S01 Attachment 3 - Plans - Anderson Site - Kandiyohi Co MN.pdf
PDF 3 MB Posted
- Attached to
- Wetland Restoration - Four Sites – Otter Tail, Kandiyohi, Mower, and Yellow Medicine Counties, Minnesota
- Solicitation number
- 12FPC321B0016
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
Miles
0.50.250
*Temporary Bench Marks will be set prior to the start of construction
AutoCAD SHX Text Sheet 1 of 6
AutoCAD SHX Text File Name
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Drawn
AutoCAD SHX Text 6/14/2021
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2021
AutoCAD SHX Text 0900WKK_Kandiyohi_Anderson_Repair.dwg
AutoCAD SHX Text LOCATION MAP Burbank Township Township
AutoCAD SHX Text R. 34 W.34 W. W.
AutoCAD SHX Text T. 122 N.122 N. N.
AutoCAD SHX Text
LOCATION IN MINNESOTA
AutoCAD SHX Text
U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE
AutoCAD SHX Text Detail Plans for Anderson Dewatering Kandiyohi County, Minnesota County, Minnesota 6663220900WKK
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text
JF
AutoCAD SHX Text 5/24/2021
AutoCAD SHX Text
II
AutoCAD SHX Text Kandiyohi County County
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2
AutoCAD SHX Text Sec. 22, Burbank Twp., Kandiyohi Co., Minnesota22, Burbank Twp., Kandiyohi Co., Minnesota, Burbank Twp., Kandiyohi Co., MinnesotaBurbank Twp., Kandiyohi Co., Minnesota Twp., Kandiyohi Co., MinnesotaKandiyohi Co., Minnesota Co., Minnesota
AutoCAD SHX Text N
AutoCAD SHX Text
TEMPORARY BENCH MARKS*
AutoCAD SHX Text
NO.
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COORDINATE SYSTEM: NAD83 (CONUS), UTM 15N, GEOID 18. UNITS: US SURVEY FT.
AutoCAD SHX Text
COVER SHEET 1 DEWATERING PROJECT PROJECT ANDERSON
AutoCAD SHX Text Minnesota specifications for conservation practices apply for all materials and construction work. these specifications are part of this plan. Changes in the drawings or specifications must be authorized by the owner and the NRCS representative with the proper approval authority. The owner is responsible for obtaining land rights and local, state, and federal permits or other permission necessary to perform and maintain the practice. State law and NRCS policy require that the excavator contact Gopher State One Call at least 48 hours prior to the start of excavation work. GSOC Number _______________________________
AutoCAD SHX Text This installation meets NRCS standards and specifications. __Yes __No Inspected by:__________________ Certified by:__________________ Date:_______________________
AutoCAD SHX Text
CONSTRUCTION CERTIFICATIONCONSTRUCTION CERTIFICATION
AutoCAD SHX Text Eng. Job Class
AutoCAD SHX Text I have reviewed and understand the construction plans and specifications and agree to as described. ___________________ ______________ COOPERATORS SIGNATURE DATE
AutoCAD SHX Text Access ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
Basin 3
Basin 1
Basin 0
Basin 2
AutoCAD SHX Text Sheet 2 of 6
AutoCAD SHX Text File Name
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Drawn
AutoCAD SHX Text 6/14/2021
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2021
AutoCAD SHX Text 0900WKK_Kandiyohi_Anderson_Repair.dwg
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text
JF
AutoCAD SHX Text 5/24/2021
AutoCAD SHX Text
II
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2
AutoCAD SHX Text Sec. 22, Burbank Twp., Kandiyohi Co., Minnesota22, Burbank Twp., Kandiyohi Co., Minnesota, Burbank Twp., Kandiyohi Co., MinnesotaBurbank Twp., Kandiyohi Co., Minnesota Twp., Kandiyohi Co., MinnesotaKandiyohi Co., Minnesota Co., Minnesota
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Scale in Feet
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
PLANVIEW DEWATERING PROJECT PROJECT ANDERSON
AutoCAD SHX Text Eng. Job Class
AutoCAD SHX Text
1. Remove and salvage rock rip rap. Remove and salvage rock rip rap. 2. Excavate around structure and disconnect Excavate around structure and disconnect outlet pipe. Ensure outlet pipe is protected from sediment 3. Remove Pre-cast weir structure Remove Pre-cast weir structure 4. This will function as a sump to de-water This will function as a sump to de-water the area prior to tile installation
AutoCAD SHX Text
1. Remove, salvage, and reset 15" HDPE Remove, salvage, and reset 15" HDPE Culvert Pipe. Pipe shall be reset in original location with an upstream elevation of 1223.7 and a downstream elevation of 1223.6. Fill shall be placed to match existing ground. 2. Excavate Channel to a depth of 1222.7. Excavate Channel to a depth of 1222.7. Material excavated from channel shall be spread on the south side of the channel to a maximum depth of 1'
AutoCAD SHX Text
1. Search for tile outlet Search for tile outlet 2. If found, connect to new If found, connect to new 10" tile system with manufacturer's recommended connector
AutoCAD SHX Text
1. Install 330 ft of 10" Perforated Install 330 ft of 10" Perforated Tile 2. Install 1220 ft of 10" Install 1220 ft of 10" Non-Perforated tile
Planned pool elevation 1223.7 ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
Upstream ViewSide View
Existing 48" Diameter Precast Concrete Structure to be Removed
AutoCAD SHX Text Sheet 3 of 6
AutoCAD SHX Text File Name
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Drawn
AutoCAD SHX Text 6/14/2021
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2021
AutoCAD SHX Text 0900WKK_Kandiyohi_Anderson_Repair.dwg
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text
JF
AutoCAD SHX Text 5/24/2021
AutoCAD SHX Text
II
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVER
AutoCAD SHX Text
TITLE
AutoCAD SHX Text Sec. 22, Burbank Twp., Kandiyohi Co., Minnesota22, Burbank Twp., Kandiyohi Co., Minnesota, Burbank Twp., Kandiyohi Co., MinnesotaBurbank Twp., Kandiyohi Co., Minnesota Twp., Kandiyohi Co., MinnesotaKandiyohi Co., Minnesota Co., Minnesota
AutoCAD SHX Text
EXISTING STRUCTURE REMOVAL DEWATERING PROJECT PROJECT ANDERSON
AutoCAD SHX Text Eng. Job Class
AutoCAD SHX Text Weir Wall
AutoCAD SHX Text Notes: 1. Remove weir wall from inside concrete Remove weir wall from inside concrete structure. 2. Allow water to drain to bottom of lowest Allow water to drain to bottom of lowest opening (approx. 1220.4') 3. Remove upper barrel of structure. Remove upper barrel of structure. 4. Allow water to drain to top of base Allow water to drain to top of base approx. 1219.7') 5. Disconnect and protect outlet pipe and Disconnect and protect outlet pipe and remove structure base. 6. Place additional 2" filter aggregate for Place additional 2" filter aggregate for base as needed before setting new structure
AutoCAD SHX Text Upper Barrel
AutoCAD SHX Text 1220.4'
AutoCAD SHX Text 1219.7'
AutoCAD SHX Text Outlet Pipe
Structure Base ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
Feet 0 40 80
Connection plan and materials must be approved by NRCS Rep prior to installation.
AutoCAD SHX Text Sheet 4 of 6
AutoCAD SHX Text File Name
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Drawn
AutoCAD SHX Text 6/14/2021
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2021
AutoCAD SHX Text 0900WKK_Kandiyohi_Anderson_Repair.dwg
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text
JF
AutoCAD SHX Text 5/24/2021
AutoCAD SHX Text
II
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2
AutoCAD SHX Text Sec. 22, Burbank Twp., Kandiyohi Co., Minnesota22, Burbank Twp., Kandiyohi Co., Minnesota, Burbank Twp., Kandiyohi Co., MinnesotaBurbank Twp., Kandiyohi Co., Minnesota Twp., Kandiyohi Co., MinnesotaKandiyohi Co., Minnesota Co., Minnesota
AutoCAD SHX Text
DRAINIAGE PIPE DETAIL DEWATERING PROJECT PROJECT ANDERSON
AutoCAD SHX Text Eng. Job Class
AutoCAD SHX Text 10" Perforated Tile Sta 0+00 to 3+30
AutoCAD SHX Text Install cap at beginning of line with manufactured approved cap
AutoCAD SHX Text Connect 10" Perforated Tile to 10" Non-perforated Tile
AutoCAD SHX Text 10" Non-perforated Tile Sta 3+30 - 15+15
AutoCAD SHX Text 10" Non-perforated Tile Sta 3+30 - 15+15
AutoCAD SHX Text Connect Non-perforated Tile to concrete structure as per manufacturer's recommendation.
AutoCAD SHX Text 10" HDPE Dual Wall Rigid Pipe Sta 15+15-15+35
AutoCAD SHX Text slope = 0.40%%%
AutoCAD SHX Text slope = 0.40%%% slope = 0.40%%%
SECTION B-BSECTION A-AUpstream View Downstream View A
A
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
B B
AutoCAD SHX Text Sheet 5 of 6
AutoCAD SHX Text File Name
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Drawn
AutoCAD SHX Text 6/14/2021
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2021
AutoCAD SHX Text 0900WKK_Kandiyohi_Anderson_Repair.dwg
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text
JF
AutoCAD SHX Text 5/24/2021
AutoCAD SHX Text
II
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2
AutoCAD SHX Text Sec. 22, Burbank Twp., Kandiyohi Co., Minnesota22, Burbank Twp., Kandiyohi Co., Minnesota, Burbank Twp., Kandiyohi Co., MinnesotaBurbank Twp., Kandiyohi Co., Minnesota Twp., Kandiyohi Co., MinnesotaKandiyohi Co., Minnesota Co., Minnesota
AutoCAD SHX Text
STRUCTURE_DETAIL_1 DEWATERING AND REPAIR PROJECT ANDERSON
AutoCAD SHX Text Eng. Job Class
AutoCAD SHX Text 48" X 48" X 5' PRECAST CONCRETE STRUCTURE WITH (6) OPENINGS OF 10" X 21" DETAILS PAGE ____
AutoCAD SHX Text 48" X 48" PRECAST CONCRETE STRUCTURE WITH 72" X 72" X 8" THICK INTEGRAL BASE SLAB
AutoCAD SHX Text 1224.7
AutoCAD SHX Text 1224.7
AutoCAD SHX Text 1224.7
AutoCAD SHX Text 1224.7
AutoCAD SHX Text 1216.7
AutoCAD SHX Text 1216.7
AutoCAD SHX Text 1216.7
AutoCAD SHX Text
(14)-2" X 6" X 50.5" GALVANIZED STEEL STOP LOGS SEE DETAILS
AutoCAD SHX Text
INFLOW FROM 10" HDPE DUAL-WALL PIPE
AutoCAD SHX Text
OUTFLOW TO 12: HDPE DUAL-WALL PIPE
AutoCAD SHX Text
(NOT TO SCALE)
AutoCAD SHX Text
%%USTOP LOG DETAILS
AutoCAD SHX Text
(NOT TO SCALE)
AutoCAD SHX Text
5/8" DIA LIFTING PIN SOLID ROUND STOCK
AutoCAD SHX Text
%%UFRONT VIEW
AutoCAD SHX Text
%%UPLAN VIEW
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 7"
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text 2"x6"x3/16" GALVANIZED STEEL TUBING (50.5" LONG, " CLEAR EACH END)34" CLEAR EACH END)
AutoCAD SHX Text
LIFTING PIN 5/8" DIAM. ROUND STOCK, (ONE ON EACH END OF STOP LOG)
AutoCAD SHX Text 1/8"
AutoCAD SHX Text
(NOT TO SCALE)
AutoCAD SHX Text
%%USTOP LOG LIFTING HOOK
AutoCAD SHX Text
2-REQUIRED
AutoCAD SHX Text 3"
AutoCAD SHX Text 7'
AutoCAD SHX Text
FROM 1/2" GALVANIZED
AutoCAD SHX Text
LIFTING HOOK CONSTRUCTED
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 9"
AutoCAD SHX Text 2"
AutoCAD SHX Text 5"
AutoCAD SHX Text NOTE: PROVIDE A PIECE OF HEAVY CHAIN AND WELD TO A CONVENIENT LOCATION ALONG THE CATWALK FOR LOCKING THE LIFTING HOOKS TO THE STRUCTURE. CHAIN SHALL BE LARGEST SIZE THAT CAN EASILY PASS THROUGH HANDLE OF LIFTING HOOKS.
AutoCAD SHX Text
ROUND STOCK
AutoCAD SHX Text 1223.4
AutoCAD SHX Text 1221.9
AutoCAD SHX Text 1220.4
AutoCAD SHX Text
FOR GRATE WITH HATCH SEE PAGE ____
AutoCAD SHX Text Boot to connect to 10" HDPE Dual Walled Pipe
AutoCAD SHX Text Boot to connect to 12" HDPE Dual Walled Pipe
AutoCAD SHX Text Boot to connect to 10" HDPE Dual Walled Pipe
Boot to connect to 12" HDPE Dual Walled Pipe ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
TYPICAL BOULDER PLACEMENT AGAINST FACE OF
CATCH BASIN ORIFICE OPENINGS
TOPVIEW OF BOULDER AND RIPRAP PLACEMENT
OPENING DETAILS OF 48" X 48" BOX OUTLET STRUCTURE
A
A
GRATE COVER FOR CONCRETE STRUCTURE
NOTE: THE GRATE COVER SHALL
BE DESIGN BUILD AND MUST BE
APPROVED BY THE NRCS REP
PRIOR TO ORDERING.
AutoCAD SHX Text Sheet 6 of 6
AutoCAD SHX Text File Name
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Drawn
AutoCAD SHX Text 6/14/2021
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2021
AutoCAD SHX Text 0900WKK_Kandiyohi_Anderson_Repair.dwg
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text
JF
AutoCAD SHX Text 5/24/2021
AutoCAD SHX Text
II
AutoCAD SHX Text cclarin
AutoCAD SHX Text 5/2
AutoCAD SHX Text Sec. 22, Burbank Twp., Kandiyohi Co., Minnesota22, Burbank Twp., Kandiyohi Co., Minnesota, Burbank Twp., Kandiyohi Co., MinnesotaBurbank Twp., Kandiyohi Co., Minnesota Twp., Kandiyohi Co., MinnesotaKandiyohi Co., Minnesota Co., Minnesota
AutoCAD SHX Text
STRUCTURE_DETAIL_2 DEWATERING AND REPAIR PROJECT ANDERSON
AutoCAD SHX Text Eng. Job Class
AutoCAD SHX Text
10" X 21" X ORIFICE OPENINGS
SALVAGE THE (12)-24" DIA BOULDERS AROUND THE FRONT FACE OF THE EXISTING STRUCTURE AND PLACE ON THE FRONT FACE OF THE NEW STRUCTURE AS SHOWN.
| Sheets and Views |
| 0900WKK_Kandiyohi_Anderson_Repair-COVER SHEET 1 |
| 0900WKK_Kandiyohi_Anderson_Repair-Planview |
| 0900WKK_Kandiyohi_Anderson_Repair-Existing Structure Removal |
| 0900WKK_Kandiyohi_Anderson_Repair-Drainiage Pipe Detail |
| 0900WKK_Kandiyohi_Anderson_Repair-Structure_Detail_1 |
| 0900WKK_Kandiyohi_Anderson_Repair-Structure_Detail_2 |
File details come from the government source that posted it. Updated .