This architectural plans document supports the City of Cheyenne's 2026 Various Roof Replacements project, which encompasses reroof work at six municipal facilities: George Cox Parking Garage, Ice and Event Center, City Records Building, Pioneer Park Center, Spiker Parking Garage, and the Street and Alley Building. The project involves removing existing roofing systems, insulation, coping, and downspouts, then replacing them with new EPDM roofing membranes, parapet coping, and associated flashing components. Specific work scopes vary by facility, ranging from 1,897 square feet at the Records Building to 186,000 square feet at the George Cox Parking Garage. All work must comply with 2024 International Building Code standards and achieve Class "A" roof assemblies with 90 mile-per-hour wind speed warranties. The project is designed by Plan One/Architects, with Steve Gaer as the City of Cheyenne's Facilities Manager contact and Britt Morgan, AIA, as the architect contact.

The design specifications establish minimum roof slopes of 1/4 inch per foot for adequate drainage and mandate that contractors verify all existing conditions in the field prior to work commencement. Contractors may substitute alternative EPDM roofing systems upon approval, provided the systems manufacturer and contractor assume responsibility for modifying details to accommodate their specific products, with no additional compensation available after bid opening. All existing mechanical, plumbing, and electrical equipment is designated to remain in place, with contractors responsible for replacing damaged boots, supports, and flashing around these installations. Demolition notes specify legal disposal of all removed materials and require notification to the Wyoming Department of Environmental Quality if asbestos-containing materials are encountered. The design basis references Carlisle and MBCI roofing products as primary standards, though equivalent systems may be substituted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XXX

X

AX.X

X

XX.X

CX X'-X"

XXX

X

ROOMNAME

XXX

BUILDING SECTION LETTER

SHEET DRAWN ON

WALL SECTION NUMBER

SHEET DRAWN ON

DETAIL NUMBER

SHEET DRAWN ON

EXTERIOR ELEVATION

NUMBER

SHEET DRAWN ON

INTERIOR & EXTERIOR

DOOR OR GATE

NUMBER

ROOMNAME & NUMBER

KEYED NOTE NUMBER

EXTERIOR WINDOW LETTER

WALL TYPE LETTER

BORROWED LITE SYMBOLS

TOILET ACCESSORY

CEILING TYPE

CEILING HEIGHT

INTERIOR ELEV. NUMBER

SHEET DRAWN ON

INDICATES CENTER LINE

X

AX.X

X

XX.X

A101

SIM

STANDARD ABBREVIATIONS

ABV Above A/C Air Conditioning ACT Acoustical Ceiling Tile ADJ Adjustable, Adjacent A.F.F. Above Finish Floor A.I.B. Air Infiltration Barrier ALT Alternate ALUM Aluminum APPROX Approximate ARCH Architectural/Architect ATH Aluminum Threshold

BD Board BLDG Building BLK Block BLKG Blocking BM Beam B.M. Bench Mark BN Bullnose B.O.F. Bottom of Footing BRG Bearing BSMNT Basement BTM Bottom BTWN Between B.U. Built-up B.L. Borrowed Lite

CAB Cabinet CEM Cement C.I. Cast Iron C.J. Control Joint CLG Ceiling CLO Closet C.M. Construction Manager C.M.U. Concrete Masonry Unit C.O. Cleanout COL Column CONC Concrete CONST.JT. Construction Joint CONT Continuous CONTR Contractor COORD Coordinate CORR Corridor CPT Carpet C.R.A. Cold Rolled Angle C.T. Ceramic Tile CTR Center C.W. Cold Water

DBL Double DET Detail D.F. Drinking Fountain DIA Diameter DIM Dimension DISP Dispenser/Disposal DN Down D.P. Dampproofing DR Door DRF Draftstopping D.S. Downspout DWG Drawing

EA Each E.C. Electrical Contractor E.E. Each End E.I.F.S. Exterior Insulation and Finish System E.J. Expansion Joint E.J.C. Expansion Joint Cover

EL Elevation ELEC Electrical/Electric ELEV Elevator/Elevation E/O Equipment by Owner E.P.D.M. Ethylene Propylene

Diene Monomer E.P.S. Expanded Polystyrene EQ Equal EQUIP Equipment E.W.C. Electric Water Cooler E.W.S. Exterior Wall System EXIST/(E) Existing EXP Expansion EXT Exterior

F.D. Floor Drain FDN Foundation F.E. Fire Extinguisher FIN Finish FLR/FL Floor F.N.D. Feminine Napkin Disposal F.N.V. Feminine Napkin Vendor F.O.B. Face of Brick F.O.F. Face of Foundation F.O.S. Face of Stud FR Frame F.R.S. Flushing Rim Sink F.S. Floor Sink FT Feet/Foot FTG Footing FURR Furring

GA Gauge GALV Galvanized G.B. Grab Bar GEN General G.I. Galvanized Iron GL Glass G.W.B. Gypsum Wallboard

H High H.B. Hose Bibb H/C Handicapped H.C. Hollow Core H.D. Heavy Duty HDNR Hardener HDW Hardware H.M. Hollow Metal HORZ Horizontal HR Hour HR.D. Hair Dryer HT Height H.W. Hot Water

I.D. Inside Diameter IN Inch/Inches INCL Including INFO Information INSUL Insulation INT Interior INV Invert

JAN Janitor JT Joint

LKRS Lockers L.L.H. Long Leg Horizontal L.L.V. Long Leg Vertical LOC Location

MASR'Y Masonry Block MAT/MAT'L Material MAX Maximum MECH Mechanical MEMB.W.P. Membrane Waterproofing MEZZ. Mezzanine MFR/MFG Manufacturer/Manufacturing M.H. Manhole MIN Minimum MISC Miscellaneous M.L.P. Metal Liner Panel M.O. Masonry Opening M.T. Metal Threshold MTL Metal M.T.P. Metal Toilet Partition

(N) New NEC'Y Necessary N.I.C. Not in Contract NOM Nominal N.T.S. Not To Scale

O.A.F. Overall Frame O.C. On Center O.D. Outside Diameter O.H. Overhead OPNG Opening OPP Opposite OPP.H. Opposite Hand ORIG Original

O/ OVER

PR PAIR

PL Plate P.LAM. Plastic Laminate PLAS Plaster PLAS.LAM. Plastic Laminate PLYWD Plywood PREFAB Prefabricated PT Paint P.T.D. Paper Towel Dispenser PTN Partition PTW Pressure Treated Wood

QT Quarry Tile

(R) Remove RAD Radius R.D. Roof Drain RECMND Recommendation REF Reference REINF Reinforce/Reinforcing REQ'D Required RET Retain/Retained REV Revisions R.F. Resilient Flooring RM Room R.O. Rough Opening RTG Rating

S.C. Solid Core SCHED Schedule S.C.W. Solid Core Wood S.D. Soap Dispenser SECT Section S.F. Square Feet S.F.C. Special Floor Coating S.G.T. Structural Glazed Tile SHWR Shower

SHT Sheet SHTG Sheathing SIM Similar SPECS Specifications SQ Square S.S. Stainless Steel STD Standard STL Steel STOR Storage STRUCT Structural SUSP Suspended S.W.C. Special Wall Coating

TEL Telephone TEMP Tempered T.O.BM. Top of Beam T.O.C. Top of Concrete T.O.F. Top of Footing TOIL Toilet T.O.J. Top of Joist T.O.M. Top of Masonry T.O.S. Top of Steel T.P.D. Toilet Paper Dispenser TRTD Treated TYP Typical

U.G. Underground U.L. Underwriters Laboratory UNEXC Unexcavated UNFIN Unfinished U.S. Underside U.N.O. Unless Noted Otherwise

(V) Verify V.C.T. Vinyl Composition Tile VENT Ventilation/Ventilator VERT Vertical V.I.F. Verify in Field VISQ.I.B. Visqueen Vapor Barrier V.S.G. Vinyl Sheet Goods V.T.R. Vent Thru Roof VWC Vinyl Wallcovering

W/ With W.C. Water Closet WD Wood WDW/WDO Window W/O Without W.P. Waterproof W.R. Water Receptacle W.W.F. Welded Wire Fabric

KEY TO SYMBOLS PROJECT TEAM

OWNER:

CITY OF CHEYENNE

2101 O'NEIL AVENUE, ROOM 102

CHEYENNE, WY 82001

CONTACT: STEVE GAER, FACILITIES MANAGER

ARCHITECT:

PLAN ONE / ARCHITECTS

325 WEST 18TH, SUITE 3

CHEYENNE, WY 82001

CONTACT: BRITT MORGAN, AIA

PHONE: 307-514-4575

SET NO.

T1.1A TITLE SHEET

ARCHITECTURAL

D4.1A ENLARGED DEMOLITION FLOOR PLANS

D4.2A DEMOLITION PHOTOS

A4.1A ENLARGED ROOF PLAN

A4.2A ROOF DETAILS

NOTE: NOT ALL ABBREVIATIONS ARE USED

NOTE: NOT ALL SYMBOLS ARE USED

INDEX

PROJECT SUMMARY

THE PROJECT CONSISTS OF REMOVING THE EXISTING ROOFING, INSULATION,

COPING AND DOWNSPOUTS OVER THE STAIR TOWERS AND ENTRY. REPLACE

WITH NEW EPDM ROOFING SYSTEM, NEW PARAPET COPING, FLASHING AT

SCUPPERS AND DOWNSPOUTS.

PROJECT LOCATION

2101 O NEIL AVE.

CHEYENNE, WY 82001

SITE PLAN

PERMIT REVIEW DRAWINGS

GEORGE COX PARKING GARAGE REROOF

VARIOUS ROOF REPLACEMENTS

PROJECT ADDRESS:

GEORGE COX PARKING FACILITY

2101 O NEIL AVENUE

CHEYENNE, WY 82001

JURISDICTION:

CITY OF CHEYENNE

OCCUPANCY

GEORGE COX PARKING FACILITY S-2

NUMBER OF STORIES 3

GROSS AREA 186,000 SF

TYPE OF CONSTRUCTION

TYPE II-B

CODES:

PROJECT DATA

CITY OF CHEYENNE

INTERNATIONAL BUILDING CODE 2024 EDITION

INTERNATIONAL EXISTING BUILDING CODE 2024 EDITION

INTERNATIONAL MECHANICAL CODE 2024 EDITION

INTERNATIONAL PLUMBING CODE 2024 EDITION

NATIONAL ELECTRICAL CODE 2023 EDITION

INTERNATIONAL FIRE CODE 2024 EDITION

ADA ACCESSIBILITY GUIDELINES 2010 EDITION

ANSI A117.1 ACCESSIBLE & USABLE BUILDINGS & FACILITIES ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 ro c k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 b o z e m a n m o n ta n a d ic k e rs o n s u it e

-5

2522project:

date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

O N

E

IL

A V

E

C H

E Y

E N

N E

W

Y

CO

X

PA

RK

IN

G

GA

RA

GE

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

T1.1A

GENERAL NOTES

1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.

2. LEGALLY DISPOSE OF ALL DEMOLISHED MATERIALS.

3. PROVIDE COMPONENTS AS REQUIRED TO MEET CLASS "A" ASSEMBLY.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS - RAISE CURBS

PIPING AND STANDS AS REQUIRED TO MEET MANUFACTURERS MINIMUM

FLASHING REQUIREMENTS.

5. WHERE SLOPE CANNOT BE ACHIEVED WITH MINIMUM 1/4" PER FOOT,

CONTACT ARCHITECT FOR CLARIFICATIONS. THE SLOPE MUST BE

MAINTAINED FOR ADEQUATE DRAINAGE AND INSTALLED WITH RECOVERY

BOARD TO THE DRAIN TO PREVENT HAIL DAMAGE IN COMPLIANCE WITH

THE MANUFACTURERS WARRANTY.

6. THE BASIS OF DESIGN AND DETAILS SHOWN ARE BASED ON CARLISLE.

ROOFING PRODUCTS, OTHER ROOFING EPDM SYSTEMS SPECIFIED MAY

BE BID UPON APPROVAL HOWEVER IT SHALL BE THE RESPONSIBILITY OF

THE SYSTEMS MANUF. AND THE CONTRACTOR TO MODIFY DETAILS AS

REQUIRED FOR THEIR SYSTEM. THERE WILL BE NO ADDITIONAL

COMPENSATION AFTER THE BID OPENING FOR ANY REQUIRED CHANGES.

7. IF SUSPECTED ASBESTOS CONTAINING MATERIALS ARE ENCOUNTERED

DURING ANY PORTION OF WORK, NOTIFY OWNER PRIOR TO START OF

DEMOLITION. CONTRACTOR TO NOTIFY DEQ PRIOR TO START OF

DEMOLITION.

DEMOLITION NOTES

ROOF SYSTEMS

NO WORK

NO WORK

NO WORK

WORK AREA 1-A WORK AREA 2-A

KEY PLAN

REMOVE EXISTING MODIFIED BITUMEN ROOFING AND TAPERED

INSULATION DOWN TO METAL DECKING SUBSTRATE

EXISTING MECH. EQUIPMENT TO REMAIN

REMOVE EXISTING SCUPPER AND DOWNSPOUT AND REPLACE

WITH NEW

REMOVE EXISTING PARAPET COPING - PREP FOR NEW

NO WORK ON THIS ROOF

1/4" : 12" TYP.

1/4" : 12" TYP.

1 REMOVE EXISTING MODIFIED BITUMEN ROOFING

ON 2" TAPERED INSULATION TO METAL DECKING -

REMOVE COPING AND REPLACE NAILER IF

NEEDED.

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

O N

E

IL

A V

E

C H

E Y

E N

N E

W

Y

CO

X

PA

RK

IN

G

GA

RA

GE

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

D4.1A

NORTHD4.1A 1/4" = 1'-0"

1 ENLARGED DEMOLITION PLAN 1-A

D4.1A 1/4" = 1'-0"

5 ENLARGED DEMOLITION PLAN 2-A

REMOVE AND REPLACE

EXISTING ROOF SCUPPER

AND DOWNSPOUT. SEE

DETAIL 2/A4.2A

REMOVE EXISTING

MODIFIED BITUMEN

ROOFING AND TAPERED

INSULATION DOWN TO

METAL DECKING

SUBSTRATE

EXISTING GRAVITY

VENTILATOR TO REMAIN

REMOVE EXISTING PRE-

FINISHED METAL COPING

REMOVE EXISTING

MODIFIED BITUMEN

ROOFING AND TAPERED

INSULATION DOWN TO

METAL DECKING

SUBSTRATE

REMOVE EXISTING

MODIFIED BITUMEN

ROOFING AND TAPERED

INSULATION DOWN TO

METAL DECKING

SUBSTRATE

EXISTING GRAVITY

VENTILATOR TO REMAIN

REMOVE EXISTING PRE-

FINISHED METAL COPING.

SEE DETAIL 1/A4.2A

REMOVE EXISTING

MODIFIED BITUMEN

ROOFING AND TAPERED

INSULATION DOWN TO

METAL DECKING

SUBSTRATE

EXISTING EXHAUST FAN

TO REMAIN - REPLACE

DAMAGED CAP

REMOVE EXISTING PRE-

FINISHED METAL

COPING

REPLACE ROOF CAP

WITH NEW PRE-FINISHED

METAL CAP - EXTEND

OVER EDGE OF BRICK -

SEE DETAIL 3/A4.2A

REMOVE EXISTING PRE-

FINISHED METAL COPING

REMOVE AND REPLACE

EXISTING ROOF SCUPPER

AND DOWNSPOUT - SEE

DETAIL 2/A4.2A

REMOVE EXISTING

MODIFIED BITUMEN

ROOFING AND TAPERED

INSULATION DOWN TO

METAL DECKING

SUBSTRATE

EXISTING GRAVITY

VENTILATOR TO REMAIN

REMOVE EXISTING PRE-

FINISHED METAL COPING

REMOVE AND REPLACE

EXISTING ROOF SCUPPER

AND DOWNSPOUT. SEE

DETAIL 2/A4.2A

REMOVE EXISTING

MODIFIED BITUMEN

ROOFING AND TAPERED

INSULATION DOWN TO

METAL DECKING

SUBSTRATE

REMOVE AND REPLACE

EXISTING ROOF SCUPPER

REMOVE EXISTING PRE-

FINISHED METAL COPING

REMOVE EXISTING

MODIFIED BITUMEN

ROOFING AND TAPERED

INSULATION DOWN TO

METAL DECKING

SUBSTRATE

REMOVE AND REPLACE

EXISTING ROOF SCUPPER

AND DOWNSPOUT. SEE

DETAIL 2/A4.2A

GENERAL NOTES

SEE SHEET D4.1A FOR GENERAL NOTES THAT PERTAIN TO THIS SHEET

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

O N

E

IL

A V

E

C H

E Y

E N

N E

W

Y

CO

X

PA

RK

IN

G

GA

RA

GE

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

D4.2A

D4.2A 3/8" = 1'-0"

1 EXISTING SCUPPER & DOWNSPOUT

D4.2A 3/8" = 1'-0"

2 EXISTING GRAVITY VENTILATOR

D4.2A 3/8" = 1'-0"

3 EXISTING HIGH ROOF - SOUTH/WEST

D4.2A 3/8" = 1'-0"

4 EXISTING EXHAUST FAN

D4.2A 3/8" = 1'-0"

5 EXISTING METAL BRICK CAP

D4.2A 3/8" = 1'-0"

6 EXISTING SCUPPER

D4.2A 3/8" = 1'-0"

7 EXISTING SCUPPER & DOWNSPOUT 2

D4.2A 3/8" = 1'-0"

8 EXISTING SCUPPER & DOWNSPOUT 3

D4.2A 3/8" = 1'-0"

9 DOWNSPOUT 2

KEY PLAN

1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.

2. LEGALLY DISPOSE OF ALL DEMOLISHED MATERIALS.

3. PROVIDE COMPONENTS AS REQUIRED TO MEET CLASS "A" ROOF ASSEMBLY

FOR ALL ROOF AREAS.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS - RAISE CURBS,

PIPING AND STANDS AS REQUIRED TO MEET MANUFACTURES MINIMUM

FLASHING REQUIREMENTS.

5. WHERE SLOPE TO SCUPPERS CANNOT BE ACHIEVED WITH MINIMUM 1/4"

PER FOOT SLOPE, CONTACT ARCHITECT FOR CLARIFICATIONS. THE SLOPE

MUST BE MAINTAINED FOR ADEQUATE DRAINAGE AND INSTALLED WITH

RECOVERY BOARD TO THE DRAIN TO PREVENT HAIL DAMAGE IN

COMPLIANCE WITH THE MANUFACTURERS WARRANTY.

6. THE BASIS OF DESIGN AND DETAILS SHOWN ARE BASED ON CARLISLE

ROOFING PRODUCTS, OTHER ROOFING EPDM SYSTEMS SPECIFIED MAY BE

BID UPON APPROVAL HOWEVER IT SHALL BE THE RESPONSIBILITY OF THE

SYSTEMS MANUFACTURER AND THE CONTRACTOR TO MODIFY DETAILS AS

REQUIRED FOR THEIR SYSTEM. THERE WILL BE NO ADDITIONAL

COMPENSATION AFTER THE BID OPENING FOR ANY REQUIRED CHANGES.

6. THE CONTRACTOR SHALL MAINTAIN ROOF FUNCTIONALITY OF ALL SCUPPERS

AND DOWNSPOUTS UPON COMPLETION AND WALK THE SITE WITH THE OWNER

UPON COMPLETION.

7. PROVIDE CRICKETS BEHIND CURBS AT HIGH SIDE OF ROOF.

8. PROVIDE A 90 M.P.H WIND SPEED WARRANTY FOR ALL ROOF SYSTEMS.

KEYED NOTES

ROOF SYSTEMS

NO WORK

NO WORK

NO WORK

WORK AREA 1-A WORK AREA 2-A

1 NEW MECHANICALLY FASTENED 60 MIL. EPDM ROOFING

SYSTEM OVER METAL DECKING - SEE ROOF SYSTEM THIS

SHEET

2 NEW SCUPPER AND DOWNSPOUTS - SEE DETAIL 2 & 4/A4.2A

3 EXISTING MECH AND PLUMBING VENTS TO REMAIN - PROVIDE

CRICKETS ON HIGH SIDE OF ROOF SLOPE

4 NEW METAL PARAPET COPING - SEE DETAIL 1/A4.1A

5 NO WORK ON PARKING SLAB

6 NEW METAL CAP AT BRICK - SEE DETAIL 3/A4.2A

1 1

1/4" : 12" TYP.

1/4" : 12" TYP.

1/4" : 12" TYP.

1/4" : 12" TYP.

NEW 60 MIL. MECHANICALLY

FASTENED EPDM MEMBRANE

(2) LAYERS OF 1-1/2"

TAPERED POLY-ISO

INSULATION ON METAL DECK

1/2" RECOVERY BOARD

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

O N

E

IL

A V

E

C H

E Y

E N

N E

W

Y

CO

X

PA

RK

IN

G

GA

RA

GE

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

A4.1A

NORTHA4.1A 1/4" = 1'-0"

1 ENLARGED ROOF PLAN 1-A

A4.1A 1/4" = 1'-0"

5 ENLARGED ROOF PLAN 2-A

NEW PRE-FINISHED METAL COPING ON

SLOPED NAILER - COLOR TO MATCH

EXISTING

EXIST. CMU MASONRY WALL W/ EXISTING

METAL FASCIA SYSTEM ON 1/2" METAL FURRING

CHANNELS TO REMAIN

EXIST. STRUCT. TO REMAIN

NEW MECHANICALLY FASTENED 60 MIL. EPDM

MEMBRANE ON 1/2" GYPSUM PROTECTION

BOARD ON 3" RIGID TAPERED INSUL. ON

EXISTING METAL DECK

EXIST. METAL DECKING TO REMAIN

CAULK AND SEAL UNDER BOTTOM OF

METAL CAP PER MANUFACTURER'

SPECIFICATIONS

26 GA. GALV.

STEEL SCUPPER

1" 8"

2" 7"

1" 2"

2"

1'

4x6 OPEN FACED

GALV. STEEL

DOWN SPOUT

NEW PRE-FINISHED METAL COPING ON

SLOPED NAILER - COLOR TO MATCH

EXISTING

EXIST. CMU MASONRY WALL

EXIST. STRUCT. TO REMAIN

EXIST. METAL DECKING TO REMAIN

NEW PRE-FINISHED METAL DOWNSPOUT

MATCH EXISTING TYPE AND COLOR

NEW ROOF SCUPPER MATCH EXISTING

CAULK AND SEAL UNDER BOTTOM OF

METAL CAP PER MANUFACTURER'

SPECIFICATIONS

NEW MECHANICALLY FASTENED 60 MIL. EPDM

MEMBRANE ON 1/2" GYPSUM PROTECTION

BOARD ON 3" RIGID TAPERED INSUL. ON

EXISTING METAL DECK

EXIST. MECH. UNIT TO REMAIN

NEW TERMINATION BAR W/ SEALANT

NEW MECHANICALLY FASTENED 60 MIL. EPDM ROOFING

MEMBRANE ON 1/2" GYPSUM PROTECTION BOARD ON 3"

RIGID TAPERED INSUL. ON EXISTING METAL DECKING ON

SLOPED RIGID INSUL. AS NEEDED FOR 1/4" SLOPE AWAY

FROM UNIT

NEW 3" RIGID TAPERED POLYISO. INSULATION

EXIST. MTL. DECKING ON EXIST. STL.

JOIST TO REMAIN

NEW 16 GA. GUTTER STRAP AT 30" O.C. MAX.

EXISTING CMU, TO REMAIN

PROVIDE 12" X 36" PRECAST SPLASH

BLOCK WHERE DOWNSPOUTS OCCUR

EXISTING CONC. FOUNDATION - TO REMAIN

NEW PREFINISHED METAL ON TOP OF

EXISTING CMU AND BRICK COLUMN

NAILER AS NEEDED AS ATTACHED W/

MASONRY ANCHORS

(E.) 8" CMU - TO REMAIN

(E.) 4" BRICK - TO REMAIN

1' - 11 1/4" F.V.

CAULK AND SEAL UNDER BOTTOM OF

METAL CAP PER MANUFACTURER'

SPECIFICATIONS

CONFORMING

BACKING

PLATE

PRE-FINISHING METAL

COPING FORM OF

LENGTHS AS LONG AS

PRACTICAL. SET IN

BED OF SEALANT TO

BACKING PLATE

1/

4"

OVERLAP ALL METAL

SEAMS

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

O N

E

IL

A V

E

C H

E Y

E N

N E

W

Y

CO

X

PA

RK

IN

G

GA

RA

GE

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

A4.2A

A4.2A 1 1/2" = 1'-0" 1 PARAPET DETAIL AT CRICKET (George Cox)

A4.2A 1 1/2" = 1'-0" 2 PARAPET SCUPPER DETAIL AT DOWNSPOUT (George Cox)

A4.2A 1 1/2" = 1'-0" 4 PARAPET DETAIL DOWNSPOUT AT LOW ROOF (George Cox)

A4.2A 1 1/2" = 1'-0" 6 MECHANICAL CURB DETAIL (George Cox)

A4.2A 1 1/2" = 1'-0" 5 GUTTER DETAIL (George Cox)

A4.2A 1 1/2" = 1'-0"

3 TOP OF COLUMN DETAIL

A4.2A 1 1/2" = 1'-0"

7 METAL COPING DETAIL

AX.X

X

XX.X

CX X'-X"

XXX

X

ROOMNAME

XXX

BUILDING SECTION LETTER

SHEET DRAWN ON

WALL SECTION NUMBER

SHEET DRAWN ON

DETAIL NUMBER

SHEET DRAWN ON

EXTERIOR ELEVATION

NUMBER

SHEET DRAWN ON

INTERIOR & EXTERIOR

DOOR OR GATE

NUMBER

ROOMNAME & NUMBER

KEYED NOTE NUMBER

EXTERIOR WINDOW LETTER

WALL TYPE LETTER

BORROWED LITE SYMBOLS

TOILET ACCESSORY

CEILING TYPE

CEILING HEIGHT

INTERIOR ELEV. NUMBER

SHEET DRAWN ON

INDICATES CENTER LINE

X

AX.X

X

XX.X

A101

SIM

STANDARD ABBREVIATIONS

ABV Above A/C Air Conditioning ACT Acoustical Ceiling Tile ADJ Adjustable, Adjacent A.F.F. Above Finish Floor A.I.B. Air Infiltration Barrier ALT Alternate ALUM Aluminum APPROX Approximate ARCH Architectural/Architect ATH Aluminum Threshold

BD Board BLDG Building BLK Block BLKG Blocking BM Beam B.M. Bench Mark BN Bullnose B.O.F. Bottom of Footing BRG Bearing BSMNT Basement BTM Bottom BTWN Between B.U. Built-up B.L. Borrowed Lite

CAB Cabinet CEM Cement C.I. Cast Iron C.J. Control Joint CLG Ceiling CLO Closet C.M. Construction Manager C.M.U. Concrete Masonry Unit C.O. Cleanout COL Column CONC Concrete CONST.JT. Construction Joint CONT Continuous CONTR Contractor COORD Coordinate CORR Corridor CPT Carpet C.R.A. Cold Rolled Angle C.T. Ceramic Tile CTR Center C.W. Cold Water

DBL Double DET Detail D.F. Drinking Fountain DIA Diameter DIM Dimension DISP Dispenser/Disposal DN Down D.P. Dampproofing DR Door DRF Draftstopping D.S. Downspout DWG Drawing

EA Each E.C. Electrical Contractor E.E. Each End E.I.F.S. Exterior Insulation and Finish System E.J. Expansion Joint E.J.C. Expansion Joint Cover

EL Elevation ELEC Electrical/Electric ELEV Elevator/Elevation E/O Equipment by Owner E.P.D.M. Ethylene Propylene

Diene Monomer E.P.S. Expanded Polystyrene EQ Equal EQUIP Equipment E.W.C. Electric Water Cooler E.W.S. Exterior Wall System EXIST/(E) Existing EXP Expansion EXT Exterior

F.D. Floor Drain FDN Foundation F.E. Fire Extinguisher FIN Finish FLR/FL Floor F.N.D. Feminine Napkin Disposal F.N.V. Feminine Napkin Vendor F.O.B. Face of Brick F.O.F. Face of Foundation F.O.S. Face of Stud FR Frame F.R.S. Flushing Rim Sink F.S. Floor Sink FT Feet/Foot FTG Footing FURR Furring

GA Gauge GALV Galvanized G.B. Grab Bar GEN General G.I. Galvanized Iron GL Glass G.W.B. Gypsum Wallboard

H High H.B. Hose Bibb H/C Handicapped H.C. Hollow Core H.D. Heavy Duty HDNR Hardener HDW Hardware H.M. Hollow Metal HORZ Horizontal HR Hour HR.D. Hair Dryer HT Height H.W. Hot Water

I.D. Inside Diameter IN Inch/Inches INCL Including INFO Information INSUL Insulation INT Interior INV Invert

JAN Janitor JT Joint

LKRS Lockers L.L.H. Long Leg Horizontal L.L.V. Long Leg Vertical LOC Location

MASR'Y Masonry Block MAT/MAT'L Material MAX Maximum MECH Mechanical MEMB.W.P. Membrane Waterproofing MEZZ. Mezzanine MFR/MFG Manufacturer/Manufacturing M.H. Manhole MIN Minimum MISC Miscellaneous M.L.P. Metal Liner Panel M.O. Masonry Opening M.T. Metal Threshold MTL Metal M.T.P. Metal Toilet Partition

(N) New NEC'Y Necessary N.I.C. Not in Contract NOM Nominal N.T.S. Not To Scale

O.A.F. Overall Frame O.C. On Center O.D. Outside Diameter O.H. Overhead OPNG Opening OPP Opposite OPP.H. Opposite Hand ORIG Original

O/ OVER

PR PAIR

PL Plate P.LAM. Plastic Laminate PLAS Plaster PLAS.LAM. Plastic Laminate PLYWD Plywood PREFAB Prefabricated PT Paint P.T.D. Paper Towel Dispenser PTN Partition PTW Pressure Treated Wood

QT Quarry Tile

(R) Remove RAD Radius R.D. Roof Drain RECMND Recommendation REF Reference REINF Reinforce/Reinforcing REQ'D Required RET Retain/Retained REV Revisions R.F. Resilient Flooring RM Room R.O. Rough Opening RTG Rating

S.C. Solid Core SCHED Schedule S.C.W. Solid Core Wood S.D. Soap Dispenser SECT Section S.F. Square Feet S.F.C. Special Floor Coating S.G.T. Structural Glazed Tile SHWR Shower

SHT Sheet SHTG Sheathing SIM Similar SPECS Specifications SQ Square S.S. Stainless Steel STD Standard STL Steel STOR Storage STRUCT Structural SUSP Suspended S.W.C. Special Wall Coating

TEL Telephone TEMP Tempered T.O.BM. Top of Beam T.O.C. Top of Concrete T.O.F. Top of Footing TOIL Toilet T.O.J. Top of Joist T.O.M. Top of Masonry T.O.S. Top of Steel T.P.D. Toilet Paper Dispenser TRTD Treated TYP Typical

U.G. Underground U.L. Underwriters Laboratory UNEXC Unexcavated UNFIN Unfinished U.S. Underside U.N.O. Unless Noted Otherwise

(V) Verify V.C.T. Vinyl Composition Tile VENT Ventilation/Ventilator VERT Vertical V.I.F. Verify in Field VISQ.I.B. Visqueen Vapor Barrier V.S.G. Vinyl Sheet Goods V.T.R. Vent Thru Roof VWC Vinyl Wallcovering

W/ With W.C. Water Closet WD Wood WDW/WDO Window W/O Without W.P. Waterproof

OWNER:

CITY OF CHEYENNE

2101 O'NEIL AVENUE, ROOM 102

CHEYENNE, WY 82001

CONTACT: STEVE GAER, FACILITIES MANAGER

ARCHITECT:

PLAN ONE / ARCHITECTS

325 WEST 18TH, SUITE 3

CHEYENNE, WY 82001

CONTACT: BRITT MORGAN, AIA

PHONE: 307-514-4575

SET NO.

T1.1B TITLE SHEET

ARCHITECTURAL

D4.1B ICE AND EVENT CENTER DEMOLITION ROOF PLAN

D4.2B DEMOLITION PHOTOS

A4.1B ICE AND EVENT CENTER ROOF PLAN

A4.2B ROOF DETAILS

NOTE: NOT ALL ABBREVIATIONS ARE USED

NOTE: NOT ALL SYMBOLS ARE USED

INDEX

PROJECT SUMMARY

THE PROJECT CONSISTS OF REMOVING THE EXISTING EPDM ROOFING,

INSULATION AND PARAPET COPING AND DOWNSPOUTS. REPLACE WITH NEW

EPDM ROOFING SYSTEM, NEW PARAPET COPING AND DOWNSPOUTS.

PROJECT LOCATION

SITE PLAN

PERMIT REVIEW DRAWINGS

ICE AND EVENT CENTER REROOF

VARIOUS ROOF REPLACEMENTS

PROJECT ADDRESS:

ICE AND EVENT CENTER ROOF

1530 WEST LINCOLNWAY

CHEYENNE, WY 82001

JURISDICTION:

CITY OF CHEYENNE

OCCUPANCY

CHEYENNE ICE AND EVENT CENTER A-3

NUMBER OF STORIES 1

GROSS AREA 42,797 SF

FIRST FLOOR 37,856 SF

MEZZANINE 4,941 SF

TYPE OF CONSTRUCTION

TYPE II-A ONE HOUR

INTERNATIONAL BUILDING CODE 2024 EDITION

INTERNATIONAL EXISTING BUILDING CODE 2024 EDITION

INTERNATIONAL MECHANICAL CODE 2024 EDITION

INTERNATIONAL PLUMBING CODE 2024 EDITION

NATIONAL ELECTRICAL CODE 2023 EDITION

INTERNATIONAL FIRE CODE 2024 EDITION

ADA ACCESSIBILITY GUIDELINES 2010 EDITION

ANSI A117.1 ACCESSIBLE & USABLE BUILDINGS & FACILITIES

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

W . L

IN

C

O L

N W

A Y

C H

E Y

E N

N E

, W Y

IC

E A

ND

EV

EN

T

CE

NT

ER

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

T1.1B

2. LEGALLY DISPOSE OF ALL DEMOLISHED MATERIALS.

3. PROVIDE COMPONENTS AS REQUIRED TO MEET CLASS "A" ROOF ASSEMBLY

FOR ALL ROOF AREAS.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS - RAISE CURBS,

PIPING AND STANDS AS REQUIRED TO MEET MANUFACTURES MINIMUM

FLASHING REQUIREMENTS.

5. WHERE SLOPE TO GUTTERS CANNOT BE ACHIEVED WITH MINIMUM 1/4"

PER FOOT SLOPE, CONTACT ARCHITECT FOR CLARIFICATIONS. THE SLOPE

MUST BE MAINTAINED FOR ADEQUATE DRAINAGE IN

COMPLIANCE WITH THE MANUFACTURERS WARRANTY.

6. THE BASIS OF DESIGN AND DETAILS SHOWN ARE BASED ON MBCI

ROOFING PRODUCTS, OTHER ROOFING SYSTEMS SPECIFIED MAY BE

BID UPON APPROVAL HOWEVER IT SHALL BE THE RESPONSIBILITY OF THE

SYSTEMS MANUFACTURER AND THE CONTRACTOR TO MODIFY DETAILS AS

REQUIRED FOR THEIR SYSTEM. THERE WILL BE NO ADDITIONAL

COMPENSATION AFTER THE BID OPENING FOR ANY REQUIRED CHANGES.

6. THE CONTRACTOR SHALL MAINTAIN ROOF FUNCTIONALITY OF ALL GUTTERS

AND DOWNSPOUTS UPON COMPLETION AND WALK THE SITE WITH THE

OWNER UPON COMPLETION.

7. PROVIDE CRICKETS BEHIND CURBS AT HIGH SIDE OF ROOF.

8. PROVIDE A 90 M.P.H WIND SPEED WARRANTY FOR ALL ROOF SYSTEMS.

DEMOLITION NOTES

1 REMOVE EXISTING EPDM ROOF SYSTEM AND INSULATION

DOWN TO METAL DECKING SUBSTRATE

2 EXISTING MECH. AND PLUMBING TO REMAIN

3 REMOVE EXISTING GUTTER AND DOWNSPOUT AND REPLACE

WITH NEW

4 EXISTING ROOF ACCESS HATCH TO REMAIN

5 REMOVE EXISTING PARAPET COPING

6 NO WORK ON THIS ROOF

7. REMOVE EXISTING ABANDONED MECHANICAL CURB AND INFILL

DECKING AT NEW CONSTRUCTION PER DETAIL 8/A4.2B..

8. EXISTING GAS PIPES TO REMAIN - REPLACE EXISTING

SUPPORTS PER DETAIL 4/A4.2B. NOTE: ALL GRAPHIC

DEPICTIONS OF GAS LINES LOCATED ABOVE ROOF ARE

APPROXIMATIONS ONLY. CONTRACTOR TO FIELD VERIFY

LOCATIONS OF ALL EXISTING GAS LINES ABOVE ROOF AND

RETAIN EXISTING GAS LINES AT CURRENT LOCATIONS.

2 5

KEY PLAN

NO WORK

WORK AREA

NO WORK

NO WORK

EXISTING ROOF SYSTEM

1 REMOVE EXISTING EPDM MEMBRANE ROOFING ON COVER

BOARD ON TAPERED INSULATION ON VAPOR BARRIER TO

EXISTING METAL DECKING ON STEEL JOISTS BELOW

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

W . L

IN

C

O L

N W

A Y

C H

E Y

E N

N E

, W Y

IC

E A

ND

EV

EN

T

CE

NT

ER

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

D4.1B

NORTH

D4.1B 1/4" = 1'-0"

1 ENLARGED DEMOLITION ROOF PLAN

EXIST. ROOFING SYSTEM

TO BE REMOVED AND

REPLACED

EXISTING HVAC UNIT TO

REMAIN - REPLACE

FLASHING

EXIST. ROOFING SYSTEM

TO BE REMOVED AND

REPLACED

EXISTING PIPING TO

REMAIN IN PLACE.

REPLACE PIPE

SUPPORT - SEE DETAIL

4/A4.2B

REMOVE EXISTING

ABANDONED

MECHANICAL CURB &

INFILL DECKING BELOW.

SEE DETAIL 8/A4.2B

EXIST. ROOFING SYSTEM

AND WALK PADS TO BE

REMOVED AND

REPLACED

EXISTING HVAC UNIT TO

REMAIN - REPLACE

FLASHING

EXISTING ROOF HATCH

TO REMAIN & ADD

LADDER ASSIST -

SEE SPECS

EXIST. ROOFING SYSTEM

TO BE REMOVED AND

REPLACED

EXISTING HVAC UNIT TO

REMAIN - REPLACE

FLASHING

EXISTING PIPING TO

REMAIN. REPLACE PIPE

SUPPORTS - SEE DETAIL

4/A4.2B

REPLACE PRE-FINISHED

REGLET ALONG BRICK

WALL

EXIST. ROOFING SYSTEM

TO BE REMOVED AND

REPLACED

EXISTING HVAC UNIT TO

REMAIN - REPLACE

FLASHING

REPLACE PRE-FINISHED

REGLET ALONG BRICK

WALL EXIST. ROOFING SYSTEM

TO BE REMOVED AND

REPLACED

EXISTING HVAC UNIT TO

REMAIN - REPLACE

FLASHING

EXISTING PIPING TO

REMAIN . REPLACE PIPE

SUPPORTS - SEE DETAIL

4/A4.2B

EXIST. ROOFING SYSTEM

TO BE REMOVED AND

REPLACED

EXISTING HVAC UNIT TO

REMAIN - REPLACE

FLASHING

EXIST. ROOFING SYSTEM

TO BE REMOVED AND

REPLACED

REMOVE AND REPLACE

PRE-FINISHED METAL

COPING AND GUTTER

EXIST. ROOFING SYSTEM

TO BE REMOVED AND

REPLACED

EXISTING MECH. DUCT

TO REMAIN REUSE

DUCTWORK SUPPORT

EXISTING GUTTER TO BE

REMOVED AND

REPLACED

EXISTING CMU WALL TO

REMAIN

EXISTING HVAC UNIT TO

REMAIN - REPLACE

FLASHING

REMOVE AND REPLACE

EXISTING GUTTER AND

DOWNSPOUT

EXISTING HVAC UNIT TO

REMAIN - REPLACE

FLASHING

REMOVE AND REPLACE

EXISTING GUTTER

GENERAL NOTES

SEE SHEET D4.1B FOR GENERAL NOTES THAT PERTAIN TO THIS SHEET

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

W . L

IN

C

O L

N W

A Y

C H

E Y

E N

N E

, W Y

IC

E A

ND

EV

EN

T

CE

NT

ER

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

D4.2B

D4.2B 3/8" = 1'-0"

4 HVAC

D4.2B 3/8" = 1'-0"

3 ABANDONED MECHANICAL CURB

D4.2B 3/8" = 1'-0"

2 ROOF HATCH

D4.2B 3/8" = 1'-0"

1 ROOF PIPING

D4.2B 3/8" = 1'-0"

8 MECHANICAL EQUIPMENT

D4.2B 3/8" = 1'-0"

7 ROOF PIPING #2

D4.2B 3/8" = 1'-0"

6 MECHANICAL EQUIPMENT #2

D4.2B 3/8" = 1'-0"

5 PARAPET

D4.2B 3/8" = 1'-0"

12 MECHANICAL EQUIPMENT #3

D4.2B 3/8" = 1'-0"

11 PARAPET FLOOR VIEW

D4.2B 3/8" = 1'-0"

10 GUTTER FLOOR VIEW

D4.2B 3/8" = 1'-0"

9 MECHANICAL EQUIP. FLOOR VIEW

KEY PLAN

1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.

2. LEGALLY DISPOSE OF ALL DEMOLISHED MATERIALS.

3. PROVIDE COMPONENTS AS REQUIRED TO MEET CLASS "A" ROOF ASSEMBLY

FOR ALL ROOF AREAS.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS - RAISE CURBS,

PIPING AND STANDS AS REQUIRED TO MEET MANUFACTURES MINIMUM

FLASHING REQUIREMENTS.

5. WHERE SLOPE TO SCUPPERS CANNOT BE ACHIEVED WITH MINIMUM 1/4"

PER FOOT SLOPE, CONTACT ARCHITECT FOR CLARIFICATIONS. THE SLOPE

MUST BE MAINTAINED FOR ADEQUATE DRAINAGE AND INSTALLED WITH

RECOVERY BOARD TO THE DRAIN TO PREVENT HAIL DAMAGE IN

COMPLIANCE WITH THE MANUFACTURERS WARRANTY.

6. THE BASIS OF DESIGN AND DETAILS SHOWN ARE BASED ON CARLISLE

ROOFING PRODUCTS, OTHER ROOFING EPDM SYSTEMS SPECIFIED MAY BE

BID UPON APPROVAL HOWEVER IT SHALL BE THE RESPONSIBILITY OF THE

SYSTEMS MANUFACTURER AND THE CONTRACTOR TO MODIFY DETAILS AS

REQUIRED FOR THEIR SYSTEM. THERE WILL BE NO ADDITIONAL

COMPENSATION AFTER THE BID OPENING FOR ANY REQUIRED CHANGES.

6. THE CONTRACTOR SHALL MAINTAIN ROOF FUNCTIONALITY OF ALL SCUPPERS

AND DOWNSPOUTS UPON COMPLETION AND WALK THE SITE WITH THE OWNER

UPON COMPLETION.

7. PROVIDE CRICKETS BEHIND CURBS AT HIGH SIDE OF ROOF.

8. PROVIDE A 90 M.P.H WIND SPEED WARRANTY FOR ALL ROOF SYSTEMS.

KEYED NOTES

NO WORK

WORK AREA

NO WORK

NO WORK

A4.2B

A4.2B

A4.2B

A4.2B 4

A4.2B

SL

O

P E

1/

1'-

TY

P

SL

O

P E

1/

1'-

TY

P

A4.2B

A4.2B

A4.2B

1 NEW FULLY ADHERED ROOF SYSTEM - SEE NEW ROOF SYSTEM

2 EXISTING MECH AND PLUMBING VENTS TO REMAIN - PROVIDE

CRICKETS ON HIGH SIDE OF ROOF SLOPE

3 EXISTING HVAC UNIT TO REMAIN

4 EXISTING 2" VENT TO REMAIN

5 EXISTING ROOF HATCH TO REMAIN ADD LADDER ASSIST - SEE

SPECS

6 EXISTING ROOF EXHAUST TO REMAIN

7 EXISTING GAS PIPING TO REMAIN - REPLACE SUPPORTS.

SEE DETAIL 4/A4.2B

8 NEW PREFINISHED GUTTER AND DOWNSPOUTS. MATCH

EXISTING COLOR

9. NEW AREA OF INFILL OF ROOF CONSTRUCTION DECKING

UNDER NEW ROOF ASSEMBLY PER DEMOLITION PLAN 1/D4.1B

10. PROVIDE ROOF WALK PADS AROUND ROOF HATCH - SEE

SPECS

EXISTING ROOF SYSTEM

2 NEW 60 MIL. MECHANICALLY FASTENED EPDM MEMBRANE ON

1/2" COVER BOARD ON 3" MECHANICALLY FASTENED ON

TAPERED INSULATION ON 40 MIL. SELF ADHERING VAPOR

BARRIER ON EXISTING METAL DECKING ON EXISTING STEEL

JOISTS

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

W . L

IN

C

O L

N W

A Y

C H

E Y

E N

N E

, W Y

IC

E A

ND

EV

EN

T

CE

NT

ER

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

A4.1B

NORTH

A4.1B 1/4" = 1'-0"

1 ENLARGED ROOF PLAN

NEW 60 MIL. MECHANICALLY FASTENED EPDM

MEMBRANE ON 1/2" COVER BOARD ON 3"

MECHANICALLY FASTENED TAPERED RIGID

INSULATION ON 40 MIL. SELF ADHERING VAPOR

BARRIER ON EXISTING METAL DECKING ON EXISTING

STEEL JOISTS

EXISTING WALL TO REMAIN

NEW TERM BAR WITH SEALANT & COUNTER FLASHING.

PROVIDE SLOPED NEW ROOFING SYSTEM AT PARAPET

WALL AS SHOWN.

NEW 60 MIL. MECHANICALLY FASTENED EPDM

MEMBRANE ON 1/2" COVER BOARD ON 3"

MECHANICALLY FASTENED TAPERED RIGID

INSULATION ON 40 MIL. SELF ADHERING VAPOR

BARRIER ON EXISTING METAL DECKING ON

STEEL JOISTS

EXISTING WALL TO REMAIN

NEW PRE-FINISHED METAL TRIM UNDER NEW

PRE-FINISHED METAL GUTTER AND DOWNSPOUT

A4.2B

V A R

IE

S

NEW PRE-FINISHED PARAPET CAP - MATCH

EXISTING COLOR. REPLACE WD. NAILER AS

NEEDED.

NEW 60 MIL. MECHANICALLY FASTENED EPDM MEMBRANE

ON 1/2" COVER BOARD ON 3" MECHANICALLY FASTENED

TAPERED RIGID INSULATION ON 40 MIL. SELF ADHERING

VAPOR BARRIER ON EXISTING METAL DECKING ON

EXISTING STEEL JOISTS.

EXISTING WALL TO REMAIN

CAULK AND SEAL UNDER BOTTOM OF METAL CAP

PER MANUFACTURER'S SPECIFICATIONS

TERMINATE NEW ROOF MEMBRANE UP AND OVER

PARAPET AND INSTALL COPING OVER MEMBRANE

PER MANUFACTURER'S SPECIFICATIONS

PROVIDE SLOPED NEW ROOFING SYSTEM AT PARAPET

WALL AS SHOWN.

NEW HMB-5-H-164-PG PIPE SUPPORT

BY ANVIL STRUT OR EQUAL AT 10'-0 O.C.

NEW MECHANICALLY FASTENED EPDM ROOFING

MEMBRANE ON 1/2" GYPSUM PROTECTION BOARD

ADHERED TO 3" TAPERED RIGID INSULATION

MECHANICALLY FASTENED TO 40 MIL SELF ADHERING

VAPOR/AIR BARRIER ON EXISTING METAL DECKING

EXIST. ROOF DECK ON EXIST. STL. JOIST

EXIST. MECH. UNIT TO REMAIN

NEW PRE-FINISHED METAL TRIM AROUND ALL SIDES

OF CURB- COLOR TO MATCH EXIST.

NEW MECHANICALLY FASTENED EPDM ROOFING MEMBRANE

ON 1/2" COVER BOARD ON 3" TAPERED RIGID INSULATION

MECHANICALLY FASTENED TO 40 MIL SELF ADHERING

VAPOR BARRIER ON EXISTING METAL DECKING

EXIST. MTL. DECKING ON EXIST. STL.

JOIST TO REMAIN

VARIES

ROOF MFR PRE-MOLDED

PIPE SEAL W/ INTEGRAL

INTACT RIB

ROOF SEALANT

PIPE BOOT - PER MFR.

SEE A4.2B FOR ROOF SYSTEM

NEW 60 MIL MECHANICALLY

FASTENED EPDM ROOF MEMBRANE

ON 1/2" COVER BOARD ON 3"

TAPERED RIGID INSULATION

ON VAPOR BARRIER ON EXISTING

METAL DECK.

NEW PRE-FINISHED METAL TRIM W/

DRIP EDGE BEHIND GUTTER

INSTALLED UNDER NEW MEMBRANE

EXISTING WALL

NEW 24 GA PRE-FINISHED METAL

GUTTER AND DOWNSPOUTS WITH PRE-

FINISHED METAL FLASHING & 16

GAUGE GUTTER STRAP AT 30" O.C.

MAX.

CONFORMING

BACKING

PLATE

PRE-FINISHING METAL

COPING FORM OF

LENGTHS AS LONG AS

PRACTICAL. SET IN

BED OF SEALANT TO

BACKING PLATE

1/

4"

OVERLAP ALL METAL

SEAMS

OPENING PER EXISTING CONDITIONS

OVERLAP PER MANUFACTURER SPECS

OVERLAP PER MANUFACTURER'S SPECS

NEW 60 MIL MECHANICALLY FASTENED

EPDM MEMBRANE ON 1/2" COVER

BOARD ON 3" MECHANICALLY

FASTENED TAPERED RIGID INSULATION

ON 40 MIL SELF ADHERING VAPOR

BARRIER.

EXISTING METAL DECK TO REMAIN

NEW METAL DECK OVERLAP

INFILL PER MANUFACTURER'S

RECOMMENDATIONS TO MATCH

EXISTING METAL DECK

EXISTING STEEL BAR JOISTS TO

REMAIN (TOP CHORD)

EXISTING CUT LINE OF

OPENING TO BE INFILLED.

NEW METAL DECK INFILL

COVERING EXISTING OPENING.

EXISTING STEEL BAR JOISTS TO

REMAIN (BOTTOM CHORD AND

WEB)

NEW 16 GA. GUTTER STRAP AT 30" O.C.

MAX.

EXISTING CMU TO

REMAIN

EXISTING CONC. FOUNDATION - TO

REMAIN

DOWNSPOUT TO MATCH EXISTING

STYLE AND LOCATION.

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

W . L

IN

C

O L

N W

A Y

C H

E Y

E N

N E

, W Y

IC

E A

ND

EV

EN

T

CE

NT

ER

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

A4.2B

A4.2B 1 1/2" = 1'-0"

1 ICE AND EVENT AT BLDG. CONNECTION

A4.2B 1 1/2" = 1'-0"

2 ICE AND EVENT DETAIL

A4.2B 1 1/2" = 1'-0"

3 ICE AND EVENT AT PARAPET

A4.2B 3" = 1'-0"

4 PIPE SUPPORT DETAIL (ICE AND EVENT)

A4.2B 1 1/2" = 1'-0"

5 MECHANICAL CURB DETAIL (ICE AND EVENT)

A4.2B 1 1/2" = 1'-0"

6 VENT THRU ROOF DETAIL (ICE AND EVENT)

A4.2B 3" = 1'-0"

7 ENLARGED GUTTER DETAIL

A4.2B 1 1/2" = 1'-0"

9 METAL COPING DETAIL B

A4.2B 1 1/2" = 1'-0"

8 NEW METAL DECK INFILL DETAIL

A4.2B 1 1/2" = 1'-0" 10 DOWNSPOUT DETAIL (Ice Event Center)

AX.X

X

XX.X

CX X'-X"

XXX

X

ROOMNAME

XXX

BUILDING SECTION LETTER

SHEET DRAWN ON

WALL SECTION NUMBER

SHEET DRAWN ON

DETAIL NUMBER

SHEET DRAWN ON

EXTERIOR ELEVATION

NUMBER

SHEET DRAWN ON

INTERIOR & EXTERIOR

DOOR OR GATE

NUMBER

ROOMNAME & NUMBER

KEYED NOTE NUMBER

EXTERIOR WINDOW LETTER

WALL TYPE LETTER

BORROWED LITE SYMBOLS

TOILET ACCESSORY

CEILING TYPE

CEILING HEIGHT

INTERIOR ELEV. NUMBER

SHEET DRAWN ON

INDICATES CENTER LINE

X

AX.X

X

XX.X

A101

SIM

STANDARD ABBREVIATIONS

ABV Above A/C Air Conditioning ACT Acoustical Ceiling Tile ADJ Adjustable, Adjacent A.F.F. Above Finish Floor A.I.B. Air Infiltration Barrier ALT Alternate ALUM Aluminum APPROX Approximate ARCH Architectural/Architect ATH Aluminum Threshold

BD Board BLDG Building BLK Block BLKG Blocking BM Beam B.M. Bench Mark BN Bullnose B.O.F. Bottom of Footing BRG Bearing BSMNT Basement BTM Bottom BTWN Between B.U. Built-up B.L. Borrowed Lite

CAB Cabinet CEM Cement C.I. Cast Iron C.J. Control Joint CLG Ceiling CLO Closet C.M. Construction Manager C.M.U. Concrete Masonry Unit C.O. Cleanout COL Column CONC Concrete CONST.JT. Construction Joint CONT Continuous CONTR Contractor COORD Coordinate CORR Corridor CPT Carpet C.R.A. Cold Rolled Angle C.T. Ceramic Tile CTR Center C.W. Cold Water

DBL Double DET Detail D.F. Drinking Fountain DIA Diameter DIM Dimension DISP Dispenser/Disposal DN Down D.P. Dampproofing DR Door DRF Draftstopping D.S. Downspout DWG Drawing

EA Each E.C. Electrical Contractor E.E. Each End E.I.F.S. Exterior Insulation and Finish System E.J. Expansion Joint E.J.C. Expansion Joint Cover

EL Elevation ELEC Electrical/Electric ELEV Elevator/Elevation E/O Equipment by Owner E.P.D.M. Ethylene Propylene

Diene Monomer E.P.S. Expanded Polystyrene EQ Equal EQUIP Equipment E.W.C. Electric Water Cooler E.W.S. Exterior Wall System EXIST/(E) Existing EXP Expansion EXT Exterior

F.D. Floor Drain FDN Foundation F.E. Fire Extinguisher FIN Finish FLR/FL Floor F.N.D. Feminine Napkin Disposal F.N.V. Feminine Napkin Vendor F.O.B. Face of Brick F.O.F. Face of Foundation F.O.S. Face of Stud FR Frame F.R.S. Flushing Rim Sink F.S. Floor Sink FT Feet/Foot FTG Footing FURR Furring

GA Gauge GALV Galvanized G.B. Grab Bar GEN General G.I. Galvanized Iron GL Glass G.W.B. Gypsum Wallboard

H High H.B. Hose Bibb H/C Handicapped H.C. Hollow Core H.D. Heavy Duty HDNR Hardener HDW Hardware H.M. Hollow Metal HORZ Horizontal HR Hour HR.D. Hair Dryer HT Height H.W. Hot Water

I.D. Inside Diameter IN Inch/Inches INCL Including INFO Information INSUL Insulation INT Interior INV Invert

JAN Janitor JT Joint

LKRS Lockers L.L.H. Long Leg Horizontal L.L.V. Long Leg Vertical LOC Location

MASR'Y Masonry Block MAT/MAT'L Material MAX Maximum MECH Mechanical MEMB.W.P. Membrane Waterproofing MEZZ. Mezzanine MFR/MFG Manufacturer/Manufacturing M.H. Manhole MIN Minimum MISC Miscellaneous M.L.P. Metal Liner Panel M.O. Masonry Opening M.T. Metal Threshold MTL Metal M.T.P. Metal Toilet Partition

(N) New NEC'Y Necessary N.I.C. Not in Contract NOM Nominal N.T.S. Not To Scale

O.A.F. Overall Frame O.C. On Center O.D. Outside Diameter O.H. Overhead OPNG Opening OPP Opposite OPP.H. Opposite Hand ORIG Original

O/ OVER

PR PAIR

PL Plate P.LAM. Plastic Laminate PLAS Plaster PLAS.LAM. Plastic Laminate PLYWD Plywood PREFAB Prefabricated PT Paint P.T.D. Paper Towel Dispenser PTN Partition PTW Pressure Treated Wood

QT Quarry Tile

(R) Remove RAD Radius R.D. Roof Drain RECMND Recommendation REF Reference REINF Reinforce/Reinforcing REQ'D Required RET Retain/Retained REV Revisions R.F. Resilient Flooring RM Room R.O. Rough Opening RTG Rating

S.C. Solid Core SCHED Schedule S.C.W. Solid Core Wood S.D. Soap Dispenser SECT Section S.F. Square Feet S.F.C. Special Floor Coating S.G.T. Structural Glazed Tile SHWR Shower

SHT Sheet SHTG Sheathing SIM Similar SPECS Specifications SQ Square S.S. Stainless Steel STD Standard STL Steel STOR Storage STRUCT Structural SUSP Suspended S.W.C. Special Wall Coating

TEL Telephone TEMP Tempered T.O.BM. Top of Beam T.O.C. Top of Concrete T.O.F. Top of Footing TOIL Toilet T.O.J. Top of Joist T.O.M. Top of Masonry T.O.S. Top of Steel T.P.D. Toilet Paper Dispenser TRTD Treated TYP Typical

U.G. Underground U.L. Underwriters Laboratory UNEXC Unexcavated UNFIN Unfinished U.S. Underside U.N.O. Unless Noted Otherwise

(V) Verify V.C.T. Vinyl Composition Tile VENT Ventilation/Ventilator VERT Vertical V.I.F. Verify in Field VISQ.I.B. Visqueen Vapor Barrier V.S.G. Vinyl Sheet Goods V.T.R. Vent Thru Roof VWC Vinyl Wallcovering

W/ With W.C. Water Closet WD Wood WDW/WDO Window W/O Without W.P. Waterproof

SET NO.

T1.1 TITLE SHEET

ARCHITECTURAL

D4.1C CITY RECORDS BUILDING DEMOLITION ROOF PLAN

D4.2C DEMOLITION PHOTOS

A4.1C CITY RECORDS BUILDING ROOF PLAN

A4.2C ROOF DETAILS

NOTE: NOT ALL ABBREVIATIONS ARE USED

NOTE: NOT ALL SYMBOLS ARE USED

INDEX

PROJECT SUMMARY

THE PROJECT CONSISTS OF REMOVING THE EXISTING ROOFING, INSULATION,

COPING AND DOWNSPOUTS OVER THE STAIR TOWERS AND ENTRY. REPLACE

WITH NEW EPDM ROOFING SYSTEM, NEW PARAPET COPING, FLASHING AT

SCUPPERS AND DOWNSPOUTS.

PROJECT LOCATION

SITE PLAN

PERMIT REVIEW DRAWINGS

RECORDS BUILDING REROOF

VARIOUS ROOF REPLACEMENTS

PROJECT ADDRESS:

CITY OF CHEYENNE MUNICIPAL BUILDING

2101 O'NEIL AVENUE

CHEYENNE, WY 82001

JURISDICTION:

OCCUPANCIES:

GROUP

TYPE OF CONSTRUCTION:

EXISTING V-A AND II-IA AND NEW V-B: FULLY

SPRINKLERED WITH FIRE SPRINKLER / ALARM

SYSTEM

SQUARE FOOTAGE:

OVERALL: 1,897 SF

INTERNATIONAL BUILDING CODE 2024 EDITION

INTERNATIONAL EXISTING BUILDING CODE 2024 EDITION

INTERNATIONAL MECHANICAL CODE 2024 EDITION

INTERNATIONAL PLUMBING CODE 2024 EDITION

NATIONAL ELECTRICAL CODE 2023 EDITION

INTERNATIONAL FIRE CODE 2024 EDITION

ADA ACCESSIBILITY GUIDELINES 2010 EDITION

ANSI A117.1 ACCESSIBLE & USABLE BUILDINGS & FACILITIES

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

O N

E

IL

A V

E

C H

E Y

E N

N E

W

Y

RE

CO

RD

S

BU

IL

DI

NG

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

T1.1C

OWNER:

CITY OF CHEYENNE

2101 O'NEIL AVENUE, ROOM 102

CHEYENNE, WY 82001

CONTACT: STEVE GAER, FACILITIES MANAGER

ARCHITECT:

PLAN ONE / ARCHITECTS

325 WEST 18TH, SUITE 3

CHEYENNE, WY 82001

CONTACT: BRITT MORGAN, AIA

PHONE: 307-514-4575

2. LEGALLY DISPOSE OF ALL DEMOLISHED MATERIALS.

3. PROVIDE COMPONENTS AS REQUIRED TO MEET CLASS "A" ROOF ASSEMBLY

FOR ALL ROOF AREAS.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS - RAISE CURBS,

PIPING AND STANDS AS REQUIRED TO MEET MANUFACTURES MINIMUM

FLASHING REQUIREMENTS.

5. WHERE SLOPE TO GUTTERS CANNOT BE ACHIEVED WITH MINIMUM 1/4"

PER FOOT SLOPE, CONTACT ARCHITECT FOR CLARIFICATIONS. THE SLOPE

MUST BE MAINTAINED FOR ADEQUATE DRAINAGE IN

COMPLIANCE WITH THE MANUFACTURERS WARRANTY.

6. THE BASIS OF DESIGN AND DETAILS SHOWN ARE BASED ON MBCI

ROOFING PRODUCTS, OTHER ROOFING SYSTEMS SPECIFIED MAY BE

BID UPON APPROVAL HOWEVER IT SHALL BE THE RESPONSIBILITY OF THE

SYSTEMS MANUFACTURER AND THE CONTRACTOR TO MODIFY DETAILS AS

REQUIRED FOR THEIR SYSTEM. THERE WILL BE NO ADDITIONAL

COMPENSATION AFTER THE BID OPENING FOR ANY REQUIRED CHANGES.

6. THE CONTRACTOR SHALL MAINTAIN ROOF FUNCTIONALITY OF ALL GUTTERS

AND DOWNSPOUTS UPON COMPLETION AND WALK THE SITE WITH THE

OWNER UPON COMPLETION.

7. PROVIDE CRICKETS BEHIND CURBS AT HIGH SIDE OF ROOF.

8. PROVIDE A 90 M.P.H WIND SPEED WARRANTY FOR ALL ROOF SYSTEMS.

DEMOLITION NOTES

EXISTING ROOF SYSTEM

1/ : 1

'-0

(T Y P

1/ : 1

'-0

(T Y P

REMOVE EXISTING MODIFIED BITUMEN ROOFING AND 2-1/2"

INSULATION DOWN TO 5/8" CDX SHEATHING

REMOVE EXISTING BALLASTED ROOFING AND MODIFIED

BITUMEN ROOFING AND 2-1/2" INSULATION DOWN TO 5/8"

CDX SHEATHING

EXISTING MECH. AND PLUMBING TO REMAIN

REMOVE EXISTING COPING, GUTTER AND DOWNSPOUT AND

REPLACE WITH NEW.

REFER TO EXISTING ROOF SYSTEM DETAIL ON THIS SHEET

FOR DOCUMENTATION OF EXISTING ROOF CONDITIONS OF

PROJECT. SECTION CUT OF DETAIL IS LOCATED AT THIS

PARAPET WALL SEPARATING THE TWO DIFFERENT ROOF

SYSTEMS AS NOTED.

REMOVE EXISTING MODIFIED

ROOFING SYSTEM

ON 2-1/2" INSULATION ON 5/8" CDX

SHEATHING ON WOOD STRUCTURE

REMOVE EXISTING BALLASTED MODIFIED

ROOFING SYSTEM ON 2-1/2" INSULATION ON

5/8" CDX SHEATHING ON WOOD STRUCTURE

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

O N

E

IL

A V

E

C H

E Y

E N

N E

W

Y

RE

CO

RD

S

BU

IL

DI

NG

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

D4.1C

D4.1C 1/4" = 1'-0"

1 CITY RECORDS DEMOLITION ROOF PLAN

NORTH

REMOVE AND REPLACE PRE-

FINISHED METAL COPING, GUTTER

AND DOWNSPOUTS

REMOVE AND REPLACE GUTTERS

AND DOWNSPOUTS

REMOVE AND REPLACE PRE-

FINISHED METAL COPING

REMOVE EXISTING

BUILT-UP ROOFING AND

INSULATION DOWN TO

WOOD DECKING

SUBSTRATE

REMOVE AND REPLACE

PRE-FINISHED

METAL COPING

REMOVE EXISTING MODIFIED

BITUMEN ROOFING AND

INSULATION DOWN TO WOOD

DECKING SUBSTRATE

REMOVE AND REPLACE

PRE-FINISHED

METAL COPING

REMOVE EXISTING MODIFIED

BITUMEN ROOFING AND

INSULATION DOWN TO WOOD

DECKING SUBSTRATE

EXISTING ROOF VENT TO

REMAIN REMOVE BOOT

AND REPLACE W/ NEW

REMOVE AND REPLACE

PRE-FINISHED

METAL COPING

REMOVE EXISTING MODIFIED

BITUMEN ROOFING AND

INSULATION DOWN TO WOOD

DECKING SUBSTRATE

REMOVE AND REPLACE

PRE-FINISHED

METAL COPING

REMOVE EXISTING MODIFIED

BITUMEN ROOFING AND

INSULATION DOWN TO WOOD

DECKING SUBSTRATE

EXISTING ROOF VENT TO

REMAIN REMOVE BOOT

AND REPLACE W/ NEW

REMOVE EXISTING BUILT-

UP ROOFING AND

INSULATION DOWN TO

WOOD DECKING

SUBSTRATE

REMOVE AND REPLACE

PRE-FINISHED

METAL COPING

REMOVE EXISTING MODIFIED

BITUMEN ROOFING AND

INSULATION DOWN TO WOOD

DECKING SUBSTRATE

REMOVE AND REPLACE

GUTTER AND DOWNSPOUT

GENERAL NOTES

SEE SHEET D4.1C FOR GENERAL NOTES THAT PERTAIN TO THIS SHEET

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

O N

E

IL

A V

E

C H

E Y

E N

N E

W

Y

RE

CO

RD

S

BU

IL

DI

NG

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

D4.2C

D4.2C 1/2" = 1'-0"

4 NORTH VIEW GUTTERS

D4.2C 1/2" = 1'-0"

3 DOWNSPOUT

D4.2C 1/2" = 1'-0"

2 JOG IN WALL

D4.2C 1/2" = 1'-0"

1 ROOF VENT

D4.2C 1/2" = 1'-0"

8 ROOF SLOPE

D4.2C 1/2" = 1'-0"

7 ROOF VENT #2

D4.2C 1/2" = 1'-0"

6 METAL CAP

D4.2C 1/2" = 1'-0"

5 PARAPET VIEW

A4.2C

A4.2C

A4.2C

A4.2C

UPPER ROOF

LOWER ROOF

1/

1'-

(T

Y P

1/

1'-

(T

Y P

SIM.

A4.2C

SIM.

GENERAL NOTES

KEY PLAN

EXISTING ROOF SYSTEM

1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.

2. LEGALLY DISPOSE OF ALL DEMOLISHED MATERIALS.

3. PROVIDE COMPONENTS AS REQUIRED TO MEET CLASS "A" ROOF ASSEMBLY

FOR ALL ROOF AREAS.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS - RAISE CURBS,

PIPING AND STANDS AS REQUIRED TO MEET MANUFACTURES MINIMUM

FLASHING REQUIREMENTS.

5. WHERE SLOPE TO SCUPPERS CANNOT BE ACHIEVED WITH MINIMUM 1/4"

PER FOOT SLOPE, CONTACT ARCHITECT FOR CLARIFICATIONS. THE SLOPE

MUST BE MAINTAINED FOR ADEQUATE DRAINAGE AND INSTALLED WITH

RECOVERY BOARD TO THE DRAIN TO PREVENT HAIL DAMAGE IN

COMPLIANCE WITH THE MANUFACTURERS WARRANTY.

6. THE BASIS OF DESIGN AND DETAILS SHOWN ARE BASED ON CARLISLE

ROOFING PRODUCTS, OTHER ROOFING EPDM SYSTEMS SPECIFIED MAY BE

BID UPON APPROVAL HOWEVER IT SHALL BE THE RESPONSIBILITY OF THE

SYSTEMS MANUFACTURER AND THE CONTRACTOR TO MODIFY DETAILS AS

REQUIRED FOR THEIR SYSTEM. THERE WILL BE NO ADDITIONAL

COMPENSATION AFTER THE BID OPENING FOR ANY REQUIRED CHANGES.

6. THE CONTRACTOR SHALL MAINTAIN ROOF FUNCTIONALITY OF ALL SCUPPERS

AND DOWNSPOUTS UPON COMPLETION AND WALK THE SITE WITH THE OWNER

UPON COMPLETION.

7. PROVIDE CRICKETS BEHIND CURBS AT HIGH SIDE OF ROOF.

8. PROVIDE A 90 M.P.H. WIND WARRANTY FOR ALL ROOF SYSTEMS.

WORK AREA

NEW 60 MIL. MECHANICALLY FASTED EPDM MEMBRANE ON 1/2"

COVER BOARD ON 3" TAPERED RIGID INSULATION ON EXISTING

5/8" CDX PLYWOOD ON WOOD JOIST

NEW PRE-FINISHED GUTTER AND DOWNSPOUT - 6/A4.2C

EXISTING MECH AND PLUMBING VENTS TO REMAIN

NEW PRE-FINISHED METAL COPING AT TOP OF PARAPET

KEYED NOTES

NEW 60 MIL. MECHANICALLY

FASTENED EPDM MEMBRANE ON

1/2" COVER BOARD ON 3" TAPERED

RIGID INSULATION EXISTING 5/8" CDX

PLYWOOD ON WOOD JOIST

EX

IS

TI

N G

T O

R

EM

A

IN

N

EW

R O

O F

ARCHITECTS

REVISIONS

REV. DATE DESCRIPTION

plan one / architects c o d y w y o m in g

W Y E

L L O

W S T O

N E

A V

E S U

IT

E

-8 k s p ri n g s w y o m in g d e w a r d r.

s u it e a

-2 c h e y e n n e w y o m in g w e s t th s t.

s u it e

-4 o z e m a n m o n ta n a d ic k e rs o n s u it e

-5 date: 01/28/2026

C

IT

Y O

F C

H E

Y E

N N

E

O N

E

IL

A V

E

C H

E Y

E N

N E

W

Y

RE

CO

RD

S

BU

IL

DI

NG

R

ER

OO

F

The professional services of the architect are undertaken for and are performed in the interest of

CITY OF CHEYENNE

No contractual obligation is assumed by the architect for the benefit of any other person involved in the contract.

01/28/2026

A4.1C A4.1C 1/4" = 1'-0"

1 CITY RECORDS ROOF PLAN

NORTH

NEW 16 GA. GUTTER STRAP AT 30" O.C.

MAX.

EXISTING CMU AND BRICK TO REMAIN

EXISTING CONC. FOUNDATION - TO REMAIN

DOWNSPOUT TO MATCH EXISTING

STYLE AND LOCATION.

NEW 60 MIL. MECHANICALLY FASTENED

EPDM MEMBRANE ON 1/2" COVER BOARD

ON 3" TAPERED RIGID INSULATION ON

EXISTING 5/8" CDX PLYWOOD ON WOOD

JOIST

EXISTING CMU AND BRICK WALLS TO REMAIN

NEW PRE-FINISHED GUTTER AND DOWNSPOUT

NEW PRE-FINISHED METAL TRIM W/ DRIP EDGE

BEHIND GUTTER

A4.2C

NEW 60 MIL. MECHANICALLY

FASTENED EPDM MEMBRANE ON 1/2"

COVER BOARD ON 3" TAPERED

RIGID INSULATION ON EXISTING 5/8"

CDX PLYWOOD ON WOOD JOIST

EXISTING CMU AND BRICK WALLS

TO REMAIN

NEW 24 GA PRE-FINISHED METAL

COPING. REPLACE NAILER AS

NEEDED IF DEMOLISHED. CAULK

AND SEAL AROUND PERIMETER

NEW 60 MIL. MECHANICALLY

FASTENED EPDM MEMBRANE

ON 1/2" COVER BOARD ON 3"

TAPERED RIGID INSULATION ON

EXISTING 5/8" CDX…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .