1.1 PROJECT BACKGROUND

The USDA-NRCS is conducting a project near Belgrade, MN. This project will include dewatering a wetland complex and replacing an existing wetland control structure. The project will also include the installation of 1,580’ of 10” tile and tile investigation in 1 location. Disturbed areas will be prepped for seeding and seeded.

Site is located in Burbank Township, Section 5 in Kandiyohi County, Minnesota.

1.2 PROJECT LOCATION

The project is located in the section 5 of Burbank Township (T-122N R-34W). The site is approximately 3 miles south and 2 miles east of Belgrade, Minnesota. Access to the site is off 293rd Avenue. See attached maps.

1.3 MATERIALS

A. Supply equipment as indicated in plans and specifications.

B. Certification of materials by NRCS required before installation.

1.4 EXECUTION

A. Pre-implementation conference with NRCS

B. Installation of materials

a. Installation of materials

• Construction will be completed as described in the engineering plans no later than November 30th, 2022. A notice to proceed must be issued by the Contracting Officer prior to starting work.

• After construction has been completed, all disturbed areas of the site must be prepared for seeding and seeded prior to November 30th, 2022.

a. PROTECTION All materials and equipment shall be properly protected against harm from normal weather conditions and the public.

b. CLEANUP

Work areas are to be kept clean during progress of work and until completion.

END OF STATEMENT OF WORK

USDA-NRCS Anderson WRE Dewatering Kandiyohi County, MN

STATEMENT OF WORK

1.1 PROJECT BACKGROUND
1.2 PROJECT LOCATION
1.3 MATERIALS
1.4 EXECUTION
a. PROTECTION
b. CLEANUP

File details come from the government source that posted it. Updated .