S02 ATF-50 LIMITATIONS ON SUBCONTRACTING UNDER SMALL BUSINESS SET-ASIDES.docx

DOCX document 16 KB Posted

Attached to
National Laboratory Center (NLC) Guard Booth Replacement/Modernization
Solicitation number
15A00024R00000110
Issued by

About this file

This document is an attachment called ATF-50 LIMITATIONS ON SUBCONTRACTING UNDER SMALL BUSINESS SET-ASIDES, which outlines the subcontracting limitations for small businesses and 8(a) participants awarded federal contracts. It specifies that contractors must certify the level of subcontracting proposed prior to contract award, as well as the level of subcontracting actually achieved prior to exercising any option periods. The required minimum percentages of subcontracting are: 50% for service contracts, 50% for supply contracts (excluding materials), 15% for general construction contracts, and 25% for construction by special trade contractors (excluding materials).

The related federal contract opportunity is for the replacement/modernization of the Guard Booth at the National Laboratory Center in Beltsville, MD. The Guard Booth provides security, ballistic protection, and creature comforts for the 24/7 guards at the facility's single entrance, which serves as the first line of defense for ATF staff, patrons, and assets. The solicitation number is 15A00024R00000110, and the contracting agency is the Department of Justice Bureau of Alcohol Tobacco Firearms and Explosives.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15A00024R00000110

ATF-50 LIMITATIONS ON SUBCONTRACTING UNDER SMALL BUSINESS SET-ASIDES (May 24, 2019)

In conjunction with the requirements of FAR 52.219-14, Limitations on Subcontracting, contractors shall certify the level of subcontracting proposed, prior to award of any portion of the contract set-aside or partially set-aside for a small business or 8(a) participant. Contractors shall also certify the level of subcontracting actually achieved prior to exercising any option period.

(Offerors shall indicate “N/A” for lines that are Not Applicable.)

1) Services (except construction). Offeror's/Contractor's proposed contract performance for its personnel shall be: _________ (must be at least 50%).

2) Supplies (other than procurement from a non-manufacturer of such supplies). Offeror's/Contractor's proposed contract performance for its cost of manufacturing the supplies, excluding the cost of materials shall be: _________ (must be at least 50%).

3) General construction. Offeror's/Contractor's proposed contract performance, excluding the cost of materials, with its own employees shall be: _________ (must be at least 15%).

4) Construction by special trade contractors. Offeror's/Contractor's proposed contract performance, excluding the cost of materials, with its own employees shall be: _________ (must be at least 25%).

(End of Clause)