This is a pre-proposal conference presentation for Oregon Department of Transportation's Transportation Land Use Planning Price Agreement Series (TLUP-27) Request for Proposal, OregonBuys Bid #S-73000-00017438. ODOT is soliciting proposals for architecture and engineering services across five disciplines: Transportation System Planning, Public Transportation Planning, Bicycle and Pedestrian Planning, Land Use Planning, and Statewide Transportation Plans and Policies. Services include analysis, recommendations, and planning work products supporting transportation planning decisions at state and local levels. ODOT anticipates awarding 7–10 Price Agreements for Transportation System Planning, Public Transportation Planning, and Bicycle and Pedestrian Planning each; 5–7 for Land Use Planning; and 3–5 for Statewide Plans and Policies, though the agency reserves discretion to select more or fewer based on proposal quality and need. The pre-proposal conference was held on October 6, 2026, at 11:00 AM PST. Proposals are due November 20, 2026, at 9:00 AM PST via OregonBuys, with a 180-day offer period following the bid opening date. Price Agreements are anticipated to be effective in early 2027 (January–February) with an initial Work Order Contract assignment period of three years, extendable for up to two additional years based on performance, funding availability, and agency need. Individual Work Order Contracts are anticipated to range from $50,000 to $500,000.

Evaluation is qualification-based without cost consideration during scoring, with scoring criteria covering general qualifications (alignment with agency priorities, project management capability, and interdisciplinary team management) and discipline-specific technical qualifications (understanding of services, philosophy and approach, relevant experience, and work samples). The collective maximum not-to-exceed for all Price Agreements is $100,000,000 with no separate caps on individual agreements. A 12% Certified Small Business Aspirational Target applies to state-funded Work Order Contracts exceeding $100,000. Federal Disadvantaged Business Enterprise requirements are currently suspended pending reevaluation under new federal interim final rule requirements effective October 3, 2025. All proposers must register in OregonBuys and submit cost information only after receiving an intent to award notice. Funding sources include federal agencies (EPA, FHWA, FRA, FTA, NHTSA) and state funds. Compensation methods—Cost Plus Fixed Fee, Fixed Price, Time and Materials, or Price Per Unit—will be determined by the agency for each Work Order Contract. Proposer questions must be submitted at least 10 calendar days prior to the proposal deadline; protests of the solicitation must be submitted seven calendar days prior to proposal submittal.

View the file

Other files

File Type Posted
S-73000-00017438 RFP Document.docx DOCX document
S-73000-00017438 Attachment C.docx DOCX document
S-73000-00017438 Addendum 2.docx DOCX document
S-73000-00017438 Revised Attachment C.docx DOCX document
S-73000-00017438 Addendum 1.docx DOCX document
S-73000-00017438 Addendum 3.docx DOCX document
S-73000-00017438 Revised Attachment A.docx DOCX document
S-73000-00017438 Question and Answer Document~5.docx DOCX document
S-73000-00017438 Attachment A.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Transportation Land Use Planning Price Agreement Series (“TLUP-27”) Request for proposal OregonBuys Bid #S-73000-00017438 Pre-proposal conference 10/06/2026 at 11:00am pst

Agenda Introduction RFP and Proposer Questions Sample Price Agreement and Proposer Questions

Proposer questions have been integrated into this slide deck, we will review both RFP sections and Proposer questions jointly Following the PPC, this slide deck (will include my notes) will be uploaded to OregonBuys Additionally, the questions submitted for this PPC will be uploaded to OregonBuys as the separate Question and Answer document

Disclaimer Attending this Pre-Proposal conference is not mandatory but is highly encouraged.

The purpose of this Pre-Proposal conference is to provide additional information regarding OregonBuys Bid #S-73000-00017438 and to answer questions Proposers have submitted ahead of time.

Nothing stated during this Pre-Proposal conference will change anything in the RFP. Proposers are cautioned that the official RFP requirements will change only by written addenda issued by Agency.

Be Aware of Scammers Scammers have been spoofing email addresses for Purchaser/Single-Point-of-Contact listed on a solicitation and sending emails from domains other than the legitimate “@odot.oregon.gov” domain. In these emails, the scammers are attempting to convince Proposers to pay them in order to be considered for a solicitation.

The State of Oregon and the Oregon Department of Transportation will never ask for, or demand, payment to submit a bid or be considered for an award.

The Single-Point-of-Contact for this RFP is Valerie Harms at valerie.harms@odot.oregon.gov. All communication to Proposers from the Single-Point-of-Contact for this RFP will be via email ending in “@odot.oregon.gov.”

If you believe you have received a scam email, follow your company’s internal policies and procedures for how to handle that email.

Do not forward the scam email to ODOT.

Always refer to OregonBuys for most up-to-date SPC contact information. Val will be out of office and a different SPC will be identified in OregonBuys during that time.

OregonBuys (RFP Section 0.1) All vendors must be registered in OregonBuys to do business with the state.

Registration is free.

For registration assistance see the vendor registration guide linked in RFP Section 0.1.

Vendors are responsible for ensuring their vendor registration and information is current and correct in OregonBuys.

ODOT shall not be responsible for defective registration or incorrect vendor information.

Contracting with ODOT, OregonBuys eProcurement System

Additional information and OregonBuys User Guides may be found in the “Contracting with ODOT” link https://www.oregon.gov/odot/business/procurement/pages/howto.aspx

OregonBuys (RFP Section 0.1) Proposer Question: “…is there an online location where subconsultants interested in joining teams may be notified of competitive work orders as they arise, to support proactive teaming with prime consultants?”

Answer: Yes. To ensure your firm is notified of bid opportunities (including Work Order Contracts), please make sure that your vendor contact information is up-to-date in the OregonBuys system. On the Commodity/Services Codes Tab (in OregonBuys) enter or update the commodity codes related to your business that you want to receive bid opportunity notifications.

Solicitation Schedule (RFP Section 0.3) Key RFP dates include:

Bid opening date, Proposal submittal deadline, in OregonBuys is 11/20/2026 at 9:00am PST Do not wait until the last literal minute(s) before the deadline to submit a proposal, the OregonBuys system needs time to receive the proposal documents and generate an auto-response acknowledgement email.

Make sure you receive the acknowledgement email from OregonBuys. Check your junk folders.

Proposer questions must be submitted at least 10 calendar days prior to Proposal submittal deadline in OregonBuys. Questions must be submitted in writing (via email) to Single Point of Contact.

Deadline for RFP protest: Submittal to Single Point of Contact required 7 calendar days prior to the Proposal submittal deadline

Always refer to OregonBuys for date/time of proposal submittal deadline/Bid Opening Date Save the acknowledgement email from OregonBuys Always refer to OregonBuys for current SPC contact information

Summary Overview (RFP Section 1.1.2) TLUP Projects:

Provide long-term direction for the planning and management of an integrated transportation system through consideration of how transportation systems move people and goods as well as how they affect community character, the natural and human environment, and economic development.

TLUP philosophy is covered in detail under the General Background Information paragraphs (RFP Section 1.1.2) but can be summarized as “projects which support a transportation planning decision”.

Summary Overview (RFP Section 1.1.2) There are 5 Disciplines (or Subject Areas):

Transportation System Planning Public Transportation Planning Bicycle and Pedestrian Planning Land Use Planning Statewide Transportation Plans and Policies

Proposer Question: “Can ODOT provide some examples of projects that may be procured under each of these [disciplines]?”

Answer: Yes. Project examples are provided on the following discipline-description slides.

A detailed description for each of the Disciplines can be found in: Attachment A, Sample Price Agreement, Exhibit A, Scope of Services.

Transportation System Planning Analysis and recommendations for transportation systems for an area, for a specific facility, or for a specific mode or topic to serve statewide and local needs, including but not limited to:

Develop analysis of any existing and future needs and conditions which affect the transportation system Develop plans for the location, design, and operation of any transportation facilities and services Develop supportive work products such as maps and models

TSP project example: City of Ashland Transportation System Plan

See Attachment A, Sample Price Agreement, Exhibit A, Section E (Scope of Services) TSP Project Example: City of Ashland Transportation System Plan https://www.ashlandoregon.gov/tsp

Summary Overview (RFP Section 1.1.2) Transportation System Planning Proposer Question: “Does ODOT anticipate the majority of Transportation System Planning WOCs to be full TSPs, or does ODOT expect a substantial share to consist of corridor plans, facility plans, refinement plans, multimodal studies, implementation work, or discrete technical tasks?”

Answer: ODOT anticipates a mix.

Public Transportation Planning Analysis and recommendations for integrating public transportation into state and local transportation decisions to serve statewide and local needs including but not limited to preparation or update and adoption of:

Elements of a Transportation System Plan (“TSP”) Transit Development Plans Project-level plans for public transportation facilities or improvements that result in resolving important transportation and land use issues required to move projects forward toward funding consideration.

Public Transportation project example: Long Range Mobility Plan – LTD Connect

Public Transportation project example: Long Range Mobility Plan – LTD Connect https://www.ltd.org/plans_and_projects/long-range-mobility-plan-ltd-connect-2045/

Summary Overview (RFP Section 1.1.2) Bicycle and Pedestrian Planning Analysis and recommendations for bicycle and pedestrian facilities and services to serve statewide and local needs including but not limited to preparation or update and adoption of:

Elements of a TSP Refinement plans, such as Safe Routes to Schools Action Plans Project-level plans for bicycle and pedestrian facilities or improvements that result in resolving important transportation and land use issues required to move projects forward toward funding consideration.

Bike/Ped project example: US 20 Bend Facility Plan 3rd Street to Powell Butte Highway

Bike/Ped project example: US 20 Bend Facility Plan 3rd Street to Powell Butte Highway https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=00006

Land Use Analysis and recommendations for land uses that support transportation planning decisions, including but not limited to preparation or update and adoption of:

Plan policies and an alternative land use plan for an entire urban area(s).

Specific development/redevelopment and refinement plans for a sub area such as downtown, main street, commercial or employment area, neighborhood, corridor, or interchange, including amendments to plan policies; and Comprehensive plan implementing measures, such as code amendments, infill and redevelopment strategies, and intergovernmental agreements.

Land Use project example: City of Canby UGB Concept Area Planning

Land Use project example: City of Canby Urban Growth Boundary Concept Area Planning https://www.canbyoregon.gov/dev-services/page/urban-growth-boundary

Statewide Transportation Plans and Policies Analysis and recommendations to support statewide transportation planning decisions, including but not limited to preparation or update and adoption of:

Updates and refinements of the Oregon Transportation Plan, including but not limited to its modal and topic plans Implementation measures for statewide policy plans: Strategic Action Plan, Oregon Statewide Transportation Strategy, and Oregon Transportation Plan, including but not limited to its modal and topic plans Statewide Guidance Documents

Statewide Transportation Plans and Policies project example: 2026 Transportation Safety Action Plan

SPP must support a planning decision. For example: SPP would not include Public Improvement for roadway construction notices, or data collection to maintain a model.

Statewide Transportation Plans and Policies project example: 2026 Transportation Safety Action Plan https://www.oregon.gov/odot/safety/pages/tsap.aspx

Future Work Limitations If a Consultant or any Affiliate of Consultant enters into personal services contract(s) with Agency for the purpose of advising or assisting in developing specifications, a scope or statement of work, an invitation to bid, a request for proposals or other solicitation documents and materials related to a given procurement, the consultant may not be eligible to propose/bid on the prospective procurement (based on a case-by-case assessment by Agency).

Anticipated quantity of awarded Price Agreements:

Transportation System Planning 7 to 10 Public Transportation Planning 7 to 10 Bicycle and Pedestrian Planning 7 to 10 Land Use Planning 5 to 7 Statewide Plans and Policies 3 to 5

Agency, in its sole discretion, may select more or fewer number of PA’s based on the Proposals submitted, the results of the evaluation, and Agency need for Services.

The TLUP-27 PA’s are being solicited utilizing a formal and open procurement method that encourages competition.

The number of anticipated awarded TLUP-27 PA’s is based on historical data, anticipated need, and forecasted spend.

Please note that Agency may select more or fewer number of PA’s based on the proposals submitted, the results of the evaluation, and taking into consideration any change in the Agency’s needs between the time this RFP is posted and prior to the issuing Intent to Award notices.

Summary Overview (RFP Section 1.1.2) Offer Period 180 days following the Bid Opening Date for this RFP.

A Proposer's Proposal is a firm offer, irrevocable, valid and binding on the Proposer for not less than 180 days following the Bid Opening Date for this RFP. Agency may request, either orally or in writing, that Proposer extend the offer period in writing.

WOC Assignment Specific projects will be assigned as needed by Agency via WOCs.

There is no guarantee of specific amount of services or dollar amount.

WOCs must be in scope of the Services described in the RFP.

WOC Assignment Methods described in Attachment A, Sample Price Agreement, Exhibit F, Section 1.1

WOC Assignments : Specific projects will be assigned as needed by Agency via WOCs. The WOC Assignment method is described in Attachment A, Sample Price Agreement, Exhibit F.

There is no guarantee that any specific amount of Services will be assigned or any overall dollar amount will be expended through the duration of the TLUP-27 PA.

Each WOC must be within the scope of Services described in this RFP. Scope of Services is found in Attachment A, Sample Price Agreement, Exhibit A, Section E (Scope of Services) Agency, in its sole discretion, will determine the appropriate PA series that a mini-solicitation will be issued to. Agency will consider the Services to be provided as it relates to the Scope of Services of a PA series.

Price Agreement Duration and WOC Assignment Period PAs are anticipated to be effective early 2027 (estimated January-February) PAs will have a WOC assignment period that will expire at the end of the WOC Assignment Period or when all WOCs assigned under the PA are completed, have expired, or have been terminated in accordance with their terms.

The initial WOC Assignment Period is 3 years from the execution date of the PA. The WOC assignment period may be extended for up to 2 additional years.

TLUP-27 PAs are anticipated to be effective early 2027.

PAs will have a limited WOC assignment period but will not expire until the later of: a) the end of the WOC Assignment Period, or b) when all WOCs assigned under the PA are completed, have expired, or have been terminated in accordance with their terms.

Summary Overview (RFP Section 1.1.2) Performance Evaluation Agency intends to conduct performance evaluations on each assigned WOC and may conduct evaluations on each phase of a WOC Poor performance on assigned WOCs may result in withholding of retainage and negatively impact a Consultant’s eligibility for any or all of the following:

i) amendments to extend the WOC assignment period if applicable,

ii) WOC assignments under this or other PAs and

iii) selection under other Agency solicitations.

Agency may conduct a separate solicitation near the end of the initial WOC assignment period to replace Consultants that do not receive an extension of the WOC assignment period.

Refer to: Attachment A, Sample Price Agreement, Exhibit G, Performance Evaluation.

Summary Overview (RFP Section 1.1.2) Collective maximum NTE for all Price Agreements = $100,000,000 A typical project issued under the Price Agreement series may:

Have initial Work Order Contract (“WOC”) amounts between $50,000 and $500,000

TLUP-21 Historical for March ‘22 to July ‘26
WOC Dollar Amount% of WOCs
Less than $100k5%
$100k - $250k56%
$250k - $500k30%
Over $500k9%

Collective maximum NTE amount for all of the PAs derived from this RFP is estimated to be $100,000,000.

Agency will use this collective maximum NTE amount for assignment of all WOCs under TLUP-27 PAs.

The majority of TLUP-21 projects were under $250k. We can reasonably anticipate a similar percentage spread for the WOCs issued under TLUP-27.

TLUP-21 Historical

89 total projects (WOCs) by ODOT Unit from March 2022 to July 2026*

*March 2022, first Price Agreements executed *July 2026, this PowerPoint slide deck developed

89 total projects/WOCs by ODOT unit (3/22-7/26) Majority to Planning and TGM, followed by Major Projects and DLCD TGM = Transportation Growth Management PTD = Public Transportation Division

Questions & Clarifications (RFP Section 1.2)

Proposer Question: “Will ODOT just issue one addendum that addresses all written and verbal questions 10 days prior to the due date of the proposals or will it issue multiple addendums to answer questions as they come up prior the deadline for questions?”

Answers on the next 2 slides

Proposer Questions (RFP Section 1.2.1) Answer: All questions must be submitted via email (in writing) to the Purchaser identified in OregonBuys for this RFP.

All questions must be submitted not later than the Deadline for Proposer Questions set forth in RFP Section 0.3 - Solicitation Schedule.

Addenda (RFP Section 1.2.2) Addenda to this RFP will be published in OregonBuys as “Amendments.”

Prospective Proposers are solely responsible for checking OregonBuys to determine whether or not any addenda have been issued.

All questions must come to Single Point of Contact named in OregonBuys, do not reach out to other ODOT employees Check OregonBuys for any addenda/amendments. There will not be amendment notifications outside of the OregonBuys system.

Changes or modifications to this RFP shall be binding on Agency only if in the form of written addenda published on OregonBuys.

Question and Answer Document (RFP Section 1.2.3) The Q&A document will provide clarifications and interpretations, but it does not change any RFP requirements.

The SPC/Purchaser will post to OregonBuys the questions received and the answers provided in a Q&A document.

Answers:

The Q&A document is not addendum.

ODOT may post the Question and Answer document to OregonBuys more than once as questions are received and answers provided. The deadline for Proposer questions is 10 calendar days prior to the Bid Opening Date, however, an updated Question and Answer document may be posted to OregonBuys any time prior to the Bid Opening Date.

Changes or modifications to this RFP shall be binding on Agency only if in the form of written addenda issued by Agency.

Agency may post Q&A document(s) on OregonBuys to respond to inquiries that Agency determines, in its sole discretion, do not effect changes to the RFP. Q&A documents provide clarifications and interpretations but does not change RFP requirements.

Answers to questions Agency receives and that Agency, in its sole discretion, determines are substantive, will be issued as official addenda to this RFP (or as Question and Answer documents - see section 1.2.3)

Protests (RFP Section 1.3) Solicitation Protest (RFP Section 1.3.1) Protest must be submitted to the Purchaser/Single Point of Contact identified in OregonBuys for this RFP.

Protest must be submitted in writing (via email) no later than the deadline for RFP protests set forth in RFP section 0.3 Solicitation Schedule.

Agency will resolve all timely submitted protests in accordance with OAR 731-148-0240(2).

Selection (Award) Protest (RFP Section 1.3.2) Protest must be submitted to the Purchaser/Single Point of Contact identified in OregonBuys for this RFP.

Protest must be submitted in writing (via email) no later than the deadline for RFP protests set forth in RFP section 0.3 Solicitation Schedule.

Agency will resolve all timely submitted protests in accordance with OAR 731-148-0240(3).

Solicitation Protest: must be submitted in writing (by email) to the SPC not later than 7 calendar days prior to the Bid Opening Date and time Award Protest: must be submitted in writing ( by email) to the SPC not later than 7 calendar days after the Intent to Award Notice is issued RFP Section 1.3.3: “All costs of a protest shall be the responsibility of the protestor and undertaken at the protestor’s expense.”

“Pass/Fail” Proposal Submission Requirements (RFP Section 1.4) Proposal Submittal Deadline (RFP Section 1.4.1) Refer to the date and time specified in OregonBuys

Terms and Conditions (RFP Section 1.4.2) ODOT’s Terms and Conditions as set forth in Sample Price Agreement (RFP Attachment A). Any other terms and conditions, or rights to negotiate, will be rejected.

1.4 “PASS/FAIL” PROPOSAL SUBMISSION REQUIREMENTS

Proposals must comply with all of the following Pass/Fail criteria to be considered for further evaluation. Proposals with items in this Section 1.4 marked as “PASS/FAIL” that are incomplete (except for minor informalities), not submitted by Proposal due date and time, or are otherwise not in substantial conformance with the requirement, will be rejected as non-responsive.

1.4.1 PROPOSAL SUBMITTAL DEADLINE (PASS/FAIL)

Proposals must be received in OregonBuys by the submittal deadline. Agency will not accept Proposals submitted by facsimile or electronic mail, nor will Agency accept Proposals submitted after the Proposal submittal deadline (except as Agency may permit for REQUIRED items under section 1.5). Agency is not responsible for and will not accept late or mis-delivered Proposals.

1.4.2 TERMS AND CONDITIONS (PASS/FAIL)

Unless an official addendum has modified or reserved the right to negotiate any terms and conditions contained in the PA or exhibits thereto, Agency will not negotiate any term or condition after the solicitation protest deadline, except SOW and pricing information with the selected Proposer(s) per section 2.4. By Proposal submittal, the selected Proposer(s) agree(s) to be bound by the Oregon Department of Transportation Terms and Conditions as set out in RFP Attachment A – Sample Price Agreement, and as they may have been modified or reserved by Agency for negotiation. Any Proposal that is received conditioned on Agency’s acceptance of any other terms and conditions or rights to negotiate will be rejected. Any subsequent negotiated changes may be subject to prior approval by the Department of Justice.

Government bodies subject to ORS Chapter 190 do not bid or compete on the same basis as private-sector Proposers, however, Agency will initially review Proposals from government bodies according to the same evaluation criteria described in this RFP. Government bodies submitting a Proposal must comply with all applicable Proposal requirements described in this RFP. In addition to any other Proposer selection, Agency may enter into an ORS Chapter 190 agreement with any government body for the Services. Alternatively, Agency may cancel this RFP if it would be in the public interest as determined by Agency, and enter into an ORS Chapter 190 agreement with a government body.

Required Proposal Submittal Items and Scoring Deductions (RFP Section 1.5) Scoring Deductions 2% scoring deduction, based upon the total available points, for each item in section 1.5 that is incomplete.

Incomplete or missing items must be completed and submitted via email within 2 business days of email request by Agency.

Only 1 scoring deduction will be applied per deficiency.

Scoring deductions are on an average score per Proposal basis and not a deduction per evaluator.

1.5 “REQUIRED” PROPOSAL SUBMITTAL ITEMS & SCORING DEDUCTIONS

Scoring Deductions:

Proposals will receive a 2% scoring deduction, based upon the total available points, for each item in section 1.5 marked as “REQUIRED” that is incomplete (except for minor informalities). Incomplete items must be completed and submitted within 2 business days of a request by Agency. Incomplete items must be delivered to the Purchaser as identified in the request in order to provide an appropriate time stamp. Failure to complete and deliver incomplete “REQUIRED” items within 2 business days of request by Agency shall result in Proposal rejection. Time limitations will be based upon the time of the request sent by Agency and the time of the e-mail sent in response to Agency request.

Scoring deductions are on an average score per Proposal basis and not a deduction per evaluator. For example, if a Proposer received an average score of 92 points from the evaluation committee, a 2 percent scoring deduction would result in a Proposal score of 90. (Percentage will be rounded to either the lower number if under .5 or to the higher number if .5 or over.)

Required Proposal Submittal Items and Scoring Deductions (RFP Section 1.5) RFP Section 1.5.2 – Minimum Qualifications This is marked reserved at the RFP level, and will be determined at the WOC level, based on the individual needs of each project.

Not all WOCs will require a certified professional (i.e. Professional Engineer or Landscape Architect).

Required Proposal Submittal Items and Scoring Deductions (RFP Section 1.5) RFP Section 1.5.3(b) – Format for Proposal Submittals and page length limitation

ComponentsSectionMaximum Number of PagesSubmission
Attachment C: Proposal Cover Sheet1.5.43

Single combined PDF file

Subcontractor Solicitation and Utilization Report1.5.41
COI Disclosure Form (if required)1.5.4as required
General Proposal - Response to evaluation criteria 2.2.1 through 2.2.32.2

Separate PDF file Technical Proposal - For each discipline being proposed on, response to evaluation criteria 2.2.5 through 2.2.8 2.2 11 pages for each discipline

Separate PDF file for each discipline being proposed on

Required Submittals Via OregonBuys (RFP Section 1.5.4) Example: If firm ABC proposes on 3 disciplines of Transportation System Planning, Public Transportation Planning and Bicycle and Pedestrian Planning, then ABC’s Proposal would include the following separate 4 files:

General Proposal Response to evaluation criteria 2.2.1 through 2.2.3 (separate PDF file);

Technical Proposal Transportation System Planning discipline specific proposal - response to evaluation criteria 2.2.5 through 2.2.8 (separate PDF file);

Public Transportation Planning discipline specific proposal - response to evaluation criteria 2.2.5 through 2.2.8 (separate PDF file); and Bicycle and Pedestrian Planning discipline specific proposal - response to evaluation criteria 2.2.5 through 2.2.8 (separate PDF file).

Format for Proposal Submittals and Page Length Limitations (RFP Section 1.5.3)

Proposer Question: “May proposers allocate the 11-page limit Technical Proposal pages at their discretion, provided all required evaluation criteria are addressed? If no, please describe ODOT's expected page allocation and section breakdown.”

Answer: Yes. Please see RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation).

Proposer Question: “Page 15 of the RFP document under [Section] 1.5.3 states “…Key Staff Resumes (if required)” – Please confirm if resumes are required or optional. If yes, please share any specific format or template required for resumes?”

Answer: While Key Staff Resumes are not required for this solicitation, a Proposer may include information typically found on those forms at Proposer’s discretion, and within the allocated page limit, for the discipline-specific Technical Proposal(s).

Proposer Question: “May proposers include a table of contents in the proposals? If yes, will the table of contents count toward the page limit?”

Answer: Yes, a Proposer may include a table of contents in a proposal. No, a table of contents does not count towards the page limit. Please see RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation).

Proposer Question: “May proposers include supplemental narrative, annotations, or explanatory text alongside work samples to explain their relevance to the proposed category and evaluation criteria? If yes, are there any limitations on the type or amount of supplemental information that may be included, assuming the original work sample is not modified?”

Answer: Yes. Keep in mind that any such supplementation must meet the requirements stated in RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation).

Required Submittals Via OregonBuys (RFP Section 1.5.4)

Proposer Question: “In [RFP] Section 1.5.4 Required Submittals, the RFP states that a completed [Subcontractor Solicitation and Utilization Report] form is required, even if not utilizing subs. Can ODOT confirm that a compliant form for a submission with no subs should just have fields 1-9 completed, with no entries in fields 10-15?”

Answer: ODOT is currently working with the Department of Justice to assess if we can exclude the SSUR form as a required submittal item. To be determined.

Public Records (RFP Section 1.6) Proposals shall be open to public inspection in accordance with ORS 279C.107 and OAR 137-048-0130(7).

Identifying the Proposal in whole as trade secret, confidential or otherwise exempt from disclosure is not acceptable. In such circumstances Agency will require Proposer to submit a memorandum citing the statutory justification for each specific area of the Proposal that Proposer claims to be exempt.

By submitting a response to this RFP, Proposer grants the State a non-exclusive, perpetual, irrevocable, royalty-free, worldwide license for the rights to copy, distribute, display, prepare derivative works and transmit the response for the purpose of conducting this procurement and to fulfill obligations under Oregon Public Records Laws.

Generative Artificial Intelligence (RFP Section 1.8) As defined by Executive Order 14110: “Generative artificial intelligence (“GenAI”) is the class of AI models that emulate the structure and characteristics of input data to generate derived synthetic content. This can include images, videos, audio, text, and other digital content.”

GenAI Provisions for Price Agreements and Work Order Contracts: Agency reserves the right to amend any awarded Price Agreement(s) and any Work Order Contract(s) to add provisions related to acceptable use of GenAI.

GenAI Use Disclosure for Deliverables: Agency, at its discretion, may require an awarded Consultant to disclose how, and to what extent, GenAI was used for the development of a deliverable under a Work Order Contract.

Evaluation Process (RFP Section 2.1) Proposal Evaluation (RFP Section 2.1.1) Agency will evaluate Proposals in accordance with the evaluation procedures set forth in OAR 731-148-0220 and this RFP.

Proposals meeting all Pass/Fail criteria (including submittal of all REQUIRED items in the time allowed) will be forwarded to the evaluation committee for review and scoring.

The evaluation committee members will review both General & Technical Proposals Discipline-specific subject matter experts may used in the evaluation each specific discipline

Evaluation Process (RFP Section 2.1) Proposal Evaluation (RFP Section 2.1.1) The outcome of the Evaluation process may, in Agency’s sole discretion, result in:

Notice to Proposer(s) of selection or rejection for PA negotiation and possible award;

Further steps to gather additional information for evaluation, (e.g. notice of placement on an interview list, requesting clarification); or Cancellation of the RFP and either re-issuance of the RFP in the same or revised form or no further action by Agency with respect to the RFP.

Interviews/Follow-Up Questions (RFP Section 2.1.2) Interviews/follow-up questions may be conducted and scored at the discretion of Agency.

Evaluation of the optional interview or other requested information will be within the parameters of the following criteria:

Understanding of Requested Services Technical Approach Project Management/Cost Effectiveness Proposer’s General Qualifications Proposer’s Capabilities Proposer’s Relevant Experience Project Team and Qualifications

Clarifications (RFP Section 2.1.4) Agency may require any clarification it needs to understand the Proposer’s Proposal.

Any necessary clarifications or modifications which are in the best interest of Agency may be made before the Proposer is awarded a PA, and some or all of the clarifications or modifications may become part of the final PA.

Clarifications cannot be used to rehabilitate a non-responsive Proposal.

Scoring Criteria (RFP Section 2.2) General Proposal Provide a single PDF file response to evaluation criteria 2.2.1 through 2.2.3

2.2.1 Proposer’s Alignment with Agency Priorities and Goals

2.2.2 Proposer’s Project Management

2.2.3 Proposer’s Interdisciplinary Teams

Reminder: As stated in RFP Section 1.5.3, hyperlinks to external information included in the General Proposal, Technical Proposal(s), Proposal Cover Sheet (Attachment C), Key Staff Resumes, or Work Samples will not be evaluated or considered.

Proposer’s Project Management (RFP Section 2.2.2) Proposer Question: “The RFP [Section 2.2.2] says, “Describe the Proposer’s management and organizational structure, and how that structure aids in the delivery of the Services included in this RFP. Demonstrate how this structure benefits the Agency and the management of a Price Agreement (“PA”). Utilize a chart to clearly demonstrate the firm’s chain of command and the Proposer’s Project Manager (“PM”) and Price Agreement Administrator for the Services included in this RFP. Include in the chart the placement of subcontractors.” Does ODOT have a preference if the Price Agreement Administrator is not also a Project Manager? Or is it acceptable to have someone who could fulfill both roles?”

Answer: Staffing decisions are a business decision. The role of Project Manager and Price Agreement Administrator may (or may not) be filled by the same (or different) Proposer staff.

Question: Does ODOT have a preference if the Price Agreement Administrator is not also a Project Manager? Or is it acceptable to have someone who could fulfill both roles?

Proposer’s Project Management (RFP Section 2.2.2) Proposer Question: “Please describe the roles ODOT sees for the Proposer’s Project Manager vs the Proposer’s Price Agreement Administrator [RFP document] (General Proposal criteria 2.2.2).”

Answer: ODOT does not define roles for Proposer’s own personnel, since roles and responsibilities for these job titles may vary across industries and between companies.

A general description of these roles may include, but may not limited to:

Price Agreement Administrator: managing the lifecycle of the Price Agreement, acting as the main point-of-contact between Proposer’s internal departments and with ODOT’s Price Agreement Administrator, ensuring internal compliance and understanding of Price Agreement Terms and Conditions, Exhibits, and provisions.

Project Manager: Acts as primary point-of-contact for Work Order Contracts issued under the Price Agreement, plans, executes, and delivers a specific project within an agreed upon budget and timeline, works closely with ODOT’s Project Manager to keep a project moving forward, and address scope change to a specific project.

Proposer’s Project Management (RFP Section 2.2.2) Proposer Question: “In [RFP] Section 2.2 Scoring Criteria, for the General Proposal (Evaluation Criteria 2.2.2 Proposers Project Management) proposers are asked to "include in the chart the placement of subcontractors." Can ODOT confirm that it is not looking for proposers to name specific subcontractors/subconsultants, but to show the placement of potential subs in the organizational structure of WOC’s?”

Answer: Correct. ODOT is looking for the placement of potential subcontractors in Proposer’s management and organizational structure. A Proposer is not required to list specific subcontractors in response to RFP Section 2.2.2.

Question: Can ODOT confirm that it is not looking for proposers to name specific subcontractors/subconsultants, but to show the placement of potential subs in the organizational structure of WOC’s?

Proposer’s Interdisciplinary Teams (RFP Section 2.2.3) Proposer Question: “Under [RFP] section 2.2.3 of the Scoring Criteria, the RFP requires a proposer to describe the process of finding and selecting qualified subconsultants. Does ODOT need us to feature specific subconsultants or these are only required at the WOC stage of the project?”

Answer: No, a Proposer is not required to list specific subconsultants in response to RFP Section 2.2.3.

Scoring Criteria (RFP Section 2.2) Technical Proposal(s) Provide a separate PDF file for each discipline being proposed on (response to evaluation criteria 2.2.5 through 2.2.8).

2.2.5 Understanding of Requested Services

2.2.6 Philosophy and Approach

2.2.7 Relevant Experience and Qualifications

2.2.8 Work Samples

NOTE: Evaluation criteria 2.2.7 requests information which is typically included in Key Staff Resumes. You may allocate this information within the page limit for each Technical Proposal.

While Key Staff Resumes are NOT a requirement for this solicitation, you may include information typically found on those forms at your discretion and within the allocated page limit for your discipline specific Technical Proposal(s).

Reminder: As stated in RFP Section 1.5.3, hyperlinks to external information included in the General Proposal, Technical Proposal(s), Proposal Cover Sheet (Attachment C), Key Staff Resumes, or Work Samples will not be evaluated or considered.

Relevant Experience and Qualifications (RFP Section 2.2.7) Proposer Question: “For the four required project summaries, how will evaluators weigh a project where the proposer was a subconsultant versus prime consultant?”

Answer: Evaluation and scoring are based on the quality of the response, not whether or not work was performed as a prime or a subconsultant. There is no point penalty if the work is done as a subconsultant.

Proposer Question: “Is similarity of scope more important than percentage of work performed?”

Answer: No.

Proposer Question: “This question primarily pertains to the Project Summaries section (RFP Section 2.2.7). However, it is our understanding that the four Project Summaries should correspond and match the four Work Samples (RFP Section 2.2.8). Is that correct?...”

Answer: No. Work samples (RFP Section 2.2.8) do not need to be the same the projects featured under project summaries (RFP Section 2.2.7).

Proposer Question: “…Additionally, may we include project summaries and work samples for projects that our staff members worked on while employed by a previous firm or public agency?”

Answer: ODOT is looking for project summaries from work performed by the Proposer or work performed by a Proposer’s current staff when employed elsewhere.

Proposer Question: “May the same project [summary] and/or work sample be used in more than one discipline proposal when the project demonstrates relevant experience in multiple disciplines?”

Answer: Yes.

Work Samples (RFP Section 2.2.8) Proposer Question: “Does the project sample need to be from the project featured under the summaries?”

Answer: No. Work samples (RFP Section 2.2.8) do not need to be the same the projects featured under project summaries (RFP Section 2.2.7).

Proposer Question: “For project samples, under [RFP Section] 2.2.8, can we can put multiple samples from a project on one page?”

Answer: Yes. Be mindful of the requirements stated in RFP Section 1.5.3 (Format For Proposal Submittals; Page Length Limitations).

Proposer Question: “For the project samples, we weren’t sure if it needed to be an unaltered page from a report or document, or if we could add some text overlaying it to explain what the sample is from and how it addresses ODOT’s needs.”

Answer: It is at Proposer’s discretion whether or not to use an unaltered page or to add explanatory text. Keep in mind that any such supplementation must meet the requirements stated in RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation).

Proposer Question: “The RFP [Section 2.2.8] says, “The work samples may contain content and images from actual documents, project websites, power point presentations etc.” To confirm, you are wanting text/pictures/pages from the plans included in the proposal? Or would hyperlinks be sufficient?”

Answer: It is at the Proposer’s discretion whether or not to include content and images from actual documents, project websites, power point presentations, etc.

Regarding hyperlinks, see RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation), which states: “Hyperlinks to external information included in the General Proposal, Technical Proposal(s), Proposal Cover Sheet (Attachment C), Key Staff Resumes, or Work Samples will not be evaluated or considered.”

Method of Award (RFP Section 2.3) Method of Award General Proposal Score = Total of all evaluator scores for criteria 2.2.1 through 2.2.4, divided by the number of evaluators.

Technical Proposal Score (Discipline / Subject Area Specific Proposal Score) = Total of all evaluator scores for a given Proposal, criteria 2.2.5 through 2.2.9 in a given discipline, divided by the number of evaluators.

Deductions = minus any SCORING DEDUCTIONS received per Section 1.5.

Total Proposal Score = Total of General Proposal Score plus Technical Proposal Score minus SCORING DEDUCTIONS.

Total Interview or Follow-up Questions Score (if conducted) = Total of all evaluator scores for a given Proposal in a given discipline, divided by the number of evaluators.

Final Score = Total Proposal Score plus Total Interview or Follow-up Questions Score (if conducted).

Total Proposal Score = General Proposal Score + Technical Proposal Score – Scoring Deductions Final Score = Total Proposal Score + Total Interview/Follow-Up Score (if conducted)

Negotiations (RFP Section 2.4) Agency will:

Negotiate the Price Agreement in the best interest of the State;

Negotiate with the top ranked Proposer(s);

Formally terminate negotiations with the highest ranked Proposer if Agency and Proposer are unable for any reason to reach agreement on a Price Agreement within a reasonable amount of time (as determined in the sole discretion of Agency).

Negotiations (RFP Section 2.4) Agency may:

End this solicitation if negotiations with any Proposer do not result in a PA within a reasonable amount of time (as determined in the sole discretion of Agency); and Proceed (in its sole discretion) with a new solicitation for the same Services or consider any other options available under the applicable rules, laws, and policies.

time check

Price Agreement Award Requirements (RFP Section 3.0) The requirements in this Section 3 apply only to any Proposer that receives an intent to award notice following Agency’s evaluation and scoring of Proposals (and interviews, if conducted).

Agency, in its sole discretion, will start utilizing executed PA’s in accordance with the WOC assignment methods (see Attachment A, Sample Price Agreement) when the Agency determines that a majority of the PA’s have been executed.

Executed = the document has been signed by both Parties

Cost Information & Billing Rate Information (RFP Sections 3.1 and 3.1.1) The requirements in this Section 3 apply only to any Proposer that receives an intent to award notice following Agency’s evaluation and scoring of Proposals (and interviews, if conducted).

Selected Proposer(s) submit labor rates electronically to Agency. Firms with current rates on file are not required to resubmit.

Submissions and questions must be sent to the ODOT Billing Rate Updates team at ODOTBillingRateUpdates@odot.oregon.gov Direct and indirect costs as applied to cost estimates and invoices under federally funded Agency contracts and subcontracts must be in conformance with Federal Cost Principles (48CFR Part 31).

Rate information must include either “Direct Salary and Overhead Information” or “Negotiated Billing Rate Schedule”.

Cost Disclosure Questionnaire (RFP Section 3.1.2) The requirements in this Section 3 apply only to any Proposer that receives an intent to award notice following Agency’s evaluation and scoring of Proposals (and interviews, if conducted).

The apparent successful Proposer(s) and all subconsultants (if any) that do not have a current Cost Disclosure Questionnaire (“CDQ”) on file with Agency shall complete and submit a CDQ within 5 business days of receipt of Intent to Award notice.

Certificates of Insurance (RFP Section 3.2) The requirements in this Section 3 apply only to any Proposer that receives an intent to award notice following Agency’s evaluation and scoring of Proposals (and interviews, if conducted).

The apparent successful Proposer(s) shall provide (electronically via e-mail) Certificates of Insurance to Agency for levels of Insurance coverage shown in Sample Price Agreement (RFP Attachment A, Exhibit C) prior to PA execution.

See Attachment A, Sample Price Agreement, Exhibit C (Insurance Requirements)

Miscellaneous Forms (RFP Sections 3.3 and 3.4) The requirements in this Section 3 apply only to any Proposer that receives an intent to award notice following Agency’s evaluation and scoring of Proposals (and interviews, if conducted).

Section 3.3.1 Conflict of Interest Disclosure: If any disclosures are required per the ODOT COI Guidelines that were not disclosed with Proposal submittal (or that occurred or were discovered since the Proposal submittal), the apparent successful Proposer(s) shall complete and submit a signed COI Disclosure Form within 5 business days of receipt of Intent To Award notice.

Section 3.3.2 List of Subconsultants: Will be determined and required at the WOC level.

Section 3.4 Responsibility Inquiry Form: The apparent successful Proposer(s) shall submit a completed, accurate and signed Responsibility Inquiry form within 5 business days of receipt of Intent to Award notice.

Miscellaneous Forms (RFP Sections 3.5 and 3.8 and 3.9) The requirements in this Section 3 apply only to any Proposer that receives an intent to award notice following Agency’s evaluation and scoring of Proposals (and interviews, if conducted).

Section 3.5 Business Registry: The apparent successful Proposer must be duly authorized by the State of Oregon to transact business in the State before executing the Price Agreement.

Section 3.8 Consultant Quality Plan: Quality Plans must be submitted for A&E Consultants that perform disciplines related to preliminary engineering and design Services. This is reserved at the PA level and will be determined, and may be required, at the WOC level.

Section 3.9 Joint Venture/Partnership Information: An apparent successful Proposer, if in a Joint Venture/Partnership shall, within 14 calendar days of Intent to Award notice, provide a copy of the joint venture agreement or partnership agreement evidencing authority to propose and to enter into the resulting PA that may be awarded, together with corporate resolutions (if applicable) evidencing corporate authority to participate as a joint venturer or partner.

Attachment A, Sample Price Agreement Proposer Question: “Are all Work Orders competitive processes?”

Answer: No. Please see RFP Attachment A, Sample Price Agreement, Exhibit F, Section 1.1

Option 1, Mini Solicitation: Competitive process Option 2, Small Purchase: Competitive process not required Option 3, Intermediary Procedure: Competitive process not required

Attachment A, Sample Price Agreement Proposer Question: “For future task assignments and small procurements under the resulting price agreement, will ODOT and local agency staff review both the General Qualifications proposal and the applicable Technical proposal? If no, please clarify which proposal materials will be considered during consultant selection.”

Answer: Per Oregon Administrative Rule 731-148-0205, ODOT or Local Agency staff may review the qualifications of at least 3 firms, this review may include but is not limited to, a Proposer’s material response to this RPF. Additionally, please refer to RFP Attachment A, Exhibit F, Section 1.1.2, for criteria and considerations under this selection method.

Thank you image2.emf image3.tmp