S02 - 528A6-19-614 Upgrade Ventilation B76 Drawings.pdf

PDF 20 MB Posted

Attached to
Z1DA--528A6-17-627 UPGRADE VENTILATION B76 Federal contract opportunity
Solicitation number
36C24220B0064
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This notice summarizes a federal contract opportunity to upgrade ventilation systems in Building 76 at the Bath VA Medical Center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 will issue solicitation number 36C24220B0064 on or around October 7, 2020 seeking bids for project number 528A6-17-627. The project scope involves installing a new central air distribution system on the fourth and portions of the fifth floors, constructing a chase way for future ductwork to the third and second floors, and cross connecting certain piping systems. The NAICS code is 238220 for plumbing, heating, and air-conditioning contractors and the small business size standard is $16.5 million. The estimated cost range is $1 million to $5 million. A pre-bid site visit will be scheduled and noted in the solicitation. Bids must include a 20% bid bond and performance and payment bonds will be required from the successful bidder. This procurement is reserved exclusively for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A6-17-627 UPGRADE VENTILATION B76, newest first.
File Type Posted
36C24220B0064 0004.docx DOCX document
528A6-19-614 Upgrade Ventilation B76 Drawings - Revised.zip ZIP file
20201130 PreBid RFI Log Response to Contractors Updated.xlsx XLSX spreadsheet
36C24220B0064 0003.docx DOCX document
528A6-19-614 Upgrade Ventilation B76 Revised Specifications.pdf PDF
S06 - PreBid RFI Log Response to Contractors.xlsx XLSX spreadsheet
36C24220B0064 0002.docx DOCX document
S06 - 9550-A VA Bath Healthcare Center Additional Limited ACM Survey Revised 6-10-2020_opt.pdf PDF
36C24220B0064 0001.docx DOCX document
S04 - Pre-Bid Attendance Sheet.pdf PDF
36C24220B0064_1.docx DOCX document
S02 - 528A6-19-614 Upgrade Ventilation B76 Specifications.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION, B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

T-101

JWE MPL

GENERAL

T-101 COVER SHEET & DRAWING INDEX

G-101 CONSTRUCTION PHASING PLAN

HAZ-MAT

H-101 HAZARDOUS MATERIALS - THIRD FLOOR SOUTH

H-102

HAZARDOUS MATERIALS - FOURTH FLOOR

SOUTH

H-103

HAZARDOUS MATERIALS - FOURTH FLOOR

NORTH

H-104 HAZARDOUS MATERIALS - SIXTH FLOOR SOUTH

H-105 HAZARDOUS MATERIALS - SIXTH FLOOR NORTH

H-106 HAZARDOUS MATERIALS - ATTIC

STRUCTURAL

S-100

THIRD FLOOR STRUCTURAL DEMOLITION AND

FRAMING PLAN

S-101

FOURTH FLOOR STRUCTURAL DEMOLITION AND

FRAMING PLAN

S-102

FIFTH FLOOR STRUCTURAL DEMOLITION AND

FRAMING PLAN

S-103

SIXTH FLOOR STRUCTURAL DEMOLITION AND

FRAMING PLAN

S-104

ATTIC FLOOR STRUCTURAL DEMOLITION AND

FRAMING PLAN

S-501

SECTIONS, DETAILS & GENERAL NOTES

ARCHITECTURAL

AD-101

ARCHITECTURAL DEMOLITION PLAN - SECOND

FLOOR SOUTH

AD-102

ARCHITECTURAL DEMOLITION PLAN - THIRD

FLOOR SOUTH

AD-103

ARCHITECTURAL DEMOLITION PLAN - FOURTH

FLOOR SOUTH

AD-104

ARCHITECTURAL DEMOLITION PLAN - FIFTH

FLOOR SOUTH

AD-105

ARCHITECTURAL DEMOLITION PLAN - FIFTH

FLOOR NORTH

AD-106

ARCHITECTURAL DEMOLITION PLAN - SIXTH

FLOOR SOUTH

AD-107

ARCHITECTURAL DEMOLITION PLAN - SIXTH

FLOOR NORTH

AD-108 ARCHITECTURAL DEMOLITION PLAN - ATTIC

A-101

ARCHITECTURAL CONSTRUCTION - SECOND

FLOOR SOUTH

A-102

ARCHITECTURAL CONSTRUCTION - THIRD FLOOR

SOUTH

A-103

ARCHITECTURAL CONSTRUCTION - FOURTH

FLOOR SOUTH

A-104

ARCHITECTURAL CONSTRUCTION - FIFTH FLOOR

SOUTH

A-105

ARCHITECTURAL CONSTRUCTION - FIFTH FLOOR

NORTH

A-106

ARCHITECTURAL CONSTRUCTION - SIXTH FLOOR

NORTH

A-107

ARCHITECTURAL CONSTRUCTION - SIXTH FLOOR

SOUTH

A-108 ARCHITECTURAL CONSTRUCTION - ATTIC

A-109

ARCHITECTURAL CONSTRUCTION RCP - FOURTH

FLOOR SOUTH

A-110

ARCHITECTURAL CONSTRUCTION RCP - FOURTH

FLOOR NORTH

A-111

ARCHITECTURAL CONSTRUCTION RCP - FIFTH

FLOOR NORTH

MECHANICAL

M-001 MECHANICAL GENERAL NOTES AND SYMBOLS

MD100

MECHANICAL DEMOLITION PLAN - GROUND

FLOOR

MD101

MECHANICAL DEMOLITION PLAN - FOURTH

FLOOR SOUTH

MD102

MECHANICAL DEMOLITION PLAN - FOURTH

FLOOR NORTH

MD103

MECHANICAL DEMOLITION PLAN - FIFTH FLOOR

NORTH

MD104

MECHANICAL DEMOLITION PLAN - SIXTH FLOOR

SOUTH

MD105 MECHANICAL DEMOLITION PLAN - ATTIC

MH101

MECHANICAL DUCTWORK PLAN - FOURTH FLOOR

SOUTH

MH102

MECHANICAL DUCTWORK PLAN - FOURTH FLOOR

NORTH

MH103

MECHANICAL DUCTWORK PLAN - FIFTH FLOOR

NORTH

MH104 MECHANICAL PLAN - SIXTH FLOOR SOUTH

MH105

MECHANICAL DUCTWORK PLAN - SIXTH FLOOR

NORTH

MH106 MECHANICAL PLAN - ATTIC

MP101

MECHANICAL PIPING PLAN - FOURTH FLOOR

SOUTH

MP102

MECHANICAL PIPING PLAN - FOURTH FLOOR

NORTH

MP103 MECHANICAL PIPING PLAN - FIFTH FLOOR NORTH

MP104 MECHANICAL PIPING PLAN - SIXTH FLOOR NORTH

MP105 MECHANICAL PIPING PLAN - ATTIC

M-301 MECHANICAL DUCTWORK RISER DIAGRAM

M-302 MECHANICAL PIPING RISER DIAGRAM

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-603 MECHANICAL SCHEDULES

M-701

MECHANICAL CONTROLS SCHEMATICS & POINTS

LIST

M-702

MECHANICAL CONTROLS SCHEMATICS & POINTS

LIST

ELECTRICAL

E-001

ELECTRICAL NOTES, SYMBOLS, ABBREVIATIONS,

AND SCHEDULES

ED-101 ELECTRICAL LIGHTING DEMOLITION PLANS

ED-102 ELECTRICAL LIGHTING DEMOLITION PLANS

E-101 ELECTRICAL FLOOR PLANS

E-102 ELECTRICAL FLOOR PLANS

E-103 ELECTRICAL LIGHTING PLANS

E-104 ELECTRICAL LIGHTING PLANS

E-105 ELECTRICAL LIGHTING PLANS

COVER SHEET

BATH VAMC

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A6-17-627 BUILDING 76 BATH VAMC, BATH, NEW YORK

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

SITE LOCATION

AutoCAD SHX Text

UPGRADE VENTILATION

AutoCAD SHX Text B-76

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION, B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

G-101

JWE MPL

CONSTRUCTION PHASING PLAN

336 SF

409 SF

FOURTH FLOOR

FIFTH FLOOR

SIXTH FLOOR

6HA3-76

179 SF

21 SF

607A

180 SF

186 SF

183 SF

195 SF

6HA1-76

498 SF

6HA4-76

115 SF

85 SF

611A

615A

13 SF 19 SF

302 SF

224 SF

219 SF

616A

6HA2-76

272 SF

80 SF

617A

665 SF

186 SF

22 SF

OCCUPIABLE SPACE (SF)

SOUTH

NA

NA

CENTER

NA

NORTH

NA

37 SF

623A

170 SF

252 SF

185 SF

605A 184 SF

177 SF

66 SF

189 SF

147 SF

250 SF 624A

23 SF

362 SF

366 SF

229 SF

125 SF

109 SF

SIXTH FLOOR SWING SPACE

245 SF

211 SF

143 SF

106 SF

5HA7-76

117 SF

51 SF

472 SF

71 SF

117 SF

242 SF

244 SF

105 SF

111 SF

813 SF

108 SF

107 SF

115 SF

116 SF

434A

417A

115 SF

425A

116 SF

92 SF

97 SF

351 SF

PHASE 2

83 SF

374 SF

PHASE 1

FIFTH FLOOR PROJECT AREA

132 SF

439B

431A

38 SF

427A

116 SF

120 SF

414B

45 SF

81 SF

138 SF

25 SF

109 SF

432A

240 SF

178 SF

204 SF

432B

414A

732 SF

100 SF

53 SF

413A

34 SF

78 SF

47 SF

269 SF

407A

76 SF

401A

197 SF

253 SF

252 SF

434 SF

109 SF

408A

109 SF

224 SF

199 SF

86 SF

156 SF

216 SF

113 SF

49 SF

265 SF

87 SF

465B

166 SF

173 SF

166 SF

463A

166 SF

299 SF

465A

47 SF

87 SF

464A

107 SF

112 SF

107 SF

92 SF

281 SF

456A

50 SF

456B

44 SF

40 SF

65 SF

4HA3-76

886 SF

217 SF

253 SF

433A

97 SF

96 SF

4HA5-76

276 SF

217 SF

CLOS.EL. CLOS.

9 SF 17 SF

4HA4-76

900 SF

508 SF

439C

123 SF

175 SF

112 SF

439A

248 SF

122 SF

30 SF

440A

35 SF

143 SF

74 SF

145 SF

75 SF

191 SF

442 SF

238 SF

434B

38 SF

PHASE 3

4HA6-76

S

F

653 SF

103 SF

226 SF

114 SF

FOURTH FLOOR PROJECT AREA

227 SF

75 SF

230 SF

222 SF

112 SF

H

A

S

F

H

A

S

F

H

A

S

F

283 SF

NOTE: CONTRACTOR SHALL COORDINATE WITH VA COR TO

DETERMINE ACTUAL OCCUPANT RELOCATION NEEDS AT

THE TIME OF CONSTRUCTION. CONTRACTOR SHALL SUBMIT

A FINAL PHASING PLAN FOR APPROVAL BY THE COR PRIOR

TO COMMENCING WORK IN ANY OCCUPIED AREA.

82 SF 96 SF

96 SF 24

S

F634 SF

403 SF

616 SF

247 SF

142 SF 121 SF

765 SF

344 SF

122 SF

1256 SF616 SF

103 SF

121 SF

110 SF

125 SF

105 SF

97 SF

88 SF

241 SF

112 SF

105 SF

348 SF

4 S

F

178 SF

189 SF 109 SF

82 SF

35 SF

187 SF

245 SF

111 SF

589 SF

115 SF

238 SF

92 SF

98 SF

98 SF

0 S

F

226 SF

43 SF

201 SF

310A

311A

309B

9A

351311B

305 304

318A 316A

362 353

302A

3H A1

-7

3H A2

-7

3H A3

-7

3HA5-76

350C

321D

319B

319A

320B

320A

307B

616 SF

143 SF

100 SF

62 SF

118 SF

97 SF

3HA4-76

215 SF

321D

DUCT

CHASE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION, B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

H-101

JWE MPL

HAZARDOUS MATERIALS -

THIRD FLOOR SOUTH

KEY NOTES:

1 THERMAL SYSTEM INSULATION CLOTH

PATCH ON A VERTICAL LINE TO BE

ABATED BY CONTRACTOR

SCALE: 1/8" = 1'-0"

HAZARDOUS MATERIALS - THIRD FLOOR SOUTH

E8

HAZARDOUS MATERIAL NOTES:

1. THE CONTRACTOR SHALL REVIEW ALL HAZARDOUS MATERIALS SURVEYS PROVIDED AS PART OF THE CONTRACT DOCUMENTS. IF ANY ADDITIONAL HAZARDOUS MATERIALS ARE ENCOUNTERED, REPORT THEM TO THE COR AND AWAIT FURTHER GUIDANCE - THESE MATERIALS WILL REQUIRE REMOVAL/ABATEMENT IF DISTURBED BY THE CONSTRUCTION.

2. THE “PATH OF CONSTRUCTION SUPPLEMENTAL ASBESTOS-CONTAINING MATERIALS SURVEY” REPORT DATED 06/04/20 PERFORMED BY ECS SHALL BE INCLUDED AND FOLLOWED AS A CONSTRUCTION DOCUMENT. ALL ASBESTOS CONTAINING MATERIAL (ACM) AND PRESUMED ASBESTOS CONTAINING MATERIAL (PACM) SHALL BE ABATED.

3. ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE REGULATIONS. PERSONNEL HOLDING CURRENT NEW YORK STATE DEPARTMENT OF LABOR (NYSDOL) ASBESTOS HANDLER'S CERTIFICATES SHALL PERFORM THE WORK. ADDITIONALLY, THE CONTRACTOR MUST EMPLOY NYSDOL CERTIFIED SUPERVISORS TO BE ON THE WORK SITE FOR ALL ABATEMENT ACTIVITIES. THE CONTRACTOR MUST BE CURRENTLY

LICENSED BY THE NYSDOL.

4. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED MATERIALS WITHIN THE SPECIFIED AREAS.

5. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL QUANTITIES OF ASBESTOS-CONTAINING MATERIALS.

6. CONTRACTOR IS RESPONSIBLE FOR PRECLEANING ANY AND ALL EXISTING ASBESTOS CONTAMINATION, DUST AND DEBRIS WITHIN THE REMOVAL AREAS.

7. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF BUILDING FINISHES. FLOORING SHALL BE PROTECTED WITH 1/8" MASONITE SHEETS. THE CONTRACTOR SHALL REPAIR ANY AND ALL DAMAGES CAUSED BY ABATEMENT

ACTIVITIES OR HIS PERSONNEL.

8. THE CONTRACTOR IS TO REMOVE THE ASBESTOS-CONTAINING MATERIALS (ACM'S) IN ACCORDANCE WITH NEW YORK STATE INDUSTRIAL CODE RULE 56 (12 NYCRR PART 56), THE VA SPECIFICATION AND APPLICABLE FEDERAL OSHA AND EPA REGULATIONS. WHERE THERE IS A DISCREPANCY, THE MOST STRINGENT REGULATION SHALL APPLY.

9. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF HIS REMOTE PERSONNEL AND WASTE DECONTAMINATION UNIT(S), AND WASTE DUMPSTER WITH THE COR.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES RESULTING FROM ASBESTOS ABATEMENT ACTIVITIES.

11. SCHEDULING OF WORK SHALL BE COORDINATED WITH THE COR. ASBESTOS ABATEMENT SHALL BE COORDINATED TO AVOID INTERRUPTIONS TO THE NORMAL ACTIVITIES OF THE FACILITY. THE REMOVAL MAY BE SCHEDULED AFTER

NORMAL BUSINESS HOURS AT NO ADDITIONAL COST TO THE OWNER.

12. IN AREAS OF PUBLIC ACCESS, THE CONTRACTOR SHALL ERECT ISOLATION BARRIERS THAT SEPARATE THE WORK AREAS FROM THE REMAINDER OF THE BUILDING. THE BARRIERS SHALL BE CONSTRUCTED OF A FIRE RETARDANT SHEATHING MATERIAL OF AT LEAST 1/2" THICKNESS. THE ISOLATION BARRIER SHALL BE PLASTICIZED WITH TWO (2) LAYERS OF 6-MIL PLASTIC SHEETING. THE ISOLATION BARRIERS SHALL BE CAULKED AT THE SHEATHING SEAMS AND WHERE THE SHEATHING MEETS THE FLOOR, WALLS AND CEILING. THE ISOLATION BARRIER SHALL BE CONSTRUCTED USING 2"X4" FRAMING, 16 INCHES CENTER-TO-CENTER, AND CAULKED AT ALL SEAMS.

13. THE ABATEMENT CONTRACTOR SHALL PERFORM REMOVAL WITHIN HEPA-FILTERED NEGATIVE AIR PRESSURE TENT ENCLOSURES. ALL ABATEMENT AREAS SHALL HAVE AN AIRLOCK ENTRANCE OR ATTACHED DECON UNIT. THE TENT ENCLOSURE SHALL BE VENTED TO THE OUTDOOR AIR VIA HEPA-FILTERED NEGATIVE AIR MACHINES. TENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH 12 NYCRR PART 56. IN AREAS OF PUBLIC ACCESS, THE TENT ENCLOSURES SHALL

BE SHEATHED FOR SAFETY.

LEGEND

AREA TO BE ABATED BY CONTRACTOR

AutoCAD SHX Text D.F.

D.F.

DUCT

CHASE

PROV. OFFICE SMITH

TOILET

PROSTHETICS

PROTHETICS

TELEHEALTH

TELEHEALTH WAITING

TELEHEALTH EXAM RM

C&P

TELEHEALTH EXAM ROOM

TELEHEALTH

425A

C&P

417A

C&P

C&P

MENS TOILET

IRM TRAINING ROOM

414A

BREAK ROOM

414B

VESTIBULE

TELEHEALTH

TEMP. P.B.

413A

C&P STORAGE

CORRIDOR

4HA2-76

PAIN MGMT.

PAIN MGMT.

408A

PAIN MGMT.

TELEHEALTH GRP RM

TOILET

E.H. ROOM

TOILET

STORAGE

407A

EMP. HEALTH

DATA CLOSET

INFECTION CONTROL

OFFICE

EQUIP. STRG.

H.A.C.

CHIRO. OFF.

TOILET

431A

WAITING

EXAM ROOM

EXAM ROOM

401A

EXAM ROOM

EXAM RM

MED RM

434A

CHIRO EXAM

432B

MENS TOILET

432A

CORRIDOR

4HA1-76

CORRIDOR

4HA3-76

STERILE SUPPLY

DIRTY

NURSING OFFICE

PODIATRY EXAM

433A

CHIRO EXAM

CHIRO EXAM

TOILET

427A

EMPLOYEE TOILET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION, B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

H-102

JWE MPL

HAZARDOUS MATERIALS -

FOURTH FLOOR SOUTH

SCALE: 1/8" = 1'-0"

HAZARDOUS MATERIALS - FOURTH FLOOR SOUTH

E8

KEY NOTES:

1 GREY CERAMIC FLOOR TILE GROUT TO BE

ABATED BY CONTRACTOR

2 GREY CERAMIC FLOOR TILE GROUT TO BE

ABATED BY CONTRACTOR

HAZARDOUS MATERIAL NOTES:

1. THE CONTRACTOR SHALL REVIEW ALL HAZARDOUS MATERIALS SURVEYS PROVIDED AS PART OF THE CONTRACT DOCUMENTS. IF ANY ADDITIONAL HAZARDOUS MATERIALS ARE ENCOUNTERED, REPORT THEM TO THE COR AND AWAIT FURTHER GUIDANCE - THESE MATERIALS WILL REQUIRE REMOVAL/ABATEMENT IF DISTURBED BY THE CONSTRUCTION.

2. THE “PATH OF CONSTRUCTION SUPPLEMENTAL ASBESTOS-CONTAINING MATERIALS SURVEY” REPORT DATED 06/04/20 PERFORMED BY ECS SHALL BE INCLUDED AND FOLLOWED AS A CONSTRUCTION DOCUMENT. ALL ASBESTOS CONTAINING MATERIAL (ACM) AND PRESUMED ASBESTOS CONTAINING MATERIAL (PACM) SHALL BE ABATED.

3. ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE REGULATIONS. PERSONNEL HOLDING CURRENT NEW YORK STATE DEPARTMENT OF LABOR (NYSDOL) ASBESTOS HANDLER'S CERTIFICATES SHALL PERFORM THE WORK. ADDITIONALLY, THE CONTRACTOR MUST EMPLOY NYSDOL CERTIFIED SUPERVISORS TO BE ON THE WORK SITE FOR ALL ABATEMENT ACTIVITIES. THE CONTRACTOR MUST BE CURRENTLY

LICENSED BY THE NYSDOL.

4. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED MATERIALS WITHIN THE SPECIFIED AREAS.

5. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL QUANTITIES OF ASBESTOS-CONTAINING MATERIALS.

6. CONTRACTOR IS RESPONSIBLE FOR PRECLEANING ANY AND ALL EXISTING ASBESTOS CONTAMINATION, DUST AND DEBRIS WITHIN THE REMOVAL AREAS.

7. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF BUILDING FINISHES. FLOORING SHALL BE PROTECTED WITH 1/8" MASONITE SHEETS. THE CONTRACTOR SHALL REPAIR ANY AND ALL DAMAGES CAUSED BY ABATEMENT

ACTIVITIES OR HIS PERSONNEL.

8. THE CONTRACTOR IS TO REMOVE THE ASBESTOS-CONTAINING MATERIALS (ACM'S) IN ACCORDANCE WITH NEW YORK STATE INDUSTRIAL CODE RULE 56 (12 NYCRR PART 56), THE VA SPECIFICATION AND APPLICABLE FEDERAL OSHA AND EPA REGULATIONS. WHERE THERE IS A DISCREPANCY, THE MOST STRINGENT REGULATION SHALL APPLY.

9. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF HIS REMOTE PERSONNEL AND WASTE DECONTAMINATION UNIT(S), AND WASTE DUMPSTER WITH THE COR.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES RESULTING FROM ASBESTOS ABATEMENT ACTIVITIES.

11. SCHEDULING OF WORK SHALL BE COORDINATED WITH THE COR. ASBESTOS ABATEMENT SHALL BE COORDINATED TO AVOID INTERRUPTIONS TO THE NORMAL ACTIVITIES OF THE FACILITY. THE REMOVAL MAY BE SCHEDULED AFTER

NORMAL BUSINESS HOURS AT NO ADDITIONAL COST TO THE OWNER.

12. IN AREAS OF PUBLIC ACCESS, THE CONTRACTOR SHALL ERECT ISOLATION BARRIERS THAT SEPARATE THE WORK AREAS FROM THE REMAINDER OF THE BUILDING. THE BARRIERS SHALL BE CONSTRUCTED OF A FIRE RETARDANT SHEATHING MATERIAL OF AT LEAST 1/2" THICKNESS. THE ISOLATION BARRIER SHALL BE PLASTICIZED WITH TWO (2) LAYERS OF 6-MIL PLASTIC SHEETING. THE ISOLATION BARRIERS SHALL BE CAULKED AT THE SHEATHING SEAMS AND WHERE THE SHEATHING MEETS THE FLOOR, WALLS AND CEILING. THE ISOLATION BARRIER SHALL BE CONSTRUCTED USING 2"X4" FRAMING, 16 INCHES CENTER-TO-CENTER, AND CAULKED AT ALL SEAMS.

13. THE ABATEMENT CONTRACTOR SHALL PERFORM REMOVAL WITHIN HEPA-FILTERED NEGATIVE AIR PRESSURE TENT ENCLOSURES. ALL ABATEMENT AREAS SHALL HAVE AN AIRLOCK ENTRANCE OR ATTACHED DECON UNIT. THE TENT ENCLOSURE SHALL BE VENTED TO THE OUTDOOR AIR VIA HEPA-FILTERED NEGATIVE AIR MACHINES. TENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH 12 NYCRR PART 56. IN AREAS OF PUBLIC ACCESS, THE TENT ENCLOSURES SHALL

BE SHEATHED FOR SAFETY.

3 YELLOW MASTIC TO BE ABATED BY

CONTRACTOR

4 1' X 1' VFT TO BE ABATED BY CONTRACTOR

5 BROWN COVE BASE AND MASTIC TO BE

ABATED BY CONTRACTOR

6 YELLOW/BLACK CARPET MASTIC TO BE

ABATED BY CONTRACTOR

7 VFT AND BLACK/BROWN MASTIC TO BE

ABATED BY CONTRACTOR

8 BLACK HVAC DUCT WRAP TO BE ABATED

BY CONTRACTOR

9 GREEN AND OLIVE VFT TO BE ABATED BY

CONTRACTOR

LEGEND

AREA TO BE ABATED BY CONTRACTOR

EXAM RM

STORAGE

434B

SPECIALTY SUPPORT

EMPLOYEE TOILET

EXAM RM

CLEAN UTIL.

465B

STORAGE

465A

MED RM

464A

EYE EXAM

EYE EXAM

463A

PROG. ASST.

EYE EXAM

DATA CLOSET

WAITING RM

MED INSTR. TECH

MED INSTR. TECH

ECHO ROOM

EMS STR.

456B

STORAGE

456A

FAMTEL BDRM

FAMTEL BDRM

CORRIDOR

4HA7-76

HOPTEL BDRM

HOPTEL BDRM

HOPTEL BDRM

TOILET

TOILET

UNASSIGN

CONFERENCE RM

HOPTEL/FAMTEL LOUNGE

EKG ROOM EXAM TABLE

STORAGE

LACTATION/ COPIER/FAX

TOILET

440A

H.A.C.

PROG. ASST.

WOMENS TOILET

439A

LOW VISION CLINIC

STORAGE

439B

RETHERM. ROOM

EXAM RM

CORRIDOR

4HA6-76

CORRIDOR

4HA4-76

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION, B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

H-103

JWE MPL

HAZARDOUS MATERIALS -

FOURTH FLOOR NORTH

SCALE: 1/8" = 1'-0"

HAZARDOUS MATERIALS - FOURTH FLOOR NORTH

E8

HAZARDOUS MATERIAL NOTES:

1. THE CONTRACTOR SHALL REVIEW ALL HAZARDOUS MATERIALS SURVEYS PROVIDED AS PART OF THE CONTRACT DOCUMENTS. IF ANY ADDITIONAL HAZARDOUS MATERIALS ARE ENCOUNTERED, REPORT THEM TO THE COR AND AWAIT FURTHER GUIDANCE - THESE MATERIALS WILL REQUIRE REMOVAL/ABATEMENT IF DISTURBED BY THE CONSTRUCTION.

2. THE “PATH OF CONSTRUCTION SUPPLEMENTAL ASBESTOS-CONTAINING MATERIALS SURVEY” REPORT DATED 06/04/20 PERFORMED BY ECS SHALL BE INCLUDED AND FOLLOWED AS A CONSTRUCTION DOCUMENT. ALL ASBESTOS CONTAINING MATERIAL (ACM) AND PRESUMED ASBESTOS CONTAINING MATERIAL (PACM) SHALL BE ABATED.

3. ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE REGULATIONS. PERSONNEL HOLDING CURRENT NEW YORK STATE DEPARTMENT OF LABOR (NYSDOL) ASBESTOS HANDLER'S CERTIFICATES SHALL PERFORM THE WORK. ADDITIONALLY, THE CONTRACTOR MUST EMPLOY NYSDOL CERTIFIED SUPERVISORS TO BE ON THE WORK SITE FOR ALL ABATEMENT ACTIVITIES. THE CONTRACTOR MUST BE CURRENTLY

LICENSED BY THE NYSDOL.

4. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED MATERIALS WITHIN THE SPECIFIED AREAS.

5. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL QUANTITIES OF ASBESTOS-CONTAINING MATERIALS.

6. CONTRACTOR IS RESPONSIBLE FOR PRECLEANING ANY AND ALL EXISTING ASBESTOS CONTAMINATION, DUST AND DEBRIS WITHIN THE REMOVAL AREAS.

7. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF BUILDING FINISHES. FLOORING SHALL BE PROTECTED WITH 1/8" MASONITE SHEETS. THE CONTRACTOR SHALL REPAIR ANY AND ALL DAMAGES CAUSED BY ABATEMENT

ACTIVITIES OR HIS PERSONNEL.

8. THE CONTRACTOR IS TO REMOVE THE ASBESTOS-CONTAINING MATERIALS (ACM'S) IN ACCORDANCE WITH NEW YORK STATE INDUSTRIAL CODE RULE 56 (12 NYCRR PART 56), THE VA SPECIFICATION AND APPLICABLE FEDERAL OSHA AND EPA REGULATIONS. WHERE THERE IS A DISCREPANCY, THE MOST STRINGENT REGULATION SHALL APPLY.

9. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF HIS REMOTE PERSONNEL AND WASTE DECONTAMINATION UNIT(S), AND WASTE DUMPSTER WITH THE COR.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES RESULTING FROM ASBESTOS ABATEMENT ACTIVITIES.

11. SCHEDULING OF WORK SHALL BE COORDINATED WITH THE COR. ASBESTOS ABATEMENT SHALL BE COORDINATED TO AVOID INTERRUPTIONS TO THE NORMAL ACTIVITIES OF THE FACILITY. THE REMOVAL MAY BE SCHEDULED AFTER

NORMAL BUSINESS HOURS AT NO ADDITIONAL COST TO THE OWNER.

12. IN AREAS OF PUBLIC ACCESS, THE CONTRACTOR SHALL ERECT ISOLATION BARRIERS THAT SEPARATE THE WORK AREAS FROM THE REMAINDER OF THE BUILDING. THE BARRIERS SHALL BE CONSTRUCTED OF A FIRE RETARDANT SHEATHING MATERIAL OF AT LEAST 1/2" THICKNESS. THE ISOLATION BARRIER SHALL BE PLASTICIZED WITH TWO (2) LAYERS OF 6-MIL PLASTIC SHEETING. THE ISOLATION BARRIERS SHALL BE CAULKED AT THE SHEATHING SEAMS AND WHERE THE SHEATHING MEETS THE FLOOR, WALLS AND CEILING. THE ISOLATION BARRIER SHALL BE CONSTRUCTED USING 2"X4" FRAMING, 16 INCHES CENTER-TO-CENTER, AND CAULKED AT ALL SEAMS.

13. THE ABATEMENT CONTRACTOR SHALL PERFORM REMOVAL WITHIN HEPA-FILTERED NEGATIVE AIR PRESSURE TENT ENCLOSURES. ALL ABATEMENT AREAS SHALL HAVE AN AIRLOCK ENTRANCE OR ATTACHED DECON UNIT. THE TENT ENCLOSURE SHALL BE VENTED TO THE OUTDOOR AIR VIA HEPA-FILTERED NEGATIVE AIR MACHINES. TENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH 12 NYCRR PART 56. IN AREAS OF PUBLIC ACCESS, THE TENT ENCLOSURES SHALL

BE SHEATHED FOR SAFETY.

KEY NOTES:

1 1' X 1' VFT AND MASTIC TO BE ABATED BY

CONTRACTOR

2 1' X 1' VFT TO BE ABATED BY CONTRACTOR

3 1' X 1' BROWN AND WHITE VFT AND MASTIC

TO BE ABATED BY CONTRACTOR

4 GREEN CARPET MASTIC TO BE ABATED BY

CONTRACTOR

5 1' X 1' VFT TO BE ABATED BY CONTRACTOR

6 1' X 1' VFT TO BE ABATED BY CONTRACTOR

7 1' X 1' BROWN AND WHITE VFT AND MASTIC

TO BE ABATED BY CONTRACTOR

SW-6/76

PENTHOUSE

ELEVATOR

NO.1

6ATS1-76

6HA5-76

6ATS1-76

6ATS2-76

6ATS3-76

6HA1-76

DATA CLOSET

ELEV. NO.3

611A

ELEV. NO.2DIRTY UTL.

605 605A 604 606 603

607A

HAC

RESTROOM

GROUP ROOM

OFFICE MNGR.

OFFICE

MED. RM.

OFFICE BREAKRM.

STORAGE

LAUNDRY CHUTE

OFFICE

PATIENT RM.

PATIENT RM.

PATIENT RM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION, B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

H-104

JWE MPL

HAZARDOUS MATERIALS -

SIXTH FLOOR SOUTH

SCALE: 1/8" = 1'-0"

HAZARDOUS MATERIALS - SIXTH FLOOR SOUTH

E8

HAZARDOUS MATERIAL NOTES:

1. THE CONTRACTOR SHALL REVIEW ALL HAZARDOUS MATERIALS SURVEYS PROVIDED AS PART OF THE CONTRACT DOCUMENTS. IF ANY ADDITIONAL HAZARDOUS MATERIALS ARE ENCOUNTERED, REPORT THEM TO THE COR AND AWAIT FURTHER GUIDANCE - THESE MATERIALS WILL REQUIRE REMOVAL/ABATEMENT IF DISTURBED BY THE CONSTRUCTION.

2. THE “PATH OF CONSTRUCTION SUPPLEMENTAL ASBESTOS-CONTAINING MATERIALS SURVEY” REPORT DATED 06/04/20 PERFORMED BY ECS SHALL BE INCLUDED AND FOLLOWED AS A CONSTRUCTION DOCUMENT. ALL ASBESTOS CONTAINING MATERIAL (ACM) AND PRESUMED ASBESTOS CONTAINING MATERIAL (PACM) SHALL BE ABATED.

3. ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE REGULATIONS. PERSONNEL HOLDING CURRENT NEW YORK STATE DEPARTMENT OF LABOR (NYSDOL) ASBESTOS HANDLER'S CERTIFICATES SHALL PERFORM THE WORK. ADDITIONALLY, THE CONTRACTOR MUST EMPLOY NYSDOL CERTIFIED SUPERVISORS TO BE ON THE WORK SITE FOR ALL ABATEMENT ACTIVITIES. THE CONTRACTOR MUST BE CURRENTLY

LICENSED BY THE NYSDOL.

4. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED MATERIALS WITHIN THE SPECIFIED AREAS.

5. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL QUANTITIES OF ASBESTOS-CONTAINING MATERIALS.

6. CONTRACTOR IS RESPONSIBLE FOR PRECLEANING ANY AND ALL EXISTING ASBESTOS CONTAMINATION, DUST AND DEBRIS WITHIN THE REMOVAL AREAS.

7. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF BUILDING FINISHES. FLOORING SHALL BE PROTECTED WITH 1/8" MASONITE SHEETS. THE CONTRACTOR SHALL REPAIR ANY AND ALL DAMAGES CAUSED BY ABATEMENT

ACTIVITIES OR HIS PERSONNEL.

8. THE CONTRACTOR IS TO REMOVE THE ASBESTOS-CONTAINING MATERIALS (ACM'S) IN ACCORDANCE WITH NEW YORK STATE INDUSTRIAL CODE RULE 56 (12 NYCRR PART 56), THE VA SPECIFICATION AND APPLICABLE FEDERAL OSHA AND EPA REGULATIONS. WHERE THERE IS A DISCREPANCY, THE MOST STRINGENT REGULATION SHALL APPLY.

9. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF HIS REMOTE PERSONNEL AND WASTE DECONTAMINATION UNIT(S), AND WASTE DUMPSTER WITH THE COR.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES RESULTING FROM ASBESTOS ABATEMENT ACTIVITIES.

11. SCHEDULING OF WORK SHALL BE COORDINATED WITH THE COR. ASBESTOS ABATEMENT SHALL BE COORDINATED TO AVOID INTERRUPTIONS TO THE NORMAL ACTIVITIES OF THE FACILITY. THE REMOVAL MAY BE SCHEDULED AFTER

NORMAL BUSINESS HOURS AT NO ADDITIONAL COST TO THE OWNER.

12. IN AREAS OF PUBLIC ACCESS, THE CONTRACTOR SHALL ERECT ISOLATION BARRIERS THAT SEPARATE THE WORK AREAS FROM THE REMAINDER OF THE BUILDING. THE BARRIERS SHALL BE CONSTRUCTED OF A FIRE RETARDANT SHEATHING MATERIAL OF AT LEAST 1/2" THICKNESS. THE ISOLATION BARRIER SHALL BE PLASTICIZED WITH TWO (2) LAYERS OF 6-MIL PLASTIC SHEETING. THE ISOLATION BARRIERS SHALL BE CAULKED AT THE SHEATHING SEAMS AND WHERE THE SHEATHING MEETS THE FLOOR, WALLS AND CEILING. THE ISOLATION BARRIER SHALL BE CONSTRUCTED USING 2"X4" FRAMING, 16 INCHES CENTER-TO-CENTER, AND CAULKED AT ALL SEAMS.

13. THE ABATEMENT CONTRACTOR SHALL PERFORM REMOVAL WITHIN HEPA-FILTERED NEGATIVE AIR PRESSURE TENT ENCLOSURES. ALL ABATEMENT AREAS SHALL HAVE AN AIRLOCK ENTRANCE OR ATTACHED DECON UNIT. THE TENT ENCLOSURE SHALL BE VENTED TO THE OUTDOOR AIR VIA HEPA-FILTERED NEGATIVE AIR MACHINES. TENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH 12 NYCRR PART 56. IN AREAS OF PUBLIC ACCESS, THE TENT ENCLOSURES SHALL

BE SHEATHED FOR SAFETY.

KEY NOTES:

1 BLACK HVAC DUCT WRAP TO BE ABATED BY

CONTRACTOR

2 JOINT COMPOUND TO BE ABATED BY

CONTRACTOR

6ATN1-76

6ATN3-76

6HA6-76 6ATN5-76

6H A7

-7

6ATN4-76

6HA2-76

615615A

623A 624A

622 621 620

617A617

616A

6186HA3-76

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION, B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

H-105

JWE MPL

HAZARDOUS MATERIALS -

SIXTH FLOOR NORTH

SCALE: 1/8" = 1'-0"

HAZARDOUS MATERIALS - SIXTH FLOOR NORTH

E8

HAZARDOUS MATERIAL NOTES:

1. THE CONTRACTOR SHALL REVIEW ALL HAZARDOUS MATERIALS SURVEYS PROVIDED AS PART OF THE CONTRACT DOCUMENTS. IF ANY ADDITIONAL HAZARDOUS MATERIALS ARE ENCOUNTERED, REPORT THEM TO THE COR AND AWAIT FURTHER GUIDANCE - THESE MATERIALS WILL REQUIRE REMOVAL/ABATEMENT IF DISTURBED BY THE CONSTRUCTION.

2. THE “PATH OF CONSTRUCTION SUPPLEMENTAL ASBESTOS-CONTAINING MATERIALS SURVEY” REPORT DATED 06/04/20 PERFORMED BY ECS SHALL BE INCLUDED AND FOLLOWED AS A CONSTRUCTION DOCUMENT. ALL ASBESTOS CONTAINING MATERIAL (ACM) AND PRESUMED ASBESTOS CONTAINING MATERIAL (PACM) SHALL BE ABATED.

3. ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE REGULATIONS. PERSONNEL HOLDING CURRENT NEW YORK STATE DEPARTMENT OF LABOR (NYSDOL) ASBESTOS HANDLER'S CERTIFICATES SHALL PERFORM THE WORK. ADDITIONALLY, THE CONTRACTOR MUST EMPLOY NYSDOL CERTIFIED SUPERVISORS TO BE ON THE WORK SITE FOR ALL ABATEMENT ACTIVITIES. THE CONTRACTOR MUST BE CURRENTLY

LICENSED BY THE NYSDOL.

4. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED MATERIALS WITHIN THE SPECIFIED AREAS.

5. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL QUANTITIES OF ASBESTOS-CONTAINING MATERIALS.

6. CONTRACTOR IS RESPONSIBLE FOR PRECLEANING ANY AND ALL EXISTING ASBESTOS CONTAMINATION, DUST AND DEBRIS WITHIN THE REMOVAL AREAS.

7. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF BUILDING FINISHES. FLOORING SHALL BE PROTECTED WITH 1/8" MASONITE SHEETS. THE CONTRACTOR SHALL REPAIR ANY AND ALL DAMAGES CAUSED BY ABATEMENT

ACTIVITIES OR HIS PERSONNEL.

8. THE CONTRACTOR IS TO REMOVE THE ASBESTOS-CONTAINING MATERIALS (ACM'S) IN ACCORDANCE WITH NEW YORK STATE INDUSTRIAL CODE RULE 56 (12 NYCRR PART 56), THE VA SPECIFICATION AND APPLICABLE FEDERAL OSHA AND EPA REGULATIONS. WHERE THERE IS A DISCREPANCY, THE MOST STRINGENT REGULATION SHALL APPLY.

9. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF HIS REMOTE PERSONNEL AND WASTE DECONTAMINATION UNIT(S), AND WASTE DUMPSTER WITH THE COR.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES RESULTING FROM ASBESTOS ABATEMENT ACTIVITIES.

11. SCHEDULING OF WORK SHALL BE COORDINATED WITH THE COR. ASBESTOS ABATEMENT SHALL BE COORDINATED TO AVOID INTERRUPTIONS TO THE NORMAL ACTIVITIES OF THE FACILITY. THE REMOVAL MAY BE SCHEDULED AFTER

NORMAL BUSINESS HOURS AT NO ADDITIONAL COST TO THE OWNER.

12. IN AREAS OF PUBLIC ACCESS, THE CONTRACTOR SHALL ERECT ISOLATION BARRIERS THAT SEPARATE THE WORK AREAS FROM THE REMAINDER OF THE BUILDING. THE BARRIERS SHALL BE CONSTRUCTED OF A FIRE RETARDANT SHEATHING MATERIAL OF AT LEAST 1/2" THICKNESS. THE ISOLATION BARRIER SHALL BE PLASTICIZED WITH TWO (2) LAYERS OF 6-MIL PLASTIC SHEETING. THE ISOLATION BARRIERS SHALL BE CAULKED AT THE SHEATHING SEAMS AND WHERE THE SHEATHING MEETS THE FLOOR, WALLS AND CEILING. THE ISOLATION BARRIER SHALL BE CONSTRUCTED USING 2"X4" FRAMING, 16 INCHES CENTER-TO-CENTER, AND CAULKED AT ALL SEAMS.

13. THE ABATEMENT CONTRACTOR SHALL PERFORM REMOVAL WITHIN HEPA-FILTERED NEGATIVE AIR PRESSURE TENT ENCLOSURES. ALL ABATEMENT AREAS SHALL HAVE AN AIRLOCK ENTRANCE OR ATTACHED DECON UNIT. THE TENT ENCLOSURE SHALL BE VENTED TO THE OUTDOOR AIR VIA HEPA-FILTERED NEGATIVE AIR MACHINES. TENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH 12 NYCRR PART 56. IN AREAS OF PUBLIC ACCESS, THE TENT ENCLOSURES SHALL

BE SHEATHED FOR SAFETY.

KEY NOTES:

1 BLACK HVAC DUCT WRAP TO BE ABATED BY

CONTRACTOR

2 HVAC VIBRATION DAMPENER TO BE

ABATED BY CONTRACTOR

3 BLACK DUCT WRAP AND INSULATION ON PIPE

HANGERS TO BE ABATED BY CONTRACTOR

LEGEND

AREA TO BE ABATED BY CONTRACTOR

6ATN2-76

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION, B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

H-106

JWE MPL

HAZARDOUS MATERIALS -

ATTIC

SCALE: 1/8" = 1'-0"

HAZARDOUS MATERIALS - ATTIC

D6

HAZARDOUS MATERIAL NOTES:

1. THE CONTRACTOR SHALL REVIEW ALL HAZARDOUS MATERIALS SURVEYS PROVIDED AS PART OF THE CONTRACT DOCUMENTS. IF ANY ADDITIONAL HAZARDOUS MATERIALS ARE ENCOUNTERED, REPORT THEM TO THE COR AND AWAIT FURTHER GUIDANCE - THESE MATERIALS WILL REQUIRE REMOVAL/ABATEMENT IF DISTURBED BY THE CONSTRUCTION.

2. THE “PATH OF CONSTRUCTION SUPPLEMENTAL ASBESTOS-CONTAINING MATERIALS SURVEY” REPORT DATED 06/04/20 PERFORMED BY ECS SHALL BE INCLUDED AND FOLLOWED AS A CONSTRUCTION DOCUMENT. ALL ASBESTOS CONTAINING MATERIAL (ACM) AND PRESUMED ASBESTOS CONTAINING MATERIAL (PACM) SHALL BE ABATED.

3. ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE REGULATIONS. PERSONNEL HOLDING CURRENT NEW YORK STATE DEPARTMENT OF LABOR (NYSDOL) ASBESTOS HANDLER'S CERTIFICATES SHALL PERFORM THE WORK. ADDITIONALLY, THE CONTRACTOR MUST EMPLOY NYSDOL CERTIFIED SUPERVISORS TO BE ON THE WORK SITE FOR ALL ABATEMENT ACTIVITIES. THE CONTRACTOR MUST BE CURRENTLY

LICENSED BY THE NYSDOL.

4. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED MATERIALS WITHIN THE SPECIFIED AREAS.

5. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL QUANTITIES OF ASBESTOS-CONTAINING MATERIALS.

6. CONTRACTOR IS RESPONSIBLE FOR PRECLEANING ANY AND ALL EXISTING ASBESTOS CONTAMINATION, DUST AND DEBRIS WITHIN THE REMOVAL AREAS.

7. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF BUILDING FINISHES. FLOORING SHALL BE PROTECTED WITH 1/8" MASONITE SHEETS. THE CONTRACTOR SHALL REPAIR ANY AND ALL DAMAGES CAUSED BY ABATEMENT

ACTIVITIES OR HIS PERSONNEL.

8. THE CONTRACTOR IS TO REMOVE THE ASBESTOS-CONTAINING MATERIALS (ACM'S) IN ACCORDANCE WITH NEW YORK STATE INDUSTRIAL CODE RULE 56 (12 NYCRR PART 56), THE VA SPECIFICATION AND APPLICABLE FEDERAL OSHA AND EPA REGULATIONS. WHERE THERE IS A DISCREPANCY, THE MOST STRINGENT REGULATION SHALL APPLY.

9. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF HIS REMOTE PERSONNEL AND WASTE DECONTAMINATION UNIT(S), AND WASTE DUMPSTER WITH THE COR.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES RESULTING FROM ASBESTOS ABATEMENT ACTIVITIES.

11. SCHEDULING OF WORK SHALL BE COORDINATED WITH THE COR. ASBESTOS ABATEMENT SHALL BE COORDINATED TO AVOID INTERRUPTIONS TO THE NORMAL ACTIVITIES OF THE FACILITY. THE REMOVAL MAY BE SCHEDULED AFTER

NORMAL BUSINESS HOURS AT NO ADDITIONAL COST TO THE OWNER.

12. IN AREAS OF PUBLIC ACCESS, THE CONTRACTOR SHALL ERECT ISOLATION BARRIERS THAT SEPARATE THE WORK AREAS FROM THE REMAINDER OF THE BUILDING. THE BARRIERS SHALL BE CONSTRUCTED OF A FIRE RETARDANT SHEATHING MATERIAL OF AT LEAST 1/2" THICKNESS. THE ISOLATION BARRIER SHALL BE PLASTICIZED WITH TWO (2) LAYERS OF 6-MIL PLASTIC SHEETING. THE ISOLATION BARRIERS SHALL BE CAULKED AT THE SHEATHING SEAMS AND WHERE THE SHEATHING MEETS THE FLOOR, WALLS AND CEILING. THE ISOLATION BARRIER SHALL BE CONSTRUCTED USING 2"X4" FRAMING, 16 INCHES CENTER-TO-CENTER, AND CAULKED AT ALL SEAMS.

13. THE ABATEMENT CONTRACTOR SHALL PERFORM REMOVAL WITHIN HEPA-FILTERED NEGATIVE AIR PRESSURE TENT ENCLOSURES. ALL ABATEMENT AREAS SHALL HAVE AN AIRLOCK ENTRANCE OR ATTACHED DECON UNIT. THE TENT ENCLOSURE SHALL BE VENTED TO THE OUTDOOR AIR VIA HEPA-FILTERED NEGATIVE AIR MACHINES. TENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH 12 NYCRR PART 56. IN AREAS OF PUBLIC ACCESS, THE TENT ENCLOSURES SHALL

BE SHEATHED FOR SAFETY.

KEY NOTES:

1 BLACK TAR IN CORK PIPE WRAP INSULATION

TO BE ABATED BY CONTRACTOR

203A

220A

W TOILET

206 SF

AUDIO CONTROL

125 SF

63 SF

34 SF

131 SF

PAT. ADVO.

238 SF

202D

AUDIOLOGY WTG/RECEPTION

214A

203B

HEARING AID. MOD.

AUDIOLOGY

202C

AUDIOLOGY RAMP

M TOILET

170 SF

135 SF

132 SF 156 SF

106 SF

34 SF

130 SF

248 SF

92 SF

205 204

2HA4-76

DATA CLOSET

221B

AUDIO OBSV.

DIRECTOR SEC.

GOSINK

101 SF110 SF

411 SF

246 SF

130 SF

101 SF

PUBLIC AFFAIRS

SPCH. PATHOLOGIST

VACANTEEO SPEC.

DEMO ENTIRE

ACT CEILING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

ARCHITECTURAL DEMOLITION PLAN -

SECOND FLOOR SOUTH

AD-101

EWW LMR

SCALE: 1/4" = 1'-0"

ARCHITECTURAL DEMOLITION PLAN - SECOND FLOOR SOUTH

A1

GENERAL NOTE:

SMOKE DETECTORS, SPRINKLERS AND DIFFUSERS TO BE

INDEPENDENTLY SUPPORTED AND PROTECTED DURING

CEILING REMOVAL, AND REINSTALLED IN NEW CEILING GRID.

REFER TO STRUCTURAL FOR

EXTENT OF FLOOR DEMOLITION

3'-6"

DEMO ACT

CEILING (ALL) AND

FLOOR FINISH

82 SF 96 SF 247 SF

142 SF 121 SF

765 SF

616 SF

348 SF

178 SF

189 SF 109 SF

82 SF

35 SF

187 SF

245 SF

238 SF

92 SF

FOOD SERVICE

VACANTVENDING AREA

UP

EL

EV

. 1

ASST. CHIEF

OT CLINIC

305 STAGE

CHAPEL

E.M.S.

318A

O.D. RM.

316A

TOILET

UNISEX

CONFERENCE RM

DATA CLOSET

SWSW3-76

DN 316

MOD LOUNGE

319B

319A

OFFICE

DIRTY UTIL

307B

OFFICE/STORG.

100 SF

62 SF

3HA4-76

RESP. WRKST.

DEMO EXISTING 42"Wx85"H WINDOW AND INTERIOR

ALUMINUM SILL. EXTERIOR STONE SILL TO REMAIN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

ARCHITECTURAL DEMOLITION PLAN -

THIRD FLOOR SOUTH

AD-102

EWW LMR

SCALE: 1/4" = 1'-0"

ARCHITECTURAL DEMOLITION PLAN - THIRD FLOOR SOUTH

A1

GENERAL NOTE:

SMOKE DETECTORS, SPRINKLERS AND DIFFUSERS TO BE

INDEPENDENTLY SUPPORTED AND PROTECTED DURING

CEILING REMOVAL, AND REINSTALLED IN NEW CEILING GRID.

AutoCAD SHX Text D.F.

DATA CLOSET

H.A.C.

431A

407A

EXAM RM

TOILET

405 404

TOILET

EL

EV

. 1

427 429

CHIRO OFF.

432A

TOILET

MENS

STORAGE

SWSW4-76

427A

4HA3-76

425A

PAIN MANGMT

CHIRO EXAM

WAITING

EQUIP. STRG.

EMP. HEALTH

TELEHEALTH

TELEHEALTH EXAM RM

INFECT.

OFFICE

DUCT

CONTROL CHASE

DEMO EXISTING 42"Wx85"H WINDOW AND INTERIOR

ALUMINUM SILL. EXTERIOR STONE SILL TO REMAIN.

DEMO ENTIRE ACT CEILING

REFER TO STRUCTURAL FOR EXTENT OF FLOOR DEMOLITION

DEMO PLUMBING FIXTURES

DEMO FLOOR FINISH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

ARCHITECTURAL DEMOLITION PLAN -

FOURTH FLOOR SOUTH

AD-103

EWW LMR

SCALE: 1/4" = 1'-0"

ARCHITECTURAL DEMOLITION PLAN - FOURTH FLOOR SOUTH

A1

GENERAL NOTE:

SMOKE DETECTORS, SPRINKLERS AND DIFFUSERS TO BE

INDEPENDENTLY SUPPORTED AND PROTECTED DURING

CEILING REMOVAL, AND REINSTALLED IN NEW CEILING GRID.

510A

508 507 506

5HA3-76

518I

518J

518K

160 SF

115 SF

119 SF

98 SF

264 SF

45 SF

76 SF

120 SF 114 SF119 SF113 SF

146 SF

25 SF

127 SF

79 SF167 SF

241 SF

92 SF

BVAC

BVAC

BVAC

BVAC

BVAC BVAC

BVAC

BVAC

MVAC

MVAC

IT

MVAC

DEMO EXISTING 42"Wx85"H WINDOW AND INTERIOR

ALUMINUM SILL. EXTERIOR STONE SILL TO REMAIN.

DEMO ACT

CEILING

SALVAGE ROLLER BLINDS, RADIATOR &

GRILLE COVER.TURN OVER TO OWNER

SEE STRUCTURAL FOR EXTENT OF FLOOR REMOVALS.

(FOR FUTURE DUCTWORK)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

ARCHITECTURAL DEMOLITION PLAN -

FIFTH FLOOR SOUTH

AD-104

EWW LMR

SCALE: 1/4" = 1'-0"

ARCHITECTURAL DEMOLITION PLAN - FIFTH FLOOR SOUTH

A1

GENERAL NOTE:

SMOKE DETECTORS, SPRINKLERS AND DIFFUSERS TO BE

INDEPENDENTLY SUPPORTED AND PROTECTED DURING

CEILING REMOVAL, AND REINSTALLED IN NEW CEILING GRID.

AutoCAD SHX Text D.F.

ELEV. NO.3

532532A

LOBBY

DIETICIAN

533A

558A

MENS TOILET

VACANT

534A

535A

UP

KITCHEN

STORE RM

PACT OFFICE

P.T. STOR.

555B

PHARM.

PACT TEAM 4

DATA CLOSET

TOILET

HAC

CORRIDOR

536A

5HA6-76

NO.4

FHR

ELEV.

DN

540A

CORRECTIVE THERAPY

MEETING RM

CHIEF, PM&R

PHYSICAL THERAPY

5HA7-76

SWC5-76

SW

EX

5-

SWNW5-76TOILETTOILET

DN

5H A7

-7

5HA4-76

561A

TOILET

559A

PSA OFFICE

WAITING ROOM

WOUND CLINIC

CLINICAL PHARM.

PATIENT ED.

NURSE STATION

501A 501

EQUIP.

TOILET TOILET

EXAM RM15

EXAM 17

534B

STORAGE

SW OFFICE

NURSE WORK RM.

ELEVATOR

ELEV. NO.2

MENS WOMENS

EXAM RM2

PSA OFFICE

PSA OFFICE

PACT OFFICE

VACANT

WAITING RM

EXAM RM1

AD-105

A2

DEMO ACT CEILING

DEMO ACT CEILING

DEMO ACT CEILING

DEMO ACT CEILING

DEMO ACT CEILING

DEMO ACT CEILING

DEMO ACT CEILING

DEMO ENTIRE ACT

CEILING

DEMO GYPSUM WALL BOARD, VINYL WALL

BASE, AND LGMF STUD CHASE WALLS

DEMO DRYWALL SOFFIT

ABOVE. REFER TO A-111

FOR EXTENT

DEMO ACT CEILING

TO EXTENT

NECESSARY FOR

SHAFT WALL WORK

CUT LOW COUNTERTOP. COORDINATE

EXTENT WITH NEW WALL.

REFER TO STRUCTURAL FOR

EXTENT OF FLOOR DEMOLITION

REMOVE BASE CABINET AND

SALVAGE FOR RE-INSTALLATION

REMOVE

TRANSACTION

COUNTER AND

SCREEN

DEMO HALF WALL TO EXTENT

NECESSARY FOR SHAFT WALL

CONSTRUCTION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

ARCHITECTURAL DEMOLITION PLAN -

FIFTH FLOOR NORTH

AD-105

EWW LMR

SCALE: 1/8" = 1'-0"

ARCHITECTURAL DEMOLITION PLAN - FIFTH FLOOR NORTH

A1

SCALE: 1/2" = 1'-0"

ENLARGED NURSING STATION DEMOLITION PLAN

A2

GENERAL NOTE:

SMOKE DETECTORS, SPRINKLERS AND DIFFUSERS TO BE

INDEPENDENTLY SUPPORTED AND PROTECTED DURING

CEILING REMOVAL, AND REINSTALLED IN NEW CEILING GRID.

AutoCAD SHX Text D.F.

ELEVATOR

NO.1

6ATS1-76

6HA5-76

6ATS2-76

6ATS3-76

607A

HAC

RESTROOM

179 SF 180 SF

252 SF

21 SF

MED. RM.

PATIENT RM.

MVAC

PHARMACY

REFER TO STRUCTURAL FOR EXTENT OF FLOOR REMOVAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

ARCHITECTURAL DEMOLITION -

SIXTH FLOOR SOUTH

AD-106

EWW LMR

SCALE: 1/4" = 1'-0"

ARCHITECTURAL DEMOLITION PLAN - SIXTH FLOOR SOUTH

A1

SW

EX

6-

UP

ACCESS

PANELS

PANELS

ACCESS

6ATN1-76

PENTHOUSE

NO.4

ELEVATOR

6ATN3-76

6HA6-76 6ATN5-76

6H A7

-7

6ATN4-76

6HA2-76 446 SF

7 S

F

DATA CLOSET

6HA4-76

615R 615A

UTIL.FH

TELE. CLOS. CLOS.

ELEV. NO.3

611A

ELEV. NO.2DIRTY UTL.

UP

CS-6/76

626 624

623A

624A

622 621 620

LINEN

HAC

617A617 616A

CLEAN

RESTROOM

195 SF

85 SF

189 SF

170 SF

147 SF

CORRIDOR

6HA3-76

125 SF

TOILET

66 SF

250 SF

109 SF

37 SF

23 SF

362 SF

409 SF

336 SF

224 SF 219 SF

272 SF 80 SF

186 SF

22 SF

229 SF366 SF

302 SF

115 SF

665 SF

GROUP ROOM

SPACE

PROVIDER OFF.

OFFICE MNGR.

OFFICE

STORAGE

MED RM

NURSES STATION

227 SF

13 SF 19 SF

BREAKRM.

STORAGE

PATIENT RM.

LAUNDRY CHUTE ELECTRICAL CLOSET

PATIENT RM.

PATIENT RM.

PATIENT RM. PATIENT RM. PATIENT RM.

3'-0"

CENTERED ON

WINDOW BELOW

CUT AND REMOVE EXISTING

BRICK WALL WITH CMU

BACKUP TO

ACCOMMODATE NEW

LOUVER. PROVIDE NEW

STL. LINTEL., REFER TO

LINTEL SCHEDULE.

DEMO EXISTING METAL STUD AND

GYP BD WALL CONSTRUCTION

REFER TO STRUCTURAL AND MECHANICAL

FOR EXTENT OF FLOOR REMOVAL

DEMO ACT CEILING

DEMOLISH WINDOW AND REPAIR OPENING TO

RECEIVE LOUVER

REFER TO STRUCTURAL AND

MECHANICAL FOR EXTENT OF

FLOOR REMOVAL

REFER TO STRUCTURAL AND

MECHANICAL FOR EXTENT OF

FLOOR REMOVAL

REFER TO STRUCTURAL AND

MECHANICAL FOR EXTENT OF

FLOOR REMOVAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

ARCHITECTURAL DEMOLITION -

SIXTH FLOOR NORTH

AD-107

EWW LMR

SCALE: 1/8" = 1'-0"

ARCHITECTURAL DEMOLITION PLAN - SIXTH FLOOR NORTH

A1

GENERAL NOTE:

SMOKE DETECTORS, SPRINKLERS AND DIFFUSERS TO BE

INDEPENDENTLY SUPPORTED AND PROTECTED DURING

CEILING REMOVAL, AND REINSTALLED IN NEW CEILING GRID.

AutoCAD SHX Text

6ATN2-76

AutoCAD SHX Text D.F.

7ATC1-76

7ATC2-76

DEMO EXISTING PLYWOOD DUCT CHASE

CUT AND REMOVE EXISTING BRICK

WALL WITH CMU BACKUP TO

ACCOMMODATE NEW LOUVER.

PROVIDE NEW STL. LINTEL., REFER

TO LINTEL SCHEDULE. COORDINATE

WITH MECHANICAL CONTRACTOR.

DEMO EXISTING WINDOW AND

LOUVER IN DORMERS. PREPARE

OPENINGS TO RECEIVE NEW

LOUVERS. TO BE COORDINATED

WITH MECHANICAL CONTRACTOR.

SEE STRUCTURAL DRAWINGS FOR EXTENT OF FLOOR DEMOLITION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

100% SUBMISSION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Watson Engineering 1112 State Route 434 Owego, NY 13827 (607)223-4334

Electrical Consultant C&S Companies 499 Col Eileen Collins Blvd Syracuse, NY 13212 (315)455-2000

UPGRADE VENTILATION B-76

BATH VAMC, BATH, NY

528A6-17-627

BUILDING 76

Project Director

7/8/2020Revisions: Date:

Asbestos Consultant ECS Mid-Atlantic, LLC 4507 Metropolitan Ct Frederick, MD 21704 (301)668-4303

Cost Estimating Trophy Point 4588 South Park Ave Buffalo, NY 14219 (716)823-0006

ARCHITECTURAL DEMOLITION PLAN -

ATTIC

AD-108

EWW LMR

SCALE: 1/8" = 1'-0"

ARCHITECTURAL PLAN - ATTIC

A1

125 SF

131 SF

238 SF

5 S

F

AUDIOLOGY WTG/RECEPTION

2H

A2 -7

170 SF

248 SF

92 SF

5 S

F

205 204

2HA4-76

DATA CLOSET

GOSINK

101 SF110 SF130 SF

101 SF

PUBLIC AFFAIRS

SPCH. PATHOLOGIST

VACANTEEO SPEC.

A-101

A3

AUDIOLOGY WTG/RECEPTION

170 SF

248 SF

92 SF

2HA4-76

SPCH. PATHOLOGIST

FLOOR PENETRATION ABOVE,

REFER TO MECHANICAL AND

STRUCTURAL (FOR FUTURE

DUCTWORK)

GENERAL NOTE:

SMOKE DETECTORS, SPRINKLERS AND DIFFUSERS TO BE

INDEPENDENTLY SUPPORTED AND PROTECTED DURING

CEILING REMOVAL, AND REINSTALLED IN NEW CEILING GRID.

A-101

B1

EXISTING WINDOW

OPENING

NEW 4" BRICK VENEER TO

MATCH EXISTING,

RECESS 2" FROM

FACE OF EXISTING

STONE SILL

STONE SILL TO REMAIN

EXISTING BRICK

A-101

A2

METAL C-H (OR E) STUDS 24" OC WITH

TOP DEFLECTION

(2) LAYERS 5/8" TYPE X GYP BD

M

I N

1" GYP BD LINER

PANEL

FIRE STOP AND SEALANT AT

RATED

WALLS

SCHEDULED

CEILING

2 HR RATING - UL DESIGN U497

TYPE MATERIAL DEPTH STUD

FIRE

RATING

UNBRACED

HEIGHT

DESCRIPTION

MD-3 GWB 4-3/4" 2-1/2" 2 HR - -

SCHEDULED

FLOOR/BASE

J-TRACK

J-TRACK

PAINT, MATCH EXISTING

MD

THROUGH WALL FLASHING AND WEEPS

4" BRICK VENEER TO MATCH EXISTING

6" CMU WITH INSULATED CORES

METAL LATH & PLASTER TO

MATCH EXISTING, WHERE

EXPOSED IN OCCUPIED ROOM

2"

EXISTING STONE SILL

EXISTING WALL CONSTRUCTION,

BRICK WITH CMU BACKUP

EXISTING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .