RS0149P0036-0036.pdf

PDF 315 KB Posted

Attached to
Cable Creek Basin (Upper) RFP
Solicitation number
PWG126-ADMIN-6438
Issued by
San Bernardino County, San Bernardino City, California

About this file

Summary

This is a Scope of Work document for the Rhode Island Department of Transportation (RIDOT) for a roadway reconstruction and related improvements project. The project involves the reconstruction of approximately 1.9 miles of Route 6 in West Greenwich, Rhode Island, including pavement removal and replacement, drainage improvements, utility relocations, and associated site work. The project scope encompasses full-depth pavement reconstruction, installation of new drainage systems, sidewalk and curb improvements, traffic signal modifications, and environmental controls. The contract term is expected to be approximately 24 months from the notice to proceed, with completion by December 31, 2025. The project is part of RIDOT's capital improvement program and represents a significant infrastructure modernization effort for this corridor.

The estimated project cost is approximately $28.5 million, with funding provided through federal and state transportation funds. The project is open to all qualified contractors and is subject to prevailing wage requirements under both federal and state regulations. Key contract requirements include compliance with RIDOT Standard Specifications, environmental permits and controls, utility coordination with existing service providers, and adherence to traffic management plans during construction. The contractor must provide detailed schedules, equipment plans, and quality assurance protocols. Contract award is contingent upon federal authorization and approval of the federal funding mechanism. All bidders must comply with Buy American provisions and equal employment opportunity requirements applicable to federally-funded transportation projects.

View the file

Other files

File Type Posted
3038-153 REC ALL.pdf PDF
57603-01.pdf PDF
3-9_Irvington Land and Water.pdf PDF
932504447 Plotted Easements.pdf PDF
1-32 MAP RECORDOFSURVEY.pdf PDF
2268-146.pdf PDF
261-13_ASSESSOR MAP.pdf PDF
Invoice 932504448-1.pdf PDF
78701-04.pdf PDF
56803-02 (1).pdf PDF
Finishes.Metal Framing Systems.Stud.jpg JPG image
230241_Cable_Creek_RW.txt TXT text file
AM 0348-08.pdf PDF
Sitework.Paving - Surfacing.Asphalt.1.jpg JPG image
RS0073P0086-0086.pdf PDF
21-32 MAP SUBDIVISION.pdf PDF
BG2025_0813_Cable Creek.pdf PDF
4594-204 REC ALL.pdf PDF
RS0146P0077-0079.pdf PDF
197-22 MAP SUBDIVISION.pdf PDF
230241CableCreekTopoSBCO2025.dwg DWG drawing
EAS 1988-122325.pdf PDF
RFP-PWG126-ADMIN-6438-Cable Creek Basin.pdf PDF
1991-474266 street.pdf PDF
Sitework.Planting.Gravel.Crushed.jpg JPG image
RS0138P0086-0087.pdf PDF
VESTING 2268-146.pdf PDF
7-23 MAP SUBDIVISION.pdf PDF
261-12 MAP ASSESSOR.pdf PDF
932504427 Plotted Easements.pdf PDF
Invoice 932504435-1.pdf PDF
RS0121P0028-0028.pdf PDF
56803-02 (1).jpg JPG image
PP_152.1.pdf PDF
Sitework.Planting.Grass.Short.jpg JPG image
AM 0261-13.pdf PDF
m - APN Map.pdf PDF
2-32 of Maps.pdf PDF
932504437 Plotted Easements.pdf PDF
4507-130 REC ALL.pdf PDF
RS0043P0017-0018.pdf PDF
RS0163P0007-0007.pdf PDF
AM 0261-12.pdf PDF
APN 0261-121-10-0000.pdf PDF
MB0162P0059-0060.pdf PDF
Invoice 932504451-1.pdf PDF
Sitework.Planting.Soil.jpg JPG image
4462-73 REC ALL.pdf PDF
Tax_12-18 MAP SUBDIVISION.pdf PDF
PP_106.81.pdf PDF
Show 40 more

Latest 50 of 140 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .