This document is a Supplemental Quality Assurance Provision (SQAP) for JP-10 aerospace fuel manufacturing from DLA Energy, dated August 2019. The document outlines strict pre-production and first article testing requirements for fuel contractors. Key requirements include:
Pre-Production Sampling: Contractors must prepare four one-gallon homogeneous samples of JP-10 (without Fuel System Icing Inhibitor) from existing production plants, pilot plants, or using specified feedstock. Two samples must be tested by the contractor according to MIL-PRF-87107 standards, with certified analysis submitted to DLA Energy Aerospace Energy and the Aerospace Fuels Laboratory. If samples fail government laboratory testing, contractors may resubmit once at their own expense, with no contract award date adjustments allowed.
First Article Approval: Contractors must produce a 6,000-gallon first article batch at least 30 days before initial delivery, performing full specification testing. A two-gallon sample with analysis results must be sent to the U.S. Government laboratory. If the sample meets specifications, the government will authorize lump sum payment for start-up costs. Failure to meet specifications may result in authorized plant modifications or potential contract termination, with repeated failures grounds for contract cancellation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_SPE60126R03000001.PDF | ||
| SF1449_SPE60126R0300.pdf | ||
| RP_Attach 5 - Energy QAP E1.16 Contractor Insp Resp (Aug 2014).pdf | ||
| RP_Attach 9 - KO Requirements.pdf | ||
| RP_Attach 7 - Trans Equipment Delay Cert.pdf | ||
| RP_Attach 1 - RP SOO 21 Jul 25 (1).pdf | ||
| RP_Attach 2 - MIL-DTL-25576F.pdf | ||
| RP_Attach 6 - Contractor Perf Data Sheet.pdf | ||
| RP_Attach 3 - Energy QAP E33.10.pdf | ||
| RP_Attach 8 - Pricing Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PDF (DLA)DLA FORM 1889, OCT 2011
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
SHEET 1 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page
Print Form Email Form Clear Export Data Import Data About Check for Newer Version Contact Us
REV DESCRIPTION DATE APPROVED
ENERGY QAP E45.01 (Aug 2019) Manufacturing Qualification08/06/2019
REVISIONS
E45.01 Manufacturing Qualifications Requirements (JP-10/PF-1) (Aerospace Energy)
(a) PRE-PRODUCTION SAMPLES. The propellant furnished under this contract shall be a product which has been sampled and tested, as specified below, and has met the requirements specified in the specification when tested by the U.S. Government laboratory within 21 days of contract award.
(1) The Contractor shall prepare four homogenous one -gallon samples of JP-10 (without Fuel System Icing Inhibitor). .
These samples shall consist of product that is developed from one of the following techniques:
(i) Produced/blended from an existing production plant;
(ii) Produced from a pilot plant that utilizes the same process, including the same materials of construction as the offeror's proposed production plant; or
(iii) Blended utilizing feedstock from the offeror's proposed supplier(s).
Two of the JP-10 samples shall be tested by the Contractor in accordance with the most current revision of MIL-PRF-87107..
(2) The Contractor shall submit a certified copy of their pre-production sample analysis to --
DLA Energy Aerospace Energy 1014 Billy Mitchell Blvd Bldg 1621 San Antonio, TX 78226 Or
FAX (210) 925-4842
(3) The Contractor shall submit a copy of their certified Pre-production sample analysis along with the remaining two gallons of JP-10 to:
AEROSPACE FUELS LABORATORY
HQ AFPA/PTPLA
2430 C STREET, BUILDING 70 AREA B
WRIGHT-PATTERSON AFB, OH 45433-7632
(4) The Contractor is responsible for all costs associated with meeting the pre-production sampling requirements and shipping the samples to the assigned U.S. Government laboratory identified in paragraph (3) above.
(a) If any of the pre-production samples analyzed by the U.S. Government laboratory fail to meet MIL-PRF-87107 requirements, the Contractor, at its own expense, will be allowed to resubmit a sample at lease once. In no case will the contract award date be adjusted to accommodate the requirements of pre-production sampling. It is solely the Contractor's responsibility to have its initial samples and any resubmission of samples analyzed.
(b) The Contractors laboratory analysis may either be conducted at an on-site laboratory facility or may utilize an independent commercial laboratory. The Contractor shall ensure all samples submitted are properly labeled with product name and grade, lot/batch number, and a request for full specification testing in accordance with the most current version of MIL-PRF-87107 Each sample's label should also clearly identify sample origin and should request that sample results be emailed to the DLA Energy Contracting Officer of record
DISTRIBUTION
STATEMENT - A
APPROVED FOR
PUBLIC RELEASE
DISTRIBUTION IS
"UNLIMITED"
DATE
08/06/2019
APPROVED BY
DATE
07/31/2019
REVIEWED BY
DATE
07/31/2019
PREPARED BY
DRAWING NUMBERSCALE
CODE ID NO.
SIZE
NSN
9135-01-048-5285
ITEM
ENERGY QAP E45.1
DLA Land & Maritime DLA Troop Support DLA Aviation clear
DLA Energy Aerospace Energy 1014 Billy Mitchell Blvd San Antonio, Tx 78226
DLA Energy
PDF (DLA)DLA FORM 1889, OCT 2011
SHEET 2 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page
Print Form Email Form Clear Export Data Import Data About Check for Newer Version Contact Us
REV DESCRIPTION DATE APPROVED
ENERGY QAP E45.01 (Aug 2019) Manufacturing Qualification08/06/2019
REVISIONS
(c) FIRST ARTICLE APPROVAL.
(1) The Contractor shall produce a first article batch at least 30 days prior to the initial contract schedule delivery requirements consisting of approximately 6,000 gallons of JP-10 from the Contractor's production facility. The Contractor shall perform full specification testing of the first article batch and send a two-gallon sample, along with a certified copy of their analysis results, to the U.S.
Government laboratory, as designated in paragraph (a)(3) above. The Contractor shall notify the Government prior to sampling/testing of the first article batch in order to allow a Government representative to witness the Contractor's sampling and testing procedures.
(2) If the initial first article batch sample meets full specification requirements when analyzed by the U.S. Government laboratory, the Government shall notify the Contractor that the sample has met specification and, as such, lump sum payment pertaining to all start-up costs, to include plant retrofit/facility modification, may be invoiced and shall be paid by the Government in accordance with the appropriate contract line item number. When the Government issues its first delivery order, the Contractor shall submit batch samples prior to shipping in accordance with the CONTRACTOR INSPECTION RESPONSIBILITIES contract provision of this contract.
(3) However, if the initial first article batch sample fails to meet specification requirements when analyzed by the U.S.
Government laboratory, the Contractor may be authorized by the Contracting Officer to resample and submit a second sample from the initial first article batch, with a Government representative witnessing the sampling procedures, for analysis at the U.S. Government laboratory. If the resample fails, when analyzed by the U.S. Government laboratory, the Government, at its sole discretion, has the following two options:
(i) The Contractor may be allowed to make necessary repairs, changes, modifications and/or other alterations to the Contractor's production process or plant in order to remedy the quality defects; or
(ii) The Government may terminate the contract for cause in accordance with the Termination for Cause provisions stated in the contract.
If the Government authorizes the Contractor to modify its plant or otherwise adjust its production process in the expectation of producing on-specification product, in lieu of termination for cause, such efforts on the part of the Contractor will not result in an equitable adjustment to the contract price. Upon completion of plant modification and/or adjustment of the Contractor's process, the Contractor shall then prepare another 6,000 gallon first article batch to be sampled and tested in accordance with the sampling and testing procedures set forth in paragraph (c)(1) of this contract provision. The sample procedures apply as previously described herein until such time as the Contracting Officer no longer authorizes plant modification and/or adjustment of the Contractor's process. Repeated failure will be grounds to terminate this contract under the Termination for Cause provision and in accordance with the terms and conditions of this contract with the Government having no responsibility to pay for any plant retrofit and/or facility modifications.
DISTRIBUTION STATEMENT - A
APPROVED FOR PUBLIC RELEASE
DISTRIBUTION IS "UNLIMITED"
SUPPLEMENTAL QUALITY ASSURANCE PROVISION
(SQAP)
DRAWING NUMBERSCALE CODE ID NO.SIZE
DLA Energy Aerospace Energy 1014 Billy Mitchell Blvd San Antonio, Tx 78226
PDF (DLA)
DLA FORM 1889, OCT 2011
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
SHEET OF
PREVIOUS EDITION IS USABLE
REV
DESCRIPTION
DATE
APPROVED
REVISIONS
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
DISTRIBUTION STATEMENT - A
APPROVED FOR PUBLIC RELEASE
DISTRIBUTION IS "UNLIMITED"
REV
DESCRIPTION
DATE
APPROVED
REVISIONS
DISTRIBUTION STATEMENT - A
APPROVED FOR PUBLIC RELEASE
DISTRIBUTION IS "UNLIMITED"
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
Supplemental Quality Assurance Provision (SQAP) DSCC Form 2291, Feb 2004 online none standard Quality Assurance
DLA
1 + No Tech Qual Deskbook n/a No Supplemental Quality Assurance Provision (SQAP) interactive October 2011 (added Energy; updated supply center names)
| CurrentPage: |
| PageCount: |
| btnPrint: |
| btnEmail: |
| btnClear: |
| btnExport: |
| btnImport: |
| btnAbout: |
| btnChkVersion: |
| btnContactUs: |
| Button1: |
| rev: |
| description: ENERGY QAP E45.01 (Aug 2019) Manufacturing Qualification Requirements(JP-10/PF-1)(Aerospace)(DLA Energy) |
| revdate: 2019-08-06 |
| revapproved: |
| revcomments: |
| apprdate: 2019-08-06 |
| apprBy: |
| reviewdate: 2019-07-31 |
| revBy: |
| prepdateA: 2019-07-31 |
| prepbyA: |
| drawingNum: |
| scale: |
| codeIDNo: |
| size: |
| nsn: 9135-01-048-5285 |
| itemdesc: ENERGY QAP E45.1 |
| btnDSCC: |
| btnDSCP: |
| btnDSCR: |
| line1: DLA Energy Aerospace Energy |
| line2: 1014 Billy Mitchell Blvd |
| line3: San Antonio, Tx 78226 |
| revcomments2: |
| totInstances: 1.00000000 |