MECH. RM. 1400
ROOF
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
FIRST FLOOR ROOF
BASEMENT ROOF
FD
BASEMENT ROOF
STAIR 1
STAIR 2
STAIR 5
EQUIP.
STORAGE
SEMI-RESTRICTED
CORRIDOR
ANESTHESIA
WORK ROOM
SOILED
UTILITY
MALE LOCKER/
SHOWER ROOM
SCRUB
2105A
SUB-STERILE
2101A
ROOM - WEST
OPERATING
ROOM - EAST
OPERATING
SUPPLY
STERILE
ROOM
TREATMENT
ENDOSCOPY
SUPPLY
CLEAN
ALCOVE
WHEELCHAIR
MEN'S
FEMALE
2112A MALE
2111A
WOMEN
CLOSET
HSKG
BED #8
PACU
2129K
BED #9
PACU
2129L
SUPERVISOR
OR
ALCOVE
GOWNING
BED #3
PRE/POST
2129C
BED #4
PRE/POST
2129D
STORAGE
EQUIP.
UTILITY
SOILED
TOILET
PT.
ROOM
WAITING
BED #2
PRE/POST
2129B
TREATMENT
ROOM
TREATMENT
ROOM
TREATMENT
ROOM
TREATMENT
SUPPLY
CLEAN
ROOM
TREATMENT
CLOSET
HSKG
BED #7
PRE/POST
2129G
VIEW
PACS
STATION
NURSE
SUPPLY
STERILE
2171A
TOILET
UTILITY
SOILED
CLERKS
CHECK-IN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LOUNGE
STAFF
TOILET
2143A
CHUTE
LAUNDRY
ROOM
TREATMENT
ROOM
WORK
2145A
DATA
BIOMED
BED #5
PRE/POST
2129E
BED #6
PRE/POST
2129F
STATION
NURSING
SUPPLY
STERILE
ENDOSCOPY
SHOWER RM.
FEMALE LCKR/
SUPPLY
CLEAN
PT. TOILET
TUBE COMP
PNUEMATIC
PHONE
DATA &
CORRIDOR
2299H
TREATMENT
HALLWAY
CORRIDOR
PRE/POST
CORRIDOR
CL
EA
N
CO
RR
ID
OR
RE
ST
RI
CT
ED
2299B
CORRIDOR
2129A
PRE/POST
BED #1
PACS
WORK STATION
2176A
PT.
TOILET
2110A
CART
ALCOVE2110C
CART
ALCOVE
2110D
BLANKET
WARMER
FINISHES
FLOOR: SHEET VINYL
BASE: INTEGRAL
WALL: WALL PRO & PAINT
CEILING: ACT
SECOND FLOOR PLAN - WEST
AE106
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
OCTOBER 20, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
100% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
AE106
F3 SECOND FLOOR PLAN - WEST
1/8" = 1'-0"
KEYPLAN
NO SCALE
N
N
4'0" 2' 8' 12'
DWG. 6 OF 59
GENERAL NOTES
1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/
PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,
OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,
WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT
ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH
AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE
RATING REQUIREMENTS
3. SEE COVER SHEET FOR PARTITION SCHEDULE
2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
NEW WORK KEYED NOTES:
1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER
COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.
REPLACE ALL DAMAGED ACT WITH NEW ACT
2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON
COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL
PROTECTION, BASE AND FLOORING AS REQUIRED
FIRST FLOOR ROOF
FD
UP
DN
UP
DN
ROOF
MECH
CHASE
PASSENGER
ELEVATOR
DN
UP
OPEN TO FIRST
FLOOR
MECH.
SHAFT
CHASE
CHASE
PASSENGER
ELEVATOR
MECH.
SHAFT
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
FOLDING
WALL
FIRST FLOOR ROOF
FIRST FLOOR ROOF
STAIR 3
STAIR 4
VIEWING
PACS
ROOM
CONTROL
2242A
FLUOROSCOPY
RADIOLOGY
TEST
STRESS
TOILET
PATIENT
ULTRASOUND
2237 ROOM
TECH. WORK
UNLTRASOUND
TOILET
PT.
2242B
& LOUNGE
STAFF LOUNGE
SUPPLY
CLEAN
VIEWING
PACS
TOILET
PT.
ROOM
CHANGING
TOILET
STAFF
HSKG
CONTROL
CT SCAN
CT SCAN
TOILET
PT.
HOT LAB
2254A
MEDICINE
NUCLEAR
DENSITY
BONE
CHUTE
LAUNDRY
UTILITY
ROOM
CONTROL
2263A
COMPUTERS
PACS
2215A
RADIOLOGY
SCANNER
GE CT
STORAGE
2263B
CHIEF
IMAGING
CLEAN
STERILE
ENDOSCOPY
CYSTOSCOPY
CLOSET
HSKG
MECHANICAL
MECHANICAL
2307A
LOBBY
ELEVATOR
TUBE COMP
PNUEMATIC
PHONE
DATA &
ROOM
CHANGING
2245A
ALCOVE
EQUIP.
2230A
CORRIDOR
2230P
ROOM
TECH WORK
C2-2
CORRIDOR
SOCIAL
WORKER
ACCUPUNCTURE
EXAM ROOM
DATA
CLOSET
ACCUPUNCTURE
EXAM ROOM
EYE PRE-
TREATMENT
EYE PRE-
TREATMENT
OFFICE
STAFF
LOUNGE
STERILE
SUPPLY
CLEAN
SUPPLY
SOCIAL
WORKER
SUB-WAIT
AREA
2335A
PATIENT
TOILET
CHEMOTHERAPY
MENTAL HEALTH
EXAM
HSKG CLST
ELECTRICAL
ROOM
LANE
ROOM
LANE
ROOM
LANE
ROOM
EYE
INSTRUMENTS
TELE-HEALTH
EXAM RM
TELE-HEALTH
EXAM RM
TELE-HEALTH
OFFICE
TELE-HEALTH
EXAM RM
TELE-HEALTH
EXAM RM
MENS
TOILET
WAITING
AREA
MEETING
ROOM
MEETING
ROOM
WOMENS
TOILET
CLERKS
AREA
2374A
STAFF
WORK AREA
NEUROLOGY
EXAM RM.
NEUROLOGY
EXAM RM. 2365
NEUROLOGY
EXAM RM.
CORRIDOR
STAFF
TOILET
SUB-WAIT
AREA
WOMENS
HEALTH EXAM 2352
TOILET
WOMENS
HEALTH EXAM
WOMENS
HEALTH EXAM
WOMENS
HEALTH EXAM
WOMENS
HEALTH EXAM
FAMILY
LOUNGE
2338A
FAMILY
RESTROOM
ONOCOLOGY
EXAM/OFFICE
ONOCOLOGY
EXAM/PROC.
SOILED
LINEN
2261A
CONTROL
ROOM
PACS
WORK STATION
CLERK
CHECK-IN
WAITING
AREA
FEMALE
TOILET
MALE
TOILET
C2-1
CORRIDOR
AREA
DUMBWAITER
/CART ALCOVE
2110B
SCRUB
ALCOVE
2252P
CORRIDOR
2230B
EQUIP
ALCOVE
CORRIDOR
SUB-WAIT
HALLWAY
CORRIDOR
STAFF
TOILET
STAFF
TOILET
IT ROOM
(VENDOR)
ELECTRICAL
ROOM
IT ROOM (VA)
SECOND FLOOR PLAN - EAST
AE107
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
OCTOBER 20, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
100% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
AE107
F1 SECOND FLOOR PLAN - EAST
1/8" = 1'-0"
KEYPLAN
NO SCALE
N
N
4'0" 2' 8' 12'
DWG. 7 OF 59
GENERAL NOTES
1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/
PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,
OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,
WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT
ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH
AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE
RATING REQUIREMENTS
3. SEE COVER SHEET FOR PARTITION SCHEDULE
2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
NEW WORK KEYED NOTES:
1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER
COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.
REPLACE ALL DAMAGED ACT WITH NEW ACT
2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON
COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL
PROTECTION, BASE AND FLOORING AS REQUIRED
SEE GENERAL NOTE 2 FOR
THIS AREA. VA PROJECT
585-336 (EXPAND PRIMARY
CARE ADDITION).
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
B.H. NURSING,
AUDIOLOGY
WAITING ROOM
RECEPTION
CLERKS
3105A
CORRIDOR
3299A-1
WOMEN
B.H. CHECK-OUT
CLERKS
PSYCHIATRIST
B.H.
SOCIAL
WORKER
PSYCHOLOGIST
B.H.
VOC
REHAB
B.H.
PEER
MENS
TOILET
WOMENS
TOILET
B.H.
TELE-HEALTH
SUPPLY
CLOSET
SUPPLY
DATA &
PHONE
PSYCHOLOGIST
INTERNS
B.H.
PEERS
B.H.
B.H.
PHARMACIST
B.H.
PSYCHIATRIST
SOCIAL
WORKER
CLEAN
LINEN
B.H.
ADMIN
TOILET
MEDIA
STORAGE
HSKG
UTILITY
3142A
PSYCHOLOGIST
B.H.
ADMIN
SOCIAL
WORKER
SOCIAL
WORKER
PSYCHOLOGIST
SOCIAL
WORKER
PSYCHOLOGIST
3147 SOCIAL
WORKER
3145 SOILED
LINEN
STORAGE
B.H.
CONFERENCE
ROOM
SOCIAL
WORKER
PSYCHOLOGIST
PSYCHOLOGIST
/ ASST.
CHIEF,
B.H.
PSYCHOLOGIST
/ CHIEF,
B.H.
B.H.
ADMIN
SUPPORT
SOCIAL
WORKER
ADMIN
OFFICER
BREAK
ROOM
SOCIAL
WORKER
SOCIAL
WORKER
B.H.
TELE-HEALTH
B.H.
TELE-HEALTH
B.H.
GROUP
ROOM
B.H.
GROUP
ROOM
WHOLE
HEALTH
ROOM
3286 TELE-HEALTH
EXAM
ROOM
TOILET
HSKG
HSKG
STORAGE
DATA &
PHONE
TOILET
3225A
MEN
AUDIOLOGY
CHECK-IN
3184C
AUDIOLOGY
WAITING
AUDIOLOGY
WAITING
3184B
AUDIOLOGY
OFFICE
3184A
CORRIDOR
HEARING
TESTING
AUDIOLOGY
OFFICE
3280A
SPEECH
THERAPY
GE
1 1 1
1 1
FINISHES
FLOOR: CARPET
BASE: RUBBER
WALL: PAINT
CEILING: GYPSUM
THIRD FLOOR PLAN - WEST
AE108
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
OCTOBER 20, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
100% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
KEYPLAN
NO SCALE
N
N
4'0" 2' 8' 12'
AE108
F1 THIRD FLOOR PLAN - WEST
1/8" = 1'-0"
DWG. 8 OF 59
GENERAL NOTES
1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/
PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,
OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,
WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT
ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH
AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE
RATING REQUIREMENTS
3. SEE COVER SHEET FOR PARTITION SCHEDULE
2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
NEW WORK KEYED NOTES:
1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER
COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.
REPLACE ALL DAMAGED ACT WITH NEW ACT
11 ALIGN NEW WALL WITH EDGE OF SOFFIT ABOVE, LENGTH TO BE AS
REQUIRED TO ENCLOSE PIPES. WALL FINISH TO MATCH EXISTING
ADJACENT SURFACES. ADD/PATCH BASE AND FLOORING TO MATCH
EXISTING. RELOCATE WALL CLOCK AS REQUIRED
13 REMOVE HARD CEILING AS REQUIRED FOR TRADES WORK. UPON
COMPLETION OF WORK, PATCH CEILING TO MATCH EXISTING
DPD JAP
2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON
COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL
PROTECTION, BASE AND FLOORING AS REQUIRED
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
KINGSTON
K-2005
FIRST FLOOR ROOF
FIRST FLOOR ROOF
DUCT
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
WOMEN
WHOLE
HEALTH
ROOM
3286 TELE-HEALTH
EXAM
ROOM
TOILET
NURSE
MANAGER
TELE-HEALTH
TELE-HEALTH
CORRIDOR
HSKG
HSKG
STORAGE
DATA &
PHONE
BIO-MED
CLOSET
STAFF
LOUNGE &
LOCKERS
MSA
OFFICE
TELE-HEALTH
STAFF
OFFICE
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
SOILED
UTILITY
CLEAN
SUPPLY
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
STERILE
SUPPLY
CORRIDOR
MECH
3244A
NURSE
EDUCATION
TRAINING
ROOM
NURSE
EDUCATION
TRAINING
ROOM
TOILET
3246A
TOILET
3250A
PASSAGEWAY
NURSE
EDUCATION
OFFICE
NURSE
EDUCATION
CONFERENCE
ROOM
3245STORAGE
X-RAY
CONTROL
3228A
OPERATORY
OPERATORY
OPERATORY
SOILED
CLEAN
STORAGE
STERILE
LAB
OPERATORY
OPERATORY
OPERATORY
CHIED,
DENTAL
PASSAGE
PASSAGE
3237A
WAITING
ROOM
CLERK
/ WORK
TOILET
3225A
MEN
WAITING
AREA
HEARING
TESTING
AUDIOLOGY
OFFICE
3280A
SPEECH
THERAPY
1 1
THIRD FLOOR PLAN - EAST
AE109
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
OCTOBER 20, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
100% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
AE109
F1 THIRD FLOOR PLAN - EAST
1/8" = 1'-0"
KEYPLAN
NO SCALE
N
N
4'0" 2' 8' 12'
DWG. 9 OF 59
GENERAL NOTES
1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/
PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,
OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,
WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT
ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH
AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE
RATING REQUIREMENTS
3. SEE COVER SHEET FOR PARTITION SCHEDULE
2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
NEW WORK KEYED NOTES:
1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER
COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.
REPLACE ALL DAMAGED ACT WITH NEW ACT
2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON
COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL
PROTECTION, BASE AND FLOORING AS REQUIRED
SEE GENERAL NOTE 2 FOR
THIS AREA. VA PROJECT
585-336 (EXPAND PRIMARY
CARE ADDITION).
DPD JAP
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
KINGSTON
K-2005
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
MECH
SHAFT
DUMB
WAITER
DN
STAIR 5
DN
UP
STAIR 2
DN
STAIR 4
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
UPUP
DN
UP
STAIR 1 STAIR 3
UP
DN
LDRY
CHUT
MECH
SHAFT
MECH
SHAFT
3RD FLOOR ROOF
FIRE
EQUIP
MECH
SHAFT
PASSENGER
ELEVATOR
K-4330KINGSTONC_TOILETSVITREOUS CHINA K-4330KINGSTONC_TOILETSVITREOUS CHINA
K-4330KINGSTONC_TOILETSVITREOUS CHINA
MECH
SHAFT
PIPE
SHAFT
MED/SURG
WAITING ROOM
FAMILY
BREAK AREA
4107A
TOILET
CORRIDOR
4205C
ISOLATION
LOCKER RM.
STAFF
LOUNGE
STAFF
CLOSET
HSKPG
RM.
NURSING
4116A TOILET
TEST
STRESS
GAS
BLOOD
PFL
CHART ROOM
EDUCATION/
RESP./CARDIO.
CHIEF,
ROOM
DRESSING
4282A
LOCKER
4282WAITING
CARDIO-P
4280 EQUIPMENT
4212 TOILET
4216A
STA
NURSE
PHONE
DATA &
NOURISH
COMMUNICATOR
MEDS
MED/SURG BED
MED/SURG BED
MED/SURG BED
TOILET
4268A
TOILET
4270A
CONFERENCE
ALCOVE
CART
ROOM
CONSULT.
4260 HSKPG
TOILET
4262A
LOBBY
ELEVATOR
TOILET
4250A
TOILET
4251A
TOILET
4245A
STORAGE
EQUIP.
MED/SURG #11
MED/SURG #10
MED/SURG #9
STATION
NURSE
STORAGE
LINEN
CLEAN
MED/SURG #8
MED/SURG #7
MED/SURG #6
BARIATRIC M/S #5
BARIATRIC M/S #4
TOILET
4230A
TOILET
4234A
TOILET
4236A
TOILET
4237A
TOILET
4233A
STA
NURSE
ROOM
TUB
MANAGER
NURSE
SUPPLY
STERILE
TOILET
STAFF
WORKER
SOCIAL
OFFICE
PHYS CHART
MED/SURG #2
TOILET
4215A
TOILET
4211A
OBSERVATION
SEMI-PRIVATE
ANTI-RM
TOILET
PT.
4205A
TOILET
MENS
TOILET
WOMENS
4113CHIEF
PM&R
CLERKS
CHECK-IN
PHONE
DATA &
& WORKSTATIONS
CHECK-IN CLERKS
ASSEMBLY
RECEIVING &
STORAGE
PROTHESTICS
THERAPIST
RESPIRATORY
ALCOVE
SUPPLY
4134A
UTILITY
SOILED
PROSTHETICS
CHIEF,
THERAPY RM.
RESP.
LOBBY
ELEVATOR
PASSAGE
4280P
CORR.
4129P
WAITING AREA
PM&R
CORRIDOR
4205C
CORRIDOR
4260C
PASSAGE
4242P
PASSAGE
4230P
LAUNDRY
SOILED
MED/SURG #3
CORRIDOR
4212C
TREATMENT
TREATMENT
TREATMENT
TREATMENT
HALLWAY
4143P
TREATMENT
CHIRO
TREATMENT
CHIRO
4146 TOILET
ADL
4142A
TREATMENT
ADL
STORAGE
EQUIPMENT
STORAGE
PT/RT
GYMNASIUM
PHYS. THERAPY
ROOM
TECH WORK
SUPPLY
CLEAN
ALCOVE
STORAGE
THERAPY
SPEECH
SUPPLY
STERILE
TOILET
SLEEP ROOM
4271A
MOD ROOM
STATION
NURSE
4260D
TOILET
PATIENT
4269A
ROOM
PATIENT
ROOM, ISO.
PATIENT
TOILET
PATIENT
4267A
ANTE
FINISHES
FLOOR: CARPET
BASE: RUBBER
WALL: PAINT
CEILING: GYPSUM
1 1 1
FOURTH FLOOR PLAN
AE110
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
OCTOBER 20, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
100% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
AE110
F1 FOURTH FLOOR PLAN
1/8" = 1'-0"
N
4'0" 2' 8' 12'
KEYPLAN
NO SCALE
N
DWG. 10 OF 59
REMOVE AND SALVAGE CASEWORK AND PLUMBING FOR WORK
BEHIND WALL. REINSTALL UPON COMPLETION OF WORK.
GENERAL NOTES
1. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/
PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS,
OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS, GUARDRAILS,
WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND FLOORS THAT
ARE NOT SCHEDULED TO RECEIVE NEW FINISHES, PROVIDE SMOOTH
AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING CODE AND FIRE
RATING REQUIREMENTS
3. SEE COVER SHEET FOR PARTITION SCHEDULE
2. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
NEW WORK KEYED NOTES:
1 REMOVE CEILING AS REQUIRED FOR TRADES WORK. AFTER
COMPLETION OF WORK, RE-INSTALL CEILING AT SAME HEIGHT.
REPLACE ALL DAMAGED ACT WITH NEW ACT
2 SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. UPON
COMPLETION OF WORK, PATCH WALL INCLUDING WALL FINISH, WALL
PROTECTION, BASE AND FLOORING AS REQUIRED
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
DUCT
INTAKE
4TH FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
3RD FLOOR ROOF
2ND FLOOR ROOF
DN
UP
RAMP
UP
FLOOR RAISED 9"
STEP
UP
DUMB
WAITER
DN
STAIR 5
LDRY
CHUT
FIRE
EQUIP
STAIR 1 STAIR 3
STEP
UP
DN
UP
STAIR 2
DN
STAIR 4
DUCT
INTAKE
UP
DN
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
MECH.
SHAFT
LDRY
CHUT
PIPE
SHAFT
WORKSTATIONS
OPEN
STORAGE
STORAGE
SPECIALISTS
COMPUTER
SERVERS
STORAGE
5281A
SPECIALISTS
COMPUTER
RECEPTION
STORAGE
CONFERENCE
EQUIP
BIOMED
ROOM
CONFERENCE
IMPROVEMENT ADMIN.
PERFORMANCE
OFFICER
COMPLIANCE
IMPROVEMENT
CHIEF, PERFORMANCE
AREA
PRINTER
STORAGE
PI/QA
STATIONS
PI/QA WORK
ROOM
CONFERENCE
DIRECTOR
HSS TO
OF STAFF
CHIEF
STORAGE
5243 OF NURSING
DIRECTOR
SECRETARY'S
NURSING & DIRECTOR'S
CREDENTIALS
ASSOC. DIRECTOR
HHS TO
AD, COS, AND PRI.CARE
ADMIN SUPPORT FOR
PRI CARE / NURS.
ADMIN SUPPORT
PROGRAM MNGR.
WOMEN VETERAN
ADMIN NURSING
HHS TO COS &
PHONE
DATA &
ROOM
MECH
5281B
LOUNGE
STAFF
TOILET
WOMENS
CORRIDOR
5299B-1
CO
RR
ID
OR
D-
CORRIDOR
5199E-1
CO
RR
ID
OR
C-
CO
RR
ID
OR
C-
CORRIDOR
5199A-1
STORAGE
AFFAIRS
PUBLIC
OF NURSING
ASST. CHIEF
OFFICE
DIRECTORS
DIRECTOR
ASSOCIATE
CORRIDOR
5299E-1
CORRIDOR
5180-1
LOBBY
ELEVATOR
5299A-1
CORRIDOR
PI/QA
5299F
MENS TOILET
OFFICE
5209A
OFFICE
5209B
OFFICE
5209C
OFFICE
5209D
LOUNGE
DRIVERS
5205A
OFFICE
5205B
RECEPTION
WORKROOM
STORAGE
5105A
MANAGER
VTS
5107A
COORDINATOR
VTS
MEDICINE
CHIEF OF
5111C
OFFICE
5111D
CLERK
P.A.S.
OFFICE
P.A.S.
5111A
OFFICE
P.A.S.
5111B
MENS TOILET
TOILET
WOMENS
OFFICE CLERK
FISCAL
FISCAL
ASST. CHIEF
FISCAL
CHIEF,
STATIONS
FISCAL WORK
MULTIPURPOSE
FISCAL
STATIONS
FISCAL WORK
STORAGE
FILE
GROUP ROOM
FISCAL
CENTER
CONFERENCE
LOUNGE
STAFF
OFFICER
PRIVACY
OFFICER
COMPLIANCE
ASSISTANT
PROGRAM
HR
CHIEF
CHIEF HR
ASSISTANT
WO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .