RR_A_line_4.jpg
JPG image 174 KB Posted
- Attached to
- Flood Park Restroom A Sewer Line Replacement
- Solicitation number
- 2026-RFP-00308
- Issued by
- San Mateo County, California
About this file
This is a project specification image related to the Flood Park Restroom A Sewer Line Replacement project issued by the County of San Mateo Parks Department. The image depicts a detailed engineering schematic or site plan illustrating the sewer line routing and installation specifications for the approximately 130 linear feet of failing 6-inch vitrified clay pipe replacement with new HDPE or PVC SDR 35 pipe. The project encompasses demolition, excavation, installation via directional boring or open trench methods, and reconnection of two lateral lines serving an adobe building with toilet and sink facilities and a public restroom facility. A non-mandatory pre-proposal meeting is scheduled for January 29, 2026 at 10:00 AM at Flood Park, with a deadline for questions and contract exceptions of February 4, 2026 at 5:00 PM. Proposals are due electronically via the County's eProcurement portal by February 12, 2026 at 5:00 PM. All work must be completed within 60 days from the start date, conducted between 7:00 AM and 5:00 PM, Monday through Friday, and comply with California Plumbing Code, ASTM standards, and OSHA safety regulations. The contract term is one year with no renewal options specified.
Evaluation shall be based on price as the sole criterion, with the County of San Mateo applying a Procurement Preference for Local Businesses Ordinance providing an additional 3 percent preference for small businesses or small non-profits and 5 percent for micro businesses or micro non-profits applied to the 25-point price evaluation. Minimum qualifications require proposers to have provided similar services for at least four years within the last seven years, confirmation of non-debarred status in SAM.gov, and a valid UEI number. No incumbent vendor or current contractor is identified in the procurement documents. Contractors must maintain workers' compensation insurance with statutory coverage, general liability insurance of $1,000,000, motor vehicle liability insurance of $1,000,000, and professional liability insurance of $1,000,000, naming the County as an additional insured. All work must comply with prevailing wage requirements for public works projects and the County's Living Wage Ordinance. The specific award value or budget range is not disclosed in available procurement documents; however, the County has provided contract templates for both agreements exceeding $200,000 and contracts under $200,000, suggesting the project value may fall within either range pending final award determination.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .