S02 - 537-26-101 SOW Att - Contract Progress Report.pdf

PDF 530 KB Posted

Attached to
Z1DA--Construction of Ogden Elevator Cab Interiors Jesse Brown Medical Center
Solicitation number
36C25226B0033
Issued by

About this file

This is a VA Form 10-6001a, Contract Progress Report, used by the Department of Veterans Affairs to track construction project performance and financial status.

The form is designed to report on contracts with the Centra Texas Health Care System (CTVHCS) located at 1901 Memorial Drive, Temple, TX 76504, specifically for the Jesse Brown VAMC project. The document serves as a template for capturing essential contract data including project identification numbers, contract award dates, notice to proceed dates, and construction start dates. It tracks financial performance through fields for original contract amounts, scheduled versus actual percent completion, and estimated versus extended completion dates. The form includes detailed line items (rows 15-23 and 24-40) for recording the branch of work, total value, value of work completed in prior periods, and value of work installed in current periods. Additional sections document contract modifications through supplemental agreements (additions and deductions), change orders, field changes, and time extensions with approval dates and day extensions. The fiscal data section (items 41-50) captures current contract amounts, work-in-place values, retainage calculations, and payment information. The form requires certification by a resident engineer and includes fields for equipment status, materials status, work progress tracking, and submission status. The estimated burden for completion is 12 minutes per submission.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT PROGRESS REPORT

LOCATION OF PROJECT

TO

Centra Texas Health Care System (CTVHCS) 1901 Memorial Drive Temple, TX 76504

1. PROJECT NO. 2. CONTRACT NO. 3. DATE CONTRACT AWARD 4. DATE NOTICE TO PROCEED RECEIVED

6. NAME AND ADDRESS OF CONTRACTOR 7. DESCRIPTION OF CONTRACT

12. EXTENDED CONTRACT COMPLETION DATE

ITEM

NO.

15.

VA FORM

JUN 2012 10-6001a

5. DATE CONST. STARTED

BRANCH OF WORK TOTAL VALUE VALUE OF WORK IN

PLACE-END LAST PERIOD

VALUE OF WORK INSTALLED

IN CURRENT PERIOD(A) (B)

(C) (D)

13. ESTIMATED COMPLETION DATE

OMB Approval No. 2900-0208 Estimated burden 12 minutes

16.

17.

18.

19.

20.

21.

22.

23.

14. DATE COMPLETED

8. ORIGINAL CONTRACT AMOUNT

9. SCHEDULED PERCENT COMPLETION

10. ACTUAL PERCENT COMPLETION

11. ORIGINAL CONTRACT COMPLETION DATE

REPORT FOR PERIOD ENDING

VHACHSNosalM Cross-Out

VA FORM

JUN 2012 10-6001a

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

SUPPLEMENTAL AGREEMENT - ADD

SUPPLEMENTAL AGREEMENT - DEDUCT

TOTAL $$$

CONTRACT FISCAL DATA

CHANGE ORDERS, SUPPLEMENTAL AGREEMENTS, AND TIME EXTENSIONS

41.

42.

43.

44.

45.

46.

47.

48.

49.

50.

55A.

55B.

55C.

55D.

56.

57.

58.

59.

60.

CURRENT CONTRACT AMOUNT (From Item 40, Col. B)

VALUE - UNUSED MATERIALS PAID FOR THIS PERIOD

RETAINAGE (Based on Item 45 less cost of bond premiums)

PAYMENT THIS PERIOD

TOTAL PAYMENT TO DATE (Item 47 plus 48)

CO CHANGE ORD., PREV. REPORTED, NO.

ISSUED THIS PERIOD

ISSUED THIS PERIOD

ISSUED THIS PERIOD

ISSUED THIS PERIOD

TO INCL.CO SUPPL. AGREE. PREV. REPORTED, SYM

TO

TO

TO

TO INCL.

INCL.

INCL.

INCL.

51. EQUIPMENT STATUS 52. MATERIALS STATUS 53A. WORK PROGRESS 53B. PROGRESS FACTOR 54. SUBMISSIONS OVERDUE

ITEM

NO.

