S02 - 537-26-101 SOW Att - Contractor Production Report.pdf

PDF 87 KB Posted

Attached to
Z1DA--Construction of Ogden Elevator Cab Interiors Jesse Brown Medical Center
Solicitation number
36C25226B0033
Issued by

About this file

This is VA Form 10101, a Contractor Production Report used by the U.S. Department of Veterans Affairs to document daily construction work activities and progress on federal construction contracts.

The form captures essential project documentation including contract identification, contractor and superintendent information, weather conditions, and detailed work performance data organized by schedule activity number. Contractors must report work location and description, employer identification, trade classifications, and hours worked for each activity performed. The form includes mandatory safety reporting sections requiring documentation of daily safety meetings, lost-time accidents, and specialized hazardous work such as crane operations, trenching, scaffolding, high-voltage electrical work, and hazardous materials handling. Contractors must also track cumulative work hours from project inception and document any safety inspections and actions taken. Additional sections address equipment and materials received for job incorporation, construction equipment used on site with hours of operation, and general remarks. The form requires contractor and superintendent signature with report preparation date. Completion is estimated at 24 minutes per report and is required to ensure adequate labor and material allocation and verify contract performance. The form displays OMB No. 2900-0208 with an expiration date of March 31, 2022.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB No.: 2900-0208 Exp. Date: Mar 31. 2022 Respondent Burden: 24 Minutes

CONTRACTOR PRODUCTION REPORT

(Attach additional sheets if necessary)

DATE

CONTRACT NUMBER TITLE AND LOCATION (Title and Location of Construction Contract) REPORT NUMBER

CONTRACTOR SUPERINTENDENT

AM WEATHER (Weather data, include precipitation & winds) PM WEATHER (Weather data, include precipitation & winds) MAX TEMP (F) MIN TEMP (F)

WORK PERFORMED TODAY

SCHEDULE ACTIVITY NO. WORK LOCATION AND DESCRIPTION EMPLOYER NUMBER TRADE HOURS

JOB SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

(If YES, attach copy of the meeting minutes) YES NO

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES, attach copy of completed OSHA report) YES NO

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/HAZMAT

WORK DONE? (If YES, attach statement or checklist showing inspection performed)

YES NO

TOTAL WORK HOURS ON JOB SITE, THIS

DATE, INCL CON'T SHEETS

CUMULATIVE TOTAL OF WORK HOURS

FROM PREVIOUS REPORT

TOTAL WORK HOURS FROM START OF

CONSTRUCTION

SCHEDULE

ACTIVITY NO.

LIST ANY SAFETY ACTION TAKEN TODAY/SAFETY

INSPECTION CONDUCTED

(Include any safety topic covered during the safety meeting)

SAFETY REQUIREMENTS

HAVE BEEN MET

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (Indicate a schedule activity number) SCHEDULE ACTIVITY NO. SUBMITTAL NUMBER DESCRIPTION OF EQUIPMENT/MATERIAL RECEIVED

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY, INDICATE

HOURS USED AND SCHEDULE ACTIVITY NUMBER

SCHEDULE ACTIVITY NO. OWNER DESCRIPTION OF CONSTRUCTION EQUIPMENT USED TODAY (Include Make and Model)

SCHEDULE ACTIVITY NO. REMARKS

CONTRACTOR/SUPERINTENDENT DATE REPORT PREPARED

The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to , a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will be average 24 minutes. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. If your firm does not already have a similar form, this is used to record the data necessary to assure the contractor provides sufficient labor and materials to accomplish the contract work. This form or a similar document is required to guarantee the performance of the work necessary to complete the project.

VA FORM

JUL 2018 10101

OMB No.: 2900-0208 Exp. Date: Mar 31. 2022 Respondent Burden: 24 Minutes O M B No.: 2900-0208 Exp. Date: Mar 31. 2022 Respondent Burden: 24 Minutes Department of Veterans Affairs LOGO

CONTRACTOR PRODUCTION REPORT

(Attach additional sheets if necessary)

CONTRACTOR PRODUCTION REPORT

(Attach additional sheets if necessary)

DATE

CONTRACT NUMBER

TITLE AND LOCATION (Title and Location of Construction Contract)

REPORT NUMBER

CONTRACTOR

SUPERINTENDENT

AM WEATHER (Weather data, include precipitation & winds) PM WEATHER (Weather data, include precipitation & winds)

MAX TEMP (F)

MIN TEMP (F)

WORK PERFORMED TODAY

SCHEDULE ACTIVITY NO.

WORK LOCATION AND DESCRIPTION

EMPLOYER

NUMBER

TRADE

HOURS

JOB SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

(If YES, attach copy of the meeting minutes)

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES, attach copy of completed OSHA report)

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/HAZMAT

WORK DONE? (If YES, attach statement or checklist showing inspection performed)

TOTAL WORK HOURS ON JOB SITE, THIS

DATE, INCL CON'T SHEETS

CUMULATIVE TOTAL OF WORK HOURS

FROM PREVIOUS REPORT

TOTAL WORK HOURS FROM START OF

CONSTRUCTION

SCHEDULE

ACTIVITY NO.

LIST ANY SAFETY ACTION TAKEN TODAY/SAFETY

INSPECTION CONDUCTED

(Include any safety topic covered during the safety meeting) EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (Indicate a schedule activity number)

SCHEDULE ACTIVITY NO.

SUBMITTAL NUMBER

DESCRIPTION OF EQUIPMENT/MATERIAL RECEIVED

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY, INDICATE

HOURS USED AND SCHEDULE ACTIVITY NUMBER

SCHEDULE ACTIVITY NO.

OWNER

DESCRIPTION OF CONSTRUCTION EQUIPMENT USED TODAY (Include Make and Model)

SCHEDULE ACTIVITY NO.

REMARKS

CONTRACTOR/SUPERINTENDENT

DATE REPORT PREPARED

The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to , a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will be average 24 minutes. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. If your firm does not already have a similar form, this is used to record the data necessary to assure the contractor provides sufficient labor and materials to accomplish the contract work. This form or a similar document is required to guarantee the performance of the work necessary to complete the project.

VA FORMJUL 2018

V A Form 1 0 1 0 1, JULY 2018 10101 C:\Program Files\Adobe\Form Designer\Forms\Adobe.xft\VA3918.xft David Wachter April 2015 5.0

OA&MM

VA3918

{CF3222A7-20FA-11D4-ABC1-00D0B71D6ABB}

PDFForms.xml Spelling Checker;{224F7DEA-B7C1-11D3-AB40-00902712A5C9};PLSSpeller.cab Intra-Agency Transfer Request David Wachter VA Form 3918

JULY 2018

10101, CONTRACTOR, PRODUCTION, CONSTRUCTION

Missie Vaccaro-Palomaki VA Form 10101, CONTRACTOR PRODUCTION REPORT Rafael Taylor/Sterai Payne/Karen Bruce (003A2A)

DATE REPORT PREPARED

The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to , a collection of information unless it displays a valid O M B number. We anticipate that the time expended by all individuals who must complete this form will be average 24 minutes. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. If your firm does not already have a similar form, this is used to record the data necessary to assure the contractor provides sufficient labor and materials to accomplish the contract work. This form or a similar document is required to guarantee the performance of the work necessary to complete the project.:

CONTRACTOR/SUPERINTENDENT:
SCHEDULE ACTIVITY NUMBER, line 4 of 4:
OWNER, line 4 of 4:
REMARKS, line 4 of 4:
SCHEDULE ACTIVITY NUMBER, LINE 4 OF 5:
WORK LOCATION AND DESCRIPTION, LINE 4 OF 5:
HOURS, LINE 4 OF 5:
SCHEDULE ACTIVITY NUMBER, LINE 5 OF 5:
WORK LOCATION AND DESCRIPTION, LINE 5 OF 5:
HOURS, LINE 5 OF 5:
SAFETY REQUIREMENTS

HAVE BEEN MET "YES" CHECK BOX.: 0

SAFETY REQUIREMENTS

HAVE BEEN MET "YES" CHECK BOX.: 0

SAFETY REQUIREMENTS

HAVE BEEN MET "YES" CHECK BOX.: 0

SAFETY REQUIREMENTS

HAVE BEEN MET "YES" CHECK BOX.: 0

"NO" CHECK BOX.: 0
"NO" CHECK BOX.: 0
"NO" CHECK BOX.: 0
TOTAL WORK HOURS ON JOB SITE, THIS

DATE, INCL CON'T SHEETS:

CUMULATIVE TOTAL OF WORK HOURS

FROM PREVIOUS REPORT:

TOTAL WORK HOURS FROM START OF

CONSTRUCTION (Auto calculated field):

File details come from the government source that posted it. Updated .