This document is Addendum #3 to Request for Proposal #S-73000-00017438 issued by the Oregon Department of Transportation (ODOT) Procurement Office on November 4, 2026, addressing modifications to the Transportation Land Use Planning 2027 Price Agreement solicitation. The addendum modifies three sections of the RFP: Section 1.1.2 regarding Disadvantaged Business Enterprise (DBE) program requirements, Section 1.5.3 concerning proposal format and page length limitations, and replaces Attachment A with a revised Sample Price Agreement. Proposers must acknowledge that DBE requirements previously applicable to federally funded projects are suspended pending implementation of the federal DBE Interim Final Rule and Final Rule effective October 3, 2025, which requires individualized reevaluation of all DBE-certified firms. The Oregon Certification Office for Business Inclusion and Diversity (COBID) completed reevaluations on February 24, 2026. Protests to this addendum must be submitted by November 11, 2026, at 3:00 p.m. Pacific Time.

The addendum establishes revised proposal submission requirements, specifying that General Proposals may not exceed 4 pages, Technical Proposals may not exceed 11 pages per discipline, and Proposal Cover Sheets may not exceed 3 pages, all using 12-point minimum font except for specific forms requiring 11-point minimum. Proposers must comply with the revised DBE provisions detailed in Exhibit E of the Sample Price Agreement for work orders with race-conscious DBE goals and Exhibit E.1 for federally funded work orders with no DBE goal assigned. The addendum emphasizes that proposers must efficiently process any contractual modifications ODOT deems necessary to implement DBE program changes resulting from the federal regulatory updates, and that DBE requirements may be reinstated or modified as implementation of the final rule progresses and ODOT's updated DBE Program Plan is approved by the Federal Highway Administration.

View the file

Other files

File Type Posted
S-73000-00017438 RFP Document.docx DOCX document
S-73000-00017438 Pre-Proposal Conference.pptx PPTX presentation
S-73000-00017438 Attachment C.docx DOCX document
S-73000-00017438 Addendum 2.docx DOCX document
S-73000-00017438 Revised Attachment C.docx DOCX document
S-73000-00017438 Addendum 1.docx DOCX document
S-73000-00017438 Revised Attachment A.docx DOCX document
S-73000-00017438 Question and Answer Document~5.docx DOCX document
S-73000-00017438 Attachment A.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form S003-B080715

ODOT Procurement Office 355 Capitol St MS-33 Salem, OR 97301

Date:11/04/2026
To:RFP #S-73000-00017438 Planholders
From:Val Harms, Procurement and Contracts Specialist
Valerie.harms@odot.oregon.gov

Re: RFP #S-73000-00007438 Transportation Land Use Planning 2027 (”TLUP-27”)

ADDENDUM #3

to RFP #S-73000-00017438

This Addendum modifies the Request for Proposal (RFP) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum shall remain in full force and effect. This Addendum is hereby made an integral part of the RFP document. Proposer must be responsive to any requirements of this Addendum as if the requirements were set forth in the RFP. Failure to do so may result in Proposal rejection. See the RFP regarding requests for clarification or change and protests of this Addendum, and the deadlines for the foregoing.

Due date and time for addendum protests:

Protests to this Addendum must be submitted to the Single Point of Contact for this RFP via email no later than 11/11/2026, 3:00p.m. Pacific Time, or they will not be considered.

The purpose of this Addendum is to:

1. Revise RFP Section 1.1.2 (Summary Overview) to address the changes to the U.S. Department of Transportation (“USDOT”) Disadvantaged Business Enterprise (“DBE”) program;

2. Revise RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation) to correct the maximum number of pages allowed in Revised Attachment C; and

3. Replace Attachment A (Sample Price Agreement) with Revised Attachment A (Sample Price Agreement), to addresses the changes to the U.S. Department of Transportation (“USDOT”) Disadvantaged Business Enterprise (“DBE”) program.

A. RFP Section 1.1.2 (Summary Overview) is revised as follows: new text is shown as italics and underline, and deleted text is shown as strikethrough:

ODOT’s Disadvantaged Business Enterprise (“DBE”) Policy Statement is posted on the Office of Civil Rights DBE page (https://www.oregon.gov/ODOT/Business/OCR/Pages/Disadvantaged-Business-Enterprise.aspx).

The DBE Policy Statement is incorporated in this RFP with the same force and effect as though fully set forth in this RFP.

DBE Participation Goals:

On October 3, 2025, the U.S. Department of Transportation (“USDOT”) issued an interim final rule (“IFR”) modifying the certification, compliance and reporting requirements of the Disadvantaged Business Enterprise (“DBE”) program (“DBE IFR”). The DBE IFR was published in the Federal Register and took effect on October 3, 2025 [90 Fed Reg 47,969 (2025)]. On September 25, 2026, the DBE Final Rule was issued to update the IFR (49 CFR Parts 23 and 26; FR Doc. 2026-19688). The DBE IFR Final Rule requires the eligibility of all DBE-certified firms to be reevaluated on an individualized basis, without reliance on race- or sex-based presumptions of disadvantage. The Oregon Certification Office for Business Inclusion and Diversity (“COBID”) administers the Unified Certification Program (“UCP”) for the State of Oregon and is responsible for performing reevaluations and certifications of businesses that are certified under the DBE program. COBID completed the reevaluation process on February 24, 2026. Pursuant to the DBE IFR Final Rule, until the reevaluation process is completed, ODOT may not update its overall DBE goal, set any contract DBE goals on federally-funded projects or count any DBE participation toward DBE goals until the updated DBE Program Plan is approved by FHWA. In accordance with the DBE IFR, ODOT’s DBE requirements that were applicable to federally funded projects prior to the 10/03/2025 effective date of the rule are no longer in effect, and the associated DBE goal, reporting and compliance requirements are hereby suspended. Proposer acknowledges that the DBE goal and contractual requirements may be reinstated or modified for purposes of compliance with federal law as the DBE IFR Final Rule is implemented. Proposer agrees to efficiently process any contractual modifications ODOT deems necessary or appropriate to effectuate the DBE program resulting from the DBE IFR Final Rule implementation or future modifications to the DBE Program and corresponding regulations.

See RFP Attachment A, Sample PA:

· Exhibit E for DBE provisions and reporting requirements applicable to WOCs with race conscious DBE goals assigned, and

· Exhibit E.1 for DBE provisions and reporting requirements applicable to Federally funded WOCs with no DBE goal assigned.

B. RFP Section 1.5.3 (Format for Proposal Submittals; Page Length Limitation) is revised as follows: new text is shown as italics and underline, and deleted text is shown as strikethrough:

a. (REQUIRED) Proposals must use 12-point minimum font size for the substantive text (including text in tables) with the following exceptions which should use an 11-point minimum font size: RFP Attachment C – Proposal Cover Sheet, “Key Staff Resumes” (if required), and COI Disclosure Form (if required). Proposers may use their discretion for the font size of other materials that do not include substantive text (e.g. graphics, picture or graphics captions, and organizational charts).

b. The Proposal and Proposal Submittal Items must be organized in accordance with the list of Scoring Criteria categories in Section 2.2. The Proposal must not exceed the number of pages listed below, excluding any tabs or indexes, and table of contents. If a Proposer submits a Proposal exceeding the maximum number of pages per component, Agency will consider the pages up to the allowable page limit and discard all subsequent pages.

Components
Section
Maximum Number of Pages
Submission
Attachment C: Proposal Cover Sheet
1.5.4
4

Single combined PDF file

COI Disclosure Form (if required)
1.5.4
as required
General Proposal - Response to evaluation criteria 2.2.1 through 2.2.3
2.2

Separate PDF file

Technical Proposal - For each discipline being proposed on, response to evaluation criteria 2.2.5 through 2.2.8
2.2

11 pages for each discipline

Separate PDF file for each discipline being proposed on

Proposers shall not include responses to any evaluation criteria on Attachment C Proposal Cover Sheet, or the COI Disclosure Form. Responses given on these forms will not be evaluated.

Hyperlinks to external information included in the General Proposal, Technical Proposal(s), Proposal Cover Sheet (Attachment C), Key Staff Resumes, or Work Samples will not be evaluated or considered.

One (1) Page is defined as: one side of a single 8-1/2" x 11" page that meets the font size requirements stated in subsection “a” above. Any page over this size will be counted as 2 pages. Any page, partial page, tabs, indexes or table of contents with substantive text, tables, graphics, charts, resumes, etc., will be counted as 1 page.

Level 3 - Restricted

Level 3 - Restricted

Level 3 - Restricted image1.jpg