61. REMARKS

62. SIGNATURE OF RESIDENT ENGINEER 63. DATE

ADDITIONS DEDUCTIONS

(C) (D) (E)

DATE

APPROVED

(B)

DAYS

EXTENSIONSYMBOLS

(A)

VALUE - CONTRACT NOT EARNED (Item 41 minus 45)

VALUE - WORK IN PLACE TO DATE (Item 40, Cols. C plus D)

VALUE - UNUSED MATERIALS PREVIOUSLY PAID FOR

EARNED TO DATE (Items 42 plus 43 plus 44)

TOTAL PREVIOUS PAYMENTS

FIELD SUPPL. AGREE. PREV. REPORTED, NO.

FIELD CHANGE ORD. PREV. REPORTED, SYM.

TIME EXTENS. PREV. REPORTED, NO.

VA FORM

JUN 2012 10-6001a

The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will average 12 minutes. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. If your firm does not already have a similar form, this is used to record the data necessary to assure the contractor provides sufficient labor and materials to accomplish the contract work. This form or a similar document is required to guarantee the performance of the work necessary to complete the project.

D:19970130153324Z

CONTRACT PROGRESS REPORT

CONTRACT PROGRESS REPORT

LOCATION OF PROJECT

LOCATION OF PROJECT

TO

TO

Centra Texas Health Care System (CTVHCS) 1901 Memorial Drive Temple, TX 76504 Centra Texas Health Care System (CTVHCS) 1901 Memorial Drive Temple, TX 76504

1. PROJECT NO.

1. PROJECT NO.

2. CONTRACT NO.

2. CONTRACT NO.

3. DATE CONTRACT AWARD

3. DATE CONTRACT AWARD

4. DATE NOTICE TO PROCEED RECEIVED

4. DATE NOTICE TO PROCEED RECEIVED

6. NAME AND ADDRESS OF CONTRACTOR

6. NAME AND ADDRESS OF CONTRACTOR

7. DESCRIPTION OF CONTRACT

7. DESCRIPTION OF CONTRACT

12. EXTENDED CONTRACT COMPLETION DATE

12. EXTENDED CONTRACT COMPLETION DATE

ITEM

NO.

15.

VA FORM

JUN 2012

10-6001a

5. DATE CONST. STARTED

5. DATE CONST. STARTED

BRANCH OF WORK

BRANCH OF WORK

TOTAL VALUE

TOTAL VALUE

VALUE OF WORK IN

PLACE-END LAST PERIOD

VALUE OF WORK IN

PLACE-END LAST PERIOD

VALUE OF WORK INSTALLED

IN CURRENT PERIOD

VALUE OF WORK INSTALLED

IN CURRENT PERIOD

(A) (B) (C) (D) \\iaimain\apps1\Pam_Ward\Logos\Formlogo.jpg Department of Veterans Affairs

13. ESTIMATED COMPLETION DATE

13. ESTIMATED COMPLETION DATE

OMB Approval No. 2900-0208 Estimated burden 12 minutes 16.

17.

18.

19.

20.

21.

22.

23.

14. DATE COMPLETED

14. DATE COMPLETED

8. ORIGINAL CONTRACT AMOUNT

8. ORIGINAL CONTRACT AMOUNT

9. SCHEDULED PERCENT COMPLETION

9. SCHEDULED PERCENT COMPLETION

10. ACTUAL PERCENT COMPLETION

10. ACTUAL PERCENT COMPLETION

11. ORIGINAL CONTRACT COMPLETION DATE

11. ORIGINAL CONTRACT COMPLETION DATE

REPORT FOR PERIOD ENDING

REPORT FOR PERIOD ENDING

VA FORM

JUN 2012

10-6001a 24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

SUPPLEMENTAL AGREEMENT - ADD

38. SUPPLEMENTAL AGREEMENT - ADD

SUPPLEMENTAL AGREEMENT - DEDUCT

39. SUPPLEMENTAL AGREEMENT - DEDUCT

TOTAL

40. TOTAL

CONTRACT FISCAL DATA

CHANGE ORDERS, SUPPLEMENTAL AGREEMENTS, AND TIME EXTENSIONS

41.

42.

43.

44.

45.

46.

47.

48.

49.

50.

55A.

55B.

55C.

55D.

56.

57.

58.

59.

60.

CURRENT CONTRACT AMOUNT (From Item 40, Col. B)

41. CURRENT CONTRACT AMOUNT (From Item 40, Col. B)

VALUE - UNUSED MATERIALS PAID FOR THIS PERIOD

44. VALUE - UNUSED MATERIALS PAID FOR THIS PERIOD

RETAINAGE (Based on Item 45 less cost of bond premiums)

46. RETAINAGE (Based on Item 45 less cost of bond premiums)

PAYMENT THIS PERIOD

48. PAYMENT THIS PERIOD

TOTAL PAYMENT TO DATE (Item 47 plus 48)

49. TOTAL PAYMENT TO DATE (Item 47 plus 48)

CO CHANGE ORD., PREV. REPORTED, NO.

55B. CO CHANGE ORD., PREV. REPORTED, NO.

ISSUED THIS PERIOD

57. ISSUED THIS PERIOD

ISSUED THIS PERIOD

58. ISSUED THIS PERIOD

ISSUED THIS PERIOD

59. ISSUED THIS PERIOD

ISSUED THIS PERIOD

60. ISSUED THIS PERIOD

TO

INCL.

CO SUPPL. AGREE. PREV. REPORTED, SYM

55A. CO SUPPL. AGREE. PREV. REPORTED, SYM

TO

TO

TO

TO

INCL.

INCL.

INCL.

INCL.

51. EQUIPMENT STATUS

51. EQUIPMENT STATUS

52. MATERIALS STATUS

52. MATERIALS STATUS

53A. WORK PROGRESS

53A. WORK PROGRESS

53B. PROGRESS FACTOR

53B. PROGRESS FACTOR

54. SUBMISSIONS OVERDUE

54. SUBMISSIONS OVERDUE

ITEM

NO.

61. REMARKS

61. REMARKS

62. SIGNATURE OF RESIDENT ENGINEER

62. SIGNATURE OF RESIDENT ENGINEER

63. DATE

63. DATE

ADDITIONS

ADDITIONS

DEDUCTIONS

DEDUCTIONS

(C) (D) (E)

DATE

APPROVED

DATE APPROVED

(B)

DAYS

EXTENSION

DAYS EXTENSION

SYMBOLS

(A) VALUE - CONTRACT NOT EARNED (Item 41 minus 45)

50. VALUE - CONTRACT NOT EARNED (Item 41 minus 45) VALUE - WORK IN PLACE TO DATE (Item 40, Cols. C plus D)

42. VALUE - WORK IN PLACE TO DATE (Item 40, Cols. C plus D)

VALUE - UNUSED MATERIALS PREVIOUSLY PAID FOR

43. VALUE - UNUSED MATERIALS PREVIOUSLY PAID FOR

EARNED TO DATE (Items 42 plus 43 plus 44)

45. EARNED TO DATE (Items 42 plus 43 plus 44)

TOTAL PREVIOUS PAYMENTS

47. TOTAL PREVIOUS PAYMENTS

FIELD SUPPL. AGREE. PREV. REPORTED, NO.

55C. FIELD SUPPL. AGREE. PREV. REPORTED, NO.

FIELD CHANGE ORD. PREV. REPORTED, SYM.

55D. FIELD CHANGE ORD. PREV. REPORTED, SYM.

TIME EXTENS. PREV. REPORTED, NO.

56. TIME EXTENS. PREV. REPORTED, NO.

VA FORM

JUN 2012

10-6001a The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will average 12 minutes. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. If your firm does not already have a similar form, this is used to record the data necessary to assure the contractor provides sufficient labor and materials to accomplish the contract work. This form or a similar document is required to guarantee the performance of the work necessary to complete the project.

D40. TOTAL: Jesse Brown VAMC
TextField2: