S02 15A00024R00000110 Technical Exhibit 1_(For Reference Only).pdf

PDF 5 MB Posted

Attached to
National Laboratory Center (NLC) Guard Booth Replacement/Modernization
Solicitation number
15A00024R00000110
Issued by

About this file

This document appears to be a Technical Exhibit for a solicitation from the Department of Justice Bureau of Alcohol Tobacco Firearms and Explosives (ATF) to replace and modernize the guard booth at the National Laboratory Center in Beltsville, MD. The key objectives are to provide a prefabricated guard attendant booth with UL Level 3 ballistic protection, repair and rehab the existing barriers to like-new condition, and repair and rehab the gate functions with controls from the visitor center and the new booth. The document specifies detailed technical requirements for the booth structure, electrical systems, HVAC, and other furnishings. It also includes requirements for renovating the existing barriers and gates. The solicitation number is 15A00024R00000110 and the document provides a detailed overview of the technical requirements for this contract opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Objective:1

(1) Prefabricated Guard Attendant Booth, 7’ x 12’ base dimensions x 10’nominal height with the following features.

The booth will be designed to U.L. 752 standards for Level 3 protection. This protection will be in ALL areas of the booth, from finished floor height up to finished ceiling height. The roof, fascia.

Overhang, soffit & floor are not bullet resistant. UL Level 3 will provide protection against (3) shots from a .44 Magnum using 240 grain SWC ammunition with a velocity of 1350-1485 ft\sec.

Objective:2

Repair and rehab Barriers to like new condition. List of recommendations from Vendor Below.

Objective:3

Repair and rehab gate functions with working controls from the SOC (Visitor Center) and the new booth to the gates. Gate entrance and exit should be able to be controlled from both locations.

Booth Requirements

STRUCTURAL:

FRAME: To be minimum 2” x 3” & 3" x 3" x .083” structural mechanical steel tubing, formed for accuracy.

WALL SYSTEM: To be minimum 16ga. cold rolled galvanized steel panels on the interior and U.L Level 3 armor plate steel panels at the exterior, insulated to R-10. The booth will have an additional exterior layer of R-9.6 continuous insulation from floor height to soffit height encapsulated withing the final exterior layer of 16ga galvanized steel wall panels. Total wall insulation is R-19.6.

FLOOR: Unit to have a R-10 insulated 12ga. galvanized steel plate floor covered with polished aluminum diamond plate, floor system is welded to a 2" galvanized steel tube frame and joists.

ROOF: To be all steel construction designed for exterior use. Roof to be insulated to R-19. Roof to be constructed of internal steel framing with 16ga. Galvanized steel decking that is covered with a three-part membrane providing an SRI index of 95 or greater. Roof to have a 22” fascia and 12” overhang on three sides and:

Lane 1 Overhang: The overhang will be a permanent flat roof style, that runs the width of the booth (12 feet)to the Start of the first lane. The Overhang should be the same material as roof and to be made to look like a continuous one-piece extension from the booth roof.

Administrator Typewritten Text 15A00024R00000110 - TECHNICAL EXHIBIT (For Reference Only)

DOORS: Unit to have two commercial steel framed slide door that is top hung from a 10ga. galvanized steel track welded to the header. Door has eight 3” diameter rigid. Steel ball bearing rollers with lower stainless-steel guide, stainless steel pull handles welded to the frame and mortise lock.

WINDOWS: Unit to have steel window frame system with flush mounted welded corners. Booth will have a 360-degree view.

All windows to be fixed and glazed with U.L Level 3 Gray tinted laminated glass clad.

Polycarbonate

ELECTRICAL:

LIGHTS: Unit to have interior LED 1’ x 4’ lights recessed in 16ga. galvanized steel ceiling mounted at 96” AFF with a wall mounted dimmer switch.

OUTLETS: Unit to have three duplex outlets mounted under the shelf. Unit will also have two double gang J-Boxes mounted under the shelf with 3\4” conduits and pull string to the stub area for data\com line by others.

LOAD CENTER: To be one three wire single phase, 12 pole, 125 amp rated, 120/240 volt.

panel surface mounted on the right-side wall with a 40-amp main breaker. All wiring to be minimum # 12 copper in EMT and, concealed wire to be in approved flex.

HAVC: Unit to have a commercial ductless split system HVAC with 9,000 BTU cooling and 9,000 BTU heating. The booth will have the interior air cassette fully installed on one wall above the windows.

Booth will have all wiring to the breaker panel and to the thermostat location.

The refrigerant line, power line and condensate line will be routed out the back of the booth in a 16ga. galvanized steel chase. The exterior HVAC condenser unit will ship loose.

The power & refrigerant lines will need to be connected to the Condenser by a licensed Mechanical Contractor. The Contractor will also have to charge the condenser with R-410A if required, it ships full. They will need to install & program the thermostat and run start up.

Other Furnishings:

SHELF: Unit to have (2) 24" deep full width type 304 stainless steel shelf/desk heght with # 4 finish. The placement are to be on the North and South facing walls running from East to West.

HEATER: Unit to have one wall mounted fan forced electric wall heater with 400 watts and an integral thermostat.

WEATHER PROOFING & FINISH:

WEATHER PROOFING: All seams and joints to be pressure bonderized, all openings to be fully weather stripped, roof to have weather seal.

FINISH: Unit to be Primed with Heavy Duty Rust Inhibitive High Solid Primer finished with a gloss Impact, Fade Resistant High Gloss Polyurethane 5 Mil Impact, Fade Graffiti and Chemical resistant topcoat, that exceeds 3500 HR Salt Test. One Color to be selected.

Notes:

This booth will ship in one piece totally prefabricated, completely wired, and painted. The booth will be delivered on a flatbed semi-truck and will need to be off-loaded onsite, based on topography associated in the attached image . Off-loading can be done by a crane; this booth will weigh about 7,000-9,000 pounds.

Renovate (2) Nasatka III-B Plate Barriers to Include:

• Prep, pressure, wash, and re-paint each of the (2) plate barriers red (existing unpainted galvanized surfaces will remain as-is and will NOT be painted)

• Apply (1) new STOP decal to each of the (2) plate barriers

• Remove and replace the existing pumping unit (motor, gear pump, and valves) for each of the (2)plate barriers

• Remove and replace the existing hydraulic cylinder for each of the (2) plate barriers

• Remove and replace the existing spring for each of the (2) plate barriers

• Remove and replace the existing limit switches with a position tilt sensor for each of the(2) plate barriers

• Remove and replace (2) loops for each of the (2) plate barriers

• Remove and replace the existing programmable logic controller(PLC) with a programmable automation controller (PAC) with built-in VFD for each of the (2) plate barriers – includes replacement of loop detectors and motor contactors as part of the upgrade from PLCs to PACs edmiller2 Polygonal Line Overhang/Permanent Awning. over first single lane east of booth.

edmiller2 Line Conduit- underground 2" (Multiple) edmiller2 Line Conduit- underground 2" (Multiple) edmiller2 Line Conduit- underground 2" (Multiple) edmiller2 Line Conduit- underground 2" (Multiple) edmiller2 Typewritten Text Barriers & Gates edmiller2 Line o v o m o ovvm o o nm o I oz r T r >-r t= : 1 8v l -n l a ur lo - + t o

,0 l> g t R

* t 6-r lxo l a f i l d i i lo-t l m lfi

IT

l o lz t< l m l1 It H l - { l o l z e ! i E s s E q 3 H 7 i 2 i ; r * = H f f i e ;

i e E F ! E ; ; = $ d i i ' i = = = - H = N ; f

E = i ; 6 3 e $ : ; E Z : E ; r E Z q u *q z i r E d s r s i ; t f ;

F 9 E I r u ) -x = x-z = t H X z e o l z o J : * E b : > i : g ; S *8E ; . l a J> a s a i f n :

c 5 = ) - j

H ;'D ri O F R =$ = E S d T l f -oz

-o x z

*E PA =n RE s J t r t r t rggin€es$$F$EH v F l i i q f r s E A +

8 3 + = e g s 9 E ' a E E S e S g & i a E 9 q e € E n g l * 3 E + 9 ' * 3 5 - r g' - g f < a d @ o o o

(D ..{0) o n n r -l

I-c a a-{

UT

o, Porta-King Building Systems 4133 Shoreline Drive Earth City, MO 63045 800-456-5464 www.portaking.com

Rev. 8/2017

PREFABRICATED PRODUCT

MAINTENANCE MANUAL

ANCHOR DETAILS

PREASSEMBLED BUILDINGS

Porta-King Building Systems 4133 Shoreline Drive Earth City, MO 63045

RECEIVING and

OFFLOADING INSTRUCTIONS

Porta-King Building Systems 4133 Shoreline Drive

RECEIVING

Each Porta-King preassembled building will arrive to the job site via flatbed truck. Each building will be individually wrapped by Porta-King; additionally, the trucker will have tarped each building to further protect it during transit.

Once the building arrives, INSPECT each building PRIOR TO SIGNING the CLEAR BILL. If the building arrives damaged note the damage on the clear bill. If you are unable to inspect each building thoroughly prior to signing the clear bill, note on the clear bill the phrase

“SUBJECT TO

INSPECTION.” This will reduce your liability should the building have incurred any “hidden” damage not yet identified.

Offload the building using either a forklift truck or overhead crane. Set the building on a concrete pad.

Refer to “Installation Instructions” for additional information.

IMPORTANT: Buildings with exterior roofs can be exposed to the outdoor elements. If your building does not feature an exterior roof design then the building must be protected from the elements. Any wall / roof penetration (climate control units, etc…) must be sealed PRIOR to exposure to the outside elements

OFFLOADING (FORKLIFT TRUCK)

1. Prior to shipping, each building is positioned onto a flat bed truck utilizing a forklift truck; therefore, the use of a forklift truck is recommended for offloading the building at the job site. The building ships on skids to allow easy access t beneath the building.

2. Simply drive the forks of the forklift truck beneath the elevated base of the building. Be sure not to puncture the sub-floor with the forks as the building is lifted; forklift extensions may be needed on buildings with wider spans.

3. Gently lift the building from beneath its base. Be sure to protect the building during the offloading process to keep from damaging the building walls, glazing, and/or gutter / fascia.

4. Wider buildings will require the use of two- (2) forklift trucks, each positioned on the long sides of the building, lifting and allowing the truck to be driven out from under the building.

OFFLOADING (OVERHEAD CRANE)

1. The building ships on skids to allow easy access to beneath the building.

2. Cradle the building by positioning slings (…appropriately designed to carry the weight of the building…) beneath the building base. Be sure to use spreader bars to prevent damage to the building top-frame and/or roof fascia during the offloading process.

3. Gently lift the building and set onto a concrete pad.

OFFLOADING (LIFTING RINGS)

1. Utilizing the “adder optional” lifting rings, attach the lifting straps (…appropriately designed to carry the weight of the building…) to the lifting rings, which are attached through the roof material.

2. Gently lift the building and set onto a concrete pad.

PREPARATORY WORK

and INSTALLATION

Porta-King Building Systems 4133 Shoreline Drive

PREPARATORY

WORK

It is the responsibility of the buyer to perform all preparatory work (unless otherwise specified in a Porta-King Building Systems contract).

IMPORTANT: The securing of building permits and compliance with appropriate building codes is not the responsibility of Porta- King, but is the responsibility of the purchaser of the building.

It is NOT the responsibility of Porta- King to verify that these “suggestions” comply with local and state codes, rather, it is the responsibility of the purchaser of the building.

SUGGESTIONS

1. Pour concrete island (pad) minimum 4” deep. The island should be a minimum of 12” wider than the roofline dimensions to allow a 6” concrete border on each side of the building roofline.

2. Level the concrete island and install bollards at each corner of the building to further protect the building from damage caused by passing vehicles.

3. Provide three-wire 240v/110v single-phase, 100 amperage, service (standard) to the concrete island.

Refer to your Porta-King approval drawing, which illustrate the proper “stub up” location for your electrical source.

4. If your installation requires plumbing, provide a fresh water supply line and gray-matter waste line to the concrete island. Refer to your Porta-King approval drawing, which illustrate the proper “stub up” location for your plumbing lines.

5. Receive and offload the building using either a forklift truck or overhead crane. Position the building square on the concrete island and anchor.

6. Before setting, apply a moisture barrier of urethane sealant under the building frame. Failure to seal the perimeter of the booth may result in damage over time.

7. Recommended concrete anchor is ½” x 4” galvanized or stainless steel, or comply with local codes – which ever is MORE stringent.

8. Make the final electrical / plumbing / communication connections and clean the work area.

9. After fastening the booth to the pad, apply an additional bead of clear urethane sealant around the entire perimeter of the booth. Failure to seal the perimeter of the booth may result in damage over time.

TYPICAL CONDUIT ACCESS CUTOUT

LOCATION AND BREAKER BOX

SPECIFICATION

1. The “typical” conduit access floor cutout measures 6” x

12”. It is located 10” and 4” from the corner of the building, as illustrated.

2. The “standard” breaker box is a single-phase, 12-circuit, 100-amp main load center, positioned as illustrated.

GENERAL BUILDING CARE

and MAINTENANCE

Porta-King Building Systems 4133 Shoreline Drive

GENERAL

BUILDING CARE

and

MAINTENANCE

Periodic cleaning and maintenance using proper procedures and compatible cleaners is recommended to prolong service life.

For general cleaning and maintenance, it is recommended that the following instructions be used.

FOUNDATION

1. Inspect the concrete island (pad) on which the building sits. The island should be kept clean and free of debris.

Sweep the concrete island on a regular basis.

2. Inspect the grout and / or caulk around the base of the booth and foundation. Replace as needed.

BUILDING INTERIOR

1. Periodically, sweep the interior of the booth with a broom.

2. Clean the interior walls, doors, and glazing (refer to instructions found herein) when dirty. Be sure not to use abrasive objects and cleaners, which may damage the interior finish.

3. Inspect sliding windows and door tracks for dirt and debris. Keep dirt and debris from these areas.

4. Inspect electrical and communication connections periodically to be sure that the connections are tight and not frayed. Replace damaged / questionable components / materials. Replace light fixtures as needed.

5. Refer to your manufacturers warranty on climate control components for periodic general care and maintenance instructions.

BUILDING EXTERIOR

1. Periodically, clean the building exterior surfaces, as needed (refer to instructions found herein).

2. Inspect window framing and doors for broken seals.

Replace damaged components and repair broken seals, as needed.

3. Inspect roof, especially during the autumn months, for fallen debris (such as, leaves, sticks, paper, etc…) and remove such items from the roof. Keep the water drainage holes / scuppers free from debris to insure proper water drainage.

4. Roof surface to be inspected after final installation for damage caused by installation personnel, every two years thereafter and should be repaired as necessary to avoid potential roof leaks.

CLEAR ANODIZED ALUMINUM

SURFACES

Porta-King Building Systems

GENERAL CARE

AND

MAINTENANCE

INSTRUCTIONS

Periodic cleaning and maintenance using proper procedures and compatible cleaners is recommended to prolong service life.

For general cleaning and maintenance, it is recommended that the following instructions and materials be used.

Disclaimer: Although any information, recommendations, or advice contained herein is given in good faith, Porta-King makes no warranty or guarantee, express or implied, as to the effectiveness or safety of any procedure or materials and it shall in no event be responsible for any loss resulting from any use of these materials on its product described herein.

IMPORTANT: If a material is found to be incompatible in a short-term test, it will usually be found to be incompatible in the field. The converse, however, is not always true. Favorable performance is no guarantee that actual end-use conditions have been duplicated.

Therefore, these results should be used as a guide only and it is recommended that the user test the products under actual end-use conditions.

CLEANING PROCEDURES

1. Wash with a mild solution of soap or detergent and lukewarm water.

2. Using a soft cloth or sponge, gently wash the clear anodized aluminum surface to loosen dirt and grime and rinse well with clean water.

3. To prevent water spotting, thoroughly dry with chamois or cellulose sponge.

4. Avoid the use of abrasive cleaners, squeegees and/or other cleaning implements that may mar or gouge the glazing material. Avoid cleaning in direct sunlight to prevent streaking. Avoid use of cleaners containing acid (…citrus or otherwise).

CLEANING AGENTS WHICH HAVE BEEN

FOUND TO BE COMPATIBLE WITH CLEAR

ANODIZED ALUMINUM MATERIALS UNDER

LABORATORY CONDITIONS

Aqueous Solutions of Soaps and Detergents

Windex Top Job Joy Mr. Clean Fantastik Formula 409

Organic Solvents Naphtha (VM&P) grade (graffiti removal)

Alcohol’s Isopropyl Alcohol (graffiti removal)

All residual solvents should be removed with a secondary rinse.

COMPONENT LISTING OF CLEAR ANODIZED

ALUMINUM MATERIALS

Duraluminum: Building frame and exterior wall panels, standard-design window frames and door, gutter and fascia.

Durasteel, Durasteel-PC, Durasteel-Shelters: Building standard design window frames and doors.

4133 Shoreline Drive

PAINTED SURFACES

Porta-King Building Systems 4133 Shoreline Drive

CLEANING AND

MAINTENANCE

INSTRUCTIONS

Your Porta-King preassembled building is fabricated from either galvanized steel or clear anodized aluminum material. The building has been properly protected with a base primer and commercial quality paint. Periodic cleaning using proper procedures and compatible cleaners is recommended to prolong service life.

In the event that the building paint surface has been removed it is imperative that the damaged area be properly touched up to prevent premature oxidation.

For general cleaning and maintenance, it is recommended that the

1. Painted surfaces should be cleaned only with cool to warm water and mild detergent, such as Meguiars #M-62 car wash shampoo.

2. Using a soft cloth or sponge, gently wash the painted surface to loosen dirt and grime and rinse well with clean water. Always hand-apply cleaners.

3. To prevent water spotting, thoroughly dry with chamois or cellulose sponge.

4. For blemishes not removed by normal cleaning such as scuffs, light stains and excessively dirty areas, clean with a mild compound cleaner, such as Meguiars #M-9716 paint cleaner.

5. Avoid the use: (a) of abrasive cleaners, squeegees and/or other cleaning implements that may mar or gouge the coating; (b) aggressive compound containing grit; (c) harsh acidic type or abrasive cleaners or solvents; (d) high-speed buffers or polishes; (e) high temperature water such as a steam cleaning pressure washer designed for degreasing or industrial cleaning; (f) pressure washing is recommended ONLY with unheated water and a lower pressure – between 800 and 1200 pounds.

DAMAGE REPAIR & TOUCH-UP

Scratches and gouges where painted surfaces have been scored or removed will require paint touch-up.

For light scratches where no metal is exposed, clean the area of any contaminates – such as dirt or grease. Allow to dry – brush or dab touch-up paint into area.

For deeper scratches where bare metal is exposed, filler may be required to level the surface before painting. Sand the exposed metal with 320-grit sandpaper. To level the area, apply filler putty, such as 3M-#5966, with a razor blade or small spreader into damaged area. Allow to dry – sand smooth with the 320-grit sandpaper. After area is level, putty must be coated with any primer sealer type product either by brush or aerosol spray. After area is sealed, apply paint to repaint area. Brush edges lightly into undamaged area surrounding repair to help blend.

To repaint the entire area of a building, repair any exposed metal damage as previously instructed. Scuff all surfaces to be painted with 3M-#7447 Scotch Brite pad until sheen is removed.

Roll or spray one to two coats of exterior grade enamel paint over entire area, as required.

SLIDING DOOR and

SLIDING WINDOW ADJUSTMENTS

Porta-King Building Systems 4133 Shoreline Drive

INSTRUCTIONS

Periodic door and window adjustments may be required through normal use. Using proper procedures is recommended to prolong service life.

For general door and window maintenance, it is recommended that the following instructions be used.

DOOR LEVELING & REMOVAL

Leveling

1. Using a thin (flat) wrench turn the Post to adjust vertically for height and plumb.

2. Do not unscrew Post from the Hanger.

Removal

1. To remove door, activate Tab (gray) forward with a Flat back Screw Driver.

WINDOW LEVELING / ADJUSTMENT

Leveling

1. Using a Phillips screw-driver turn the adjustment screw either clockwise or counter clockwise to raise or lower the active window.

Removal

1. To remove window, position the window panel to the middle of the entire window-frame opening (the window will appear half-open / half-closed).

2. With your hands, grab each side of the window panel frame and gently lift upward then pull inward toward yourself.

GLAZING

Porta-King Building Systems 4133 Shoreline Drive

CLEANING AND

INSTRUCTIONS

Periodic cleaning using proper procedures and compatible cleaners is recommended to prolong service life.

For general cleaning and maintenance, it is recommended that the information, recommendations, or advice contained herein is given in good faith, Porta-King makes no warranty or guarantee, express or implied, as to the effectiveness or safety of any procedure or materials and it shall in no event be responsible for any loss resulting from any use of these materials on its product described herein.

IMPORTANT: If a material is found to be incompatible in a short-term test, it will usually be found to be incompatible in the field. The converse, however, is not always true. Favorable performance is no guarantee that actual end-use conditions have been duplicated.

Therefore, these results should be used as a guide only and it is recommended that the user test the products under actual end-use conditions.

1. Wash with a mild solution of soap or detergent and lukewarm water.

2. Using a soft cloth or sponge, gently wash the glazing to loosen dirt and grime and rinse well with clean water.

3. To prevent water spotting, thoroughly dry with chamois or cellulose sponge.

4. Avoid the use of abrasive cleaners, squeegees and/or other cleaning implements that may mar or gouge the glazing material. Avoid cleaning in direct sunlight to prevent streaking.

CLEANING AGENTS WHICH HAVE BEEN

FOUND TO BE COMPATIBLE WITH

TEMPERED GLASS, LAMINATED GLASS,

POLYCARBONATE AND ACRYLIC GLAZING

MATERIALS UNDER LABORATORY

CONDITIONS

Aqueous Solutions of Soaps and Detergents Windex Top Job Joy Mr. Clean Fantastik Formula 409

GRAFFITI REMOVAL

1. Be sure that the solvent will not attack the glazing.

2. Isopropyl alcohol, VM&P naphtha or similar solvents have been successfully used. Test in a small, non-viewing area, prior to application to verify compatibility.

3. Be sure to rinse with clear water after solvent application.

GLAZING

Porta-King Building Systems 4133 Shoreline Drive

BULLET RESISTANT GLAZING

(Please note the following information from the glazing manufacturer)

This is a plastic or glass / plastic composite!

Read and Follow Cleaning Instructions!

The persons cleaning assume risk of loss!

This product shipped in good condition. Surfaces needing aggressive cleaning methods indicate product neglect or abuse. Improper cleaning may cause irreparable damage such as crazing, cracking, blister, de-lamination or other permanent damage that may not be immediately visible.

DO NOT APPLY TAPE, STICKER, FILMS, SIGNAGE, ETC

TO SURFACES!

Do not clean in direct sunlight Do not use abrasive cleaners Do not use metal scrapers, razor blades, or putty knives

Do not use petroleum based solvents, acetone, MEK, or other solvents

The following procedures are sufficient to satisfactorily clean properly installed and maintained product. Before cleaning commences the surface to be cleaned should be examined and be free of damage, paint, mortar, plaster etc.

If not, a condition report and damage waiver should be obtained from General Contractor or authority having jurisdiction before proceeding.

information, recommendations, or advice contained herein is given in good faith, Porta-King makes no warranty or guarantee, express or implied, as to the effectiveness or safety of any procedure or materials and it shall in no event be responsible for any loss resulting from any use of these materials on its product described herein.

IMPORTANT: If a material is found to be incompatible in a short-term test, it will usually be found to be incompatible in the field. The converse, however, is not always true. Favorable performance is no guarantee that actual end-use conditions have been duplicated.

Therefore, these results should be used as a guide only and it is recommended that the user test the products under actual end-use conditions.

Flush surface with clean water to remove loose debris.

Uniformly apply a mild detergent / water solution using Joy, or Palmolive detergent to the surface using soft, clean, cloth or similar applicator.

Change / rinse cleaning cloths / applicators regularly.

Use extreme care to avoid trapping debris, sand, metal or any type foreign particles against the surface.

Flush with clean water and dry surface, gaskets, sealants and framing with soft flannel or cotton cloth to avoid potential deterioration or staining.

Examine surface for visible damage from cleaning before proceeding!

WARRANTY

DURALUMINUM and DURASTEEL PRODUCTS

Porta-King Building Systems 4133 Shoreline Drive

WARRANTY

INFORMATION

This warranty shall not cover items damaged due to acts of vandalism, misuse, abuse, damage caused by a third party, or natural phenomena.

Warranty shall not cover damage caused during maintenance actions by untrained or unapproved personnel.

DURALUMINUM PRODUCTS

Gen ely under the warranty of that manufacturer.

e here the roof is lined with EPDM roofing membrane.

URASTEEL PRODUCTS

Gen ely under the warranty of that manufacturer.

odized the roof is covered with weatherproof roofing material.

eral The workmanship and material on all Porta-King Duraluminum products are guaranteed to be free from manufacturing defect for a period of one (1) year from the date of shipment. All accessory items (i.e. storage drawers, climate control units, and/or other special “buy-out” items) shall be covered separat specific

Extended A five (5) year warranty applies to all clear an1. odized aluminum surfaces to be free from oxidation.

2. A five (5) year warranty applies to all wall panels to b free from swelling and delamination due to moisture absorption.

3. A ten (10) year limited warranty applies to the exterior roof from leaks, in applications w

D eral The workmanship and material on all Porta-King Durasteel products are guaranteed to be free from manufacturing defect for a period of one- (1) year from the date of shipment. All accessory items (i.e. storage drawers, climate control units, and/or other special “buy-out” items) shall be covered separat specific

Extended

1. A five (5) year warranty applies to all clear an aluminum surfaces to be free from oxidation.

2. A one (1) year limited warranty applies to the exterior roof from leaks, in applications where

Product data sheet Characteristics

QO112M100P

QO LoadCenter, PoN, main breaker, 100 A, 1 PH, 12 SP, NEMA1

Product availability: Stock - Normally stocked in distribution facility

Price*: 330.00 USD

Main Product or component type Load Center Range of product QO

Complementary Load center type Main breaker Line Rated Current 100 A Number of spaces 12 Short-circuit current 22 KA Number of circuits 12 Number of tandem circuit breakers 12 Phase 1 phase Box number 5 Height 378.97 Mm (14.92 in) Width 361.95 Mm (14.25 in) Depth 95.25 Mm (3.75 in)

Environment NEMA degree of protection NEMA 1 Ambient air temperature for operation 23 °F (-5 °C)

104 °F (40 °C)

Th e in fo rm at io n pr ov id ed in th is d oc um en ta tio n co nt ai ns g en er al d es cr ip tio ns a nd

/o r t ec hn ic al c ha ra ct er is tic s of th e pe rfo rm an ce o f t he p ro du ct s co nt ai ne d he re in

Th is d oc um en ta tio n is n ot in te nd ed a s a su bs tit ut e fo r a nd is n ot to b e us ed fo r d et er m in in g su ita bi lit y or re lia bi lit y of th es e pr od uc ts fo r s pe ci fic u se r a pp lic at io ns

It is th e du ty o f a ny s uc h us er o r i nt eg ra to r t o pe rfo rm th e ap pr op ria te a nd c om pl et e ris k an al ys is

, e va lu at io n an d te st in g of th e pr od uc ts w ith re sp ec t t o th e re le va nt s pe ci fic a pp lic at io n or u se th er eo f.

N ei th er S ch ne id er

E le ct ric

In du st rie s

SA

S no r a ny o f i ts a ffi lia te s or s ub si di ar ie s sh al l b e re sp on si bl e or li ab le fo r m is us e of th e in fo rm at io n co nt ai ne d he re in

N ei th er S ch ne id er

E le ct ric

In du st rie s

SA

S no r a ny o f i ts a ffi lia te s or s ub si di ar ie s sh al l b e re sp on si bl e or li ab le fo r m is us e of th e in fo rm at io n co nt ai ne d he re in

Pr ic es a re in di ca tiv e

Oct 23, 2019

Ordering and shipping details Category 10001 - QO PON 1PH LC,12-60 CKT, MB N1 Discount Schedule DE3A

GTIN 00785901595878

Package weight(Lbs) 0.45 Kg (1 lb(US)) Returnability Yes

Product Life Status : Commercialised

Duraluminum guard buildings are constructed with a clear anodized aluminum framework. Exterior wall surfaces include a gel coated (UV resistant) fiberglass reinforced polyester (FRP) exterior finish permanently laminated to a moisture resistant oriented strand board (OSB). This maintenance free design does not require paint and will never rust.

Duraluminum is our most economical preassembled building design. These factory-assembled structures are highly adaptable, cost effective alternatives to conventional construction for a range of security applications.

DURALUMINUM

GUARD BUILDINGS

GUARD

BUILDINGS

1. 3” Overhang exterior roof with integral gutters on two-sides. Includes a white, EPDM water-proof membrane.

2. Impact resistant Oriented Strand Board (OSB) wall construction with a gray, gel coated, reinforced polyester (FRP) exterior finish for extra UV resistance.

3. Floor consists of two layers of ¾” OSB with a maintenance free diamond embossed aluminum treadplate finished surface.

4. Full perimeter glazing with minimum 3/16” tempered safety glass with horizontal sliding and fixed windows.

We offer the industry’s most experienced team of engineers and fabricators to create custom designed guard buildings that meet your expectations for durability and performance. Our 160,000 square feet of manufacturing space provides us with unsurpassed production capacity. All manufacturing takes place just west of St. Louis in Montgomery City, Missouri. This centralized location enables us to cost effectively ship product anywhere in North America.

5. Maintenance-free, clear anodized aluminum structural framework.

6. High security anodized aluminum tube frame construction is a full 1 ¾” thick and available in sliding or swing type operation.

Optional design features shown here include:

7. Optional thru wall AC or HVAC unit. Mini-Split systems are also available.

8. Optional FRP interior wall surface.

9. Optional painted steel countertop.

10. R-10 wall insulation.

11. R-12 roof insulation.

The following application photos illustrate the range of sizes and design options available for Duraluminum guard buildings.

Add on Design Features Duraluminum guard buildings can include a variety of add on features to enhance both aesthetics and functional performance

1. FACTORY APPLIED BRICK

2. FACTORY APPLIED FAUX STONE

5. PLATFORMS

6. TOWERS

3. STANDING SEAM HIP ROOF

4. TRAILER MOUNTED

Contact Us

1-800-284-5346 info@portaking.com www.portaking.com

4133 Shoreline Drive St. Louis, Missouri 63045

Free on-site support before, during and after the project is completed

Denotes Porta-King Regional Sales Offices www.portaking.com/resources/sales-regions

Region 50 Tri-State NYC

Region 55 Great Lakes

Region 63 Pacific Coast (North)

Region 51 New England

Region 57 South Central Corporate

Office

Region 62 Midwest Central

Region 52 Southeast

Region 61 Pacific Coast (South)

Region 64 Mid-Atlantic

Region 61 Pacific Coast (West)

6 | KÜHL® SMART ROOM AIR CONDITIONERS

Model UPC Cooling

Btu Heating

Btu Volts Cooling Amps

Cooling Watts

Heating Amps

Heating Watts EER CEER

Esti-mated Yearly

Energy Cost COP

Moisture Removal- Pints/HR CFM

Net/ship Wt. lbs. Sleeve

Kühl® (Cool Only)

KCQ06A10A 724587436570 6000 — 115 4.8 492 — — 12.2 12.1 $48 — 1.5 190 72/85

Q KCQ08A10A 724587436587 8000 — 115 6.5 661 — — 12.1 12.0 $65 — 2.1 200 72/85

KCQ10A10B 724587436594 9500 — 115 8.6 864 — — 11.0 10.9 $85 — 3.2 250 72/85

KCS08A10A 724587436631 8000 — 115 6.5 661 — — 12.1 12.0 $65 — 1.9 255 106/128

S

KCS10A10A 724587432640 10000 — 115 8.5 826 — — 12.1 12.0 $81 — 2.9 300 112/134

KCS12A10A 724587432688 12000 — 115 9.5 1000 — — 12.0 12.0 $98 — 3.5 300 112/134

KCS12A30A 724587432695 12000 — 230 4.8 992 — — 12.1 12.0 $97 — 3.5 300 116/138

KCS14A10A 724587432701 13600 — 115 11.8 1236 — — 11.0 10.9 $121 — 4.3 275 141/154

KCS16A30A 724587436678 15700 — 230 6.6 1454 — — 10.8 10.7 $142 — 5.0 330 141/154

KCM14A10A 724587432435 13600 — 115 10.9 1140 — — 12.1 12.0 $112 — 3.0 360 138/150

M KCM18A30A 724587436617 20000 — 230 9.6 1923 — — 10.4 10.3 $188 — 6.0 425 132/153

KCM21A30A 724587436624 21500 — 230 9.6 2067 — — 10.4 10.3 $202 — 6.0 425 132/153

KCL24A30A 724587436549 24000 — 230 11.1 2308 — — 10.4 10.3 $225 — 7.5 640 191/212

L KCL28A30A 724587432657 28000 — 230 13.4 2800 — — 10.0 9.9 $273 — 9.3 640 193/214

KCL36A30A 724587436556 35000 — 230 18.2 3846 — — 9.1 9.0 $376 — 11.0 725 212/248

Kühl® + (Heat Pump)

KHS10A10A* 724587432541 10000 8800 115 8.8 917 9.1 978 10.9 10.8 $90 2.6 2.0 300 109/131 S

KHS12A33A 724587436525 12000 9800 230 5.0 1101 4.7 1257 10.9 10.8 $108 2.9 3.0 375 115/136

KHM18A34A 724587436532 17500 14900 230 7.4 1606 7.4 1568 10.9 10.8 $157 2.8 5.6 450 141/154 M

KHL24A35A 724587432633 24000 21000 230 11.1 2330 10.3 2211 10.3 10.2 $228 2.8 7.0 600 197/211 L

Kühl® + (Electric Heat)

KEQ08A11A 724587432749 7700 4000 115 6.4 694 11.2 1290 11.1 11.0 $68 — 2.1 200 72/85 Q

KES12A33A 724587430004 12000 10700 230 4.9 1091 16.0 3500 11.0 10.9 $107 — 3.6 325 113/128 S

KES16A33A 724587436678 15700 10700 230 6.6 1454 16.0 3500 10.8 10.7 $142 — 3.4 300 138/150

KEM18A34A 72458743249 20000 13000 230 9.6 1923 19.5 4200 10.4 10.3 $188 — 6.0 425 141/154 M

KEL24A35A 724587431612 24000 17300 230 11.1 2308 24.0 5500 10.4 10.3 $225 — 7.0 750 197/211 L

KEL36A35A 724587436563 35000 17300 230 18.2 3846 24.0 5500 9.1 9.0 $376 — 11.0 725 213/246

SPECIFICATIONS

* KHS10A10A heat pump operates on 115 volt and is not equipped with supplemental heat. Will not provide heat at temperatures below 40˚F.

Friedrich room air conditioners are designed to operate in outdoor temperatures from 60˚F to 115˚F.

Kühl+ Heat Pump heating information indicates heat pump performance. Kühl+ Electric Heat heating information indicates electric heat strip performance.

For Kühl+ Heat Pump electric heating performance refer to corresponding Kühl+ Electric Heat model.

As an ENERGY STAR® partner, Friedrich Air Conditioning Co. has determined that the selected ENERGY STAR® models meet the ENERGY STAR® guidelines for energy efficiency. EER is the unit’s Energy Efficiency Ratio; CEER is the unit’s Combined Energy Efficiency Ratio.

Your energy costs will depend on your utility rates and use. The estimated energy cost is based on an electricity cost of $.12 per kWh.

For more information, visit www.ftc.gov/energy.

Due to continuing research in new energy-saving technology, specifications are subject to change without notice.

ENERGY STAR® models

LISTED

ROOM AIR CONDITIONERS

183H

* Minimum extensions when mounted in a window.

** Minimum widths achieved using one side curtain assembly as opposed to both in a standard installation.

NOTE: S, M and L sleeves may be installed in window with no side kits if properly installed.

Sleeve Height Inches

Width Inches

Depth with Front

Inches

Shell Depth to Louvers

Inches

Minimum Extension

Into Room* Inches

Minimum Extension

Outside

* Inches

Window Width

INCHES

In-wall Installation Finished Hole Inches

Carton Dimensions Inches

Minimum** Maximum Height Width

Max. Depth

Height Width Depth

Q 14 1/4" 19 3/4" 21 3/8" 8 1/2" 5 1/2" 10 3/4" 22" 42" 14 1/2" 20" 8 1/2" 18 3/4" 22" 25 1/2"

S 15 15/16" 25 15/16" 29" 8 3/4" 5 3/4" 16 15/16" 27 3/8" 42" 16 3/16" 26 3/16" 7 3/8" 19" 29" 34 1/2"

M 17 15/16" 25 15/16" 29" 8 3/4" 5 3/4" 16 15/16" 27 3/8" 42" 18 3/16" 26 3/16" 7 3/8" 21" 29" 34 1/2"

L 20 3/16" 28" 35 1/2" 16 1/2" 5 3/8" 18 15/16" 29 7/8" 42" 20 3/8" 28 1/4" 15 1/8" 24 1/2" 31 5/8" 38 7/8"

FRONT

SIDE VIEW

SLEEVE DIMENSIONS DRAWING

CIRCUIT RATING/ BREAKER/ POWER CORD

Model

Circuit Rating Breaker or T-D Fuse

Plug Face

(NEMA#)

Power Cord Length (ft.)

Wall Outlet Appearance

All KCQ MODELS. KEQO8A11A.

KCS08A10A, KCS10A10A,

KCS12A10A and KCS14A10A.

KHS10A10A. KCM14A10A.

125V - 15A 5 - 15P 6

KCS12A30A and KCS16A30A.

KCM18A30A and KCM21A30A.

250V - 15A 6 - 15P 6

KCL24A30A and KCL28A30A.

KES12A33A and KES16A33A.

KHS12A33A.

250V - 20A 6 - 20P 6

KCL36A30A. KEM18A34A and KEL24A35A and KEL36A35A.

KHM18A34A and KHL24A35A.

250V - 30A 6 - 30P 6

INSTALLATION

SPECIFICATION

SHEETS

Selfield Road Selma, Alabama 36703

Tel:

800-‐633-‐2513 Fax:

334-‐875-‐2704 www.security-‐glazing.com

DB013A

4/08

PRODUCT

NAME:

Lexgard®

SP

PRODUCT

CODE:

SP

PERFORMANCE

TESTING:

Forced Entry:

ASTM

F1 Class V

ASTM

Grade

HP

White Level V-‐

TP-‐0500.02

WMFL

Level I

Ballistic:

UL

Level

UL

Listed File

BP844

.44 magnum Lead Semi-‐Wadcutter Gas Checked

No Spall, No Penetration

CONSTRUCTION:

This product is laminated polycarbonate and contains exposed polycarbonate surfaces with abrasion resistant coatings on both sides.

THICKNESS:

1.28” Nominal

THICKNESS

TOLERANCE:

1.15” 1.41”

WEIGHT:

7.97 Lbs.

Square Foot

SIZE:

72” x 96” Maximum

12” x 12” Minimum for

UL

Ballistic Rating

OPTIONS:

Bronze, gray, green tint

TECHNICAL

DATA:

U-‐Value .53

Solar Heat Gain Co-‐efficient .86

Light Transmission .63

APPLICABLE

STANDARDS:

ANSI

Z97.1

CPSC

CFR

(Category I and

II)

ASTM

C

ASTM

C

SINGLE

RESPONSIBILITY:

Global Security Glazing products are covered by our Single Responsibility® Program that ensures one firm has handled and is accountable for all phases of manufacturing.

INSTALLATION:

When used for ballistic protection, glazing should be installed in a

UL

Level Bullet

Resistant frame system.

Holes should be covered with a

UL

listed device.

All glazing should be installed in accordance with the guidelines set forth in the current edition of the Glass Association of North America

(GANA)

Glazing and Sealant Manuals.

Glazing systems should incorporate a weep system to allow moisture and water to escape the glazing channel.

Recommended Clearance:

Face:

1/8” per side

Edge:

1/4”

Bite:

1”

Technical Data Code: D-TC-012

Revision: 01

Glasliner FRP Panels Lamination Panel - Class C – Embossed and

Smooth

Effective since: 03-May-2021

Page: 1 of 2

Document property of Stabilit America, Inc. Prohibited unauthorized reproduction.

1. Product description.

Glasliner Fiberglass Reinforced Polyester (FRP) Lamination Panels, manufactured by Stabilit America, Inc. are available in textured and smooth surfaces; provide ultimate durability, satisfying the most demanding applications. Glasliner FRP Lamination Panels will not mold, mildew, rot or corrode. Glasliner FRP Lamination Panels are engineered to provide durability, easy cleaning and maintenance.

2. Purpose.

Glasliner FRP Lamination Panels are designed for indoors/outdoors that require a class C fire rating product. Glasliner FRP Lamination Panels show excellent performance on factory lamination processes over plywood, multiwall polypropylene, gypsum and OSB.

3. Physical Properties - Typical Values

Lamination Panels 0.045 in

Property Value Test Method

Flexural Strength 8,000 psi ASTM D790

Flexural Modulus 2.0 x 105 psi ASTM D790

Tensile Strength 5,390 psi ASTM D638

Tensile Modulus 4.5 x 105 psi ASTM D638

% Elongation 1.5 % ASTM D638

Izod Impact 6.5 ft-lb/in ASTM D256

Coefficient of Linear Thermal Expansion 2.22 x 10-5 in/in/°F ASTM D696

Barcol Hardness 40 minimum ASTM D2583

Water Absorption 0.25% - 72 hr @ 77°F ASTM D570

Specific Gravity 1.72 ASTM D792

Flame Spread ≤ 200 ASTM E84

Smoke Development Index < 450 ASTM E84

4. Selections

Nominal Thickness Series Finish Color∆ Sizes∆

0.045 in 160 Embossed or smooth Various Made to order ∆Custom Capabilities: other sizes and colors are available, minimum order requirements and other terms apply

5. Standard Specifications

a) Glasliner FRP panels conform to the specification set on ASTM D5319:

Flammability Classification: Class C - Flame spread index 76 to 200, smoke development index of 450 or less.

Thickness classification: Grade 3—0.040 to 0.050 in. (1.02 to 1.27 mm); 0.045 in. nominal (1.14 mm).

Size (Length and Width): Specified length and width ±1/8 in.

Squareness: ±1/8 in.

Thickness: Specified thickness ±10 %.

b) Color: Panel color shall be per specification. Within 1 dE of the specified color using the CIELab scale.

c) Panels shall have a pebble texture or smooth texture front side. Panel backside is smooth and may possess slight imperfections that do not adversely affect performance or physical properties and are not cause for rejection.

6. Approvals and Certifications

a) Manufactured on an ISO 9001 Certified plant (TÜV Rheinland of North America, lnc.).

b) Certified Product under Greenguard and Greenguard Gold criteria.

c) Meets minimum requirements of major model building codes for Class C interior wall and ceiling finishes of flame spread ≤ 200, smoke developed index 450 or less (per ASTM E84).

d) Mold & Mildew Resistant per ASTM D3273 and D3274 tests.

Technical Data Code: D-TC-012

Revision: 01

Glasliner FRP Panels Lamination Panel - Class C – Embossed and

Smooth

Effective since: 03-May-2021

Page: 2 of 2

Document property of Stabilit America, Inc. Prohibited unauthorized reproduction.

7. Storage Recommendations

a) Store panels indoors in a cool, dry, well-ventilated area.

b) Panels should be stacked on skids not more than 5 skids high.

c) Do not allow moisture to collect on or in-between panels.

8. Fabrication Recommendations

a) Safety: Use eye protection. Wear filter mask to cover nose and mouth, especially when cutting panels.

b) Tools Required: Power saw (carbide tip), saber saw (metal cutting blade), caulking gun, tape measurer, drill, file, hammer, level, saw horses and supports.

c) Preparation: It is important to store Glasliner FRP Lamination Panel flat, on a clean, dry surface for 24 hours before production. It is preferable to store them inside the actual area of lamination or, at least, under similar climate conditions. Substrates must be clean and free of all substances.

d) Inspection: Carefully inspect all panels prior to lamination. If any portion of material does not provide an acceptable appearance, Stabilit America, Inc should be notified immediately. Upon verification of unacceptability, that portion of material will be replaced by Stabilit America, Inc. Stabilit America, Inc’s responsibility is for the replacement of defective materials but not for labor or other handling or installation expenses.

e) Limitations: Glasliner FRP Lamination Panels shall maintain its performance characteristics and physical properties in temperatures ranging from -40°F to 130°F. Glasliner FRP panels may discolor near heat sources such as: ovens, fryers, heat lamps and toasters, where temperatures exceed 130°F.

DISCLAIMER: Stabilit America Inc., provides these results data for material comparison purposes only. The information offered herein is offered without charge and is accepted at recipient’s sole risk. The results expressed of this document pertain only to the specific sample(s) evaluated. Stabilit America, Inc. Testing Laboratory is not a certified testing lab, however all equipment used is calibrated using traceable standards. Because conditions of use vary and are beyond our knowledge and control, Stabilit makes no representation about and is not responsible for the accuracy of data, nor with toxicological effect or industrial hygiene requirements associated with particular uses of any product or process described herein. Stabilit requests that customers test and inspect our products before use and satisfy themselves as to contents and suitability. Nothing herein shall constitute a warranty, express or implied, including any warranty or merchantability or fitness, nor is protection from any law or patent inferred. All patent rights are reserved. The exclusive remedy for all proven claims is replacement of Stabilit materials only. FLAME SPREAD AND SMOKE DEVELOPMENT RATINGS: the numerical flame spread and smoke development ratings are not intended to reflect alleged hazards presented by Stabilit America Inc., products under actual fire conditions and this product has not been tested by Stabilit America, Inc., except as set forth below. These ratings are determined by small-scale tests conducted by independent testing facilities using the ASTM E84 test standard. Like other organic building materials (e.g. wood), panels made of fiberglass reinforced plastic resins will burn. When ignited, FRP may produce dense smoke very rapidly. All smoke is toxic. Fire safety requires proper design of facilities and fi re suppression systems, as well as precautions during construction and occupancy. Local codes, insurance requirements and any special needs of the product user will determine the correct fi re-rated interior finish and fi re suppression system necessary for a specific installation.

X17FA80

Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2021 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice

Ultra-economy field adjustable X17 is available in three sizes and a total of 6 lumen packages, all with a wide 7H x 6V NEMA distribution that makes them the optimal floodlight for a large variety of general-purpose applications. 0-10V dimming is standard on all models.Ê

Color: Bronze Weight: 5.1 lbs

Project: Type:

Prepared By: Date:

Driver Info Type Constant Current 120V 0.80A 208V 0.45A 240V 0.40A 277V 0.32A Input Watts 82/78.8/82.1W

LED Info Watts 80W Color Temp 3000K/4000K/5000K

Color Accuracy 83/85/84 CRI

L70 Lifespan 100,000 Hours

Lumens 10712/11509/11325

Efficacy 130.7/146.1/138 lm/W

Technical Specifications

Field Adjustability Field Adjustable:

Color temperature selectable by 3000K, 4000K and 5000K

Compliance UL Listed:

Suitable for wet locations

IESNA LM-79 & LM-80 Testing:

RAB LED luminaires and LED components have been tested by an independent laboratory in accordance with IESNA LM-79 and LM-80.

DLC Listed:

This product is listed by Design Lights Consortium (DLC) as an ultra-efficient premium product that qualifies for the highest tier of rebates from DLC Member Utilities. Designed to meet DLC 5.1 requirements.

DLC Product Code: PLZ4SRQ1NNVK

Electrical Driver:

Constant Current, Class 2, 120-277V, 50/60Hz, 120V: 0.80A, 208V: 0.45A, 240V: 0.40A, 277V:

0.32A

Dimming Driver:

Driver includes wiring for 0-10V dimming systems. Dim as low as 10%.

THD:

3.46% at 120V, 11.53% at 277V

Power Factor:

99.6% at 120V, 93.3% at 277V

Photocell:

120-277V Integrated Button Selectable Photocell Included that can be turned on and off. Photocell is compatible with 120V-277V.

Note:

All values are typical (tolerance +/- 10%)

LED Characteristics LEDs:

Long-life, high-efficacy, surface-mount LEDs

Color Uniformity:

RAB's range of Correlated Color Temperature follows the guidelines of the American National Standard for Specifications for the Chromaticity of Solid State Lighting (SSL) Products, ANSI C78.377-2017.

Construction IP Rating:

Ingress protection rating of IP65 for dust and water

Cold Weather Starting:

Minimum starting temperature is -40°C (-40°F)

Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2021 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice

Technical Specifications (continued)

Construction Maximum Ambient Temperature:

Suitable for use in up to 40°C (104°F)

Housing:

Precision die-cast aluminum

Mounting:

Robust knuckle mount with 180° adjustable swivel arm. Tilt angle in 10° increments.

Effective Projected Area:

EPA = 0.79

Lens:

Tempered glass

Reflector:

Polycarbonate

Finish:

Formulated for high durability and long-lasting color

Green Technology:

Mercury and UV free. RoHS-compliant components.

Optical NEMA Type:

NEMA Beam Spread 7H x 6V

Other 5 Yr Limited Warranty:

The RAB 5-year, limited warranty covers light output, driver performance and paint finish.

RAB's warranty is subject to all terms and conditions found at rablighting.com/warranty.

Buy American Act Compliance:

RAB values USA manufacturing! Upon request, RAB may be able to manufacture this product to be compliant with the Buy American Act (BAA).

Please contact customer service to request a quote for the product to be made BAA compliant.

Dimensions Features DLC Premium listed

IP65 Rated

100,000-Hour LED lifespan

5-Year, Limited Warranty https://www.rablighting.com/legal#warranty

Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2021 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice

Ordering Matrix

Family Wattage Mounting Finish Voltage

X17FA 80

15 = 15W 35 = 35W 60 = 60W 80 = 80W

105 = 105W 140 = 140W

Blank = Knuckle *

SF = Slipfitter **

T = Trunnion **

Blank = Bronze W = White

Blank = 120-277V /480 = 480V ***

** Slipfitter and trunnion mounts available for 60-140W only ** 60-80W fixtures with slipfitter or trunnion option will come with a factory-installed knuckle mount and a separate slipfitter or trunnion accessory

*** 480V available only in 140W models All values are nominal with +/- 10% tolerance. See spec sheet for more details.

• Remove and replace the existing programmable logic controller (PLC) with a programmable automation controller (PAC) with built-in VFD for each of the (2) plate barriers – includes replacement of loop detectors and motor contractors as part of the upgrade from PLCs to PACs

• Remove and replace the existing master operator panel in the SOC with a new 8” pedestal-mounted touch screen operator panel for activating the (2) plate barriers – includes replacing the existing communication cabling with Cat 6 cable between thers…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .