RP_Attach 7 - Trans Equipment Delay Cert.pdf
PDF 739 KB Posted
- Attached to
- Propellant, Rocket Grade Kerosene (RP1, RP2 and RP2 Special Blend) Federal contract opportunity
- Solicitation number
- SPE60126R0300
- Issued by
- Defense Logistics Agency Energy
About this file
The document is a Transport Equipment Delay Certificate (Form H-14), which is an attachment to solicitation SPE601-26-R-0300. This standardized form is designed to document and certify delays in transportation equipment loading, unloading, and transportation. The certificate requires detailed information about the shipment, including consignor, consignee, product, carrier, trailer number, shipping date, and freight bill number. Key sections include loading/unloading timestamps, a comprehensive explanation of delay reasons, and certification statements from the consignee, shipper, and driver. The form's final note mandates that a copy must accompany each detention invoice to provide documentation for invoice certification and payment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_SPE60126R03000001.PDF | ||
| RP_Attach 3 - Energy QAP E33.10.pdf | ||
| RP_Attach 8 - Pricing Worksheet.xlsx | XLSX spreadsheet | |
| RP_Attach 1 - RP SOO 21 Jul 25 (1).pdf | ||
| RP_Attach 2 - MIL-DTL-25576F.pdf | ||
| RP_Attach 6 - Contractor Perf Data Sheet.pdf | ||
| RP_Attach 4 - Energy QAP E45.01 (AUG 2019).pdf | ||
| SF1449_SPE60126R0300.pdf | ||
| RP_Attach 5 - Energy QAP E1.16 Contractor Insp Resp (Aug 2014).pdf | ||
| RP_Attach 9 - KO Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSPORT EQUIPMENT DELAY CERTIFICATE
1. CONSIGNOR 2. CONSIGNEE 3. PRODUCT
4. CARRIER 5. TRAILER NUMBER 6. DATE SHIPPED
7. FREIGHT BILL NUMBER 8. CBL NUMBER 9. SEAL NUMBER
10. LOADING/UNLOADING INFORMATION
DATE RECEIVED TIME DATE RECEIVED TIME
A. ARRIVED D. FINISH
B. ACCEPTED FOR
LOADING/UNLOADING E. UNIT RELEASED
C. START F. TOTAL HOUR HELD
11. REASON FOR DELAY (Make a complete statement adequately describing each segment of delay, amount of time on each delay, and whether delay was the responsibility of carrier or consignee/consignor)
12. DETENTION CERTIFICATION STATEMENT : I certify that the above information is true and correct to the best of my knowledge.
SIGNATURE AND TITLE OF CONSIGNEE SIGNATURE AND TITLE OF SHIPPER SIGNATURE OF DRIVER
13. NOTE TO CARRIER: A copy of "TRANSPORT EQUIPMENT DELAY CERTIFICATE" must accompany each detention invoice to provide documentation for invoice certification and payment.
FORM H-14
Attachment 5 - Transport Equipment Delay Certificate
SPE601-26-R-0300
File details come from the government source that posted it. Updated .