Section_D.doc
DOC document 46 KB Posted
- Attached to
- Regional Telecommunications Acquisition Services (RTAS) Federal contract opportunity
- Solicitation number
- RTAS-RFP-08002
- Issued by
- GSA Federal Acquisition Service
About this file
Section D
View the file
Other files for this federal contract opportunity
Show all 50
Regional Telecommunications Acquisition Services (RTAS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RTAS RFP 08002
Table of Contents
Section D: Packaging and Marking Section
Page 1D.1 552.211-75 Preservation, Packaging and Packing (FEB 1996)
1D.2 552.211-77 Packing List (FEB 1996)
1D.3 Packing, Marking and Storage of Equipment
1D.4 Equipment Removal
D.1.
552.211-75 Preservation, Packaging and Packing (FEB 1996)
Unless otherwise specified, all items shall be preserved, packaged, and packed in accordance with normal commercial practices, as defined in the applicable commodity specification. Packaging and packing shall comply with the requirements of the Uniform Freight Classification and the National Motor Freight Classification (issue in effect at time of shipment) and each shipping container or each item in a shipment shall be of uniform size and content, except for residual quantities. Where special or unusual packing is specified in an order, but not specifically provided for by the contract, such packing details must be the subject of an agreement independently arrived at between the ordering agency and the contractor.
D.2.
552.211-77 Packing List (FEB 1996) A packing list or other suitable shipping document shall accompany each shipment and shall indicate:
(a) Name and address of the consignor
(b) Name and complete address of the consignee
(c) Government order or requisition number
(d) Government bill of lading number covering the shipment (if any)
(e) Description of the material shipped, including item number, quantity, number of containers, package number (if any), and weight of each package
D.3.
Packing, Marking and Storage of Equipment All packing, marking and storage incidental to shipping of equipment to be provided under this contract shall be made at the contractor’s expense. Such packing, supervision marking and storage costs shall not be billed to the Government. Supervision of packing and unpacking of initially acquired equipment shall be furnished by the contractor.
D.4.
Equipment Removal All leased equipment, accessories, and devices located on Government property shall be dismantled and removed from Government premises by the contractor, at the contractor’s expense, within 90 calendar days after the service termination date. All dismantling and removal of equipment shall be performed by the contractor during normal Government business hours at the location. Advance notice must be provided to the Local Government Contact to ensure that such dismantling and removal occurs with a minimum of disruption. Exceptions to this requirement shall be mutually agreed upon and written notice issued by the Contracting Officer. Any damage to Government facilities as a result of equipment removal shall be repaired at contractor expense.
D-1
File details come from the government source that posted it. Updated .