S-73000-00017438 Question and Answer Document~5.docx

DOCX document 31 KB Posted

Attached to
Transportation Land Use Planning Price Agreement
Solicitation number
S-73000-00017438
Issued by
Oregon

About this file

This Question and Answer document addresses clarifications and interpretations regarding Oregon Department of Transportation's Request for Proposals for Transportation Land Use Planning 2027 Price Agreements (Bid #S-73000-00017438), issued October 6, 2026, with a proposal submission deadline of November 20, 2026. The RFP solicits qualifications-based proposals across five disciplines: Transportation System Planning, Public Transportation Planning, Bicycle and Pedestrian Planning, Land Use Planning, and Statewide Transportation Plans and Policies. ODOT anticipates awarding 7–10 Price Agreements in each of the first three disciplines, 5–7 for Land Use Planning, and 3–5 for Statewide Plans and Policies. Individual Work Order Contracts under the Price Agreements are anticipated to range from $50,000 to $500,000 with durations of 18 to 36 months. The Price Agreement term includes an initial three-year assignment period, extendable for up to two additional years based on agency need, funding availability, and consultant performance. Work will be performed statewide across all Oregon regions and may encompass state, local, or both facilities and services.

The collective maximum not-to-exceed for all Price Agreements is $100,000,000 with no separate caps on individual agreements. Proposals are evaluated on a qualification-based selection basis without cost consideration during scoring, with a maximum of 200 points available and up to 50 additional points for interviews or follow-up questions. Compensation methods—Cost Plus Fixed Fee, Fixed Price, Time and Materials, or Price Per Unit—will be determined by ODOT for each Work Order Contract. A 12% Certified Small Business Aspirational Target applies to state-funded Work Order Contracts exceeding $100,000; federal DBE requirements are currently suspended pending reevaluation under new federal requirements effective October 3, 2025. Funding sources include federal agencies (EPA, FHWA, FRA, FTA, NHTSA) and state funds. The anticipated effective date for Price Agreements is February 2027. Proposers must register in OregonBuys and provide cost data only after selection notification. The document contains 33 questions addressing proposal content, page limits, staffing requirements, work samples, project summaries, organizational structure, subcontractor identification, and submission procedures, clarifying RFP requirements through November 10, 2026.

View the file

Other files

File Type Posted
S-73000-00017438 RFP Document.docx DOCX document
S-73000-00017438 Pre-Proposal Conference.pptx PPTX presentation
S-73000-00017438 Attachment C.docx DOCX document
S-73000-00017438 Addendum 2.docx DOCX document
S-73000-00017438 Revised Attachment C.docx DOCX document
S-73000-00017438 Addendum 1.docx DOCX document
S-73000-00017438 Addendum 3.docx DOCX document
S-73000-00017438 Revised Attachment A.docx DOCX document
S-73000-00017438 Attachment A.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answer document for OregonBuys Bid #S-73000-00017438 Transportation Land Use Planning Price Agreement (“TLUP-27”)

10/6/2026

Question #1: The RFP [Section 2.2.2] says, “Describe the Proposer’s management and organizational structure, and how that structure aids in the delivery of the Services included in this RFP. Demonstrate how this structure benefits the Agency and the management of a Price Agreement (“PA”). Utilize a chart to clearly demonstrate the firm’s chain of command and the Proposer’s Project Manager (“PM”) and Price Agreement Administrator for the Services included in this RFP. Include in the chart the placement of subcontractors.” Does ODOT have a preference if the Price Agreement Administrator is not also a Project Manager? Or is it acceptable to have someone who could fulfill both roles?

Answer: Staffing decisions are a business decision. The role of Project Manager and Price Agreement Administrator may (or may not) be filled by the same (or different) Proposer staff.

Question #2: The RFP [Section 2.2.8] says, “The work samples may contain content and images from actual documents, project websites, power point presentations etc.” To confirm, you are wanting text/pictures/pages from the plans included in the proposal? Or would hyperlinks be sufficient?

Answer:

· It is at the Proposer’s discretion whether or not to include content and images from actual documents, project websites, power point presentations, etc.

· Regarding hyperlinks, see RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation), which states: “Hyperlinks to external information included in the General Proposal, Technical Proposal(s), Proposal Cover Sheet (Attachment C), Key Staff Resumes, or Work Samples will not be evaluated or considered.”

Question #3: Page 15 of the RFP document under [Section] 1.5.3 states “…Key Staff Resumes (if required)” – Please confirm if resumes are required or optional. If yes, please share any specific format or template required for resumes?

Answer: While Key Staff Resumes are not required for this solicitation, a Proposer may include information typically found on those forms at Proposer’s discretion, and within the allocated page limit, for the discipline-specific Technical Proposal(s).

Question #4: Under [RFP] section 2.2.3 of the Scoring Criteria, the RFP requires a proposer to describe the process of finding and selecting qualified subconsultants. Does ODOT need us to feature specific subconsultants or these are only required at the WOC stage of the project?

Answer: No, a Proposer is not required to list specific subconsultants in response to RFP Section 2.2.3.

Question #5: Can you please clarify four project summaries noted in [RFP Section] 2.2.7 vs four project samples noted in [RFP Section] 2.2.8. Does the project sample need to be from the project featured under the summaries? For project samples, under [RFP Section] 2.2.8, can we can put multiple samples from a project on one page?... For the project samples, we weren’t sure if it needed to be an unaltered page from a report or document, or if we could add some text overlaying it to explain what the sample is from and how it addresses ODOT’s needs.

Answer:

· Does the project sample need to be from the project featured under the summaries?

· No. Work samples (RFP Section 2.2.8) do not need to be the same the projects featured under project summaries (RFP Section 2.2.7).

· For project samples, under [RFP Section] 2.2.8, can we can put multiple samples from a project on one page?

· Yes. Be mindful of the requirements stated in RFP Section 1.5.3 (Format For Proposal Submittals; Page Length Limitations).

· For the project samples, we weren’t sure if it needed to be an unaltered page from a report or document, or if we could add some text overlaying it to explain what the sample is from and how it addresses ODOT’s needs.

· It is at Proposer’s discretion whether or not to use an unaltered page or to add explanatory text. Keep in mind that any such supplementation must meet the requirements stated in RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation).

Question #6: Can ODOT provide a list some examples of projects that may be procured under each of these benches?

Answer:

· Transportation System Planning: City of Ashland Transportation System Plan

· Public Transportation: Long Range Mobility Plan – LTD Connect 2045

· Bicycle/Pedestrian Planning: US 20 Bend Facility Plan 3rd Street to Powell Butte Highway

· Land Use Planning: City of Canby UGB Concept Area Planning

· Statewide Plans and Policies: 2026 Transportation Safety Action Plan

Question #7: Will ODOT just issue one addendum that addresses all written and verbal questions 10 days prior to the due date of the proposals or will it issue multiple addendums to answer questions as they come up prior the deadline for questions?

Answer:

· All questions must be submitted in writing (via email) as per RFP Section 1.2.1.

· The Question and Answer document is not addendum. “The Question and Answer document provides clarifications and interpretations but does not change RFP requirements” (RFP Section 1.2.3).

· ODOT may post the Question and Answer document to OregonBuys more than once as questions are received and answers provided. The deadline for Proposer questions is 10 calendar days prior to the Bid Opening Date, however, an updated Question and Answer document may be posted to OregonBuys any time prior to the Bid Opening Date.

Question #8: Please describe the roles ODOT sees for the Proposer’s Project Manager vs the Proposer’s Price Agreement Administrator [RFP document] (p. 21, General Proposal criteria 2.2.2).

Answer: ODOT does not define roles for Proposer’s own personnel, since roles and responsibilities for these job titles may vary across industries and between companies.

· A general description of these roles may include, but may not limited to:

· Price Agreement Administrator: managing the lifecycle of the Price Agreement, acting as the main point-of-contact between Proposer’s internal departments and with ODOT’s Price Agreement Administrator, ensuring internal compliance and understanding of Price Agreement Terms and Conditions, Exhibits, and provisions.

· Project Manager: Acts as primary point-of-contact for Work Order Contracts issued under the Price Agreement, plans, executes, and delivers a specific project within an agreed upon budget and timeline, works closely with ODOT’s Project Manager to keep a project moving forward, and address scope change to a specific project.

Question #9: In [RFP] Section 1.5.4 Required Submittals, the RFP states that a completed SSUR form is required, even if not utilizing subs. Can ODOT confirm that a compliant form for a submission with no subs should just have fields 1-9 completed, with no entries in fields 10-15?

Answer: ODOT is currently working with the Department of Justice to assess if we can exclude this form as a required submittal item. To be determined. (Reminder: RFP Section 1.2.2 and Section 1.2.3)

Question #10: In [RFP] Section 2.2 Scoring Criteria, for the General Proposal (Evaluation Criteria 2.2.2 Proposers Project Management) proposers are asked to "include in the chart the placement of subcontractors." Can ODOT confirm that it is not looking for proposers to name specific subcontractors/subconsultants, but to show the placement of potential subs in the organizational structure of WOC's?

Answer: Correct, ODOT is looking for the placement of potential subcontractors in Proposer’s management and organizational structure. A Proposer is not required to list specific subcontractors in response to RFP Section 2.2.2.

Question #11: May the same project example and/or work sample be used in more than one discipline proposal when the project demonstrates relevant experience in multiple disciplines?

Answer: Yes.

Question #12: For the four required project summaries [RFP Section 2.2.7], how will evaluators weigh a project where the proposer was a subconsultant versus prime consultant? Is similarity of scope more important than percentage of work performed?

Answer:

· For the four required project summaries, how will evaluators weigh a project where the proposer was a subconsultant versus prime consultant?

· Evaluations and scoring are based on the quality of the response, not whether or not work was performed as a prime or a subconsultant. There is no point penalty if the work is done as a subconsultant.

· Is similarity of scope more important than percentage of work performed?

· No.

Question #13: Does ODOT anticipate the majority of Transportation System Planning WOCs to be full TSPs, or does ODOT expect a substantial share to consist of corridor plans, facility plans, refinement plans, multimodal studies, implementation work, or discrete technical tasks?

Answer: ODOT anticipates a mix.

Question #14: This question primarily pertains to the Project Summaries section (RFP Section 2.2.7). However, it is our understanding that the four Project Summaries should correspond and match the four Work Samples (RFP Section 2.2.8). Is that correct? Additionally, may we include project summaries and work samples for projects that our staff members worked on while employed by a previous firm or public agency?

Answer:

· …it is our understanding that the four Project Summaries should correspond and match the four Work Samples (RFP Section 2.2.8). Is that correct?

· No. Work samples (RFP Section 2.2.8) do not need to be the same the projects featured under project summaries (RFP Section 2.2.7).

· Additionally, may we include project summaries and work samples for projects that our staff members worked on while employed by a previous firm or public agency?

· ODOT is looking for project summaries from work performed by the Proposer or work performed by a Proposer’s current staff when employed elsewhere.

Question #15: …we are wondering if you can share ODOT’s approach to resulting Work Orders. Are all Work Orders competitive processes? Also, is there an online location where subconsultants interested in joining teams may be notified of competitive work orders as they arise, to support proactive teaming with prime consultants?

Answer:

· Are all Work Orders competitive processes?

· No. Please see RFP Attachment A, Sample Price Agreement, Exhibit F.

· Also, is there an online location where subconsultants interested in joining teams may be notified of competitive work orders as they arise, to support proactive teaming with prime consultants?

· Yes. To ensure your firm is notified of bid opportunities (including Work Order Contracts), please make sure that your vendor contact information is up-to-date in the OregonBuys system. On the Commodity/Services Codes Tab (in OregonBuys) enter or update the commodity codes related to your business that you want to receive bid opportunity notifications.

Question #16: May proposers allocate the 11-page limit Technical Proposal pages at their discretion, provided all required evaluation criteria are addressed? If no, please describe ODOT's expected page allocation and section breakdown.

Answer: Yes. Please see RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation).

Question #17: May proposers include a table of contents in the proposals? If yes, will the table of contents count toward the page limit?

Answer:

· Yes, a Proposer may include a table of contents in a proposal. No, a table of contents does not count towards the page limit. Please see RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation).

Question #18: May proposers include supplemental narrative, annotations, or explanatory text alongside work samples to explain their relevance to the proposed category and evaluation criteria? If yes, are there any limitations on the type or amount of supplemental information that may be included, assuming the original work sample is not modified?

Answer: Yes. Keep in mind that any such supplementation must meet the requirements stated in RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation).

Question #19: For future task assignments and small procurements under the resulting price agreement, will ODOT and local agency staff review both the General Qualifications proposal and the applicable Technical proposal? If no, please clarify which proposal materials will be considered during consultant selection Answer:

· Per Oregon Administrative Rule 731-148-0205, ODOT or Local Agency staff may review the qualifications of at least 3 firms, this review may include but is not limited to, a Proposer’s material response to this RPF. Additionally, please refer to RFP Attachment A, Exhibit F, Section 1.1.2.

10/7/2026

Question #20: “Could you please clarify whether a subconsultant’s project example may be used to satisfy the one of the four project examples required in Section 2.2.7 of the Technical Proposal? Similarly, can an accompanying Work Sample for that subconsultant’s project be used in Section 2.2.8?”

Answer:

· ODOT is looking for project summaries and work samples from work performed by the Proposer, or work performed by a Proposer’s current staff when employed elsewhere.

· RFP Section 2.2 (Scoring Criteria) states “The Proposer must describe how Proposer meets the requirements that are specified in this RFP as related to the subsections below.”

10/20/2026

Question #21: “Would ODOT consider allowing Proposers to submit Work Samples as an appendix that is excluded from the page count?”

Answer: Work samples are subject to page limit requirements as outlined in RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation).

Question #22: “In order for Proposers to effectively incorporate answers to questions that may be submitted up until November 10th, will ODOT consider extending the submission due date to a minimum of 10 business days after final answers are released?”

Answer: ODOT has no intention of extending the submission deadline at this time.

Question #23: “If Proposers would like to include a cover page for the General Proposal or Technical Proposal with graphics, would that cover page count towards the respective page limits for those two volumes?”

Answer: A cover page would count towards the page limit. Please see RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation) for details.

Question #24: “Are Proposers permitted to make sidebar/call-out box text smaller than 12-point font?”

Answer: Substantive text must meet the requirements set forth in RFP Section 1.5.3 unless specifically excluded from the requirements. Proposers may use their discretion for materials that do not include substantive text. Please see RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation) for details.

Question #25: “RFP Section 2.2.7 notes that project summaries must include “the maximum project amount…general location of services, term or duration of the project, [and] project percentage completed” in addition to a description of the work performed. Can the specific requirements quoted in this question be smaller than 12-point font in order to maximize space in favor of the project description?”

Answer: Substantive text must meet the requirements set forth in RFP Section 1.5.3 unless specifically excluded from the requirements. Proposers may use their discretion for materials that do not include substantive text. Please see RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation) for details.

Question #26: “Addendum 1 removes the Subcontractor Solicitation and Utilization Report from the submission. On the Cover Sheet, should Proposers leave that box in the Proposal Submission Checklist unchecked or will an updated Cover Sheet be released?”

Answer: This is addressed in Addendum 2.

Question #27: “We understand that the RFP work is, at least in part, federally-funded. We note that EO 14173 eliminates contractual affirmative action on the basis of gender or race. The outlined provision requires compliance to the now-repealed executive order relating to contractual affirmative action on the basis of gender or race. Please confirm whether this requirement remains applicable to this procurement.”

Answer: ODOT will update the RFP if and when necessary to comply with federal requirements.

11/4/2026

Question #28: “Which COI Disclosure Form should be used for this proposal?”

Answer: Addendum #2 replaced Attachment C with Revised Attachment C. Please use Revised Attachment C.

Question #29: “The Revised Attachment C requests a "UEI". Is that a Unique Entity Identifier for SAM.gov?”

Answer: Yes, the “UEI” stands for “Unique Entity Identifier,” and this can be requested and obtained for free through the official SAM.gov (System for Award Management) website.

11/6/2026

Question #30: “I am wondering which COI form to use in the proposal. The link in the RFP [Section 1.5.4] goes to a page where, under Miscellaneous Procurement Forms, there are two COI docs available: Conflict of Interest Disclosure OR TGM COI Disclosure.”

Answer: Please use the form titled “Conflict of Interest Disclosure.”

11/10/2026 Question #31: “Section 6 (c) Design Within Funding Limit addresses design plans with the agency’s budget for construction set out in a WOC. Can this Section 6(c) be removed from the On-Call? The issue that arose was that some things that affect construction costs are out of consultant control. Secondly, does ODOT expect there to be projects issued under the TLUP On-Call that would include design plans with construction budget specified in a WOC, to which this term would apply?”

Answer: [Response to the following questions is based on the assumption that the use of “On-Call” means “Price Agreement.”]

· “Can this Section 6(c) be removed from the On-Call?”

0. No.

· “…does ODOT expect there to be projects issued under the TLUP On-Call that would include design plans with construction budget specified in a WOC, to which this term would apply?”

0. It is possible that Work Order Contracts could include design elements. Please see Attachment A, Sample Price Agreement, Section E, for the potential scope of services under this Price Agreement series.

Question #32:

“PDF Files: Can you confirm the number of PDF's to be attached:

(1 PDF) Revised Attachment C and COI Form - combined; 8 pages (1 PDF) General Proposal; 4 pages total (1-5 PDF's) Depending on number of Disciplines submitting on; 11 pages each”

Answer:

Please see the following RFP sections for page length limitations and for how PDFs must be organized for submittal:

· RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation)

· RFP Section 1.5.4 (Required Submittals Via OregonBuys)

· Also refer to the Addenda for any changes made to the RFP document

Question #33:

“Terms/Sample Price Agreement: Confirming there is no need to add any comments/edits regarding the Terms based on Sample Price Agreement? If yes to include, is it through the portal when creating a quote?”

Answer:

1. See RFP Section 1.3.1 (Solicitation (RFP) Protest Requirements).

0. Excerpt from RFP Section 1.3.1: “Prospective Proposers may submit a written protest of anything contained in this RFP and may request a change to any provision, specification or PA term contained in this RFP. Prospective Proposers must submit protests concerning this RFP and requests for change to any particular provisions, specifications, or PA terms contained in this RFP, to the Purchaser/Single Point of Contact identified in OregonBuys for this RFP. Protests and requests for change must be submitted in writing (via email) no later than the deadline for RFP protests set forth in RFP Section 0.3 Solicitation Schedule. Agency will not consider any protest to this RFP or request for change submitted after this deadline.”

1. See RFP Section 1.4.2 (Terms and Conditions).

1. Excerpt from RFP Section 1.4.2: “Unless an official addendum has modified or reserved the right to negotiate any terms and conditions contained in the PA or exhibits thereto, Agency will not negotiate any term or condition after the solicitation protest deadline, except SOW and pricing information with the apparent successful Proposer(s) per Section 2.4. By submitting a Proposal, the apparent successful Proposer(s) agree(s) to be bound by the Oregon Department of Transportation Terms and Conditions as set out in RFP Attachment A – Sample PA, and as they may have been modified or reserved by Agency for negotiation. Any Proposal that is received conditioned on Agency’s acceptance of any other terms and conditions or rights to negotiate will be rejected. Any subsequent negotiated changes may be subject to prior approval by the Department of Justice.’