RTI Fiber objectives 1.docx
DOCX document 34 KB Posted
- Attached to
- Fiber Optic Cabling Federal contract opportunity
- Solicitation number
- W912L8-24-Q-0053
About this file
This document is a Statement of Objectives for the installation of fiber optic cabling at Camp Dawson in Kingwood, West Virginia. The project consists of two segments - the first segment extends fiber optic cabling from the OPS Demarc Room to the Billeting Room, while the second segment extends fiber optic cabling from the Billeting Room to the RTI Room. The cabling is to include both single mode (OS2) and multimode (OM3) fiber, terminated with fusion spliced LC connectors. The installation will require placement of new conduit and cable trays, as well as the addition of two new equipment cabinets in the OPS Room. All cable installation and termination must comply with minimum Level 3 testing requirements, with test results provided. The federal contract opportunity associated with this requirement is Solicitation Number W912L8-24-Q-0053, issued by the Department of the Army West Virginia Army National Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_Answers.docx | DOCX document | |
| RFQ Provisions and Clauses for RTI Fiber.docx | DOCX document | |
| RTI SOW Attachment B Cable Route.pdf | ||
| RTI SOW Attachment A Overview.pdf | ||
| SOW RTI Fiber Statement of Work.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installation of Fiber Optic Cable, OPS Demarc to RTI Data Closet, Rev 1
This project provides for installation of fiber optic cabling to extend from OPS Demarc Room 1220 to Billeting Room 116 and continuing to RTI Room 011. This new cable is to provide additional connectivity to Billeting and provide a pathway for future redundancy for certain areas of this facility. This installation will consist of two segments.
Segment 1: Two separate cables will be placed in this segment. Both will originate in OPS Room 1220 and extend to Billeting Room 116. Each cable will be 144 fiber, OSP, gel filled, loose tube, rated for underground installation. One cable will be Single Mode (OS2), the other cable will be Multimode 50µm, OM3. Each fiber will be terminated on each end with fusion spliced, pigtail type LC connectors. The single mode cable will be housed in 4RU enclosures (Leviton 5R4UH-S12-LEV) equipped with LC duplex adapter panels (Leviton 5F1002LL, Blue) in OPS Room 1220 and Room 116. The multimode cable will be housed in 4RU enclosures (Leviton 5R4UH-S12-LEV) equipped with LC duplex adapter panels (Leviton 5F1002QL, Aqua) in OPS Room 1220 and Room 116. In OPS Room 1220 and Billeting Room 116 the cable enclosures will be mounted in existing equipment cabinets.
From OPS Room 1220 the cables will be placed in existing 4” underground conduit extending approximately 180’ to a manhole near the southeast corner of the OPS building. From this manhole the conduit continues 80’ south to a hand hole near Sapper Lane. From this handhole the conduit turns east extending approximately 275’ to a hand hole adjacent to the parking lot. From here the conduit turns, north and extends 218’ entering Billeting. Inside Billeting the conduit turns up the ceiling cavity. The existing cable tray in the ceiling cavity extends 40’ in a northerly direction to the building wall. A 4” conduit is routed from the ceiling cavity to the underground, exiting the building and extending approximately 175’ across the courtyard, reentering the building and turning up into Room 116. Some sections of the conduit run is shared with existing cables and will require placing a pull rope to facilitate installation of the new cable.
In Rooms 1220 and 116, all fibers shall be terminated in the specified rack mount enclosures with fusion spliced LC pigtail connectors, properly labeled and tested utilizing a minimum Level 3 tester. Test results are to be provided in digital and hard copy formats.
Segment 2: A total of 114 single mode fibers will be placed between Billeting Room 116 and RTI Room 011. The new cable shall be single mode, tight buffered, OFNP with aqua outer jacket. In this segment, the new cable will be placed in existing support structure (conduit, cable tray and J hooks). All cable tray and J hooks are in accessible ceiling cavity. areas. Areas with existing conduit are typically in non-accessible ceiling cavity areas and are presently being utilized for distribution cabling and will be shared with the new cable. The existing conduit will require installation of pull strings to facilitate installation of the new cable.
In Rooms 116 and 011, all fibers are to be terminated in the specified rack mount enclosures with fusion spliced LC pigtail connectors, properly labeled and tested utilizing a minimum Level 3 tester. Test results are to be provided in digital and hard copy formats.
OPS Room 1220: Two additional equipment cabinets are to be installed in OPS, Room 1220. One new cabinet is to be placed at the end of each row of existing cabinets. The new cabinets shall be Tripp-Lite Model SR45UB equipped with PDU and cable duct to match the existing. New 18” runway is to be placed to extend the existing cable tray to serve the new cabinets. Electrical outlets are to placed above each new cabinet. Materials and installation methods are to match the existing. See OPS Room 1220 Configuration Drawing for details. Fiber optic patch cables as shown in the Major Material Specifications shall be provided as part of this project.
Major Material Specifications: