S06 - 585-19-118 - Att - Electrical Drawings 011122.pdf

PDF 4 MB Posted

Attached to
Z1DA--Project# 585-19-118 Upgrade to Potable Water Risers Construction
Solicitation number
36C25221B0032
Issued by

About this file

This notice announces a forthcoming solicitation for construction services. The Oscar G. Johnson VA Medical Center seeks a contractor to install new potable water risers and associated isolation valves at an estimated cost between $1 million to $5 million. Work includes architectural, testing, and general construction aspects per drawings and specifications. Interested parties should attend a site visit between October 25-29, 2021. The solicitation will publish to SAM.gov on October 7th with bid opening tentatively scheduled for December 2, 2021. Pursuant to Public Law 109-461, this opportunity is set aside solely for verified Service-Disabled Veteran Owned Small Businesses.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MA

TC

HL

INE

MA

TC

HL

INE

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

CHAPEL

VESTIBULE

1100A

DAV

AMERICAN LEGION/

ADVOCATE

PATIENT

ADVOCATE

PATIENT

HEART

PURPLE

CHASE

CLOSET/PIPE

1182A

CLOSET

1182B

OFFICE

CHAPLAIN

KITCHENETTE

SERVICE

ELEVATOR PASSENGER

ELEVATOR

LOBBY

UP

DN

UP

DN

NURSE STA.

STORAGE

CLOTHING

CONST.

UNDER

CONST.

UNDER

1034A

SEMI-PRIVATE

TOILET

1036A

SEMI-PRIVATE

SEMI-PRIVATE

SEMI-PRIVATE

SEMI-PRIVATE

TOILET

1038A

TOILET

1040A

TOILET

1042A

TOILET

1044A

TOILET

STAFF

NURSE STA.

PRIVATE

TOILET

1052A

ELECT. ROOM

SUPPLY

STRERILE

NURSE STA.

STOR.

EQUIP.

LINEN

CLEAN

CLOSET

UTILITY

SEMI-PRIVATE

PRIVATE

PRIVATE

PRIVATE

SEMI-PRIVATE

PRIVATE

PRIVATE

SEMI-PRIVATE

SEMI-PRIVATE

TOILET

1055ATOILET

1051A

TOILET

1002A

TOILET

1006A

TOILET

1008A

TOILET

1010A

TOILET

1020A

TOILET

1024A

TOILET

1028A

STORAGE

EQUIP.

STAFF TOILET

1148B

LOCKERROOM

1148A

STAFF LOUNGE

STORAGE

RECR. THER.

WORKER

SOCIAL

STATION

MAIN NURSE

BATHING/SPA

THERAPY OFF.

RECREATION

1147A

ROOM

ACTIVITY/GROUP

LINEN CHUTE

CORRIDOR

PRIVATE

ASSISTANT

PROGRAM

PRIVATE

TOILET

1136A

TOILET

1135A

NURSE STA.

TOILET

1132A

PRIVATE

1132 PRIVATE

PRIVATE

PRIVATE

TOILET

1131A

TOILET

1128A

TOILET

1127A

CLOSET

UTILITY

1121 SATELLITE CLINIC

PHYSICAL THERAPY

PRACTIONER

NURSE

1111A

WORKER

SOCIAL

1109A

TOILET

UNISEX

STORAGE

OXYGEN

STORAGE

EQUIPMENT

SEMI-PRIVATE

ROOM

CONFERENCE

PRIVATE

PRIVATE

TOILET

1170A

TOILET

1166A

TOILET

1175A

TOILET

1171A

STOR.

IV

COORDINATOR

MDS/RESTORIV

MANAGER

NURSE

THERAPY OFFICE

OCCUPATIONAL

1165A

ADL BATH

1165B

BEDROOM

ADL OT AREA/

MEDS ROOM

DA

TA

C

LO

SE

T

CLEAN LINEN

1120 CLOSET

UTILITY

& RECREATION AREA

RESIDENT DINING

STORAGE

1116A

KITCHEN

RESIDENT

1116B

STORAGE

LOCKERS

1105A

CHASE

CHASE

ROOM

PRIVATE

PRIVATE

PRIVATE

TOILET

1025A

TOILET

1029A

PRIVATE

TOILET

1009A

TOILET

1005A

TU

BE

ST

AT

ION

FI

RE

PL

AC

E

DAY ROOM

AHU-01

MECH. RM.

MED-GAS

CHASE

MECH.

SHAFT

MECH.

SHAFT

UP

MA

TC

HL

INE

MA

TC

HL

INE

STAIR 1

STAIR 5

A

OSOS

OSOS

SP

SP

SP

SP

C1

N D

ND

N D

(ON BASEMENT ROOF)

(ON BASEMENT ROOF)

(ON BASEMENT ROOF)

(ON BASEMENT ROOF)

(ON BASEMENT ROOF)

(ON BASEMENT ROOF)

(ON BASEMENT ROOF)

(ON BASEMENT ROOF)

B

NN

C

C

C

C C

C

C

C

C

C

C

C

C

C

C

CC

C C

C

C

C

FIRST FLOOR DEMOLITION PLAN -

WEST

ED103

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

ED103

F1 FIRST FLOOR DEMOLITION PLAN - WEST

1/8" = 1'-0" 4'0" 2' 8' 12'

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A CUT BACK ONE EXISTING 3/4" CONDUIT AND #12 CONDUCTORS TO

ACCOMMODATE NEW MECHANICAL WORK. PROVIDE SPLICE BOX(ES),

CONDUIT AND WRING AS REQUIRED TO RE-ROUTE THE CONDUIT AND

WIRING AROUND THE NEW MECHANICAL WORK.

COORDINATE WITH PLUMBING TRADE TO TEMPORARILY REMOVE

EXISTING CAN LIGHT(S) WHICH ARE IN THE WAY OF NEW PIPING.

REINSTALL/RE-WIRE THE FIXTURE(S) AT PROJECT COMPLETION.

THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE

REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.

TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW

CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND

PLUMBING DEMO/NEW PLANS.

SYMBOL LIST

DWG. 52 OF 59

MLL NMP

B

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

SEE GENERAL NOTE 1 FOR

THIS AREA. VA PROJECT

585-17-114 (UPGRADE CLC

PATIENT ROOM DESIGN).

C

MATCH LINE

SEE SHEET

FOR PLAN CONTINUATION

ED104

HL

INE

BASEMENT ROOF

UP

DN

CHAPEL

SACREMNT

HOLY

1284A

VESTIBULE

WEAPONS

1201C

OFFICE

MAIN

HOLDING

1201B

POLICE

CHIEF,

TOILET

MENS

TOILET

WOMENS

ROOM

PROCEDURE

ALCOVE

WORKROOM

NURSE

FD

UTILITY

SOILED

1267A

TOILET

PATIENT

1267B

TREATMENT

WOUND CARE

ROOM

WAITING

CASHIER

AGENT

1288A

ROOM

WAITING

OFFICE

TRAVEL

1286A

KITCHENETTE

GARAGE

AMBULANCE

LOCKERS

BREAK RM/

RM

EXAM

WORK RM

NURSE

ROOM

EXAM

ROOM

EXAM

RM

EXAM

WORKER

SOCIAL

RM

EXAM

/CONSULTATION

PT. EDUCATION

RM

DECON

MEDICATION

UTILITY

SOILED

TOILET

PATIENT

RM

TREATMENT

RM

TREATMENT

ROOM

TREATMENT

MEDICATION

/SECURITY RM.

FIRE ALARM

DIABETES

TOILET

PATIENT

LOBBY

ELEVATOR

TOILET

1224A

ROOM

COAT

OFFICE

PHARMACY

CHIEF

PHARMACY

LOUNGE

ROOM

IV

HOOD RM

HAZARD

1233A

& OFFICES

MED PREP

MED PREP

PHARMACY

PHARMACY

MAIN

VAULT

1228A

MED PREP

SECURE

TOILET

PATIENT

CLERKS

RM

EXAM

WORKRM

NURSE

RM

EXAM

ROOM

EXAM

RM

EXAM

DIABETES

SUPPLY

STERILE

ROOM

EXAM

ROOM

ANTE

1312A

STATION

NURSE

DICTATION

WORKRM

NURSE

RM

EXAM

RM

EXAM

LINEN

CLEAN

HOUSEKEEPING

TOILET

STAFF

ISOLATION

TREATMENT/

TREATMENT

SECURE

TOILET

WOMENS

EVIDENCE

1201A

LAB/EKG

BLOOD DRAW

LAB/EKG

BLOOD DRAW

PT. TOILET

1312B

EQUIPMENT

FIRE

EQUIP

LO

CK

ER

S

DN

PHARMACIST

CLINICAL

SUPPLY

PHARMACY

DISPENSING

OUTPATIENT

CLOSET

HSKPG

HSKPG

ELIGIBILITY

ENROLLMENT &

AREA

WAITING

AREA

CLERK

ELECTRICAL

CONSULTING

PHARMACY

DATA

DATA & PHONE

1218A

UP

UP

DN

DUMB

WAITER

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

VESTIBULE

1300B

VESTIBULE

1300A

LOBBY

EQUIPMENT

ELEVATOR

VESTIBULE

CORRIDOR

1299A

AREA

WAITING

CONSULTING

1218B

CONSULTING

1218C

CO

RR

ID

OR

TRIAGE

STORAGE

WHLCHR

VESTIBULE

MRI

1304A

LOCKERS

1105A

VOLUNTEER

AREA

LDRY

CHUTMECH.

CHASE

TOILET

STAFF

1340A

RM

CHANGING

1304C

RM

CHANGING

1304B

VESTIBULE

MRI

OFFICE

AOD

WAITING AREA

URGENT CARE

UP

CARPET

CARPET

CARPET

TILE

TILE

TILE

ROOM

EXAM

ROOM

EXAM

TOILET

PATIENT

ALCOVE

SCALE

TOILET

MENS

FE FE

ALCOVE

SCALE

ALCOVE

PYXIS

MECH

SHAFT

PASSENGER

ELEVATOR

CLEAN RM.

NON-HAZ./

1233B

D-4 D-5

MA

TC

HL

INE

TRIAGE

ALCOVE

H/W

PHARM

CLINICAL

PHARM

CLINICAL

OFFICE

MENTAL HLTH

ALCOVE

PHARM

CLINICAL

WORKROOM

NURSE

CONNECTION

TOILET

PATIENT

TOILET

PATIENT

HSKP

ROOM

ELECTRICAL

(VA)

IT ROOM

CORRIDOR

CORRIDOR

CONFERENCE

HOLDING

SOILED

UTILITY

CLEAN

EXAM

EXAM

EXAM

EXAM

HALLWAY

CORRIDOR

SUB-WAIT

1499A

WC ALCOVE

STAIR 3

STAIR 2

STAIR 4

OPC NURSE CALL PNL

FIRE ALARM TRANSPONDER PNL

SECURITY SYSTEM

SMOKING SHELTER

(20/1 EACH, 4#10,#10G,1"C.)

L1A-82,84

L1D

L1C

CR1A

ED NURSE CALL PNLFIRE ALARM AUX PNL

LIGHTING CONTROL "LCP1B"

LIGHTING CONTROL "LCP1A"

STACKED PNLS

SECURITY SYSTEM

CONTROL PANEL

CONTROL PANEL

M M1 L1A(R) L1A(L)

CR1EQ1LS1

E1S

E1C

SECURITY SYSTEM

CONTROL PANEL

SP

N D

N D

N D

N D

N D

SP

C1

OSOS

OSOS

OSOS

OPC NURSE CALL PNL

FIRE ALARM TRANSPONDER PNL

ED NURSE CALL PNLFIRE ALARM AUX PNL

LIGHTING CONTROL "LCP1B"

LIGHTING CONTROL "LCP1A"

STACKED PNLS

S

OSOS

C

C

C

C

C

C

C C

C

C

C

C

C C

C

C

CC

C C

FIRST FLOOR DEMOLITION PLAN -

EAST

ED104

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

MLL NMP

ED104

F1 FIRST FLOOR DEMOLITION PLAN - EAST

1/8" = 1'-0" 4'0" 2' 8' 12'

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A CUT BACK ONE EXISTING 3/4" CONDUIT AND #12 CONDUCTORS TO

ACCOMMODATE NEW MECHANICAL WORK. PROVIDE SPLICE BOX(ES),

CONDUIT AND WRING AS REQUIRED TO RE-ROUTE THE CONDUIT AND

WIRING AROUND THE NEW MECHANICAL WORK.

COORDINATE WITH PLUMBING TRADE TO TEMPORARILY REMOVE

EXISTING CAN LIGHT(S) WHICH ARE IN THE WAY OF NEW PIPING.

REINSTALL/RE-WIRE THE FIXTURE(S) AT PROJECT COMPLETION.

THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE

REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.

TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW

CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND

PLUMBING DEMO/NEW PLANS.

SYMBOL LIST

B

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

C

MATCH LINE

SEE SHEET

FOR PLAN CONTINUATION

ED103

DWG. 53 OF 59

BASEMENT ROOF

BASEMENT ROOF

FD FD FD

DWV

ELEC

CABINET

FD

DN

UP

DN

UP

UP

DN

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

1st. FLOOR ROOF

MECH.

SHAFT

SUB-STERILIZER

MECH SPACE

MECH. RM. 1400

ROOF

MA

TC

HL

INE

MA

TC

HL

INE

FIRST FLOOR ROOF

BASEMENT ROOF

FD

BASEMENT ROOF

STAIR 1

STAIR 2

STAIR 5

A

A

A

A

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

2145A

CORRIDOR

OFFICE

OFFICE

OFFICE

STAFF

LOUNGE

BIOMED

DATA

DATA AND

PHONE

TREATMENT

TREATMENT

SOILED

UTILITY

TREATMENT

TREATMENT

TREATMENT

TREATMENT

PT.

TOILET

2176A

TREATMENT

CLEAN

SUPPLY

NURSE

STATION

PACS

VIEW

TOILET

STERILE

SUPPLY

2171A

WAITING

ROOM

HALLWAY

CHECK-IN

CLERKS

WOMEN

MEN

WHEELCHAIR

ALCOVE

HSKG

CLOSET

CORRIDOR

2299B

WOMEN

2112A

LAUNDRY

CHUTE

TOILET

2143A

PACU

BED #8

2129K

PACU

BED #8

2129L

OR

SUPERVISOR

WOMEN

LCKR/

SHOWER

RM.

MEN

LCKR/

SHOWER

RM.

EQUIP.

STORAGE

SOILED

UTILITY

ANESTHESIA

WORK ROOM

BLANKET

WARMER

2110D

SEMI-RESTRICTED

CORRIDOR

MECHANICAL

MEN

2111A

CORRIDOR

2299H

PRE/POST

BED #1

2129A

PRE/POST

BED #2

2129B

PRE/POST

BED #3

2129C

PRE/POST

BED #4

2129D

EQUIPMENT

STORAGE

NURSING

STATION

PRE/POST

BED #7

2129G

PRE/POST

BED #6

2129F

PRE/POST

BED #5

2129E

STERILE

SUPPLY

CLEAN

SUPPLY

PT.

TOILET

PT.

TOILET

2131 SOILED

UTILITY

PRE/POST

CORRIDOR

TREATMENT

OPERATING

ROOM

OPERATING

ROOM

HSKG

CLOSET

STERILE

SUPPLY

CLEAN

SUPPLY

CART

ALCOVE

2110C

CART

ALCOVE

2110A

ENDOSCOPY

SCRUB

2105A

SUB-

STERILE

2101A

GOWNING

ALCOVE

SECOND FLOOR DEMOLTION

PLAN - WEST

ED105

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

ED105

F4 SECOND FLOOR DEMOLTION PLAN - WEST

1/8" = 1'-0"

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE

REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.

TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW

CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND

PLUMBING DEMO/NEW PLANS.

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

MATCH LINE

SEE SHEET

FOR PLAN CONTINUATION

ED106

4'0" 2' 8' 12'

FIRST FLOOR ROOF

UP

DN

UP

DN

ROOF

MECH

CHASE

PASSENGER

ELEVATOR

DN

UP

OPEN TO FIRST

FLOOR

MECH.

SHAFT

CHASE

CHASE

PASSENGER

ELEVATOR

MECH.

SHAFT

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

FOLDING

WALL

FIRST FLOOR ROOF

FIRST FLOOR ROOF

STAIR 3

STAIR 4

OS

ENDOSCOPY

CYSTOSCOPY

SCRUB

ALCOVE

2110B

DUMBWAITER/

CART

ALCOVE

HSKG

CLOSET

DATA

AND

PHONE

HSKG

PACS

VIEWING

CLEAN

SUPPLY

STERILE

CLEAN

ULTRASOUND

PATIENT

TOILET

ULTRASOUND

IMAGING

CHIEF

STAFF

LOUNGE

AND

LOUNGE

CHANGING

ROOM

2245A

CONTROL

ROOM

2242A

EQUIPMENT

ALCOVE

2230B

PT.

TOILET

2242B

PACS

VIEWING

STRESS

TEST

TECH

WORK

ROOM

UTILITY

CORRIDOR

2230P

PT.

TOILET

PNUEMATIC

TUBE COMP.

CORRIDOR

C2-1

PACS WORK

STATION

CLERK

CHECK-IN

PACS

COMPUTERS

2215A

WAITING

AREA

EQUIPMENT

ALCOVE

2230A BONE

DENSITY

TECH

WORK

ROOM

WOMEN

TOILET

MEN

TOILET

CHANGING

ROOM

PT.

TOILET

STORAGE

2263B

GE CT

SCANNER

CONTROL

ROOM

2263A

CONTROL

ROOM

2261A

RADIOLOGY

CORRIDOR

C2-2

ELEVATOR

LOBBY

ACCUPUNCTURE

EXAM ROOM

SOCIAL

WORKER

STAFF

LOUNGE

STERILE

SUPPLY

CLEAN

SUPPLY

SOCIAL

WORKER

DATA

CLOSET

2306 ACCUPUNCTURE

EXAM ROOM

EYE

PRE-TREATMENT

EYE

PRE-TREATMENT

OFFICE

SUB-WAIT

AREA

PATIENT

TOILET

2335A

MENTAL

HEALTH

EXAMS

CHEMOTHERAPY

RADIOLOGY

FLUOROSCOPY

CT

SCAN

CONTROL

CT

SCAN

NUCLEAR

MEDICINE

HOT

LAB

2254A

MECHANICAL

2307A

MECHANICAL

HSKG

CLST

ELECTRICAL

ROOM

LANE

ROOM

LANE

ROOM

LANE

ROOM

EYE

INSTRUMENTS

TELE-HEALTH

EXAM ROOM

TELE-HEALTH

EXAM ROOM

TELE-HEALTH

EXAM ROOM

SOILED

LINEN

SUB-WAIT

AREA

TELE-HEALTH

EXAM ROOM

TELE-HEALTH

EXAM ROOM

MENS

TOILET

STAFF

TOILET

2358 WOMENS

HEALTH

EXAM

WOMENS

HEALTH

EXAM

TOILET

NEUROLOGY

EXAM

ROOM

CORRIDOR

NEUROLOGY

EXAM

ROOM

2364 NEUROLOGY

EXAM

ROOM

CLERKS

AREA

2374 STAFF

WORK AREA

2374A

WOMENS

TOILET

MEETING

ROOM

MEETING

ROOM

WAITING

AREA

FAMILY

RESTROOM

2338A

FAMILY

LOUNGE

WOMENS

HEALTH

EXAM

WOMENS

HEALTH

EXAM

WOMENS

HEALTH

EXAM

CORRIDOR

LAUNDRY

CHUTE

CORRIDOR

2252P

ONCOLOGY

EXAM/OFFICE

ONCOLOGY

EXAM/PROC.

A

A

A

A A

A

A

SECOND FLOOR DEMOLITION

PLAN - EAST

ED106

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

MATCH LINE

SEE SHEET

FOR PLAN CONTINUATION

ED105

ED106

F3 SECOND FLOOR DEMOLTION PLAN - EAST

1/8" = 1'-0" 4'0" 2' 8' 12'

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE

REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.

TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW

CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND

PLUMBING DEMO/NEW PLANS.

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

2ND FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

DN

UP

FIRE

EQUIP

RAMP

UP 7"

FLOOR

UP 7"

AUDIOLOGY

SOUND BOOTH

AUDIOLOGY

SOUND BOOTH

CARPET

VINYL TILE

STAIR 1

STAIR 2

DN

UP

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

MECH.

SHAFT

MECH

SHAFT

MECH

SHAFT

AUDIOLOGY

SOUND BOOTH

AUDIOLOGY

SOUND BOOTH

UPDN

LDRY

CHUT

STAIR 5

2ND FLOOR ROOF

MA

TC

HL

INE

MA

TC

HL

INE

B

A

OS

OS

OS

OSSP

SP

SP

SP

C3

CPA CPB

W3B W3A

W3A J-BOX

TQL-A

CR-3EB2

EX

C C

C

C

C

C C C

C

C

C

C

C

HSKG

PSYCHOLOGIST

SOCIAL

WORKER

HSKG

UTILITY

3142A

PSYCHOLOGIST

SOCIAL

WORKER

SOCIAL

WORKER

PSYCHOLOGIST

SOCIAL

WORKER

B.H.

ADMIN.

MEDIA

STORAGE

TOILET

B.H.

SOCIAL

WORKER

SOCIAL

WORKER

B.H.

ADMIN.

B.H.

PHARMACIST

PSYCHOLOGIST

B.H.

B.H.

PSYCHIATRIST

PSYCHIATRIST

B.H. VOC

REHAB

B.H.

PEER

CORRIDOR

3199B-1

WOMENS

TOILET

3165 MENS

TOILET

B.H.

CONFERENCE

ROOM

PSYCHOLOGIST

SOCIAL

WORKER

SOCIAL

WORKER

SOCIAL

WORKER

SOCIAL

WORKER

STORAGE

SOILED

LINEN

CORRIDOR

3199A-1

ADMIN.

OFFICER

BREAK

ROOM

B.H. ADMIN.

SUPPORT

PSYCHOLOGIST/

CHIEF, B.H.

PSYCHOLOGIST/

ASST. CHIEF B.H.

B.H.

TELE-HEALTH

B.H.

TELE-HEALTH

CORRIDOR

3199C-1

DATA &

PHONE

SUPPLY

CLOSET

SUPPLY

B.H.

TELE-HEALTH

PSYCHOLOGIST

AND INTERNS

B.H.

PEERS

AUDIOLOGY

CHECK-IN

3184C

AUDIOLOGY

WAITING AREA

AUDIOLOGY

WAITING

ROOM

3184B

TECHNICIAN

WORK

ROOM

3184A AUDIOLOGY

OFFICE

3280A

SPEECH

THERAPY

HEARING

TESTING

WHOLE HEALTH

GROUP ROOM

CORRIDOR

3299A-1

CORRIDOR

B.H. GROUP

ROOM

B.H. GROUP

ROOM

B.H.

CHECK-OUT

CLERK

B.H., NURSING,

AUDIOLOGY

WAITING ROOM

RECEPTION

CLERKS

3105A

WOMEN

MEN

THIRD FLOOR DEMOLITION PLAN

- WEST

ED107

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

ED107

F3 THIRD FLOOR DEMOLITION PLAN

1/8" = 1'-0"

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A CUT BACK ONE EXISTING 3/4" CONDUIT AND #12 CONDUCTORS TO

ACCOMMODATE NEW MECHANICAL WORK. PROVIDE SPLICE BOX(ES),

CONDUIT AND WRING AS REQUIRED TO RE-ROUTE THE CONDUIT AND

WIRING AROUND THE NEW MECHANICAL WORK.

COORDINATE WITH PLUMBING TRADE TO TEMPORARILY REMOVE

EXISTING CAN LIGHT(S) WHICH ARE IN THE WAY OF NEW PIPING.

REINSTALL/RE-WIRE THE FIXTURE(S) AT PROJECT COMPLETION.

THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE

REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.

TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW

CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND

PLUMBING DEMO/NEW PLANS.

SYMBOL LIST

B

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

C

4'0" 2' 8' 12'

DWG. 54 OF 59

MATCH LINE

SEE SHEET

ED108

OS

SP

SP

ROOM

MECHANICAL

2ND FLOOR ROOF

2ND FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

FIRE

EQUIP

LDRY

CHUT

DUCT

DUMB

WAITER

DN

UP

STAIR 3

STAIR 4

UP DN

PASSENGER

ELEVATOR

MECH

SHAFT

2ND FLOOR ROOF

MECH

SHAFT

MECH

SHAFT

MA

TC

HL

INE

MA

TC

HL

INE

SECOND FLOOR ROOF

HSKG

WHOLE HEALTH

TELE-HEALTH

EXAM ROOM

NURSE

STATION

TELE-HEALTH

TELE-HEALTH

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

STERILE

SUPPLY

WAITING

AREA

CORRIDOR

3299C-1

TELE-HEALTH

STAFF OFFICE

MSA

OFFICE

BIO-MED

CLOSET

DATA &

PHONE

STAFF

LOUNGE AND

LOCKERS

CORRIDOR

TOILET

CORRIDOR

MEN

TOILET

3225A

CLERK/

WORK

WAITING

ROOM

PASSAGE

3237A

CHIEF,

DENTAL

OPERATORY

OPERATORY

OPERATORY

X-RAY

OPERATORY

OPERATORY

OPERATORY

CONTROL

3228A

PASSAGE

CLEAN

STORAGE

STERILE

SOILED

LAB

CORRIDOR

3299B-1

NURSE

EDUCATION

TRAINING

ROOM

NURSE

EDUCATION

TRAINING

ROOM

PASSAGEWAY

NURSE

EDUCATION

OFFICE

NURSE

TRAINING

ROOM

3245NURSE

ED. STOR.

TOILET

3246A

TOILET

3250A

SOILED

UTILITY

CLEAN

SUPPLY

MECHANICAL

ROOM

HSKG

STORAGE

ELEVATOR

LOBBY

MECH.

3244-A

A A A A

A

A A

A

THIRD FLOOR DEMOLITION PLAN

- EAST

ED108

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

ED108

F3 THIRD FLOOR DEMOLITION PLAN - EAST

1/8" = 1'-0"

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE

REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.

TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW

CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND

PLUMBING DEMO/NEW PLANS.

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

MATCH LINE

SEE SHEET

FOR PLAN CONTINUATION

ED107

4'0" 2' 8' 12'

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

C_LAVATORY

AutoCAD SHX Text

KINGSTON

AutoCAD SHX Text K-2005

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOFFIRST FLOOR ROOFFIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

MECH

SHAFT

DUMB

WAITER

DN

STAIR 5

DN

UP

STAIR 2

DN

STAIR 4

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

SERVICE

ELEVATOR

UPUP

DN

UP

STAIR 1 STAIR 3

UP

DN

LDRY

CHUT

MECH

SHAFT

MECH

SHAFT

3RD FLOOR ROOF

FIRE

EQUIP

MECH

SHAFT

PASSENGER

ELEVATOR

K-4330KINGSTONC_TOILETSVITREOUS CHINA K-4330KINGSTONC_TOILETSVITREOUS CHINA

K-4330KINGSTONC_TOILETSVITREOUS CHINA

MECH

SHAFT

PIPE

SHAFT

OS

OS

N

N

SP

SP

F

E1

DT

SP

SP

SP

A

A

A A

A

AA

A

AA

A

A

A

A A

A

A

A

A

A

A

A

A

FOURTH FLOOR DEMOLITION

PLAN

ED109

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

ED109

F1 FOURTH FLOOR DEMOLITION PLAN

1/8" = 1'-0"

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE

REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.

TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW

CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND

PLUMBING DEMO/NEW PLANS.

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

4'0" 2' 8' 12'

5th FLOOR ROOF

3RD FLOOR ROOF

2ND FLOOR ROOF

2ND FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

4TH FLOOR ROOF

BASEMENT ROOF

DN

LDRY

CHUT

FIRE

EXTG.

FIRE

EXTG.

FIRE

EXTG.

UP

DN

STAIR 2

STAIR 1

STAIR 3

DN

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

SERVICE

ELEVATOR

5th FLOOR ROOF

PIPE

SHAFT

MECH.

SHAFT

LDRY

CHUT MECH.

SHAFT

5th FLOOR ROOF

PIPE

CHASE

SP

SP

N

COUNSELING

ROOM

6105A

COMMUNITY

CARE/CHOICE

COMMUNITY

CARE/CHOICE

6120A

MECH.

HSKG

STORAGE

STAFF

BREAK

ROOM

6120B

DATA &

PHONE

COMM.

CARE/CHOICE

SPVSR

ESCORTS

TRAINING

SPECIALIST

COMPUTER

TRAINING

6206C

PIV

OFFICE

COMM.

CARE/CHOICE

SPVSR

STORAGE

6112A

VOC

REHAB

6206A

VOC

REHAB

6206B

WALK-IN

COOLER

6210A

MICROBIOLOGY

CLEAN

SUPPLY

VOC

REHAB

ACCESSIONING

HISTOLOGY

TELEPATHOLOGY

BLOOD

BANK

STAFF

WORK

STATIONS

PASSAGE

DATA

ROOM

6222B

LABORATORY

COMM.

CARE/CHOICE

COMMUNITY

CARE/CHOICE

DRIVER

LOUNGE

CHIEF,

VOLUNTARY

SERVICES

6107A ADMIN.

ASSIST.

VOL. SERV.

NURSING

WORK

STATIONS

WOMENS

RESTROOM

MENS

RESTROOM

COMMUNITY

CARE WORK

STATIONS

RECEPTION

TOILET

BLOOD

DRAW

HSKG

CHIEF,

LAB

STAFF

LOUNGE

STORAGE

MECH

6226A

HSKG

SOILED

UTILITY

A

SIXTH FLOOR DEMOLITION PLAN

ED110

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

ED110

F1 SIXTH FLOOR DEMOLITION PLAN

1/8" = 1'-0" 4'0" 2' 8' 12'

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A THE EXISTING CEILING GRID AND TILES IN THE AREA SHALL BE

REMOVED TO ACCOMMODATE NEW MECHANICAL WORK.

TEMPORARILY SUPPORT THE EXISTING FIXTURES UNTIL THE NEW

CEILING IS INSTALLED. REFERENCE THE ARCHITECTURAL AND

PLUMBING DEMO/NEW PLANS.

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

HL

INE

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

CHAPEL

VESTIBULE

1100A

DAV

AMERICAN LEGION/

ADVOCATE

PATIENT

ADVOCATE

PATIENT

HEART

PURPLE

CHASE

CLOSET/PIPE

1182A

CLOSET

1182B

OFFICE

CHAPLAIN

KITCHENETTE

SERVICE

ELEVATOR PASSENGER

ELEVATOR

LOBBY

UP

DN

UP

DN

NURSE STA.

STORAGE

CLOTHING

CONST.

UNDER

CONST.

UNDER

1034A

SEMI-PRIVATE

TOILET

1036A

SEMI-PRIVATE

SEMI-PRIVATE

SEMI-PRIVATE

SEMI-PRIVATE

TOILET

1038A

TOILET

1040A

TOILET

1042A

TOILET

1044A

TOILET

STAFF

NURSE STA.

PRIVATE

TOILET

1052A

ELECT. ROOM

SUPPLY

STRERILE

NURSE STA.

STOR.

EQUIP.

LINEN

CLEAN

CLOSET

UTILITY

SEMI-PRIVATE

PRIVATE

PRIVATE

PRIVATE

SEMI-PRIVATE

PRIVATE

PRIVATE

SEMI-PRIVATE

SEMI-PRIVATE

TOILET

1055ATOILET

1051A

TOILET

1002A

TOILET

1006A

TOILET

1008A

TOILET

1010A

TOILET

1020A

TOILET

1024A

TOILET

1028A

STORAGE

EQUIP.

STAFF TOILET

1148B

LOCKERROOM

1148A

STAFF LOUNGE

STORAGE

RECR. THER.

WORKER

SOCIAL

STATION

MAIN NURSE

BATHING/SPA

THERAPY OFF.

RECREATION

1147A

ROOM

ACTIVITY/GROUP

LINEN CHUTE

CORRIDOR

PRIVATE

ASSISTANT

PROGRAM

PRIVATE

TOILET

1136A

TOILET

1135A

NURSE STA.

TOILET

1132A

PRIVATE

1132 PRIVATE

PRIVATE

PRIVATE

TOILET

1131A

TOILET

1128A

TOILET

1127A

CLOSET

UTILITY

1121 SATELLITE CLINIC

PHYSICAL THERAPY

PRACTIONER

NURSE

1111A

WORKER

SOCIAL

1109A

TOILET

UNISEX

STORAGE

OXYGEN

STORAGE

EQUIPMENT

SEMI-PRIVATE

ROOM

CONFERENCE

PRIVATE

PRIVATE

TOILET

1170A

TOILET

1166A

TOILET

1175A

TOILET

1171A

STOR.

IV

COORDINATOR

MDS/RESTORIV

MANAGER

NURSE

THERAPY OFFICE

OCCUPATIONAL

1165A

ADL BATH

1165B

BEDROOM

ADL OT AREA/

MEDS ROOM

DA

TA

C

LO

SE

T

CLEAN LINEN

1120 CLOSET

UTILITY

& RECREATION AREA

RESIDENT DINING

STORAGE

1116A

KITCHEN

RESIDENT

1116B

STORAGE

LOCKERS

1105A

CHASE

CHASE

ROOM

PRIVATE

PRIVATE

PRIVATE

TOILET

1025A

TOILET

1029A

PRIVATE

TOILET

1009A

TOILET

1005A

TU

BE

ST

AT

ION

FI

RE

PL

AC

E

DAY ROOM

AHU-01

MECH. RM.

MED-GAS

CHASE

MECH.

SHAFT

MECH.

SHAFT

UP

MA

TC

HL

INE

STAIR 1

STAIR 5OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

SP

SP

SP SP

SP

SP

SP SP

SP

SP

SP

SP

SP

SP

SP SP

SP SP

SP SP

SP

SP

SP

SP

SP SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

C1

J

J

J

N D N D N D N D N D N D

N D

N D

N D

N D

N D

N D

N D ND

ND

N D

N D

ND

ND ND

ND N D N D N D

N CB

N D

N D

ND

N D

N D

N DND

ND

ND

ND

N D

N D

N DN DN DN D

N D

ND

OS

SP

EX

E

NN

2 2

2 2

FIRST FLOOR NEW WORK PLAN -

WEST

E103

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

MLL NMP

E103

F1 FIRST FLOOR NEW WORK PLAN - WEST

1/8" = 1'-0"

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

1 REINSTALL/RE-WIRE THE CAN LIGHT(S) WHICH WERE REMOVED

DURING DEMOLITION.

LAY EXISTING FIXTURE(S) BACK INTO THE GRID ONCE NEW

MECHANICAL WORK IS COMPLETE.

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

4'0" 2' 8' 12'

DWG. 57 OF 59

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

MATCH LINE

SEE SHEET

E104

HL

INE

BASEMENT ROOF

CHAPEL

SACREMNT

HOLY

1284A

VESTIBULE

1100A

WEAPONS

1201C

OFFICE

MAIN

HOLDING

1201B

POLICE

CHIEF,

TOILET

MENS

TOILET

WOMENS

ROOM

PROCEDURE

ALCOVE

WORKROOM

NURSE

FD

UTILITY

SOILED

1267A

TOILET

PATIENT

1267B

TREATMENT

WOUND CARE

ROOM

WAITING

CASHIER

AGENT

1288A

ROOM

WAITING

OFFICE

TRAVEL

1286A

KITCHENETTE

GARAGE

AMBULANCE

LOCKERS

BREAK RM/

RM

EXAM

WORK RM

NURSE

ROOM

EXAM

ROOM

EXAM

RM

EXAM

WORKER

SOCIAL

RM

EXAM

/CONSULTATION

PT. EDUCATION

RM

DECON

MEDICATION

UTILITY

SOILED

TOILET

PATIENT

RM

TREATMENT

RM

TREATMENT

ROOM

TREATMENT

MEDICATION

/SECURITY RM.

FIRE ALARM

DIABETES

TOILET

PATIENT

LOBBY

ELEVATOR

TOILET

1224A

ROOM

COAT

OFFICE

PHARMACY

CHIEF

PHARMACY

LOUNGE

ROOM

IV

HOOD RM

HAZARD

1233A

& OFFICES

MED PREP

MED PREP

PHARMACY

PHARMACY

MAIN

VAULT

1228A

MED PREP

SECURE

TOILET

PATIENT

CLERKS

RM

EXAM

WORKRM

NURSE

RM

EXAM

ROOM

EXAM

RM

EXAM

DIABETES

SUPPLY

STERILE

ROOM

EXAM

ROOM

ANTE

1312A

STATION

NURSE

DICTATION

WORKRM

NURSE

RM

EXAM

RM

EXAM

LINEN

CLEAN

HOUSEKEEPING

TOILET

STAFF

ISOLATION

TREATMENT/

TREATMENT

SECURE

TOILET

WOMENS

EVIDENCE

1201A

LAB/EKG

BLOOD DRAW

LAB/EKG

BLOOD DRAW

PT. TOILET

1312B

EQUIPMENT

FIRE

EQUIP

LO

CK

ER

S

PHARMACIST

CLINICAL

SUPPLY

PHARMACY

DISPENSING

OUTPATIENT

CLOSET

HSKPG

HSKPG

ELIGIBILITY

ENROLLMENT &

AREA

WAITING

AREA

CLERK

ELECTRICAL

CONSULTING

PHARMACY

DATA

DATA & PHONE

1218A

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

VESTIBULE

1300B

VESTIBULE

1300A

LOBBY

EQUIPMENT

ELEVATOR

VESTIBULE

CORRIDOR

1299A

AREA

WAITING

CONSULTING

1218B

CONSULTING

1218C

CO

RR

ID

OR

TRIAGE

STORAGE

WHLCHR

VESTIBULE

MRI

1304A

LOCKERS

1105A LDRY

CHUT

TOILET

STAFF

1340A

RM

CHANGING

1304C

RM

CHANGING

1304B

VESTIBULE

MRI

OFFICE

AOD

WAITING AREA

URGENT CARE

ROOM

EXAM

ROOM

EXAM

TOILET

PATIENT

ALCOVE

SCALE

TOILET

MENS

FE FE

ALCOVE

SCALE

ALCOVE

PYXIS

PASSENGER

ELEVATOR

CLEAN RM.

NON-HAZ./

1233B

D-4 D-5

MA

TC

HL

INE

TRIAGE

ALCOVE

H/W

PHARM

CLINICAL

PHARM

CLINICAL

OFFICE

MENTAL HLTH

ALCOVE

PHARM

CLINICAL

WORKROOM

NURSE

CONNECTION

TOILET

PATIENT

TOILET

PATIENT

HSKP

ROOM

ELECTRICAL

(VA)

IT ROOM

CORRIDOR

CORRIDOR

HOLDING

SOILED

UTILITY

CLEAN

EXAM

EXAM

EXAM

EXAM

CORRIDOR

SUB-WAIT

1499A

WC ALCOVE

OSOS

OSOS

R1

R1

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

R1

OSOSOSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOSOSOS

OSOS

OSOS

OSOS

OSOS

N

N

SP

SMOKING SHELTER

(20/1 EACH, 4#10,#10G,1"C.)

SP

L1A-82,84

SP

SP

SPSPSP

SP

SP

SP

SP

SP

SPSPSP

N D N D

N D

N D

N D

N D N D

N D

N D

N D

N D

N D N D

N D

N D

N D N D

N D N D N D

ND

N D

N D

N D

N D

N D

N D

N D

N D

N DN D

ND N D

N D

N D

N D

N D N D

N D

N D

N D

N D

N D N D N D

N D

N D

N D

N D

N D

N D N D

N D

N D

N D N D

SP

SP

SP

SP SPSP

SP

OSOS

SP SP

SPSP

SP

ER

SP

SP

SP

E

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

OSOS

MD

OSOS

OSOS

OSOS

S

S S

S

OSOS2

2 2

FIRST FLOOR NEW WORK PLAN -

EAST

E104

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

1 REINSTALL/RE-WIRE THE CAN LIGHT(S) WHICH WERE REMOVED

DURING DEMOLITION.

REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID

ONCE NEW MECHANICAL WORK IS COMPLETE.

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

E104

F1 FIRST FLOOR NEW WORK - EAST

1/8" = 1'-0" 4'0" 2' 8' 12'

MATCH LINE

SEE SHEET

FOR PLAN CONTINUATION

E103

DWG. 58 OF 59

N

S

NURSE CALL LIGHT

SPEAKER

TELEMETRY

CAN/SURFACE MOUNT FIXTURE

WI-FI

OCCUPANCY SENSOR

LINEAR/STRIP LIGHT

MOTOR

S

BASEMENT ROOF

FD FD FD

DWV

ELEC

CABINET

FD

DN

UP

DN

UP

UP

DN

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

1st. FLOOR ROOF

MECH.

SHAFT

SUB-STERILIZER

MECH SPACE

MECH. RM. 1400

ROOF

MA

TC

HL

INE

MA

TC

HL

INE

FIRST FLOOR ROOF

BASEMENT ROOF

FD

BASEMENT ROOF

STAIR 1

STAIR 2

STAIR 5

A

OS

OS OS

OS

H2 H2 H2 H2 H2

A

A

A

A

AA

A A

A A

AA

A A

AA

AA

A A

A

A A

A

A

A A

A A

A A

A

A A A

H2

A

H2

A A A A A

A A

A

A A

A A

A

A A

PP

G

G

G

B

B

B

B B

B

B

B

B B

B

B

B

B

B

B B B

C C C

B H H

H H

H H

H

H

B

H2 H2

L L

L

L

L2

L2

N N N

L2

RR

F

F

F

F

H

J

H

H

J

H

A

A

G

K

K

B

B

B

B

A A

A A

A

A

A

L2

AAA

A

A

A

K2

K2

K2

K2

K2K2

OS

B

B

K2

K2 K2

K2

K2

K2

K2

K2

K2

K2 K2

K2

K2

K2

K2

K2

U

F3

K

K

K

K

A

A

A

AA

JJ

A

OS

OS

OS

F3

AA AAAA

F3

OS OS

OS OS

F

OSOS

F3

K2

K2

F

F

F

F

F

F

F

F F

F

F

F F

F F

F F

F

N31 N31

SP

C

A

A A

A A

A

A

A A

A A

A

A

A A

A A

A A

A

A

G

G

A A

H

OS OS OS

OS OS

OS

F

F

F F

SP

SP SP

SP SP

SP

SP

SP

SP

SP

SP

SP

SP

SP SP

SP

SP

SP

SP

SPSPSPSP

SP

SP

SP

SP

N 2

N 2

N 2 N 2

N 2

N 2N 2

N 2

N 2

N 2

N 2

N 2

N 2

N 2

N 2

N I

N 2

N 2

N 2 N 2

N 2 N 2

N 2

N 2N 2

N I

N 2

EXEX

KLKL

KL

KL

KL KL KL

KL

KL

KL

KL

1 1

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

2145A

CORRIDOR

OFFICE

OFFICE

OFFICE

STAFF

LOUNGE

BIOMED

DATA

DATA AND

PHONE

TREATMENT

TREATMENT

SOILED

UTILITY

TREATMENT

TREATMENT

TREATMENT

TREATMENT

PT.

TOILET

2176A

TREATMENT

CLEAN

SUPPLY

NURSE

STATION

PACS

VIEW

TOILET

STERILE

SUPPLY

2171A

WAITING

ROOM

HALLWAY

CHECK-IN

CLERKS

WOMEN

MEN

WHEELCHAIR

ALCOVE

HSKG

CLOSET

CORRIDOR

2299B

WOMEN

2112A

LAUNDRY

CHUTE

TOILET

2143A

PACU

BED #8

2129K

PACU

BED #8

2129L

OR

SUPERVISOR

WOMEN

LCKR/

SHOWER

RM.

MEN

LCKR/

SHOWER

RM.

EQUIP.

STORAGE

SOILED

UTILITY

ANESTHESIA

WORK ROOM

BLANKET

WARMER

2110D

SEMI-RESTRICTED

CORRIDOR

MECHANICAL

MEN

2111A

CORRIDOR

2299H

PRE/POST

BED #1

2129A

PRE/POST

BED #2

2129B

PRE/POST

BED #3

2129C

PRE/POST

BED #4

2129D

EQUIPMENT

STORAGE

NURSING

STATION

PRE/POST

BED #7

2129G

PRE/POST

BED #6

2129F

PRE/POST

BED #5

2129E

STERILE

SUPPLY

CLEAN

SUPPLY

PT.

TOILET

PT.

TOILET

2131 SOILED

UTILITY

PRE/POST

CORRIDOR

TREATMENT

OPERATING

ROOM

OPERATING

ROOM

HSKG

CLOSET

STERILE

SUPPLY

CLEAN

SUPPLY

CART

ALCOVE

2110C

CART

ALCOVE

2110A

ENDOSCOPY

SCRUB

2105A

SUB-

STERILE

2101A

GOWNING

ALCOVE

SECOND FLOOR NEW WORK

PLAN - WEST

E105

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

E105

F4 SECOND FLOOR NEW WORK PLAN - WEST

1/8" = 1'-0"

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

1 REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID

ONCE NEW MECHANICAL WORK IS COMPLETE.

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

4'0" 2' 8' 12'

MATCH LINE

SEE SHEET

FOR PLAN CONTINUATION

E106

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

N

S

NURSE CALL LIGHT

SPEAKER

TELEMETRY

CAN/SURFACE MOUNT FIXTURE

WI-FI

OCCUPANCY SENSOR

LINEAR/STRIP LIGHT

MOTOR

UP

DN

UP

DN

ROOF

MECH

CHASE

PASSENGER

ELEVATOR

DN

UP

OPEN TO FIRST

FLOOR

MECH.

SHAFT

CHASE

CHASE

PASSENGER

ELEVATOR

MECH.

SHAFT

MA

TC

HL

INE

MA

TC

HL

INE

FOLDING

WALL

FIRST FLOOR ROOF

FIRST FLOOR ROOF

STAIR 3

STAIR 4

A A AA A

B B

B B

C

C

H

H

B

A

AA

B

A A

B B

H

A

A

A

A

A

A

H

H2

H2

G

A

A A

A

A

P

PP

B

B

A

CC

B

B

B

B

B

B

B

B

B

B

AAA

C

B

B

B B

A A

A A

H2

B

B

B

B

A A

OS

OS

H2 H

H

H

H

C

C

C

C

H2

H2

H

AA

AA

C

C

C

CCC

C

C

C

CC

C

C

CCC

HHH

H

B

B

B

B

H

F4

F

F

F

F3

F4

F4

Q Q

G

F

H

C CC

C C

C

F

CC

CCC

F

F

F3

F

F

C

C

SP

A A

H2

K

K

K

N

B

K

K

A

OS

A

K2 K2

K2

K2

KK

K

H

OS

B

OS

OS

OS

H2

OS

OS

A

A

H2

B

H

H

H2

H2

H

CCC

C

F4

SP

P2

P6P6P5

P2AP2AA2A2A2A2

P2P2P2

P2 P2 P2

P2

P2 P2

P2

P2P2P2

P2A

P2A P2A

P2A P2A

P2A

P2A

P2A

P2AP2AP2AP2A

P2

P2A

P2A

P2A

P2A

P2A

P2A

P6 P6P6

P6P6

P6P6

A2 A3 A3

A3

A3A3

A3A3

A3

A3 A3A3A3

A3 A3

A3A3A3

A3 A3

A3 A3 A3 P2

P2

P2

P2

P2

A3

A3A3

P2P2

A3

A6

A6A6

A6 A6

A6A6A6

A6

A6A6

P5 P5P5

P6

P6 P6 A6

A2

A2

A2

A2

A6

P2 F1

P2A

P2A

P2

A3

K2E K2E

F1

F1

F1

F1

P2 D1

D1

A2

D1 F1

F1

F1

F1 F1

F1F1

P6P6

P5

P5

A5

P6

A5A5

P6

W1

D1

D1

W1

F1F1F1

D1D3

D3D3

D3D3

D3

D3D3

D3 D3

F1 F1 F1

A6A6

F1 F1

F1

F1

F1

F1F1

F1

F1

P6

D1D1 D1D1

P6P6

K2

K2

D1

S1 S1

F1

F1

M8 M8

X1

P5

SP SP

SP

SP SP

SPSP

SP

SP

SP

SP

SP

SP

SP

N 2 N 2

N 2 N 2

N I

N 2

N 2

N 2

N 2N 2

N 2

N 2

N 2

N 2

N 2

N 2 N 2

N 2

N 2N 2

N 2

N 2

N 2

SP

SP

N D

N D

N2

ND

N2 N2 N2

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

N 2

N2 N2

N2

N2

N2

N2

N2

N2

N2

N2N2 N2

N2

ND

N D

N 2

N D

N D

N 2 N 2

N 2

N 2

SP SP

A5

P2

F1

F1

F1

F1

W1

D1

P2P2

P2

P2

P2

P2

EX EX EX

EX

EXEX

EX

EXEX

EX EX

EX

EX

EXEX

EX

EX

EXEX

EX

KL

KL

KL

KL

KL

KL

P2 P2P2

F1F1

X3

REFUGEE

EXX2

X2

X2

X2

X2

X2

X2

L

L

L

L

L

L

L

L

L

L

L

L

LL

LL

EX

KL

ENDOSCOPY

CYSTOSCOPY

SCRUB

ALCOVE

2110B

DUMBWAITER/

CART

ALCOVE

HSKG

CLOSET

DATA

AND

PHONE

HSKG

PACS

VIEWING

CLEAN

SUPPLY

STERILE

CLEAN

ULTRASOUND

PATIENT

TOILET

ULTRASOUND

IMAGING

CHIEF

STAFF

LOUNGE

AND

LOUNGE

CHANGING

ROOM

2245A

CONTROL

ROOM

2242A

EQUIPMENT

ALCOVE

2230B

PT.

TOILET

2242B

PACS

VIEWING

STRESS

TEST

TECH

WORK

ROOM

UTILITY

CORRIDOR

2230P

PT.

TOILET

PNUEMATIC

TUBE COMP.

CORRIDOR

C2-1

PACS WORK

STATION

CLERK

CHECK-IN

PACS

COMPUTERS

2215A

WAITING

AREA

EQUIPMENT

ALCOVE

2230A

BONE

DENSITY

TECH

WORK

ROOM

WOMEN

TOILET

MEN

TOILET

CHANGING

ROOM

PT.

TOILET

STORAGE

2263B

GE CT

SCANNER

CONTROL

ROOM

2263A

CONTROL

ROOM

2261A

RADIOLOGY

CORRIDOR

C2-2

ELEVATOR

LOBBY

ACCUPUNCTURE

EXAM ROOM

SOCIAL

WORKER

STAFF

LOUNGE

STERILE

SUPPLY

CLEAN

SUPPLY

SOCIAL

WORKER

DATA

CLOSET

2306 ACCUPUNCTURE

EXAM ROOM

EYE

PRE-TREATMENT

EYE

PRE-TREATMENT

OFFICE

SUB-WAIT

AREA

PATIENT

TOILET

2335A

MENTAL

HEALTH

EXAMS

CHEMOTHERAPY

RADIOLOGY

FLUOROSCOPY

CT

SCAN

CONTROL

CT

SCAN

NUCLEAR

MEDICINE

HOT

LAB

2254A

MECHANICAL

2307A

MECHANICAL

HSKG

CLST

ELECTRICAL

ROOM

LANE

ROOM

LANE

ROOM

LANE

ROOM

EYE

INSTRUMENTS

TELE-HEALTH

EXAM ROOM

TELE-HEALTH

EXAM ROOM

TELE-HEALTH

EXAM ROOM

SOILED

LINEN

SUB-WAIT

AREA

TELE-HEALTH

EXAM ROOM

TELE-HEALTH

EXAM ROOM

MENS

TOILET

STAFF

TOILET

2358 WOMENS

HEALTH

EXAM

WOMENS

HEALTH

EXAM

TOILET

NEUROLOGY

EXAM

ROOM

CORRIDOR

NEUROLOGY

EXAM

ROOM

2364 NEUROLOGY

EXAM

ROOM

CLERKS

AREA

2374 STAFF

WORK AREA

2374A

WOMENS

TOILET

MEETING

ROOM

MEETING

ROOM

WAITING

AREA

FAMILY

RESTROOM

2338A

FAMILY

LOUNGE

WOMENS

HEALTH

EXAM

WOMENS

HEALTH

EXAM

WOMENS

HEALTH

EXAM

CORRIDOR

LAUNDRY

CHUTE

CORRIDOR

2252P

ONCOLOGY

EXAM/OFFICE

ONCOLOGY

EXAM/PROC.

SECOND FLOOR NEW WORK

PLAN - EAST

E106

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

E106

F4 SECOND FLOOR NEW WORK PLAN - EAST

1/8" = 1'-0"

MATCH LINE

SEE SHEET

FOR PLAN CONTINUATION

E105

4'0" 2' 8' 12'

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

1 REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID

ONCE NEW MECHANICAL WORK IS COMPLETE.

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

N

S

NURSE CALL LIGHT

SPEAKER

TELEMETRY

CAN/SURFACE MOUNT FIXTURE

WI-FI

OCCUPANCY SENSOR

SP

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS OS

OS OS

OSOS

OSOSOS

OS

OS

N

SP SP

SP

SP

SP

SP

SP SP

SP

SP

SP

SP

SP

C3

CPA CPB

W3B W3A

W3A J-BOX

SP

N D N D

TQL-A

CR-3EB2

OS

JJ

OS

OSOS

EX

OSOS

2ND FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

DN

UP

FIRE

EQUIP

RAMP

UP 7"

FLOOR

UP 7"

AUDIOLOGY

SOUND BOOTH

AUDIOLOGY

SOUND BOOTH

CARPET

VINYL TILE

STAIR 1

STAIR 2

DN

UP

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

MECH.

SHAFT

MECH

SHAFT

MECH

SHAFT

AUDIOLOGY

SOUND BOOTH

AUDIOLOGY

SOUND BOOTH

UPDN

LDRY

CHUT

STAIR 5

2ND FLOOR ROOF

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

2 2 2

HSKG

PSYCHOLOGIST

SOCIAL

WORKER

HSKG

UTILITY

3142A

PSYCHOLOGIST

SOCIAL

WORKER

SOCIAL

WORKER

PSYCHOLOGIST

SOCIAL

WORKER

B.H.

ADMIN.

MEDIA

STORAGE

TOILET

B.H.

SOCIAL

WORKER

SOCIAL

WORKER

B.H.

ADMIN.

B.H.

PHARMACIST

PSYCHOLOGIST

B.H.

B.H.

PSYCHIATRIST

PSYCHIATRIST

B.H. VOC

REHAB

B.H.

PEER

CORRIDOR

3199B-1

WOMENS

TOILET

3165 MENS

TOILET

B.H.

CONFERENCE

ROOM

PSYCHOLOGIST

SOCIAL

WORKER

SOCIAL

WORKER

SOCIAL

WORKER

SOCIAL

WORKER

STORAGE

SOILED

LINEN

CORRIDOR

3199A-1

ADMIN.

OFFICER

BREAK

ROOM

B.H. ADMIN.

SUPPORT

PSYCHOLOGIST/

CHIEF, B.H.

PSYCHOLOGIST/

ASST. CHIEF B.H.

B.H.

TELE-HEALTH

B.H.

TELE-HEALTH

CORRIDOR

3199C-1

DATA &

PHONE

SUPPLY

CLOSET

SUPPLY

B.H.

TELE-HEALTH

PSYCHOLOGIST

AND INTERNS

B.H.

PEERS

AUDIOLOGY

CHECK-IN

3184C

AUDIOLOGY

WAITING AREA

AUDIOLOGY

WAITING

ROOM

3184B

TECHNICIAN

WORK

ROOM

3184A AUDIOLOGY

OFFICE

3280A

SPEECH

THERAPY

HEARING

TESTING

WHOLE HEALTH

GROUP ROOM

CORRIDOR

3299A-1

CORRIDOR

B.H. GROUP

ROOM

B.H. GROUP

ROOM

B.H.

CHECK-OUT

CLERK

B.H., NURSING,

AUDIOLOGY

WAITING ROOM

RECEPTION

CLERKS

3105A

WOMEN

MEN

THIRD FLOOR NEW WORK PLAN -

WEST

E107

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

E107

F4 THIRD FLOOR NEW WORK PLAN - WEST

1/8" = 1'-0"

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

1 REINSTALL/RE-WIRE THE CAN LIGHT(S) WHICH WERE REMOVED

DURING DEMOLITION.

REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID

ONCE NEW MECHANICAL WORK IS COMPLETE.

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

4'0" 2' 8' 12'

DWG. 59 OF 59

MATCH LINE

SEE SHEET

FOR PLAN CONTINUATION

E108

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

N

S

NURSE CALL LIGHT

SPEAKER

TELEMETRY

CAN/SURFACE MOUNT FIXTURE

WI-FI

OCCUPANCY SENSOR

LINEAR/STRIP LIGHT

ROOM

MECHANICAL

2ND FLOOR ROOF

2ND FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

FIRE

EQUIP

LDRY

CHUT

DUCT

DUMB

WAITER

DN

UP

STAIR 3

STAIR 4

UP DN

PASSENGER

ELEVATOR

MECH

SHAFT

2ND FLOOR ROOF

MECH

SHAFT

MECH

SHAFT

MA

TC

HL

INE

MA

TC

HL

INE

SECOND FLOOR ROOF

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

SP

SP

SP

SP

SP

J

HR

NURSE

CALL

J

CR-3E

E3BE3B J-BOX

E3A

SP

OS

OS

OS

OS OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

SP

J

SPSP

SP

SP

N

N N

N

N

N

N

N

N

N

OS

X2X2

B4 B4

B4

HSKG

TELE-HEALTH

EXAM ROOM

NURSE

STATION

TELE-HEALTH

TELE-HEALTH

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

STERILE

SUPPLY

WAITING

AREA

CORRIDOR

3299C-1

TELE-HEALTH

STAFF OFFICE

MSA

OFFICE

BIO-MED

CLOSET

DATA &

PHONE

STAFF

LOUNGE AND

LOCKERS

CORRIDOR

TOILET

CORRIDOR

MEN

TOILET

3225A

CLERK/

WORK

WAITING

ROOM

PASSAGE

3237A

CHIEF,

DENTAL

OPERATORY

OPERATORY

OPERATORY

X-RAY

OPERATORY

OPERATORY

OPERATORY

CONTROL

3228A

PASSAGE

CLEAN

STORAGE

STERILE

SOILED

LAB

CORRIDOR

3299B-1

NURSE

EDUCATION

TRAINING

ROOM

NURSE

EDUCATION

TRAINING

ROOM

PASSAGEWAY

NURSE

EDUCATION

OFFICE

NURSE

TRAINING

ROOM

3245NURSE

ED. STOR.

TOILET

3246A

TOILET

3250A

SOILED

UTILITY

CLEAN

SUPPLY

HSKG

STORAGE

ELEVATOR

LOBBY

MECH.

3244-A

1 1 1 1

1 1

THIRD FLOOR NEW WORK PLAN -

EAST

E108

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

E108

F4 THIRD FLOOR NEW WORK PLAN - EAST

1/8" = 1'-0"

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

1 REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID

ONCE NEW MECHANICAL WORK IS COMPLETE.

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANCIES WITHIN PROJECTS.

1.

4'0" 2' 8' 12'

MATCH LINE

SEE SHEET

FOR PLAN CONTINUATION

E107

SYMBOL LIST

MS MANUAL MOTOR STARTER

PANEL

A KEY PLAN NOTE

2 x 4 LIGHT FIXTURE

DATA CONNECTION

CONDUIT

COMBINATION MOTOR STARTER

DOWNLIGHT

PULLBOX

N

S

NURSE CALL LIGHT

SPEAKER

TELEMETRY

CAN/SURFACE MOUNT FIXTURE

WI-FI

OCCUPANCY SENSOR

LINEAR/STRIP LIGHT

MOTOR

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

C_LAVATORY

AutoCAD SHX Text

KINGSTON

K-2005

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

MECH

SHAFT

DUMB

WAITER

DN

STAIR 5

DN

UP

STAIR 2

DN

STAIR 4

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

SERVICE

ELEVATOR

UPUP

DN

UP

STAIR 1 STAIR 3

UP

DN

LDRY

CHUT

MECH

SHAFT

MECH

SHAFT

3RD FLOOR ROOF

FIRE

EQUIP

MECH

SHAFT

PASSENGER

ELEVATOR

K-4330KINGSTONC_TOILETSVITREOUS CHINA K-4330KINGSTONC_TOILETSVITREOUS CHINA

K-4330KINGSTONC_TOILETSVITREOUS CHINA

MECH

SHAFT

PIPE

SHAFT

X X

X

X X X

X

X X

X

OS

A A A

B

B

B

B

A

A

A

AA

AA

AAAA

AAAA

AA

AA

AA

D

D

B

B B

B

D

A

AA

AA

AA

A

B

BBBB B BB B B B B

A A

A

A

AA

A

B

F

AA

A

A

A

A

A

A

A

A

A

A

B

A

A

A

A

A

A

A A

B B B

B

B

B

A A

A A

AA

AA

A

A A A

A A

A

SP

F

SP

SP

C

C

OS OS

OSOS

OS

OS

OS

OS

OS

OS

OS

OS OS

OS OS OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS OS

OS OS

TV

N 2

N I

N 2

N 2N 2N 2N 2

N 2 N 2 N 2

N L

N M

N L

N L N L

N L NL

N L

SP

F

N I

N 2 N

N I

N I

N 2 N 2

S3

S3S3S3S3S3 S3S3S3

S1S1

S1

S1S1

S1

S2S2S2

S2S2S2

S1

S1 S1S1 S1

SE

SP

SP

N L

SP

F

SP

F

SP

F SP

F

EX

EX

N L

EX

EX

EX

EX

EX EX

EX

EX

S3

N N

L N

L

DT

DTDT

E1

LL

DT

1515 15

SP SP

SP

SP

SP

SP

SP

SP SP

SP

SP

SP

SP

SP

ER

TREATMENT

RECEPTION

THERAPIST

HALLWAY

4143P

TREATMENT

TREATMENT

SPEECH

THERAPY

CHIRO

TREATMENT

ADL

TOILET

4142ACHIRO

TREATMENT

ADL

TREATMENT

STORAGE

ALCOVE

CLEAN

SUPPLY

PHYSICAL

THERAPY

GYMNASIUM

TECH.

WORK

ROOM

DATA &

PHONE

PT/RT

STORAGE

STAFF

LOCKER

ROOM

EQUIPMENT

STORAGE

STAFF

LOUNGE

RESP.

THERAPY

ROOM

CHIEF,

PROSTHETICS

SOILED

UTILITY

RESPIRATORY

THERAPIST

SUPPLY

ALCOVE

4134A

PROSTHETICS

STORAGE

CORRIDOR

4205C

CORRIDOR

4129P

RECEIVING AND

ASSEMBLY

CHECK-IN

CLERKS

AND WORK

STATIONS

PM&R

WAITING

AREA

PM&R

CHIEF

CHECK-IN

CLERKS

WOMENS

TOILET

MENS

TOILET

TOILET

FAMILY

BREAK

AREA

4107A

NURSING

ROOM

4116A

STERILE

SUPPLY

HSKPG

CLOSET

ELEVATOR

LOBBY

CARDIO-P

WAITING

PFL

STRESS

TEST

PASSAGE

4280P

BLOOD

GAS

TOILET

EDUCATION/

CHART ROOM

NUTRITION

OFFICE

LOCKER

DRESSING

ROOM

4282A EQUIPMENT

MED/SURG

(4E) WAITING

ROOM

ISOLATION

ROOM

PT.

TOILET

4205A

ANTI-ROOM

SEMI-PRIVATE

OBSERVATION

MED/SURG #2

TOILET

4211A

TOILET

4215A

PHYS

CHART

OFFICE

SOCIAL

WORKER

STERILE

SUPPLY

STAFF

TOILET

TOILET

4216A

MED/SURG

#3

MED/SURG

BED

MED/SURG

BED

MED/SURG

BED

MED/SURG

BED

MED/SURG

BED

TOILET

4270A

TOILET

4268A

TRAINING

ROOM

MEDS

COMMUNICATOR

NOURISH

CONSULT

ROOM

TOILET

4262A

HSKPG

CART

ALCOVE

ON-CALL

ROOM

CORRIDOR

4212C

CORRIDOR

4260C

PHONE

& DATA

NURSE

STATION

NURSE

STATION

SUPPLY

ICU

ANTEROOM

4271A

ELEVATOR

LOBBY

OFFICE

MED/ SURG #11

NURSE

STATION

MED/ SURG #10

MED/ SURG #9

SOILED

TOILET

4250A

TOILET

4245A

TOILET

4251A

PASSAGE

4242P

NURSE

MANAGER

TUB

ROOM

BARIATRIC

M/S #4

TOILET

4233A

TOILET

4237A

BARIATRIC

M/S #5

MED/SURG #6

MED/SURG #7

MED/SURG #8

STORAGE

CLEAN

LINEN

TOILET

4236A

NURSE

STATION

TOILET

4234A

PASSAGE

4230P

NURSE

STATION

FOURTH FLOOR NEW WORK PLAN

E109

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

UPGRADE POTABLE WATER

RISERS

OSCAR G. JOHNSON VAMC

585-19-118

Project Director

DECEMBER 23, 2021Revisions: Date:

50% DESIGN SUBMITTAL 10-09-2020

6163.01

ADDENDUM 1

95% DESIGN SUBMITTAL 06-30-2021

100% DESIGN SUBMITTAL 10-20-2021

ADDENDUM 1 12-23-2021

ADDENDUM 2 1-10-2022

MLL NMP

E109

F1 FOURTH FLOOR NEW WORK PLAN

1/8" = 1'-0" 4'0" 2' 8' 12'

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

1 REINSTALL EXISTING DEVICES/FIXTURE(S) BACK INTO THE GRID

ONCE NEW MECHANICAL WORK IS COMPLETE.

(THIS SHEET ONLY)

GENERAL PLAN NOTES

SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .