This document contains a pre-solicitation notice and federal contract opportunity related to upgrading the ventilation system in Building 76 at the Bath VA Medical Center. The pre-solicitation notice informs that the VA will be posting a solicitation on or about October 7, 2020 for project number 528A6-17-627. The general scope of work is to install a new central air distribution system on the 4th and part of the 5th floors, construct a chaseway for future ductwork, and connect certain piping systems. This is a 100% SDVOSB set-aside with a NAICS code of 238220 and an estimated value between $1-5 million. The solicitation will provide site visit details. A 20% bid bond and performance/payment bonds will be required. The federal contract opportunity restates much of this information and provides the solicitation number 36C24220B0064.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24220B0064 0004.docx | DOCX document | |
| 20201130 PreBid RFI Log Response to Contractors Updated.xlsx | XLSX spreadsheet | |
| 36C24220B0064 0003.docx | DOCX document | |
| 528A6-19-614 Upgrade Ventilation B76 Revised Specifications.pdf | ||
| 528A6-19-614 Upgrade Ventilation B76 Drawings - Revised.zip | ZIP file | |
| S06 - 9550-A VA Bath Healthcare Center Additional Limited ACM Survey Revised 6-10-2020_opt.pdf | ||
| 36C24220B0064 0002.docx | DOCX document | |
| S04 - Pre-Bid Attendance Sheet.pdf | ||
| 36C24220B0064 0001.docx | DOCX document | |
| 36C24220B0064_1.docx | DOCX document | |
| S02 - 528A6-19-614 Upgrade Ventilation B76 Specifications.pdf | ||
| S02 - 528A6-19-614 Upgrade Ventilation B76 Drawings.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 RFI Log-Project No 528A6-17-627, Upgrade Ventilation B-76 Date: 23 Nov 2020
| RFI# | Date Submitted | Description of RFI | Responsibility | Response | Status | |
| 1 | 10/22/20 | Per our conversation , please note teat the specifications appear to be missing the specific divisional table of contents. Please provide update as your schedule allows. | Watson | Concur-this is complete and will be provided with updated spec-book. | Answered/Additional Information Forthcoming | |
| 2a | 11/2/20 | What is the scope of work for the ceiling mastic that is on the 4th floor plaster ceiling above the drop ceiling? do we remove all of it , or only what is necessary for the other trades to do their work ? there is no note on the drawings indicating we do anything with it | C&S | Ceiling demolition shall follow description on mechanical demo drawings. Also see Asbestos Abatement specification. "Brown ceiling glue dots" have been identified as asbestos to be abated. Approximate quantities are indicated. | Answered/RFI Closed | |
| 2b | 11/2/20 | On drawing H-105 it calls for removal of the black duct wrap, it appears this was previously removed as during the pre bid walk thru we could not find it, Please confirm if it is there and it's locations. | ECS | Please ensure close review of specification 02 82 11 and the ECS asbestos survey report dated 4 June 2020. In the ECS Report 9550-A, we have included edits to provided drawings indicating a broad extent of where materials were found in the survey. These areas are not all inclusive and materials could be found outside of these areas. The black duct wrap is marked on Drawing M-102/M-106/M-107 in Appendix II drawings. There are several areas with black HVAC duct wrap (room 434 air handler, 6th floor). Appendix III, photos 2 & 3 (black tar coating/black duct wrap) shows the exact material we are referencing. | Answered/RFI Closed | |
| 3a | 11/2/20 | There’s new windows called out on MD101 KN#2? Could you please provide specs for those? | Watson/VA/C&S | To clarify, the windows called out shall have the existing window AC units removed and demolished, insulating panel with cut-out for AC unit removed and demolished, and new glazing installed to match existing. Only new glazing will for these windows will be required under this project. Additional details, to include spec 08 80 00 shall follow. | Answered/Additional Information Forthcoming | |
| 3b | 11/2/20 | Also, the “windows” more like skylights on AD-107…are there photos of the existing so we have a plan of attack for the removal? Who is the roofing warranty with? | C&S/VA | The windows are vertical, located in roof dormers, not skylights. See typical dormer louver infill elevation A2/A-108. See photo at link. https://drive.google.com/file/d/18GNSKf_wcLTHzUUC6dnkokvKK97BVJFa/view?usp=sharing | ||
| The existing roof is slate, constructed in 1938. There is no existing warranty. | Answered/RFI Closed | |||||
| 4a | 11/3/20 | During the site visit meeting, it was observed that between the ACT ceiling, and existing secondary ceiling, down the corridors and in the rooms on the forth and fifth floors, that a significant amount of conduits, pipes, cables, Unistrut, all-thread supports and more are present. It was mentioned that the intent is re-locate all existing items as needed to run the new ductwork and new piping as required. Please advise if there are any As-built drawings and if any information that can be provided to quantify the amount of items to be relocated. | Watson | No as-built drawings are available that detail above ceiling equipment and are impossible to be created until the ceiling is removed. Please refer to mechanical demolition notes #1 and #2, which describes exactly the scope of work as it applies to above ceiling work and see drawings for extent of demolition work. | Answered/RFI Closed | |
| 4b | 11/3/20 | Demolition Note# 4 on the “MD” drawings indicate that a full set of coordinated shop drawings will be required for all work above the existing ceilings. Please advise if a list describing the existing elements/trades will be provided to the contractor (i.e. Fire Suppression, Fire Alarm Electrical, Plumbing, Comm, etc.). If As-Built drawings and quantities of existing items to be relocated cannot be determined, please advise if approximate quantities for each element/trade will be provided for fair bidding purposes. | Watson | A full set of coordinated shop drawings (in CAD) shall be provided per note #4 on MD drawings. Trades shall include HVAC ductwork, HVAC piping, plumbing (including MEDGAS), electrical (including fire alarm and telecom), sprinkler, and structural steel. Also see specification 01 33 23, technical definition of coordination drawings on specification 01 91 00, specification 22 05 11 section 1.4I, specification 23 05 11 section 1.4H and notes #3, #4, and #10 on drawing M001 for additional details and requirements. | Answered/RFI Closed | |
| 4c | 11/3/20 | During the site visit, it was noted that there is an existing secondary drop ceiling above the ACT. This secondary ceiling tile removal/abatement and associated materials is indicated to be removed per Specification Section 02 82 11 / 1.1.2 Extent of Work. The drawings do not appear to delineate this work. Please advise if the scope of work in the specifications for the ceiling removal will be illustrated on the drawings. | ECS/C&S | see response to RFI 2a | Answered/RFI Closed | |
| 4d | 11/3/20 | Drawing Sheet# M-302 / Detail C6 indicates to extend 3” piping and run 6” piping alongside the building. Please advise if a detail illustrating the preferred piping support method alongside the building will be provided. | Watson | Detail and additional information shall follow. Also see specification 23 05 11, secton 3.5. | Answered/Additional Information Forthcoming | |
| 4e | 11/3/20 | Drawing Sheet# M-302 / Detail C6 indicates to run 3” piping to connection points in the basement. Please advise if a drawing will be provided to show the desired connection locations in the basement, connection details, etc. | Watson | See partial plan C9/MP-102. This is mislabeled as demolition work and will be updated. | Answered/RFI Closed | |
| 4f | 11/3/20 | Please advise the facility’s existing Fire Alarm contractor. | VA | Fire Alarm Contractor is Johnson Controls | Answered/RFI Closed | |
| 4g | 11/3/20 | The drawings indicate they are 100% submission drawings, but are not stamped by a PE. Please advise if the provided drawings without a PE stamp will be those used for bidding and construction. | Watson | A final set of drawings, addressing these RFIs as appropriate, that shall be issued for final bidding and construction. | Answered/RFI Closed | |
| 5a | 11/3/20 | Also, if you can tell us if the glazing would be able to be done from the inside as apposed to from the outside with a crane, that would be helpful. | C&S | Based on our field investigation, all windows appear to be interior glazed (i.e. accessible from inside). We are in the process of determining if any windows exist where this is not the case and if any exterior glazed windows exist, those will be called out on drawings. For bidding purposes, all windows should be assumed to be interior glazed. | Answered/Additional Information Forthcoming | |
| 6a | 11/10/20 | Major equipment like Air Handling Unit, Coils including filters: basis of design (BOD)/ manufacturer are not specified. Is TRANE providing the AHUs as BOD/ manufacturer? | Watson | Please use TRANE as BOD. | Answered/RFI Closed | |
| 6b | 11/10/20 | Please provide us drawing detail assembly for major equipment aside from schematic diagrams and points list. | Watson | An updated BOD selection from TRANE shall be shared as part of the bid package. | Answered/Additional Information Forthcoming | |
| 7a | 11/11/20 | As for concern#2, I/we were able to solve this issue except for a verification on symbols or tags V-1, V-2, V-3, V-4, V-5, V-7, V-8, V-9 in drawing MP104 and MP105. These symbols appears to be butterfly valves, no V-6 found. For your information only. | Watson | Acknowledged and yes, butterfly valves. | Answered/RFI Closed | |
| 8a | 11/12/20 | Our main concern is the access to B-76 for demo of Air Handler Units; one on 6th Floor and two in Attic; for new AHU, we will install one on 6th Floor and one in Attic. If access will be via elevators, please specify location in the drawings (w/ size and height). | Watson/VA | Service elevators available for use per proper coordination and approval by VA. Elevator service available up to 6th floor only, then stairs (single flight) required for access into attic. Contractor responsible for field verifying and determining means/methods for transporting equipment into/out of renovation spaces. Also please note: Elevators are shown on Drawing MP102. They are directly across from the center stairwell. Each car is 88-1/2"H X 85"L X 54"W. | Answered/RFI Closed | |
| 8b | 11/12/20 | I/we would like to request information of the existing expansion tank (tagged ET-3); manufacturer/brand, physical & working condition (w/ photo if available). | Watson/VA | ET-3 is shown drawing MP104 and is scheduled on M601. This expansion tank is existing and needs to be re-located to where indicated. Please note that chilled water system is 40% ethylene glycol and glycol used to fill system shall be Dynalene. | Answered/RFI Closed | |
| 9 | 11/12/20 | See attached | Watson | 1) see ans to RFI 7a above; 2) concur, sheet labeling will be adjusted; 3) concur, pipe sizes to be provided. See answer to RFI 8b regarding expansion tank. | Answered/Additional Information Forthcoming | |
| 10 | 11/12/20 | This is duplicated from RFI 9 - same attachment | Watson | see answer to RFI 9 above | Answered/RFI Closed | |
| 11 | 11/12/20 | This is duplicated from RFI 9 - same attachment | Watson | see answer to RFI 9 above | Answered/RFI Closed | |
| 12 | 11/12/20 | Will you able to provide standard detail drawings of the equipment (AHU and Heat & Cooling Coil, Heat Exchanger Skid and VAV Terminal) for this project? | Watson | see answer to RFI 17 below | Answered/RFI Closed | |
| 13 | 11/12/20 | This is duplicated from RFI 9 - same attachment | Watson | see answer to RFI 9 | Answered/RFI Closed | |
| 14a | 11/12/20 | Is project tax exempt? | VA | Project is tax exempt. | Answered/RFI Closed | |
| 14b | 11/12/20 | Can superintendent also be the SSHO? | VA | See answer to RFI 14d | Answered/RFI Closed | |
| 14c | 11/12/20 | Can superintendent also be the QA/QC? | VA | See answer to RFI 14d | Answered/RFI Closed | |
| 14d | 11/12/20 | Can superintendent also be the SSHO & QA/QC? | VA | For this size of project, the superintendent May be both SSHO ( assuming that this stands for Site Safety and Health Officer) as well as the QA/QC officer. | Answered/RFI Closed | |
| 14e | 11/12/20 | Provide location of project trailer lay-down area and size to be allocated. |
- Provide specification of site fencing to be utilized
| - Is screening required? | VA | Lay down area is across the gate and the railroad tracks. It is a very large area and will accommodate as much lay down material as you want. As it is already gated, fencing will not be required. | Answered/RFI Closed | |||
| 14f | 11/12/20 | What is existing thickness of existing concrete slab(s) to be removed? | C&S | GC responsible to Field verify all existing conditions. Existing drawings indicate 2" thick slabs in scope areas. See detail C6/S-501. | Answered/RFI Closed | |
| 14g | 11/12/20 | What is thickness of concrete pan joist of floor slab? Overall depth and thickness | C&S | GC responsible to Field verify all existing conditions. Existing drawings indicate 6" and 8" additional thickness below bottom of slab field condition appears to correspond. See detail C6/S-501. | Answered/RFI Closed | |
| 14h | 11/12/20 | Confirm that existing concrete does not contain ACM materials | ECS | We did not sample concrete since this would have been a destructive activity. Additionally, NY Code 56-5.1 f (1 does not list concrete as a suspect ACM). | Answered/RFI Closed | |
| 14i | 11/12/20 | Will pre / post tension cables be cut during the demolition process of slabs? | C&S | None known to exist. Existing drawings indicate only rebar. | Answered/RFI Closed | |
| 14j | 11/12/20 | Provide details for support of AHU as called out, E7/S-103. Provide information of existing bearing spreader channels |
- What is existing steel size for drilling?
- Can holes be burned?
| - What is anchor specification? | C&S | See A6/S-501, Existing is a C6, web bearing on the floor per details. Anchor unit as normal per unit mfgr specs to floor if required, just install any anchors through channel web to the floor. Careful hole burning could be used offsite but is not permitted inside the building. New C6 option noted on details if salvage is not fabricator preference. No additional detailing required. | Answered/RFI Closed | |||
| 14k | 11/12/20 | Sheet S-104, detail E3 calls out section F9/S-501. Is this to be F6-S-501? | C&S | Yes, detail box for F6 also includes area of F9 | Answered/RFI Closed | |
| 14l | 11/12/20 | Sheet S-501; Detail F4: what is floor to floor heights? | C&S | Building floor ot floor height is 12'-0" (typ.). Field verify. | Answered/RFI Closed | |
| 14m | 11/12/20 | Provide specific architectural finishes for all locations undergoing abatement or new finishes | C&S | New finishes are to match existing unless specifically noted otherwise. See specifications for painting and acoustic ceilings. | Answered/RFI Closed | |
| 14n | 11/12/20 | Provide schedule of finishes | C&S | New finishes are to match existing unless specifically noted otherwise. See specifications for painting and acoustic ceilings. | Answered/RFI Closed | |
| 14o | 11/12/20 | Provide missing finishes for millwork sheet A-105 | C&S | Modifications to the existing casework on A-105 are to match existing construction and finishes. GC to verify in field. | Answered/RFI Closed | |
| 14p | 11/12/20 | Provide specific replacement glass details and requirement for new glass window composition. Total overall glass window thickness. Refer to note 1 / MD 101 and note 2 / MD 101, sheet MD 102 / MD 103 | C&S | See answer to RFI 3a | Answered/RFI Closed | |
| 14q | 11/12/20 | Detail C1/A-106; What is wood sill specification / detail | C&S | 1x pressure treated wood sill, painted. | Answered/RFI Closed | |
| 14r | 11/12/20 | Louver details / masonry wall construction. Provide overall masonry wall thickness | ||||
| - Provide facebrick specification / manufacturer. Pricing varies based on specification | C&S | See Unit Masonry specification. Face brick is to match existing. At new louver locations the existing drawings indicate multi-wythe masonry, approximately 18 inches overall thickness. GC to verify in the field. | Answered/RFI Closed | |||
| 14s | 11/12/20 | Reflected ceiling plans |
- Plans call out all ceilings being darker. Are all ceilings to be replaced?
- Confirm no ceiling work sheet A-110. Nothing called out
| - A-111. Provide ceiling soffit details for repairs. Finishes? | C&S | On drawings A-109, A-110 and A-111 (Fourth & Fifth Floor Reflected Ceilings) the shaded areas are ceilings to be removed and replaced. Non-shaded areas are existing ceilings to remain. Drawing A-110 shows new ceilings. A2/A-111 calls for the cutting and patching of an existing painted soffit. Patching is to match existing soffit construction and finish, GC to verify in field. | Answered/RFI Closed | |||
| 14t | 11/12/20 | Provide details / wall section for clarification of note 2 / MH 101. Sizes, details and specifications required. | C&S | See answer to RFI 3a | Answered/RFI Closed | |
| 14u | 11/12/20 | Who is EMS and controls vendor for HVAC equipment? | Watson/VA | Building automation and temperature controls is TRANE. We are not sure what is meant by "EMS." Once clarified, we will gladly respond. | Answered/RFI Closed | |
| 15 | 11/13/20 | Clarify extent of sprinkler work and provide specification. | Watson | Sprinkler work is limited to relocating existing sprinkler pipe in order to allow for trade coordination above ceiling. See answers to RFIs #4a & #4b above. | Answered/RFI Closed | |
| 16 | 11/13/20 | This is duplicated from RFI 9 - same attachment | Watson | see answer to RFI 9 above | Answered/RFI Closed | |
| 17 | 11/13/20 | 1) Can you please issue the following details for hydronic piping systems, as none were issues with the bid documents: a) air terminal unit piping final connection detail; b) Air Handling Unit Hot and Cold Water coil connection details; c) Steam Heat Exchanger water and steam side final connection details; d) In line pump and vertical in line pump final connection details 2) Is the chilled water system able to be shut down and drained for the new chilled water connection tie-in? Or will a hot tap be required on the new system? 3) Are the steam and condensate line tie-in locations for the HX-1 on drawing MP-105 located in the attic space or the floor below? | Watson | 1) concur, will provide requested VA standard details; 2) yes, however coordination and approval required by VA; 3) they are located in attic space | Answered/Additional Information Forthcoming | |
| 18 | 11/16/20 | Repeat RFI-see RFI 17 above | Watson | see answer to RFI 17 | Answered/RFI Closed | |
| 19 | 11/16/20 | Can you please provide the size of the existing chilled water line size located in the basement/crawlspace that were are to tie into this project? | Watson | see answer to RFI 9 | Answered/RFI Closed | |
| 20 | 11/18/20 | The Hazardous Materials Abatement drawings show the areas of work and the materials requiring abatement in those areas. Specification Section 028211 includes quantities of building materials that were sampled and are trace for asbestos. As an example: Specification for the 4th floor list 9,730 SF of plaster ceiling (surface material and skim coat), 30,000 SF of ceiling glue dots above drop ceiling, 200 SF of grout associated with ceramic flooring and 500 SF of grout associated with ceramic walls. The ceiling materials are not shown for removal on the Hazardous Materials drawings. The ceramic floor grout is shown for removal on the hazardous materials drawings but the ceramic walls are not.The only other material listed as trace for asbestos is the black tar coating on fiberglass duct insulation. Typically, trace materials (<1% asbestos) are not considered as asbestos containing and do not fall under the regulations for asbestos abatement.Should the bidder follow the scope on the drawings or the specification? Please clarify. | ECS | see note #2 on H-drawings, which shall be followed for both bidding purposes and construction. | Answered/RFI Closed | |
| 21 | 11/18/20 | The dimensions shown in the air handling unit schedule for AHU-4 and AHU-5-N do not appear to be complete, the length of each unit is shown as 8”. The dimensions shown in the schedule do not match the dimensions of the AHUs shown on the floor plans. Will you please confirm the desired dimensions (LxWxH) of the AHUs? | Watson | yes, see answer to RFI 6b above | Answered/RFI Closed |
https://drive.google.com/file/d/13_8_oNL2BdGY3FU26eSm2EVZRJ-0SqX9/view?usp=sharing