RR25-12 Interactive Scoresheet Informational Only.xls
XLS spreadsheet 75 KB Posted
- Attached to
- UTARNG Environmental Assessment of Limited Army Aviation Support Facility at Cedar City Utah
- Solicitation number
- RR25-12
- Issued by
- Iron County, Utah
About this file
This document is an Interactive Scoresheet for the UTARNG Environmental Assessment of Limited Army Aviation Support Facility at Cedar City, Utah solicitation (RFP #RR25-12). The solicitation seeks proposals from contractors with prior experience in completing NEPA analysis to provide services for an environmental assessment of a limited Army aviation support facility in Cedar City, Utah. The evaluation criteria include company history and mission, NEPA experience, project management, and risk and resource management, with a minimum technical score threshold of 630 points out of 900 possible. The cost portion is worth 100 points out of the total 1,000 evaluation points. Proposals will be evaluated by a panel of up to 5 evaluators.
The scoring details for the technical and cost criteria are provided, along with a summary scoresheet template that lists the minimum mandatory requirements and scoring for each offeror. No other salient pricing, funding, or contracting details are included in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1257030-event.pdf | ||
| Attachmnet B - Scope of Work.pdf | ||
| Attachment A - Terms and Conditions for Goods & Services (Agency Contract).docx | DOCX document | |
| Changing Your Time Zone 2022.pptx | PPTX presentation | |
| Attachment C - Technical Criteria.pdf | ||
| Claim of Business Confidentiality 12.7.20.pdf | ||
| Attachment D - Cost Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Score Sheet
| UTARNG Environmental Assessment of Limited Army Aviation Support Facility at Cedar City Utah | |||
| SOLICITATION #RR25-12 | |||
| RFP EVALUATION SCORESHEET | |||
| Score will be assigned as follows: | |||
| 0 = Fail, the proposal fails to address the requirements or criteria described in the RFP or cannot be assessed du to missing information | |||
| Firm Name: | 1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFP or cannot be assessed due to incomplete information | ||
| 2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFP in an unsatisfactory manner | |||
| Evaluator: | 3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFP in a minimum satisfactory manner | ||
| 4 = Good, the proposal addresses all requirements or criteria described in the RFP and in some respects exceeds them | |||
| Date: | 5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFP | ||
| Minimum Mandatory Requirements | RFP Section | Evaluation (Pass/Fail) | |
| 1 | Offeror MUST agree to specifications, requirements, and project timeline in the Scope of Work. | ||
| 2 | Contractor understands clause in Terms & Conditions stating contractor may not assign, |
sell, transfer, subcontract or sublet rights, or delegate any right or obligation under this Contract, in whole or in part, without the prior written approval of the State Entity.
| 3 | Contractor affirms prior experience completing NEPA analysis. | |||||||||
| 0 | ||||||||||
| Scoreable Technical Criteria | RFP Section | Evaluator Score (0-5) | Criteria Weight | % of Tech Criteria | Points Possible | Points | ||||
| Earned | Minimum Required | |||||||||
| 1 | Company History and Mission | Technical | 20 | 11.1% | 100.00 | 0.00 | ||||
| 2 | NEPA Experience | Technical | 80 | 44.4% | 400.00 | 0.00 | ||||
| 3 | Project Management | Technical | 40 | 22.2% | 200.00 | 0.00 | ||||
| 4 | Risk & Resource Management | Technical | 40 | 22.2% | 200.00 | 0.00 | ||||
| 100.0% | 900.00 | 0.00 | 0.00 | |||||||
| Required Technical Point Threshold | RFP Section | Min Percent | Min Points Required | Points Earned | Percent Earned | Evaluation | ||||
| 70% | 630.0 | 0.0 | 0.0% | 0 | ||||||
| Cost | RFP Section | Low Cost Option | Offered Cost | Percent of Total | Points Possible | Points Earned | ||||
| 10% | 100.0 | 0.0 | ||||||||
| * Purchasing will use the following cost formula: The points assigned to each offerors cost proposal will be based on the lowest proposal price. The offeror with the lowest Proposed Price will receive 100% of the price points. All other offerors will receive a portion of the total cost points based on what percentage higher their Proposed Price is than the Lowest Proposed Price. The formula to compute the points is: Cost Points x (Lowest Proposed Price/Proposed Price). | ||||||||||
| Total Evaluation Points | Percent of Total | Points Possible | Points Earned | |||||||
| Total Technical Evaluation Points | 90% | 900.0 | 0.0 | |||||||
| Total Cost Evaluation Points | 10% | 100.0 | 0.0 | |||||||
| Total Evaluation Points | 100% | 1,000.0 | 0.0 |
Scoresheet Summary
RR25-12
UTARNG Environmental Assessment of Limited Army Aviation Support Facility at Cedar City Utah
| Signatures: | Date: | ||||||||||||||||||||
| Evaluator 1 | __________________ | ||||||||||||||||||||
| Evaluator 2 | __________________ | ||||||||||||||||||||
| Evaluator 3 | __________________ | ||||||||||||||||||||
| Evaluator 4 | __________________ | ||||||||||||||||||||
| Evaluator 5 | __________________ | ||||||||||||||||||||
| Minimum Mandatory Requirements | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T | |
| 1 | Offeror MUST agree to specifications, requirements, and project timeline in the Scope of Work. | ||||||||||||||||||||
| 2 | Contractor understands clause in Terms & Conditions stating contractor may not assign, |
sell, transfer, subcontract or sublet rights, or delegate any right or obligation under this Contract, in whole or in part, without the prior written approval of the State Entity.
| 3 | Contractor affirms prior experience completing NEPA analysis. | ||||||||||||||||||||
| Weight | Technical Scores | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T |
| Criteria #1 |
Company History & Mission
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 20.0 | Criteria #1 - Total Points (Total Possible Points = 100) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Criteria #2 |
NEPA Experience
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 80.0 | Criteria #2 - Total Points (Total Possible Points = 400) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Criteria #3 |
Project Management
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 40.0 | Criteria #3 - Total Points (Total Possible Points = 200) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Criteria #4 |
Risk & Resource Management
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 40.0 | Criteria #4 - Total Points (Total Possible Points = 200) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Total Technical Points (Total Possible Points = 900) Minimum Threshold = 630 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Total Cost Points | Cost Scores | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T |
| Cost | |||||||||||||||||||||
| 100.0 | Cost Points | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Score Summary | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T | |
| Total Technical Points (Total Possible = 900) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Total Cost Points (Total Possible = 100) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Grand Total Points (Total Possible = 1,000) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |