S06 - 585-19-118 - Att - Electrical Drawings 011122.pdf
PDF 4 MB Posted
- Solicitation number
- 36C25221B0032
About this file
This notice announces a forthcoming solicitation for construction services. The Oscar G. Johnson VA Medical Center seeks a contractor to install new potable water risers and associated isolation valves at an estimated cost between $1 million to $5 million. Work includes architectural, testing, and general construction aspects per drawings and specifications. Interested parties should attend a site visit between October 25-29, 2021. The solicitation will publish to SAM.gov on October 7th with bid opening tentatively scheduled for December 2, 2021. Pursuant to Public Law 109-461, this opportunity is set aside solely for verified Service-Disabled Veteran Owned Small Businesses.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MA
TC
HL
INE
MA
TC
HL
INE
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
CHAPEL
VESTIBULE
1100A
DAV
AMERICAN LEGION/
ADVOCATE
PATIENT
ADVOCATE
PATIENT
HEART
PURPLE
CHASE
CLOSET/PIPE
1182A
CLOSET
1182B
OFFICE
CHAPLAIN
KITCHENETTE
SERVICE
ELEVATOR PASSENGER
ELEVATOR
LOBBY
UP
DN
UP
DN
NURSE STA.
STORAGE
CLOTHING
CONST.
UNDER
CONST.
UNDER
1034A
SEMI-PRIVATE
TOILET
1036A
SEMI-PRIVATE
SEMI-PRIVATE
SEMI-PRIVATE
SEMI-PRIVATE
TOILET
1038A
TOILET
1040A
TOILET
1042A
TOILET
1044A
TOILET
STAFF
NURSE STA.
PRIVATE
TOILET
1052A
ELECT. ROOM
SUPPLY
STRERILE
NURSE STA.
STOR.
EQUIP.
LINEN
CLEAN
CLOSET
UTILITY
SEMI-PRIVATE
PRIVATE
PRIVATE
PRIVATE
SEMI-PRIVATE
PRIVATE
PRIVATE
SEMI-PRIVATE
SEMI-PRIVATE
TOILET
1055ATOILET
1051A
TOILET
1002A
TOILET
1006A
TOILET
1008A
TOILET
1010A
TOILET
1020A
TOILET
1024A
TOILET
1028A
STORAGE
EQUIP.
STAFF TOILET
1148B
LOCKERROOM
1148A
STAFF LOUNGE
STORAGE
RECR. THER.
WORKER
SOCIAL
STATION
MAIN NURSE
BATHING/SPA
THERAPY OFF.
RECREATION
1147A
ROOM
ACTIVITY/GROUP
LINEN CHUTE
CORRIDOR
PRIVATE
ASSISTANT
PROGRAM
PRIVATE
TOILET
1136A
TOILET
1135A
NURSE STA.
TOILET
1132A
PRIVATE
1132 PRIVATE
PRIVATE
PRIVATE
TOILET
1131A
TOILET
1128A
TOILET
1127A
CLOSET
UTILITY
1121 SATELLITE CLINIC
PHYSICAL THERAPY
PRACTIONER
NURSE
1111A
WORKER
SOCIAL
1109A
TOILET
UNISEX
STORAGE
OXYGEN
STORAGE
EQUIPMENT
SEMI-PRIVATE
ROOM
CONFERENCE
PRIVATE
PRIVATE
TOILET
1170A
TOILET
1166A
TOILET
1175A
TOILET
1171A
STOR.
IV
COORDINATOR
MDS/RESTORIV
MANAGER
NURSE
THERAPY OFFICE
OCCUPATIONAL
1165A
ADL BATH
1165B
BEDROOM
ADL OT AREA/
MEDS ROOM
DA
TA
C
LO
SE
T
CLEAN LINEN
1120 CLOSET
UTILITY
& RECREATION AREA
RESIDENT DINING
STORAGE
1116A
KITCHEN
RESIDENT
1116B
STORAGE
LOCKERS
1105A
CHASE
CHASE
ROOM
PRIVATE
PRIVATE
PRIVATE
TOILET
1025A
TOILET
1029A
PRIVATE
TOILET
1009A
TOILET
1005A
TU
BE
ST
AT
ION
FI
RE
PL
AC
E
DAY ROOM
AHU-01
MECH. RM.
MED-GAS
CHASE
MECH.
SHAFT
MECH.
SHAFT
UP
MA
TC
HL
INE
MA
TC
HL
INE
STAIR 1
STAIR 5
A
OSOS
OSOS
SP
SP
SP
SP
C1
N D
ND
N D
(ON BASEMENT ROOF)
(ON BASEMENT ROOF)
(ON BASEMENT ROOF)
(ON BASEMENT ROOF)
(ON BASEMENT ROOF)
(ON BASEMENT ROOF)
(ON BASEMENT ROOF)
(ON BASEMENT ROOF)
B
NN
C
C
C
C C
C
C
C
C
C
C
C
C
C
C
CC
C C
C
C
C
FIRST FLOOR DEMOLITION PLAN -
WEST
ED103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
ED103
F1 FIRST FLOOR DEMOLITION PLAN - WEST
1/8" = 1'-0" 4'0" 2' 8' 12'
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A CUT BACK ONE EXISTING 3/4" CONDUIT AND #12 CONDUCTORS TO
ACCOMMODATE NEW MECHANICAL WORK. PROVIDE SPLICE BOX(ES),
CONDUIT AND WRING AS REQUIRED TO RE-ROUTE THE CONDUIT AND
WIRING AROUND THE NEW MECHANICAL WORK.
COORDINATE WITH PLUMBING TRADE TO TEMPORARILY REMOVE
EXISTING CAN LIGHT(S) WHICH ARE IN THE WAY OF NEW PIPING.
REINSTALL/RE-WIRE THE FIXTURE(S) AT PROJECT COMPLETION.
THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE
REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.
TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW
CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND
PLUMBING DEMO/NEW PLANS.
SYMBOL LIST
DWG. 52 OF 59
MLL NMP
B
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
SEE GENERAL NOTE 1 FOR
THIS AREA. VA PROJECT
585-17-114 (UPGRADE CLC
PATIENT ROOM DESIGN).
C
MATCH LINE
SEE SHEET
FOR PLAN CONTINUATION
ED104
HL
INE
BASEMENT ROOF
UP
DN
CHAPEL
SACREMNT
HOLY
1284A
VESTIBULE
WEAPONS
1201C
OFFICE
MAIN
HOLDING
1201B
POLICE
CHIEF,
TOILET
MENS
TOILET
WOMENS
ROOM
PROCEDURE
ALCOVE
WORKROOM
NURSE
FD
UTILITY
SOILED
1267A
TOILET
PATIENT
1267B
TREATMENT
WOUND CARE
ROOM
WAITING
CASHIER
AGENT
1288A
ROOM
WAITING
OFFICE
TRAVEL
1286A
KITCHENETTE
GARAGE
AMBULANCE
LOCKERS
BREAK RM/
RM
EXAM
WORK RM
NURSE
ROOM
EXAM
ROOM
EXAM
RM
EXAM
WORKER
SOCIAL
RM
EXAM
/CONSULTATION
PT. EDUCATION
RM
DECON
MEDICATION
UTILITY
SOILED
TOILET
PATIENT
RM
TREATMENT
RM
TREATMENT
ROOM
TREATMENT
MEDICATION
/SECURITY RM.
FIRE ALARM
DIABETES
TOILET
PATIENT
LOBBY
ELEVATOR
TOILET
1224A
ROOM
COAT
OFFICE
PHARMACY
CHIEF
PHARMACY
LOUNGE
ROOM
IV
HOOD RM
HAZARD
1233A
& OFFICES
MED PREP
MED PREP
PHARMACY
PHARMACY
MAIN
VAULT
1228A
MED PREP
SECURE
TOILET
PATIENT
CLERKS
RM
EXAM
WORKRM
NURSE
RM
EXAM
ROOM
EXAM
RM
EXAM
DIABETES
SUPPLY
STERILE
ROOM
EXAM
ROOM
ANTE
1312A
STATION
NURSE
DICTATION
WORKRM
NURSE
RM
EXAM
RM
EXAM
LINEN
CLEAN
HOUSEKEEPING
TOILET
STAFF
ISOLATION
TREATMENT/
TREATMENT
SECURE
TOILET
WOMENS
EVIDENCE
1201A
LAB/EKG
BLOOD DRAW
LAB/EKG
BLOOD DRAW
PT. TOILET
1312B
EQUIPMENT
FIRE
EQUIP
LO
CK
ER
S
DN
PHARMACIST
CLINICAL
SUPPLY
PHARMACY
DISPENSING
OUTPATIENT
CLOSET
HSKPG
HSKPG
ELIGIBILITY
ENROLLMENT &
AREA
WAITING
AREA
CLERK
ELECTRICAL
CONSULTING
PHARMACY
DATA
DATA & PHONE
1218A
UP
UP
DN
DUMB
WAITER
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
VESTIBULE
1300B
VESTIBULE
1300A
LOBBY
EQUIPMENT
ELEVATOR
VESTIBULE
CORRIDOR
1299A
AREA
WAITING
CONSULTING
1218B
CONSULTING
1218C
CO
RR
ID
OR
TRIAGE
STORAGE
WHLCHR
VESTIBULE
MRI
1304A
LOCKERS
1105A
VOLUNTEER
AREA
LDRY
CHUTMECH.
CHASE
TOILET
STAFF
1340A
RM
CHANGING
1304C
RM
CHANGING
1304B
VESTIBULE
MRI
OFFICE
AOD
WAITING AREA
URGENT CARE
UP
CARPET
CARPET
CARPET
TILE
TILE
TILE
ROOM
EXAM
ROOM
EXAM
TOILET
PATIENT
ALCOVE
SCALE
TOILET
MENS
FE FE
ALCOVE
SCALE
ALCOVE
PYXIS
MECH
SHAFT
PASSENGER
ELEVATOR
CLEAN RM.
NON-HAZ./
1233B
D-4 D-5
MA
TC
HL
INE
TRIAGE
ALCOVE
H/W
PHARM
CLINICAL
PHARM
CLINICAL
OFFICE
MENTAL HLTH
ALCOVE
PHARM
CLINICAL
WORKROOM
NURSE
CONNECTION
TOILET
PATIENT
TOILET
PATIENT
HSKP
ROOM
ELECTRICAL
(VA)
IT ROOM
CORRIDOR
CORRIDOR
CONFERENCE
HOLDING
SOILED
UTILITY
CLEAN
EXAM
EXAM
EXAM
EXAM
HALLWAY
CORRIDOR
SUB-WAIT
1499A
WC ALCOVE
STAIR 3
STAIR 2
STAIR 4
OPC NURSE CALL PNL
FIRE ALARM TRANSPONDER PNL
SECURITY SYSTEM
SMOKING SHELTER
(20/1 EACH, 4#10,#10G,1"C.)
L1A-82,84
L1D
L1C
CR1A
ED NURSE CALL PNLFIRE ALARM AUX PNL
LIGHTING CONTROL "LCP1B"
LIGHTING CONTROL "LCP1A"
STACKED PNLS
SECURITY SYSTEM
CONTROL PANEL
CONTROL PANEL
M M1 L1A(R) L1A(L)
CR1EQ1LS1
E1S
E1C
SECURITY SYSTEM
CONTROL PANEL
SP
N D
N D
N D
N D
N D
SP
C1
OSOS
OSOS
OSOS
OPC NURSE CALL PNL
FIRE ALARM TRANSPONDER PNL
ED NURSE CALL PNLFIRE ALARM AUX PNL
LIGHTING CONTROL "LCP1B"
LIGHTING CONTROL "LCP1A"
STACKED PNLS
S
OSOS
C
C
C
C
C
C
C C
C
C
C
C
C C
C
C
CC
C C
FIRST FLOOR DEMOLITION PLAN -
EAST
ED104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
MLL NMP
ED104
F1 FIRST FLOOR DEMOLITION PLAN - EAST
1/8" = 1'-0" 4'0" 2' 8' 12'
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A CUT BACK ONE EXISTING 3/4" CONDUIT AND #12 CONDUCTORS TO
ACCOMMODATE NEW MECHANICAL WORK. PROVIDE SPLICE BOX(ES),
CONDUIT AND WRING AS REQUIRED TO RE-ROUTE THE CONDUIT AND
WIRING AROUND THE NEW MECHANICAL WORK.
COORDINATE WITH PLUMBING TRADE TO TEMPORARILY REMOVE
EXISTING CAN LIGHT(S) WHICH ARE IN THE WAY OF NEW PIPING.
REINSTALL/RE-WIRE THE FIXTURE(S) AT PROJECT COMPLETION.
THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE
REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.
TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW
CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND
PLUMBING DEMO/NEW PLANS.
SYMBOL LIST
B
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
C
MATCH LINE
SEE SHEET
FOR PLAN CONTINUATION
ED103
DWG. 53 OF 59
BASEMENT ROOF
BASEMENT ROOF
FD FD FD
DWV
ELEC
CABINET
FD
DN
UP
DN
UP
UP
DN
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
1st. FLOOR ROOF
MECH.
SHAFT
SUB-STERILIZER
MECH SPACE
MECH. RM. 1400
ROOF
MA
TC
HL
INE
MA
TC
HL
INE
FIRST FLOOR ROOF
BASEMENT ROOF
FD
BASEMENT ROOF
STAIR 1
STAIR 2
STAIR 5
A
A
A
A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
2145A
CORRIDOR
OFFICE
OFFICE
OFFICE
STAFF
LOUNGE
BIOMED
DATA
DATA AND
PHONE
TREATMENT
TREATMENT
SOILED
UTILITY
TREATMENT
TREATMENT
TREATMENT
TREATMENT
PT.
TOILET
2176A
TREATMENT
CLEAN
SUPPLY
NURSE
STATION
PACS
VIEW
TOILET
STERILE
SUPPLY
2171A
WAITING
ROOM
HALLWAY
CHECK-IN
CLERKS
WOMEN
MEN
WHEELCHAIR
ALCOVE
HSKG
CLOSET
CORRIDOR
2299B
WOMEN
2112A
LAUNDRY
CHUTE
TOILET
2143A
PACU
BED #8
2129K
PACU
BED #8
2129L
OR
SUPERVISOR
WOMEN
LCKR/
SHOWER
RM.
MEN
LCKR/
SHOWER
RM.
EQUIP.
STORAGE
SOILED
UTILITY
ANESTHESIA
WORK ROOM
BLANKET
WARMER
2110D
SEMI-RESTRICTED
CORRIDOR
MECHANICAL
MEN
2111A
CORRIDOR
2299H
PRE/POST
BED #1
2129A
PRE/POST
BED #2
2129B
PRE/POST
BED #3
2129C
PRE/POST
BED #4
2129D
EQUIPMENT
STORAGE
NURSING
STATION
PRE/POST
BED #7
2129G
PRE/POST
BED #6
2129F
PRE/POST
BED #5
2129E
STERILE
SUPPLY
CLEAN
SUPPLY
PT.
TOILET
PT.
TOILET
2131 SOILED
UTILITY
PRE/POST
CORRIDOR
TREATMENT
OPERATING
ROOM
OPERATING
ROOM
HSKG
CLOSET
STERILE
SUPPLY
CLEAN
SUPPLY
CART
ALCOVE
2110C
CART
ALCOVE
2110A
ENDOSCOPY
SCRUB
2105A
SUB-
STERILE
2101A
GOWNING
ALCOVE
SECOND FLOOR DEMOLTION
PLAN - WEST
ED105
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
ED105
F4 SECOND FLOOR DEMOLTION PLAN - WEST
1/8" = 1'-0"
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE
REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.
TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW
CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND
PLUMBING DEMO/NEW PLANS.
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
MATCH LINE
SEE SHEET
FOR PLAN CONTINUATION
ED106
4'0" 2' 8' 12'
FIRST FLOOR ROOF
UP
DN
UP
DN
ROOF
MECH
CHASE
PASSENGER
ELEVATOR
DN
UP
OPEN TO FIRST
FLOOR
MECH.
SHAFT
CHASE
CHASE
PASSENGER
ELEVATOR
MECH.
SHAFT
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
FOLDING
WALL
FIRST FLOOR ROOF
FIRST FLOOR ROOF
STAIR 3
STAIR 4
OS
ENDOSCOPY
CYSTOSCOPY
SCRUB
ALCOVE
2110B
DUMBWAITER/
CART
ALCOVE
HSKG
CLOSET
DATA
AND
PHONE
HSKG
PACS
VIEWING
CLEAN
SUPPLY
STERILE
CLEAN
ULTRASOUND
PATIENT
TOILET
ULTRASOUND
IMAGING
CHIEF
STAFF
LOUNGE
AND
LOUNGE
CHANGING
ROOM
2245A
CONTROL
ROOM
2242A
EQUIPMENT
ALCOVE
2230B
PT.
TOILET
2242B
PACS
VIEWING
STRESS
TEST
TECH
WORK
ROOM
UTILITY
CORRIDOR
2230P
PT.
TOILET
PNUEMATIC
TUBE COMP.
CORRIDOR
C2-1
PACS WORK
STATION
CLERK
CHECK-IN
PACS
COMPUTERS
2215A
WAITING
AREA
EQUIPMENT
ALCOVE
2230A BONE
DENSITY
TECH
WORK
ROOM
WOMEN
TOILET
MEN
TOILET
CHANGING
ROOM
PT.
TOILET
STORAGE
2263B
GE CT
SCANNER
CONTROL
ROOM
2263A
CONTROL
ROOM
2261A
RADIOLOGY
CORRIDOR
C2-2
ELEVATOR
LOBBY
ACCUPUNCTURE
EXAM ROOM
SOCIAL
WORKER
STAFF
LOUNGE
STERILE
SUPPLY
CLEAN
SUPPLY
SOCIAL
WORKER
DATA
CLOSET
2306 ACCUPUNCTURE
EXAM ROOM
EYE
PRE-TREATMENT
EYE
PRE-TREATMENT
OFFICE
SUB-WAIT
AREA
PATIENT
TOILET
2335A
MENTAL
HEALTH
EXAMS
CHEMOTHERAPY
RADIOLOGY
FLUOROSCOPY
CT
SCAN
CONTROL
CT
SCAN
NUCLEAR
MEDICINE
HOT
LAB
2254A
MECHANICAL
2307A
MECHANICAL
HSKG
CLST
ELECTRICAL
ROOM
LANE
ROOM
LANE
ROOM
LANE
ROOM
EYE
INSTRUMENTS
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
SOILED
LINEN
SUB-WAIT
AREA
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
MENS
TOILET
STAFF
TOILET
2358 WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
TOILET
NEUROLOGY
EXAM
ROOM
CORRIDOR
NEUROLOGY
EXAM
ROOM
2364 NEUROLOGY
EXAM
ROOM
CLERKS
AREA
2374 STAFF
WORK AREA
2374A
WOMENS
TOILET
MEETING
ROOM
MEETING
ROOM
WAITING
AREA
FAMILY
RESTROOM
2338A
FAMILY
LOUNGE
WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
CORRIDOR
LAUNDRY
CHUTE
CORRIDOR
2252P
ONCOLOGY
EXAM/OFFICE
ONCOLOGY
EXAM/PROC.
A
A
A
A A
A
A
SECOND FLOOR DEMOLITION
PLAN - EAST
ED106
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
MATCH LINE
SEE SHEET
FOR PLAN CONTINUATION
ED105
ED106
F3 SECOND FLOOR DEMOLTION PLAN - EAST
1/8" = 1'-0" 4'0" 2' 8' 12'
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE
REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.
TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW
CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND
PLUMBING DEMO/NEW PLANS.
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
DN
UP
FIRE
EQUIP
RAMP
UP 7"
FLOOR
UP 7"
AUDIOLOGY
SOUND BOOTH
AUDIOLOGY
SOUND BOOTH
CARPET
VINYL TILE
STAIR 1
STAIR 2
DN
UP
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
MECH.
SHAFT
MECH
SHAFT
MECH
SHAFT
AUDIOLOGY
SOUND BOOTH
AUDIOLOGY
SOUND BOOTH
UPDN
LDRY
CHUT
STAIR 5
2ND FLOOR ROOF
MA
TC
HL
INE
MA
TC
HL
INE
B
A
OS
OS
OS
OSSP
SP
SP
SP
C3
CPA CPB
W3B W3A
W3A J-BOX
TQL-A
CR-3EB2
EX
C C
C
C
C
C C C
C
C
C
C
C
HSKG
PSYCHOLOGIST
SOCIAL
WORKER
HSKG
UTILITY
3142A
PSYCHOLOGIST
SOCIAL
WORKER
SOCIAL
WORKER
PSYCHOLOGIST
SOCIAL
WORKER
B.H.
ADMIN.
MEDIA
STORAGE
TOILET
B.H.
SOCIAL
WORKER
SOCIAL
WORKER
B.H.
ADMIN.
B.H.
PHARMACIST
PSYCHOLOGIST
B.H.
B.H.
PSYCHIATRIST
PSYCHIATRIST
B.H. VOC
REHAB
B.H.
PEER
CORRIDOR
3199B-1
WOMENS
TOILET
3165 MENS
TOILET
B.H.
CONFERENCE
ROOM
PSYCHOLOGIST
SOCIAL
WORKER
SOCIAL
WORKER
SOCIAL
WORKER
SOCIAL
WORKER
STORAGE
SOILED
LINEN
CORRIDOR
3199A-1
ADMIN.
OFFICER
BREAK
ROOM
B.H. ADMIN.
SUPPORT
PSYCHOLOGIST/
CHIEF, B.H.
PSYCHOLOGIST/
ASST. CHIEF B.H.
B.H.
TELE-HEALTH
B.H.
TELE-HEALTH
CORRIDOR
3199C-1
DATA &
PHONE
SUPPLY
CLOSET
SUPPLY
B.H.
TELE-HEALTH
PSYCHOLOGIST
AND INTERNS
B.H.
PEERS
AUDIOLOGY
CHECK-IN
3184C
AUDIOLOGY
WAITING AREA
AUDIOLOGY
WAITING
ROOM
3184B
TECHNICIAN
WORK
ROOM
3184A AUDIOLOGY
OFFICE
3280A
SPEECH
THERAPY
HEARING
TESTING
WHOLE HEALTH
GROUP ROOM
CORRIDOR
3299A-1
CORRIDOR
B.H. GROUP
ROOM
B.H. GROUP
ROOM
B.H.
CHECK-OUT
CLERK
B.H., NURSING,
AUDIOLOGY
WAITING ROOM
RECEPTION
CLERKS
3105A
WOMEN
MEN
THIRD FLOOR DEMOLITION PLAN
- WEST
ED107
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
ED107
F3 THIRD FLOOR DEMOLITION PLAN
1/8" = 1'-0"
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A CUT BACK ONE EXISTING 3/4" CONDUIT AND #12 CONDUCTORS TO
ACCOMMODATE NEW MECHANICAL WORK. PROVIDE SPLICE BOX(ES),
CONDUIT AND WRING AS REQUIRED TO RE-ROUTE THE CONDUIT AND
WIRING AROUND THE NEW MECHANICAL WORK.
COORDINATE WITH PLUMBING TRADE TO TEMPORARILY REMOVE
EXISTING CAN LIGHT(S) WHICH ARE IN THE WAY OF NEW PIPING.
REINSTALL/RE-WIRE THE FIXTURE(S) AT PROJECT COMPLETION.
THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE
REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.
TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW
CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND
PLUMBING DEMO/NEW PLANS.
SYMBOL LIST
B
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
C
4'0" 2' 8' 12'
DWG. 54 OF 59
MATCH LINE
SEE SHEET
ED108
OS
SP
SP
ROOM
MECHANICAL
2ND FLOOR ROOF
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
FIRE
EQUIP
LDRY
CHUT
DUCT
DUMB
WAITER
DN
UP
STAIR 3
STAIR 4
UP DN
PASSENGER
ELEVATOR
MECH
SHAFT
2ND FLOOR ROOF
MECH
SHAFT
MECH
SHAFT
MA
TC
HL
INE
MA
TC
HL
INE
SECOND FLOOR ROOF
HSKG
WHOLE HEALTH
TELE-HEALTH
EXAM ROOM
NURSE
STATION
TELE-HEALTH
TELE-HEALTH
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
STERILE
SUPPLY
WAITING
AREA
CORRIDOR
3299C-1
TELE-HEALTH
STAFF OFFICE
MSA
OFFICE
BIO-MED
CLOSET
DATA &
PHONE
STAFF
LOUNGE AND
LOCKERS
CORRIDOR
TOILET
CORRIDOR
MEN
TOILET
3225A
CLERK/
WORK
WAITING
ROOM
PASSAGE
3237A
CHIEF,
DENTAL
OPERATORY
OPERATORY
OPERATORY
X-RAY
OPERATORY
OPERATORY
OPERATORY
CONTROL
3228A
PASSAGE
CLEAN
STORAGE
STERILE
SOILED
LAB
CORRIDOR
3299B-1
NURSE
EDUCATION
TRAINING
ROOM
NURSE
EDUCATION
TRAINING
ROOM
PASSAGEWAY
NURSE
EDUCATION
OFFICE
NURSE
TRAINING
ROOM
3245NURSE
ED. STOR.
TOILET
3246A
TOILET
3250A
SOILED
UTILITY
CLEAN
SUPPLY
MECHANICAL
ROOM
HSKG
STORAGE
ELEVATOR
LOBBY
MECH.
3244-A
A A A A
A
A A
A
THIRD FLOOR DEMOLITION PLAN
- EAST
ED108
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
ED108
F3 THIRD FLOOR DEMOLITION PLAN - EAST
1/8" = 1'-0"
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE
REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.
TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW
CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND
PLUMBING DEMO/NEW PLANS.
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
MATCH LINE
SEE SHEET
FOR PLAN CONTINUATION
ED107
4'0" 2' 8' 12'
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text K-2005
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOFFIRST FLOOR ROOFFIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
MECH
SHAFT
DUMB
WAITER
DN
STAIR 5
DN
UP
STAIR 2
DN
STAIR 4
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
UPUP
DN
UP
STAIR 1 STAIR 3
UP
DN
LDRY
CHUT
MECH
SHAFT
MECH
SHAFT
3RD FLOOR ROOF
FIRE
EQUIP
MECH
SHAFT
PASSENGER
ELEVATOR
K-4330KINGSTONC_TOILETSVITREOUS CHINA K-4330KINGSTONC_TOILETSVITREOUS CHINA
K-4330KINGSTONC_TOILETSVITREOUS CHINA
MECH
SHAFT
PIPE
SHAFT
OS
OS
N
N
SP
SP
F
E1
DT
SP
SP
SP
A
A
A A
A
AA
A
AA
A
A
A
A A
A
A
A
A
A
A
A
A
FOURTH FLOOR DEMOLITION
PLAN
ED109
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
ED109
F1 FOURTH FLOOR DEMOLITION PLAN
1/8" = 1'-0"
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE
REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.
TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW
CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND
PLUMBING DEMO/NEW PLANS.
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
4'0" 2' 8' 12'
5th FLOOR ROOF
3RD FLOOR ROOF
2ND FLOOR ROOF
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
4TH FLOOR ROOF
BASEMENT ROOF
DN
LDRY
CHUT
FIRE
EXTG.
FIRE
EXTG.
FIRE
EXTG.
UP
DN
STAIR 2
STAIR 1
STAIR 3
DN
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
5th FLOOR ROOF
PIPE
SHAFT
MECH.
SHAFT
LDRY
CHUT MECH.
SHAFT
5th FLOOR ROOF
PIPE
CHASE
SP
SP
N
COUNSELING
ROOM
6105A
COMMUNITY
CARE/CHOICE
COMMUNITY
CARE/CHOICE
6120A
MECH.
HSKG
STORAGE
STAFF
BREAK
ROOM
6120B
DATA &
PHONE
COMM.
CARE/CHOICE
SPVSR
ESCORTS
TRAINING
SPECIALIST
COMPUTER
TRAINING
6206C
PIV
OFFICE
COMM.
CARE/CHOICE
SPVSR
STORAGE
6112A
VOC
REHAB
6206A
VOC
REHAB
6206B
WALK-IN
COOLER
6210A
MICROBIOLOGY
CLEAN
SUPPLY
VOC
REHAB
ACCESSIONING
HISTOLOGY
TELEPATHOLOGY
BLOOD
BANK
STAFF
WORK
STATIONS
PASSAGE
DATA
ROOM
6222B
LABORATORY
COMM.
CARE/CHOICE
COMMUNITY
CARE/CHOICE
DRIVER
LOUNGE
CHIEF,
VOLUNTARY
SERVICES
6107A ADMIN.
ASSIST.
VOL. SERV.
NURSING
WORK
STATIONS
WOMENS
RESTROOM
MENS
RESTROOM
COMMUNITY
CARE WORK
STATIONS
RECEPTION
TOILET
BLOOD
DRAW
HSKG
CHIEF,
LAB
STAFF
LOUNGE
STORAGE
MECH
6226A
HSKG
SOILED
UTILITY
A
SIXTH FLOOR DEMOLITION PLAN
ED110
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
ED110
F1 SIXTH FLOOR DEMOLITION PLAN
1/8" = 1'-0" 4'0" 2' 8' 12'
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE
REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.
TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW
CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND
PLUMBING DEMO/NEW PLANS.
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
HL
INE
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
CHAPEL
VESTIBULE
1100A
DAV
AMERICAN LEGION/
ADVOCATE
PATIENT
ADVOCATE
PATIENT
HEART
PURPLE
CHASE
CLOSET/PIPE
1182A
CLOSET
1182B
OFFICE
CHAPLAIN
KITCHENETTE
SERVICE
ELEVATOR PASSENGER
ELEVATOR
LOBBY
UP
DN
UP
DN
NURSE STA.
STORAGE
CLOTHING
CONST.
UNDER
CONST.
UNDER
1034A
SEMI-PRIVATE
TOILET
1036A
SEMI-PRIVATE
SEMI-PRIVATE
SEMI-PRIVATE
SEMI-PRIVATE
TOILET
1038A
TOILET
1040A
TOILET
1042A
TOILET
1044A
TOILET
STAFF
NURSE STA.
PRIVATE
TOILET
1052A
ELECT. ROOM
SUPPLY
STRERILE
NURSE STA.
STOR.
EQUIP.
LINEN
CLEAN
CLOSET
UTILITY
SEMI-PRIVATE
PRIVATE
PRIVATE
PRIVATE
SEMI-PRIVATE
PRIVATE
PRIVATE
SEMI-PRIVATE
SEMI-PRIVATE
TOILET
1055ATOILET
1051A
TOILET
1002A
TOILET
1006A
TOILET
1008A
TOILET
1010A
TOILET
1020A
TOILET
1024A
TOILET
1028A
STORAGE
EQUIP.
STAFF TOILET
1148B
LOCKERROOM
1148A
STAFF LOUNGE
STORAGE
RECR. THER.
WORKER
SOCIAL
STATION
MAIN NURSE
BATHING/SPA
THERAPY OFF.
RECREATION
1147A
ROOM
ACTIVITY/GROUP
LINEN CHUTE
CORRIDOR
PRIVATE
ASSISTANT
PROGRAM
PRIVATE
TOILET
1136A
TOILET
1135A
NURSE STA.
TOILET
1132A
PRIVATE
1132 PRIVATE
PRIVATE
PRIVATE
TOILET
1131A
TOILET
1128A
TOILET
1127A
CLOSET
UTILITY
1121 SATELLITE CLINIC
PHYSICAL THERAPY
PRACTIONER
NURSE
1111A
WORKER
SOCIAL
1109A
TOILET
UNISEX
STORAGE
OXYGEN
STORAGE
EQUIPMENT
SEMI-PRIVATE
ROOM
CONFERENCE
PRIVATE
PRIVATE
TOILET
1170A
TOILET
1166A
TOILET
1175A
TOILET
1171A
STOR.
IV
COORDINATOR
MDS/RESTORIV
MANAGER
NURSE
THERAPY OFFICE
OCCUPATIONAL
1165A
ADL BATH
1165B
BEDROOM
ADL OT AREA/
MEDS ROOM
DA
TA
C
LO
SE
T
CLEAN LINEN
1120 CLOSET
UTILITY
& RECREATION AREA
RESIDENT DINING
STORAGE
1116A
KITCHEN
RESIDENT
1116B
STORAGE
LOCKERS
1105A
CHASE
CHASE
ROOM
PRIVATE
PRIVATE
PRIVATE
TOILET
1025A
TOILET
1029A
PRIVATE
TOILET
1009A
TOILET
1005A
TU
BE
ST
AT
ION
FI
RE
PL
AC
E
DAY ROOM
AHU-01
MECH. RM.
MED-GAS
CHASE
MECH.
SHAFT
MECH.
SHAFT
UP
MA
TC
HL
INE
STAIR 1
STAIR 5OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
SP
SP
SP SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP SP
SP SP
SP SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
C1
J
J
J
N D N D N D N D N D N D
N D
N D
N D
N D
N D
N D
N D ND
ND
N D
N D
ND
ND ND
ND N D N D N D
N CB
N D
N D
ND
N D
N D
N DND
ND
ND
ND
N D
N D
N DN DN DN D
N D
ND
OS
SP
EX
E
NN
2 2
2 2
FIRST FLOOR NEW WORK PLAN -
WEST
E103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
MLL NMP
E103
F1 FIRST FLOOR NEW WORK PLAN - WEST
1/8" = 1'-0"
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
1 REINSTALL/RE-WIRE THE CAN LIGHT(S) WHICH WERE REMOVED
DURING DEMOLITION.
LAY EXISTING FIXTURE(S) BACK INTO THE GRID ONCE NEW
MECHANICAL WORK IS COMPLETE.
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
4'0" 2' 8' 12'
DWG. 57 OF 59
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
MATCH LINE
SEE SHEET
E104
HL
INE
BASEMENT ROOF
CHAPEL
SACREMNT
HOLY
1284A
VESTIBULE
1100A
WEAPONS
1201C
OFFICE
MAIN
HOLDING
1201B
POLICE
CHIEF,
TOILET
MENS
TOILET
WOMENS
ROOM
PROCEDURE
ALCOVE
WORKROOM
NURSE
FD
UTILITY
SOILED
1267A
TOILET
PATIENT
1267B
TREATMENT
WOUND CARE
ROOM
WAITING
CASHIER
AGENT
1288A
ROOM
WAITING
OFFICE
TRAVEL
1286A
KITCHENETTE
GARAGE
AMBULANCE
LOCKERS
BREAK RM/
RM
EXAM
WORK RM
NURSE
ROOM
EXAM
ROOM
EXAM
RM
EXAM
WORKER
SOCIAL
RM
EXAM
/CONSULTATION
PT. EDUCATION
RM
DECON
MEDICATION
UTILITY
SOILED
TOILET
PATIENT
RM
TREATMENT
RM
TREATMENT
ROOM
TREATMENT
MEDICATION
/SECURITY RM.
FIRE ALARM
DIABETES
TOILET
PATIENT
LOBBY
ELEVATOR
TOILET
1224A
ROOM
COAT
OFFICE
PHARMACY
CHIEF
PHARMACY
LOUNGE
ROOM
IV
HOOD RM
HAZARD
1233A
& OFFICES
MED PREP
MED PREP
PHARMACY
PHARMACY
MAIN
VAULT
1228A
MED PREP
SECURE
TOILET
PATIENT
CLERKS
RM
EXAM
WORKRM
NURSE
RM
EXAM
ROOM
EXAM
RM
EXAM
DIABETES
SUPPLY
STERILE
ROOM
EXAM
ROOM
ANTE
1312A
STATION
NURSE
DICTATION
WORKRM
NURSE
RM
EXAM
RM
EXAM
LINEN
CLEAN
HOUSEKEEPING
TOILET
STAFF
ISOLATION
TREATMENT/
TREATMENT
SECURE
TOILET
WOMENS
EVIDENCE
1201A
LAB/EKG
BLOOD DRAW
LAB/EKG
BLOOD DRAW
PT. TOILET
1312B
EQUIPMENT
FIRE
EQUIP
LO
CK
ER
S
PHARMACIST
CLINICAL
SUPPLY
PHARMACY
DISPENSING
OUTPATIENT
CLOSET
HSKPG
HSKPG
ELIGIBILITY
ENROLLMENT &
AREA
WAITING
AREA
CLERK
ELECTRICAL
CONSULTING
PHARMACY
DATA
DATA & PHONE
1218A
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
VESTIBULE
1300B
VESTIBULE
1300A
LOBBY
EQUIPMENT
ELEVATOR
VESTIBULE
CORRIDOR
1299A
AREA
WAITING
CONSULTING
1218B
CONSULTING
1218C
CO
RR
ID
OR
TRIAGE
STORAGE
WHLCHR
VESTIBULE
MRI
1304A
LOCKERS
1105A LDRY
CHUT
TOILET
STAFF
1340A
RM
CHANGING
1304C
RM
CHANGING
1304B
VESTIBULE
MRI
OFFICE
AOD
WAITING AREA
URGENT CARE
ROOM
EXAM
ROOM
EXAM
TOILET
PATIENT
ALCOVE
SCALE
TOILET
MENS
FE FE
ALCOVE
SCALE
ALCOVE
PYXIS
PASSENGER
ELEVATOR
CLEAN RM.
NON-HAZ./
1233B
D-4 D-5
MA
TC
HL
INE
TRIAGE
ALCOVE
H/W
PHARM
CLINICAL
PHARM
CLINICAL
OFFICE
MENTAL HLTH
ALCOVE
PHARM
CLINICAL
WORKROOM
NURSE
CONNECTION
TOILET
PATIENT
TOILET
PATIENT
HSKP
ROOM
ELECTRICAL
(VA)
IT ROOM
CORRIDOR
CORRIDOR
HOLDING
SOILED
UTILITY
CLEAN
EXAM
EXAM
EXAM
EXAM
CORRIDOR
SUB-WAIT
1499A
WC ALCOVE
OSOS
OSOS
R1
R1
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
R1
OSOSOSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOSOSOS
OSOS
OSOS
OSOS
OSOS
N
N
SP
SMOKING SHELTER
(20/1 EACH, 4#10,#10G,1"C.)
SP
L1A-82,84
SP
SP
SPSPSP
SP
SP
SP
SP
SP
SPSPSP
N D N D
N D
N D
N D
N D N D
N D
N D
N D
N D
N D N D
N D
N D
N D N D
N D N D N D
ND
N D
N D
N D
N D
N D
N D
N D
N D
N DN D
ND N D
N D
N D
N D
N D N D
N D
N D
N D
N D
N D N D N D
N D
N D
N D
N D
N D
N D N D
N D
N D
N D N D
SP
SP
SP
SP SPSP
SP
OSOS
SP SP
SPSP
SP
ER
SP
SP
SP
E
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
OSOS
MD
OSOS
OSOS
OSOS
S
S S
S
OSOS2
2 2
FIRST FLOOR NEW WORK PLAN -
EAST
E104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
1 REINSTALL/RE-WIRE THE CAN LIGHT(S) WHICH WERE REMOVED
DURING DEMOLITION.
REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID
ONCE NEW MECHANICAL WORK IS COMPLETE.
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
E104
F1 FIRST FLOOR NEW WORK - EAST
1/8" = 1'-0" 4'0" 2' 8' 12'
MATCH LINE
SEE SHEET
FOR PLAN CONTINUATION
E103
DWG. 58 OF 59
N
S
NURSE CALL LIGHT
SPEAKER
TELEMETRY
CAN/SURFACE MOUNT FIXTURE
WI-FI
OCCUPANCY SENSOR
LINEAR/STRIP LIGHT
MOTOR
S
BASEMENT ROOF
FD FD FD
DWV
ELEC
CABINET
FD
DN
UP
DN
UP
UP
DN
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
1st. FLOOR ROOF
MECH.
SHAFT
SUB-STERILIZER
MECH SPACE
MECH. RM. 1400
ROOF
MA
TC
HL
INE
MA
TC
HL
INE
FIRST FLOOR ROOF
BASEMENT ROOF
FD
BASEMENT ROOF
STAIR 1
STAIR 2
STAIR 5
A
OS
OS OS
OS
H2 H2 H2 H2 H2
A
A
A
A
AA
A A
A A
AA
A A
AA
AA
A A
A
A A
A
A
A A
A A
A A
A
A A A
H2
A
H2
A A A A A
A A
A
A A
A A
A
A A
PP
G
G
G
B
B
B
B B
B
B
B
B B
B
B
B
B
B
B B B
C C C
B H H
H H
H H
H
H
B
H2 H2
L L
L
L
L2
L2
N N N
L2
RR
F
F
F
F
H
J
H
H
J
H
A
A
G
K
K
B
B
B
B
A A
A A
A
A
A
L2
AAA
A
A
A
K2
K2
K2
K2
K2K2
OS
B
B
K2
K2 K2
K2
K2
K2
K2
K2
K2
K2 K2
K2
K2
K2
K2
K2
U
F3
K
K
K
K
A
A
A
AA
JJ
A
OS
OS
OS
F3
AA AAAA
F3
OS OS
OS OS
F
OSOS
F3
K2
K2
F
F
F
F
F
F
F
F F
F
F
F F
F F
F F
F
N31 N31
SP
C
A
A A
A A
A
A
A A
A A
A
A
A A
A A
A A
A
A
G
G
A A
H
OS OS OS
OS OS
OS
F
F
F F
SP
SP SP
SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SPSPSPSP
SP
SP
SP
SP
N 2
N 2
N 2 N 2
N 2
N 2N 2
N 2
N 2
N 2
N 2
N 2
N 2
N 2
N 2
N I
N 2
N 2
N 2 N 2
N 2 N 2
N 2
N 2N 2
N I
N 2
EXEX
KLKL
KL
KL
KL KL KL
KL
KL
KL
KL
1 1
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
2145A
CORRIDOR
OFFICE
OFFICE
OFFICE
STAFF
LOUNGE
BIOMED
DATA
DATA AND
PHONE
TREATMENT
TREATMENT
SOILED
UTILITY
TREATMENT
TREATMENT
TREATMENT
TREATMENT
PT.
TOILET
2176A
TREATMENT
CLEAN
SUPPLY
NURSE
STATION
PACS
VIEW
TOILET
STERILE
SUPPLY
2171A
WAITING
ROOM
HALLWAY
CHECK-IN
CLERKS
WOMEN
MEN
WHEELCHAIR
ALCOVE
HSKG
CLOSET
CORRIDOR
2299B
WOMEN
2112A
LAUNDRY
CHUTE
TOILET
2143A
PACU
BED #8
2129K
PACU
BED #8
2129L
OR
SUPERVISOR
WOMEN
LCKR/
SHOWER
RM.
MEN
LCKR/
SHOWER
RM.
EQUIP.
STORAGE
SOILED
UTILITY
ANESTHESIA
WORK ROOM
BLANKET
WARMER
2110D
SEMI-RESTRICTED
CORRIDOR
MECHANICAL
MEN
2111A
CORRIDOR
2299H
PRE/POST
BED #1
2129A
PRE/POST
BED #2
2129B
PRE/POST
BED #3
2129C
PRE/POST
BED #4
2129D
EQUIPMENT
STORAGE
NURSING
STATION
PRE/POST
BED #7
2129G
PRE/POST
BED #6
2129F
PRE/POST
BED #5
2129E
STERILE
SUPPLY
CLEAN
SUPPLY
PT.
TOILET
PT.
TOILET
2131 SOILED
UTILITY
PRE/POST
CORRIDOR
TREATMENT
OPERATING
ROOM
OPERATING
ROOM
HSKG
CLOSET
STERILE
SUPPLY
CLEAN
SUPPLY
CART
ALCOVE
2110C
CART
ALCOVE
2110A
ENDOSCOPY
SCRUB
2105A
SUB-
STERILE
2101A
GOWNING
ALCOVE
SECOND FLOOR NEW WORK
PLAN - WEST
E105
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
E105
F4 SECOND FLOOR NEW WORK PLAN - WEST
1/8" = 1'-0"
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
1 REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID
ONCE NEW MECHANICAL WORK IS COMPLETE.
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
4'0" 2' 8' 12'
MATCH LINE
SEE SHEET
FOR PLAN CONTINUATION
E106
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
N
S
NURSE CALL LIGHT
SPEAKER
TELEMETRY
CAN/SURFACE MOUNT FIXTURE
WI-FI
OCCUPANCY SENSOR
LINEAR/STRIP LIGHT
MOTOR
UP
DN
UP
DN
ROOF
MECH
CHASE
PASSENGER
ELEVATOR
DN
UP
OPEN TO FIRST
FLOOR
MECH.
SHAFT
CHASE
CHASE
PASSENGER
ELEVATOR
MECH.
SHAFT
MA
TC
HL
INE
MA
TC
HL
INE
FOLDING
WALL
FIRST FLOOR ROOF
FIRST FLOOR ROOF
STAIR 3
STAIR 4
A A AA A
B B
B B
C
C
H
H
B
A
AA
B
A A
B B
H
A
A
A
A
A
A
H
H2
H2
G
A
A A
A
A
P
PP
B
B
A
CC
B
B
B
B
B
B
B
B
B
B
AAA
C
B
B
B B
A A
A A
H2
B
B
B
B
A A
OS
OS
H2 H
H
H
H
C
C
C
C
H2
H2
H
AA
AA
C
C
C
CCC
C
C
C
CC
C
C
CCC
HHH
H
B
B
B
B
H
F4
F
F
F
F3
F4
F4
Q Q
G
F
H
C CC
C C
C
F
CC
CCC
F
F
F3
F
F
C
C
SP
A A
H2
K
K
K
N
B
K
K
A
OS
A
K2 K2
K2
K2
KK
K
H
OS
B
OS
OS
OS
H2
OS
OS
A
A
H2
B
H
H
H2
H2
H
CCC
C
F4
SP
P2
P6P6P5
P2AP2AA2A2A2A2
P2P2P2
P2 P2 P2
P2
P2 P2
P2
P2P2P2
P2A
P2A P2A
P2A P2A
P2A
P2A
P2A
P2AP2AP2AP2A
P2
P2A
P2A
P2A
P2A
P2A
P2A
P6 P6P6
P6P6
P6P6
A2 A3 A3
A3
A3A3
A3A3
A3
A3 A3A3A3
A3 A3
A3A3A3
A3 A3
A3 A3 A3 P2
P2
P2
P2
P2
A3
A3A3
P2P2
A3
A6
A6A6
A6 A6
A6A6A6
A6
A6A6
P5 P5P5
P6
P6 P6 A6
A2
A2
A2
A2
A6
P2 F1
P2A
P2A
P2
A3
K2E K2E
F1
F1
F1
F1
P2 D1
D1
A2
D1 F1
F1
F1
F1 F1
F1F1
P6P6
P5
P5
A5
P6
A5A5
P6
W1
D1
D1
W1
F1F1F1
D1D3
D3D3
D3D3
D3
D3D3
D3 D3
F1 F1 F1
A6A6
F1 F1
F1
F1
F1
F1F1
F1
F1
P6
D1D1 D1D1
P6P6
K2
K2
D1
S1 S1
F1
F1
M8 M8
X1
P5
SP SP
SP
SP SP
SPSP
SP
SP
SP
SP
SP
SP
SP
N 2 N 2
N 2 N 2
N I
N 2
N 2
N 2
N 2N 2
N 2
N 2
N 2
N 2
N 2
N 2 N 2
N 2
N 2N 2
N 2
N 2
N 2
SP
SP
N D
N D
N2
ND
N2 N2 N2
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
N 2
N2 N2
N2
N2
N2
N2
N2
N2
N2
N2N2 N2
N2
ND
N D
N 2
N D
N D
N 2 N 2
N 2
N 2
SP SP
A5
P2
F1
F1
F1
F1
W1
D1
P2P2
P2
P2
P2
P2
EX EX EX
EX
EXEX
EX
EXEX
EX EX
EX
EX
EXEX
EX
EX
EXEX
EX
KL
KL
KL
KL
KL
KL
P2 P2P2
F1F1
X3
REFUGEE
EXX2
X2
X2
X2
X2
X2
X2
L
L
L
L
L
L
L
L
L
L
L
L
LL
LL
EX
KL
ENDOSCOPY
CYSTOSCOPY
SCRUB
ALCOVE
2110B
DUMBWAITER/
CART
ALCOVE
HSKG
CLOSET
DATA
AND
PHONE
HSKG
PACS
VIEWING
CLEAN
SUPPLY
STERILE
CLEAN
ULTRASOUND
PATIENT
TOILET
ULTRASOUND
IMAGING
CHIEF
STAFF
LOUNGE
AND
LOUNGE
CHANGING
ROOM
2245A
CONTROL
ROOM
2242A
EQUIPMENT
ALCOVE
2230B
PT.
TOILET
2242B
PACS
VIEWING
STRESS
TEST
TECH
WORK
ROOM
UTILITY
CORRIDOR
2230P
PT.
TOILET
PNUEMATIC
TUBE COMP.
CORRIDOR
C2-1
PACS WORK
STATION
CLERK
CHECK-IN
PACS
COMPUTERS
2215A
WAITING
AREA
EQUIPMENT
ALCOVE
2230A
BONE
DENSITY
TECH
WORK
ROOM
WOMEN
TOILET
MEN
TOILET
CHANGING
ROOM
PT.
TOILET
STORAGE
2263B
GE CT
SCANNER
CONTROL
ROOM
2263A
CONTROL
ROOM
2261A
RADIOLOGY
CORRIDOR
C2-2
ELEVATOR
LOBBY
ACCUPUNCTURE
EXAM ROOM
SOCIAL
WORKER
STAFF
LOUNGE
STERILE
SUPPLY
CLEAN
SUPPLY
SOCIAL
WORKER
DATA
CLOSET
2306 ACCUPUNCTURE
EXAM ROOM
EYE
PRE-TREATMENT
EYE
PRE-TREATMENT
OFFICE
SUB-WAIT
AREA
PATIENT
TOILET
2335A
MENTAL
HEALTH
EXAMS
CHEMOTHERAPY
RADIOLOGY
FLUOROSCOPY
CT
SCAN
CONTROL
CT
SCAN
NUCLEAR
MEDICINE
HOT
LAB
2254A
MECHANICAL
2307A
MECHANICAL
HSKG
CLST
ELECTRICAL
ROOM
LANE
ROOM
LANE
ROOM
LANE
ROOM
EYE
INSTRUMENTS
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
SOILED
LINEN
SUB-WAIT
AREA
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
MENS
TOILET
STAFF
TOILET
2358 WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
TOILET
NEUROLOGY
EXAM
ROOM
CORRIDOR
NEUROLOGY
EXAM
ROOM
2364 NEUROLOGY
EXAM
ROOM
CLERKS
AREA
2374 STAFF
WORK AREA
2374A
WOMENS
TOILET
MEETING
ROOM
MEETING
ROOM
WAITING
AREA
FAMILY
RESTROOM
2338A
FAMILY
LOUNGE
WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
CORRIDOR
LAUNDRY
CHUTE
CORRIDOR
2252P
ONCOLOGY
EXAM/OFFICE
ONCOLOGY
EXAM/PROC.
SECOND FLOOR NEW WORK
PLAN - EAST
E106
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
E106
F4 SECOND FLOOR NEW WORK PLAN - EAST
1/8" = 1'-0"
MATCH LINE
SEE SHEET
FOR PLAN CONTINUATION
E105
4'0" 2' 8' 12'
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
1 REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID
ONCE NEW MECHANICAL WORK IS COMPLETE.
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
N
S
NURSE CALL LIGHT
SPEAKER
TELEMETRY
CAN/SURFACE MOUNT FIXTURE
WI-FI
OCCUPANCY SENSOR
SP
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS OS
OS OS
OSOS
OSOSOS
OS
OS
N
SP SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
C3
CPA CPB
W3B W3A
W3A J-BOX
SP
N D N D
TQL-A
CR-3EB2
OS
JJ
OS
OSOS
EX
OSOS
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
DN
UP
FIRE
EQUIP
RAMP
UP 7"
FLOOR
UP 7"
AUDIOLOGY
SOUND BOOTH
AUDIOLOGY
SOUND BOOTH
CARPET
VINYL TILE
STAIR 1
STAIR 2
DN
UP
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
MECH.
SHAFT
MECH
SHAFT
MECH
SHAFT
AUDIOLOGY
SOUND BOOTH
AUDIOLOGY
SOUND BOOTH
UPDN
LDRY
CHUT
STAIR 5
2ND FLOOR ROOF
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
2 2 2
HSKG
PSYCHOLOGIST
SOCIAL
WORKER
HSKG
UTILITY
3142A
PSYCHOLOGIST
SOCIAL
WORKER
SOCIAL
WORKER
PSYCHOLOGIST
SOCIAL
WORKER
B.H.
ADMIN.
MEDIA
STORAGE
TOILET
B.H.
SOCIAL
WORKER
SOCIAL
WORKER
B.H.
ADMIN.
B.H.
PHARMACIST
PSYCHOLOGIST
B.H.
B.H.
PSYCHIATRIST
PSYCHIATRIST
B.H. VOC
REHAB
B.H.
PEER
CORRIDOR
3199B-1
WOMENS
TOILET
3165 MENS
TOILET
B.H.
CONFERENCE
ROOM
PSYCHOLOGIST
SOCIAL
WORKER
SOCIAL
WORKER
SOCIAL
WORKER
SOCIAL
WORKER
STORAGE
SOILED
LINEN
CORRIDOR
3199A-1
ADMIN.
OFFICER
BREAK
ROOM
B.H. ADMIN.
SUPPORT
PSYCHOLOGIST/
CHIEF, B.H.
PSYCHOLOGIST/
ASST. CHIEF B.H.
B.H.
TELE-HEALTH
B.H.
TELE-HEALTH
CORRIDOR
3199C-1
DATA &
PHONE
SUPPLY
CLOSET
SUPPLY
B.H.
TELE-HEALTH
PSYCHOLOGIST
AND INTERNS
B.H.
PEERS
AUDIOLOGY
CHECK-IN
3184C
AUDIOLOGY
WAITING AREA
AUDIOLOGY
WAITING
ROOM
3184B
TECHNICIAN
WORK
ROOM
3184A AUDIOLOGY
OFFICE
3280A
SPEECH
THERAPY
HEARING
TESTING
WHOLE HEALTH
GROUP ROOM
CORRIDOR
3299A-1
CORRIDOR
B.H. GROUP
ROOM
B.H. GROUP
ROOM
B.H.
CHECK-OUT
CLERK
B.H., NURSING,
AUDIOLOGY
WAITING ROOM
RECEPTION
CLERKS
3105A
WOMEN
MEN
THIRD FLOOR NEW WORK PLAN -
WEST
E107
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
E107
F4 THIRD FLOOR NEW WORK PLAN - WEST
1/8" = 1'-0"
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
1 REINSTALL/RE-WIRE THE CAN LIGHT(S) WHICH WERE REMOVED
DURING DEMOLITION.
REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID
ONCE NEW MECHANICAL WORK IS COMPLETE.
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
4'0" 2' 8' 12'
DWG. 59 OF 59
MATCH LINE
SEE SHEET
FOR PLAN CONTINUATION
E108
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
N
S
NURSE CALL LIGHT
SPEAKER
TELEMETRY
CAN/SURFACE MOUNT FIXTURE
WI-FI
OCCUPANCY SENSOR
LINEAR/STRIP LIGHT
ROOM
MECHANICAL
2ND FLOOR ROOF
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
FIRE
EQUIP
LDRY
CHUT
DUCT
DUMB
WAITER
DN
UP
STAIR 3
STAIR 4
UP DN
PASSENGER
ELEVATOR
MECH
SHAFT
2ND FLOOR ROOF
MECH
SHAFT
MECH
SHAFT
MA
TC
HL
INE
MA
TC
HL
INE
SECOND FLOOR ROOF
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
SP
SP
SP
SP
SP
J
HR
NURSE
CALL
J
CR-3E
E3BE3B J-BOX
E3A
SP
OS
OS
OS
OS OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
SP
J
SPSP
SP
SP
N
N N
N
N
N
N
N
N
N
OS
X2X2
B4 B4
B4
HSKG
TELE-HEALTH
EXAM ROOM
NURSE
STATION
TELE-HEALTH
TELE-HEALTH
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
STERILE
SUPPLY
WAITING
AREA
CORRIDOR
3299C-1
TELE-HEALTH
STAFF OFFICE
MSA
OFFICE
BIO-MED
CLOSET
DATA &
PHONE
STAFF
LOUNGE AND
LOCKERS
CORRIDOR
TOILET
CORRIDOR
MEN
TOILET
3225A
CLERK/
WORK
WAITING
ROOM
PASSAGE
3237A
CHIEF,
DENTAL
OPERATORY
OPERATORY
OPERATORY
X-RAY
OPERATORY
OPERATORY
OPERATORY
CONTROL
3228A
PASSAGE
CLEAN
STORAGE
STERILE
SOILED
LAB
CORRIDOR
3299B-1
NURSE
EDUCATION
TRAINING
ROOM
NURSE
EDUCATION
TRAINING
ROOM
PASSAGEWAY
NURSE
EDUCATION
OFFICE
NURSE
TRAINING
ROOM
3245NURSE
ED. STOR.
TOILET
3246A
TOILET
3250A
SOILED
UTILITY
CLEAN
SUPPLY
HSKG
STORAGE
ELEVATOR
LOBBY
MECH.
3244-A
1 1 1 1
1 1
THIRD FLOOR NEW WORK PLAN -
EAST
E108
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
E108
F4 THIRD FLOOR NEW WORK PLAN - EAST
1/8" = 1'-0"
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
1 REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID
ONCE NEW MECHANICAL WORK IS COMPLETE.
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
1.
4'0" 2' 8' 12'
MATCH LINE
SEE SHEET
FOR PLAN CONTINUATION
E107
SYMBOL LIST
MS MANUAL MOTOR STARTER
PANEL
A KEY PLAN NOTE
2 x 4 LIGHT FIXTURE
DATA CONNECTION
CONDUIT
COMBINATION MOTOR STARTER
DOWNLIGHT
PULLBOX
N
S
NURSE CALL LIGHT
SPEAKER
TELEMETRY
CAN/SURFACE MOUNT FIXTURE
WI-FI
OCCUPANCY SENSOR
LINEAR/STRIP LIGHT
MOTOR
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
KINGSTON
K-2005
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
MECH
SHAFT
DUMB
WAITER
DN
STAIR 5
DN
UP
STAIR 2
DN
STAIR 4
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
UPUP
DN
UP
STAIR 1 STAIR 3
UP
DN
LDRY
CHUT
MECH
SHAFT
MECH
SHAFT
3RD FLOOR ROOF
FIRE
EQUIP
MECH
SHAFT
PASSENGER
ELEVATOR
K-4330KINGSTONC_TOILETSVITREOUS CHINA K-4330KINGSTONC_TOILETSVITREOUS CHINA
K-4330KINGSTONC_TOILETSVITREOUS CHINA
MECH
SHAFT
PIPE
SHAFT
X X
X
X X X
X
X X
X
OS
A A A
B
B
B
B
A
A
A
AA
AA
AAAA
AAAA
AA
AA
AA
D
D
B
B B
B
D
A
AA
AA
AA
A
B
BBBB B BB B B B B
A A
A
A
AA
A
B
F
AA
A
A
A
A
A
A
A
A
A
A
B
A
A
A
A
A
A
A A
B B B
B
B
B
A A
A A
AA
AA
A
A A A
A A
A
SP
F
SP
SP
C
C
OS OS
OSOS
OS
OS
OS
OS
OS
OS
OS
OS OS
OS OS OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS OS
OS OS
TV
N 2
N I
N 2
N 2N 2N 2N 2
N 2 N 2 N 2
N L
N M
N L
N L N L
N L NL
N L
SP
F
N I
N 2 N
N I
N I
N 2 N 2
S3
S3S3S3S3S3 S3S3S3
S1S1
S1
S1S1
S1
S2S2S2
S2S2S2
S1
S1 S1S1 S1
SE
SP
SP
N L
SP
F
SP
F
SP
F SP
F
EX
EX
N L
EX
EX
EX
EX
EX EX
EX
EX
S3
N N
L N
L
DT
DTDT
E1
LL
DT
1515 15
SP SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
ER
TREATMENT
RECEPTION
THERAPIST
HALLWAY
4143P
TREATMENT
TREATMENT
SPEECH
THERAPY
CHIRO
TREATMENT
ADL
TOILET
4142ACHIRO
TREATMENT
ADL
TREATMENT
STORAGE
ALCOVE
CLEAN
SUPPLY
PHYSICAL
THERAPY
GYMNASIUM
TECH.
WORK
ROOM
DATA &
PHONE
PT/RT
STORAGE
STAFF
LOCKER
ROOM
EQUIPMENT
STORAGE
STAFF
LOUNGE
RESP.
THERAPY
ROOM
CHIEF,
PROSTHETICS
SOILED
UTILITY
RESPIRATORY
THERAPIST
SUPPLY
ALCOVE
4134A
PROSTHETICS
STORAGE
CORRIDOR
4205C
CORRIDOR
4129P
RECEIVING AND
ASSEMBLY
CHECK-IN
CLERKS
AND WORK
STATIONS
PM&R
WAITING
AREA
PM&R
CHIEF
CHECK-IN
CLERKS
WOMENS
TOILET
MENS
TOILET
TOILET
FAMILY
BREAK
AREA
4107A
NURSING
ROOM
4116A
STERILE
SUPPLY
HSKPG
CLOSET
ELEVATOR
LOBBY
CARDIO-P
WAITING
PFL
STRESS
TEST
PASSAGE
4280P
BLOOD
GAS
TOILET
EDUCATION/
CHART ROOM
NUTRITION
OFFICE
LOCKER
DRESSING
ROOM
4282A EQUIPMENT
MED/SURG
(4E) WAITING
ROOM
ISOLATION
ROOM
PT.
TOILET
4205A
ANTI-ROOM
SEMI-PRIVATE
OBSERVATION
MED/SURG #2
TOILET
4211A
TOILET
4215A
PHYS
CHART
OFFICE
SOCIAL
WORKER
STERILE
SUPPLY
STAFF
TOILET
TOILET
4216A
MED/SURG
#3
MED/SURG
BED
MED/SURG
BED
MED/SURG
BED
MED/SURG
BED
MED/SURG
BED
TOILET
4270A
TOILET
4268A
TRAINING
ROOM
MEDS
COMMUNICATOR
NOURISH
CONSULT
ROOM
TOILET
4262A
HSKPG
CART
ALCOVE
ON-CALL
ROOM
CORRIDOR
4212C
CORRIDOR
4260C
PHONE
& DATA
NURSE
STATION
NURSE
STATION
SUPPLY
ICU
ANTEROOM
4271A
ELEVATOR
LOBBY
OFFICE
MED/ SURG #11
NURSE
STATION
MED/ SURG #10
MED/ SURG #9
SOILED
TOILET
4250A
TOILET
4245A
TOILET
4251A
PASSAGE
4242P
NURSE
MANAGER
TUB
ROOM
BARIATRIC
M/S #4
TOILET
4233A
TOILET
4237A
BARIATRIC
M/S #5
MED/SURG #6
MED/SURG #7
MED/SURG #8
STORAGE
CLEAN
LINEN
TOILET
4236A
NURSE
STATION
TOILET
4234A
PASSAGE
4230P
NURSE
STATION
FOURTH FLOOR NEW WORK PLAN
E109
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
UPGRADE POTABLE WATER
RISERS
OSCAR G. JOHNSON VAMC
585-19-118
Project Director
DECEMBER 23, 2021Revisions: Date:
50% DESIGN SUBMITTAL 10-09-2020
6163.01
ADDENDUM 1
95% DESIGN SUBMITTAL 06-30-2021
100% DESIGN SUBMITTAL 10-20-2021
ADDENDUM 1 12-23-2021
ADDENDUM 2 1-10-2022
MLL NMP
E109
F1 FOURTH FLOOR NEW WORK PLAN
1/8" = 1'-0" 4'0" 2' 8' 12'
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
1 REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID
ONCE NEW MECHANICAL WORK IS COMPLETE.
(THIS SHEET ONLY)
GENERAL PLAN NOTES
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .